Fiscal Year 2012-2013
School Board
Jackie Magnuson - Chairperson
Rob Duchscher - Vice Chairperson
Joel Albright - Clerk
Art Coulson - Treasurer
Gary Huusko - Director
Mike Roseen - Director
Bob Schutte - Director
Administration
Jane Berenz - Superintendent
Khia Brown - Director of Community Education
Jill Coyle - School District Attorney
Kim Craven - Administrative Assistant to the Superintendent
Mary Kreger - Director of Special Education
Julie Olson - Director of Elementary Education
Mark Parr - Director of Secondary Education
Tom Pederstuen - Director of Human Resources
Jeff Solomon - Director of Finance and Operations
Tony Taschner - Communications Specialist
Steve Troen - Director of Teaching and Learning
Stella Y. Johnson - Coordinator of Finance
Page
Section I - Capital Expenditure Budget Information….…….………………………… 1
Section II - Building-level Plans………………………………………………………….. 9
2012-13 Capital Expenditure Budget Message……………………………. 3
Capital Expenditure Budget Guidelines for 2012-13………………………. 6
Capital Expenditure Allocation to Schools……………………………….…. 7
Cedar Park Elementary School……………………………………………… 11
Deerwood Elementary School……………………………………………….. 12
Apple Valley High School…………………………………………………….. 45
Eagan High School …………………………………………………………… 49
Eastview High School……………………………………………………….… 52
Rosemount High School ……………………………………………………… 54
School of Environmental Studies ………………………………………….… 56
Dakota Ridge ………………………………………………………………..… 57
Section III - District-level Plans………………………………………………………...…. 59
Diamond Path Elementary School…………………………………………... 14
Echo Park Elementary School………………………………………………. 16
Glacier Hills Elementary School……………………………………………... 17
Greenleaf Elementary School………………………………………………... 19
Highland Elementary School…………………………………………………. 21
Northview Elementary School………………………………………………… 22
Oak Ridge Elementary School………………………………………….……. 23
Parkview Elementary School……………………………………………….... 25
Pinewood Elementary School ……………………………………………….. 26
Red Pine Elementary School…………………………………………………. 27
Rosemount Elementary School………………………………………………. 29
Shannon Park Elementary School…………………………………………… 31
Southview Elementary School……………………………………….…….… 32
Thomas Lake Elementary School …………………………………………… 33
Westview Elementary School ……………………………………………….. 34
Woodland Elementary School……………………………………………….. 36
Black Hawk Middle School…………………………………………………… 37
Dakota Hills Middle School…………………………………………………… 38
Falcon Ridge Middle School…………………………………………………. 40
Rosemount Middle School………………………………………………….... 42
Scott Highlands Middle School ……………………………………………… 43
Valley Middle School ……………………………………………………….… 44
Administrative & Instructional Technology & Telecommunications……… 61
Alternative Learning Center…………………………………………………... 62
Band Instruments………………………………………………………………. 63
Classroom Leases……………….…………………………………………….. 64
Contingency for Schools..…………………………………………………….. 65
Contingency for Unplanned Expenses…………………………………….... 66
Curriculum Materials.……………………………………………………….…. 67
District Support Departments …………………………...…………………… 70
Table of Contents Continued
Page
Health and Safety Funds…………………………………………………....... 72
Major Maintenance/Special Projects………………………………………… 73
TIES Fees……………………………………………………………….……… 75
Appendix A – Health & Safety Projects…………………..………………………….. 77
Appendix B – Alternative Facilities Projects…………………………………………. 87
1
2
To:
From:
Date:
Jane Berenz, Superintendent
Jeff Solomon, Director of Finance and Operations
April 30, 2012
Subject:
2012-13 Capital Expenditure Budget
This report summarizes the preliminary capital expenditure budget for the 2012-13 fiscal year. We are recommending that the School Board approve this budget at the April 30 meeting.
While a complete preliminary budget for all of the district’s funds will be approved by the School Board in
June, development of the capital expenditure budget is normally done on an earlier schedule. This is done because most capital purchases are made during the summer months and must be completed and installed before school starts in the fall.
Budget Process.
This preliminary capital expenditure budget has been developed using the guidelines presented to the School Board on February 13, 2012. The guidelines showed the estimated expenditures in various broad categories and the amounts to be allocated to schools to be spent at their discretion.
Since February, district staff has been working to define the specific items and projects to be purchased in each category and by each school. This budget report summarizes all of the detailed items and projects.
Resources Available
Primary revenue sources include state aids and local property tax levies, each of which is determined by formulas and rules in state law. For presentation the resources are grouped into two broad categories:
1) operating capital revenue (state aid and tax levy), including lease levy funds (tax levy), and 2) health and safety funds (tax levy). The following table summarizes the 2012-13 activity:
Operating Capital
Including Health
Lease Levies
Estimated June 30, 2012 Fund Balance* $ (43,155) $ 340,395
And Safety Totals
$ 297,240
777,018 10,266,403 Plus Revenues
Total Available
9,489,385
$ 9,446,230 $ 1,117,413 $ 10,563,643
Minus Appropriations 9,964,725 915,500 10,880,225
Estimated June 30, 2013 Fund Balance $ (518,495) $ 201,913 $ (316,582)
* Estimated June 30, 2012 fund balances are based on the 2011-12 annual budget adopted by the
School Board in January 2012. Typically, the district performs better than budget and savings from the budget will increase the fiscal year-end fund balances. The March 2012 performance-to-actual analysis indicates that the operating capital (including lease levy) portion of the capital expenditure budget will perform $1.0 million better than budget; the adjusted June 30, 2012 operating capital fund balance is projected to be $954,845.
The remainder of this budget message summarizes priorities recommended in each of the funding categories.
3
Operating Capital Projects
We are estimating less operating capital revenue this year than last with a small increase in our per pupil allocation. The per pupil unit funding for operating capital revenue for 2012-13 is $199.77. This is 79 cents more than the 2011-12 per pupil unit funding of $198.98. The decrease in operating capital revenue is mainly due to a small decrease in the number of pupil units (from 31,478.18 pupil units for
2011-12 to 31,396.40 pupil units for 2012-13.)
Spending priorities to be addressed through operating capital revenue are summarized below.
Administrative and Instructional Technology and Telecommunications
– The total recommendation of $319, 000 for administrative and instructional technology includes the funding of anti-virus and web filter agreements, SAN/Virtualization and emergency needs. (see page 61).
Area Learning Center
– $10,000 is recommended for building and program capital needs (see page 62).
Band Instruments
– $60,000 is recommended for districtwide band instruments (see page 63).
Capital Contingency for Schools
– We recommend $30,000 to cover needs at the schools. This category is allocated for the respective Directors of Elementary and Secondary Education to assist schools with capital needs during the year (see page 65).
Building/Classroom Leases
– We recommend $3,206,173 for expenses related to leases for facilities.
Of this amount, $237,000 is for ice time rental. The majority of these expenses are funded through a specific levy authority provided by the state. (see page 64).
Contingency for Unplanned Expenses
- $175,000 is reserved for general contingency needs (see page 66).
Curriculum Materials
– Administration recommends an allocation of $3,611,030 to provide resources for career development/career and technical education programs, curriculum mapping, instructional materials for English, health/physical education and science. The funds will also be used for an assessment management program (see page 67).
District Support Departments
– An allocation of $187,655 is for various projects and equipment needs identified by district departments, including central receiving, facilities and grounds, finance, graphics/mailroom, human resources, secondary education and transportation (see page 70).
Major Maintenance/Special Projects
– We recommend allocating $177,100 for these items (see page 73). The classification includes custodial equipment, grounds/building improvements, and major maintenance equipment. Additional funding is levied under the alternative facilities bonding and levy program (see Appendix B, page 87) for other major maintenance projects.
Media Resources
– We recommend an allocation of $60,000 for media resources to be used for the replacement and addition of media center resources throughout the district (see page 67).
TIES Fees
– We recommend allocating $734,400 for this contractual service. We use TIES for student information software and support, finance software and support as well as other reporting functions to the state. The remaining 40 percent comes from the general account (see page 75).
Total School Building Allocation
– We recommend that $1,300,000 be allocated to schools to be budgeted at the sites. Attached is a spreadsheet showing the preliminary allocation of this amount to the individual school buildings (see pages 7 and 8).
4
Health and Safety Projects
Health and Safety funds may be used only for state authorized projects such as: removal and cleanup of asbestos, PCBs and other hazardous substances; removal of fuel storage tanks and related repairs, and correction of fire safety and life safety hazards (see page 72). These projects (see Appendix A, page 77), must be approved in advance by the state. All expenditures for approved projects are financed through property tax levy.
Of the $915,500 budgeted in this category for 2012-13, the breakdown by type of project is as follows:
$201,700
69,000
44,800
266,200
1. Physical Hazards Control
2. Hazardous Substances Removal
3. Asbestos Removal
4. Health and Safety Environmental Management
5. Fire Safety 333,800
$915,500
Alternative Facilities Levy Program Projects
Not included in this budget but available for similar projects is approximately $6.63 million from the alternative facilities levy program. Alternative facilities levy program revenues may be used only for:
1) projects normally financed by health and safety revenue; 2) disabled access improvements, and
3) deferred capital expenditures and maintenance projects necessary to prevent further erosion of facilities. All projects are approved by the state as part of a ten-year facilities plan. Appendix B (see page 87) includes the list of projects by site totaling $6,637,900.
5
Available Funds
State Aid
Operating Capital Aid
$199.77 per pupil unit & $30.00 per
year-round pupil unit
Levy
Operating Capital Levy
Building Lease Levy
FY2012 Operating Capital Adjustment
FY2010 Operating Capital Adjustment
Lease Levy Adjustment
Subtotal - Levy
Estimated Fund Balance, 6/30/2012
Total Operating Capital
Funds Available
Independent School District 196
Rosemount-Apple Valley-Eagan Public Schools
Educating our students to reach their full potential
2012-13 Capital Expenditure Account
Budget Guidelines
OPERATING CAPITAL
3,220,863
3,056,508
3,210,934
12,681
16,840
(28,441)
$6,268,522
(43,155)
9,446,230
Summary of Expenditures
Administrative & Instructional Tech. & Telecom.
Area Learning Center
Band Instruments - Districtwide
Curriculum Materials
District Support Departments
Capital Contingency for Schools
Classroom Leases (Supported by Lease Levy)
Classroom Leases (Not supported by Lease Levy)
Major Maintenance/Special Projects
Media Resources
TIES Fees
Total School Building Allocation
Contingency for Unplanned Expenses
Subtotal - Expenditures
Reserves
Total Operating Capital
Expenditures & Reserves
Recommended
Amounts
319,000
10,000
60,000
3,611,030
187,655
30,000
3,182,493
118,047
177,100
60,000
734,400
1,300,000
175,000
9,964,725
(518,495)
$9,446,230
Total Health and Safety
Funds Available
HEALTH & SAFETY
Available Funds
Health & Safety Levy
Health & Safety State Aid
Levy Adjustments
FY2011 Health & Safety Levy Adjustment
FY2010 Health & Safety Levy Adjustment
Estimated Fund Balance, 6/30/2012
$915,500
-
(22,000)
(116,482)
$340,395
$1,117,413
Summary of Expenditures
Physical Hazards Control (Fin 347)
Hazardous Substances (Fin 349)
Health & Safety Environmental Management (Fin 352)
Asbestos Removal (Fin 358)
Fire Safety (Fin 363)
Indoor Air Quality (Fin 366)
Facilities Violence Prevention (Fin 365)
Subtotal Expenditures
Reserves
Total Health and Safety Expenditures &
Reserves
Recommended
Amounts
$201,700
69,000
266,200
44,800
333,800
-
-
$915,500
201,913
$1,117,413
TOTAL CAPITAL ACCOUNT
RESOURCES AVAILABLE: $10,563,643
TOTAL CAPITAL ACCOUNT
EXPENDITURES AND RESERVES: $10,563,643
6
7
8
9
10
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
The majority of the capital expenditure budget has been targeted for general education equipment, improvements to building and grounds and replacement of outdated and worn library books. Technology equipment in the form of iPads will be purchased to support ELL and Title I instruction.
John Garcia, Principal, Cedar Park Elementary (STEM)
Capital Expenditures Summary
School Administration Operating Leases
General Education Elementary Technology (Salary & Benefits)
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
Media Center Resources
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-112-050-302-370-000
05-112-203-302-xxx-000
05-112-203-302-370-000
05-112-203-302-460-000
05-112-203-302-530-000
05-112-203-302-555-000
05-112-620-302-470-000
05-112-850-302-510-000
05-112-850-302-520-000
05-112-850-302-530-000
05-112-203-135-530-000
$0
$0
$3,900
$0
$5,400
$7,059
$5,000
$10,015
$0
$0
$0
Total Capital Expenditures: $31,374
Capital Expenditures Detail
General Education Operating Leases - 05-112-203-302-370-000
Copier lease - teacher access
General Education Equipment - 05-112-203-302-530-000
Laminator
Poster maker
Engineering materials
General Education Technology Equipment - 05-112-203-302-555-000
15 iPads
Projector bulbs
Media Center Resources - 05-112-620-302-470-000
Library books
Building Site/Grounds Improvements - 05-112-850-302-510-000
STEM Playground additions to help "Scream the Theme"
Total Capital Expenditures:
$6,000
$1,059
$7,059
$5,000
$5,000
$10,015
$10,015
$31,374
$3,900
$3,900
$2,000
$2,800
$600
$5,400
Capital Expenditure Plan April 30, 2012
11
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
The Deerwood capital expenditure budget largely consists of technology equipment (computers, projectors, and projector bulbs) and general education equipment (additional sink for the Art Room, library chairs, paper shredder and a classroom set of desks). The remainder of the budget involves M Cubed workbooks, the lease on the Xerox machine and license for Safari
Montage.
Miles Haugen, Principal, Deerwood Elementary
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
Media Center Equipment
Building Acquisition/Improvements
General Education Equipment Carryover
05-116-050-302-370-000
05-116-050-302-530-000
05-116-203-302-370-000
05-116-203-302-460-000
05-116-203-302-530-000
05-116-203-302-555-000
05-116-203-302-821-000
05-116-620-302-470-000
05-116-620-302-530-000
05-116-850-302-520-000
05-116-203-135-530-000
$0
$0
$2,100
$1,575
$4,829
$5,500
$1,800
$0
$2,000
$3,134
$0
Total Capital Expenditures: $20,938
Capital Expenditures Detail
General Education Operating Leases - 05-116-203-302-370-000
Copier lease
General Education Textbooks - 05-116-203-302-460-000
M Cubed workbooks
General Education Equipment - 05-116-203-302-530-000
30 Classroom desks
Paper shredder
General Education Technology Equipment - 05-116-203-302-555-000
6 Computers
2 Projectors
5 Projector bulbs
General Education Software License Fees - 05-116-203-302-821-000
Safari Montage license
$2,100
$2,100
$1,575
$1,575
$3,930
$899
$4,829
$3,000
$1,400
$1,100
$5,500
$1,800
$1,800
Capital Expenditure Plan April 30, 2012
12
Deerwood Elementary Capital Budget (continued)
Media Center Equipment - 05-116-620-302-530-000
Library furniture
Building Acquisition/Improvements - 05-116-850-302-520-000
Additional sink in Art room
Total Capital Expenditures:
2012-13 Capit al Budget
$2,000
$2,000
$3,134
$3,134
$20,938
Capital Expenditure Plan
13
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Diamond Path Elementary capital expenditure funds will be used for the lease of the school’s Canon copier. We will purchase classroom curriculum for grades kindergarten through five. Technology purchases will include a projector, a color printer, a SMART board, and a personal computer for our computer lab. We will also purchase our Safari Montage license.
We will use the remaining funds for building renovations to increase and optimize instructional and office space.
Lynn Hernandez, Principal, Diamond Path Elementary
Capital Expenditures Summary
General Education Elementary Technology (Salary & Benefits)
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
General Education Bldg Acquisition/Improvements
Music Technology Equipment
Building Acquisition/Improvements
General Education Equipment Carryover
05-110-203-302-xxx-000
05-110-203-302-370-000
05-110-203-302-460-000
05-110-203-302-530-000
05-110-203-302-555-000
05-110-203-302-821-000
05-110-203-302-520-000
05-110-258-302-555-000
05-110-850-302-520-000
05-110-203-135-530-000
$0
$2,100
$5,000
$0
$2,810
$1,744
$0
$2,200
$20,884
$0
Total Capital Expenditures: $34,738
Capital Expenditures Detail
General Education Operating Leases - 05-110-203-302-370-000
Copier lease - Canon
General Education Textbooks - 05-110-203-302-460-000
M Cubed curriculum for gr 3, 4, 5
Bridges Math for gr 3, 4, 5
Caulkin materials for gr 2, 3
Bridges Math for gr K, 1, 2
General Education Technology Equipment - 05-110-203-302-555-000
Projector
Color printer
Computer for computer lab
General Education Software License Fees - 05-110-203-302-821-000
Safari Montage license
Music Technology Equipment - 05-110-258-302-555-000
SMART board for music room
Capital Expenditure Plan
14
$2,100
$2,100
$1,690
$2,033
$650
$627
$5,000
$600
$1,600
$610
$2,810
$1,744
$1,744
$2,200
$2,200
April 30, 2012
Diamond Path Elementary Capital Budget (continued)
Building Acquisition/Improvements - 05-110-850-302-520-000
Building renovations to increase and optimize instructional and office space
Total Capital Expenditures:
2012-13 Capit al Budget
$20,884
$20,884
$34,738
Capital Expenditure Plan
15
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Echo Park’s capital outlay allocation will be used to purchase 9 SMART boards, computers identified in the replacement rotation, and our Safari Montage license. Funds are also designated for resource room books, music instruments and the high-volume copier lease.
Sally Soliday, Principal, Echo Park Elementary
Capital Expenditures Summary
School Administration Operating Leases
General Education Textbooks
General Education Media Resources
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Music Equipment
Media Center Resources
Building Acquisition/Improvements
General Education Equipment Carryover
05-114-050-302-370-000
05-114-203-302-460-000
05-114-203-302-470-000
05-114-203-302-530-000
05-114-203-302-555-000
05-114-203-302-821-000
05-114-258-302-530-000
05-114-620-302-470-000
05-114-850-302-520-000
05-114-203-135-530-000
$3,900
$0
$2,000
$0
$15,734
$1,600
$2,400
$0
$0
$0
Total Capital Expenditures: $25,634
Capital Expenditures Detail
School Administration Operating Leases - 05-114-050-302-370-000
Copier lease for high-volume Canon 7095
General Education Media Resources - 05-114-203-302-470-000
Resource room books
General Education Technology Equipment - 05-114-203-302-555-000
3 Computers
1 Computer
9 SMART boards
General Education Software License Fees - 05-114-203-302-821-000
Safari Montage license
Music Equipment - 05-114-258-302-530-000
12 Remo Key-Tuned Tubanos Drums
Total Capital Expenditures:
$3,900
$3,900
$2,000
$2,000
$2,700
$625
$12,409
$15,734
$1,600
$1,600
$2,400
$2,400
$25,634
Capital Expenditure Plan April 30, 2012
16
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Over half of Glacier Hills capital budget will be consumed with copier leases during the 2012-13 school year. The remaining amount will be divided among LED lights for our performance area, Peace pavers, ceramic tiles, a replacement computer, textbooks, and media licenses for Safari Montage.
Jeff Holten, Principal, Glacier Hills Elementary
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
General Education Elementary Technology (Salary & Benefits)
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-164-050-302-370-000
05-164-050-302-530-000
05-164-203-302-xxx-000
05-164-203-302-370-000
05-164-203-302-460-000
05-164-203-302-530-000
05-164-203-302-555-000
05-164-203-302-821-000
05-164-620-302-470-000
05-164-850-302-510-000
05-164-850-302-520-000
05-164-850-302-530-000
05-164-203-135-530-000
$2,904
$0
$0
$10,000
$1,976
$0
$1,200
$1,744
$0
$1,000
$4,000
$0
$0
Total Capital Expenditures: $22,824
Capital Expenditures Detail
School Administration Operating Leases - 05-164-050-302-370-000
Copier lease - Canon 3225
General Education Operating Leases - 05-164-203-302-370-000
Copier lease - Canon 7095
General Education Textbooks - 05-164-203-302-460-000
Classroom textbooks
General Education Technology Equipment - 05-164-203-302-555-000
Computer
General Education Software License Fees - 05-164-203-302-821-000
Safari Montage license core system and home access
$2,904
$2,904
$10,000
$10,000
$1,976
$1,976
$1,200
$1,200
$1,744
$1,744
Capital Expenditure Plan April 30, 2012
17
Glacier Hills Elementary Capital Budget (continued)
Building Site/Grounds Improvements - 05-164-850-302-510-000
Ceramic tiles
Peace pavers
Building Acquisition/Improvements - 05-164-850-302-520-000
LED stage lighting
Total Capital Expenditures:
2012-13 Capit al Budget
$500
$500
$1,000
$4,000
$4,000
$22,824
Capital Expenditure Plan
18
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Our contractual commitments for the lease of our copier is the first capital expenditure for the 2012-13 school year. We will also continue to purchase textbooks and the math and handwriting workbooks for classroom use. We will be purchasing software for the classroom computers. A sound system with projector and screen for large student assemblies will also be purchased with capital funds. Increasing our technology support (in the computer lab and providing troubleshooting for the teaching staff) is a priority for our capital outlay funds. Noise reduction in our open classrooms is another priority, as we will add some walls to diminish the noise level between classrooms.
Michelle deKam Palmieri, Principal, Greenleaf Elementary
Capital Expenditures Summary
School Administration Operating Leases
General Education Elementary Technology (Salary & Benefits)
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Building Acquisition/Improvements
General Education Equipment Carryover
05-111-050-302-370-000
05-111-203-302-xxx-000
05-111-203-302-460-000
05-111-203-302-530-000
05-111-203-302-555-000
05-111-203-302-821-000
05-111-850-302-520-000
05-111-203-135-530-000
$3,725
$6,406
$11,959
$0
$14,295
$2,100
$2,859
$0
Total Capital Expenditures: $41,344
Capital Expenditures Detail
School Administration Operating Leases - 05-111-050-302-370-000
Copier lease - main
Copier lease - Canon 3225
General Education Elementary Technology (Salary & Benefits) - 05-111-203-302-xxx-000
.20 FTE Tech clerk salary & benefits
General Education Textbooks - 05-111-203-302-460-000
Bridges Math for gr K, 1, 2, 3, 4, 5
M3 Math for gr 3, 4, 5
Handwriting for gr 3
General Education Technology Equipment - 05-111-203-302-555-000
Sound system - cart option (Comp View)
General Education Software License Fees - 05-111-203-302-821-000
Software for 21 new computers
$2,705
$1,020
$3,725
$6,406
$6,406
$8,349
$1,500
$2,110
$11,959
$14,295
$14,295
$2,100
$2,100
Capital Expenditure Plan April 30, 2012
19
Greenleaf Elementary Capital Budget (continued)
Building Acquisition/Improvements - 05-111-850-302-520-000
Walls for noise reduction
Total Capital Expenditures:
2012-13 Capit al Budget
$2,859
$2,859
$41,344
Capital Expenditure Plan
20
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Priorities include the obligation on our copy machine lease, additional computer switch, mounting of projectors in Labs 4 & 5,
Safari Montage license, Book Club books (gr 3), replacement of chairs (gr 3/art), and Tech Support salary (2 hrs.).
Chad Ryburn, Principal, Highland Elementary
Capital Expenditures Summary
School Administration Operating Leases
General Education Elementary Technology (Salary & Benefits)
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
General Education Equipment Carryover
05-115-050-302-370-000
05-115-203-302-xxx-000
05-115-203-302-460-000
05-115-203-302-530-000
05-115-203-302-555-000
05-115-203-302-821-000
05-115-620-302-470-000
05-115-203-135-530-000
$4,770
$9,831
$500
$2,588
$3,700
$1,800
$0
$0
Total Capital Expenditures: $23,189
Capital Expenditures Detail
School Administration Operating Leases - 05-115-050-302-370-000
Copier lease
General Education Elementary Technology (Salary & Benefits) - 05-115-203-302-xxx-000
.25 FTE Tech clerk
General Education Textbooks - 05-115-203-302-460-000
Gr 3 Lit. Circle/guided reading books
General Education Equipment - 05-115-203-302-530-000
Chairs for Art room and gr 3
General Education Technology Equipment - 05-115-203-302-555-000
Additional switch for computers
Mount Labs 4 & 5 with projectors
General Education Software License Fees - 05-115-203-302-821-000
Safari Montage license
Total Capital Expenditures:
$4,770
$4,770
$9,831
$9,831
$500
$500
$2,588
$2,588
$2,000
$1,700
$3,700
$1,800
$1,800
$23,189
Capital Expenditure Plan April 30, 2012
21
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital expenditures reflect the financial obligation of a copier lease, purchase of student Language Arts and Math textbooks/curriculum (including M Cubed) and expansion of technology in the classroom. Equipment such as new chairs for teacher's lounge, floor mats for the hallways and portable tables to use for programming and iMac computers will be purchased.
Kathy Carl, Principal, Northview Elementary School
Capital Expenditures Summary
School Administration Operating Leases
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
Media Center Technology Equipment
Building Equipment
General Education Equipment Carryover
05-106-050-302-370-000
05-106-203-302-370-000
05-106-203-302-460-000
05-106-203-302-530-000
05-106-203-302-555-000
05-106-203-302-821-000
05-106-620-302-470-000
05-106-620-302-555-000
05-106-850-302-530-000
05-106-203-135-530-000
$0
$2,100
$6,467
$600
$7,000
$0
$0
$0
$2,250
$0
Total Capital Expenditures: $18,417
Capital Expenditures Detail
General Education Operating Leases - 05-106-203-302-370-000
Copier lease
General Education Textbooks - 05-106-203-302-460-000
Language Arts, Math textbooks/curriculum (including M Cubed - Mentoring Mathematical Minds gifted and talented curriculum)
General Education Equipment - 05-106-203-302-530-000
Tables
General Education Technology Equipment - 05-106-203-302-555-000 iMac computers
Building Equipment - 05-106-850-302-530-000
Floor mats for hallway
Chairs for teacher’s lounge
Total Capital Expenditures:
$2,100
$2,100
$6,467
$6,467
$600
$600
$7,000
$7,000
$1,050
$1,200
$2,250
$18,417
Capital Expenditure Plan April 30, 2012
22
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Oak Ridge Elementary plans to spend their capital budget funds for the following items: Copier lease, library books, SMART boards, document cameras, a computer for library checkout stations, and a laptop for a special education teacher. Building site improvements include a fireproof file cabinet for student records, two teacher chairs, and one secretary office chair.
Finally, M Cubed Math workbooks will be purchased.
Kris Scallon, Principal, Oak Ridge Elementary School
Capital Expenditures Summary
School Administration Operating Leases
General Education Elementary Technology (Salary & Benefits)
General Education Textbooks
General Education Equipment
General Education Technology Equipment
Media Center Resources
Media Center Technology Equipment
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-120-050-302-370-000
05-120-203-302-xxx-000
05-120-203-302-460-000
05-120-203-302-530-000
05-120-203-302-555-000
05-120-620-302-470-000
05-120-620-302-555-000
05-120-850-302-510-000
05-120-850-302-520-000
05-120-850-302-530-000
05-120-203-135-530-000
$4,000
$0
$2,300
$3,600
$7,452
$4,000
$1,300
$0
$0
$0
$0
Total Capital Expenditures: $22,652
Capital Expenditures Detail
School Administration Operating Leases - 05-120-050-302-370-000
Copier lease
General Education Textbooks - 05-120-203-302-460-000
M Cubed student workbooks
General Education Equipment - 05-120-203-302-530-000
Fireproof lateral file cabinet for office
2 Teacher chairs
Secretary chair
General Education Technology Equipment - 05-120-203-302-555-000
4 SMART boards
4 Document cameras
Laptop for Special Ed teacher
Media Center Resources - 05-120-620-302-470-000
Library books
Capital Expenditure Plan
23
$4,000
$4,000
$2,300
$2,300
$3,100
$330
$170
$3,600
$5,309
$1,120
$1,023
$7,452
$4,000
$4,000
April 30, 2012
Oak Ridge Elementary Capital Budget (continued)
Media Center Technology Equipment - 05-120-620-302-555-000
Computer for library checkout stations
Total Capital Expenditures:
2012-13 Capit al Budget
$1,300
$1,300
$22,652
Capital Expenditure Plan
24
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital funds will be used to meet the copier lease commitments at Parkview. We will purchase books to supplement our current library book collection. Capital funds will be used to support and enhance current technology at Parkview and to fund the technology building site licenses. We will use capital funds for school improvements such as classroom wall additions.
Pam Haldeman, Principal, Parkview Elementary
Capital Expenditures Summary
School Administration Operating Leases
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-109-050-302-370-000
05-109-203-302-370-000
05-109-203-302-460-000
05-109-203-302-530-000
05-109-203-302-555-000
05-109-203-302-821-000
05-109-620-302-470-000
05-109-850-302-510-000
05-109-850-302-520-000
05-109-850-302-530-000
05-109-203-135-530-000
$0
$2,500
$0
$0
$20,000
$2,000
$6,500
$0
$4,896
$0
$0
Total Capital Expenditures: $35,896
Capital Expenditures Detail
General Education Operating Leases - 05-109-203-302-370-000
Copier leases
General Education Technology Equipment - 05-109-203-302-555-000
Document cameras, SMART boards, projectors, installation
30 iPads with power cart
General Education Software License Fees - 05-109-203-302-821-000
Safari Montage license
Media Center Resources - 05-109-620-302-470-000
Library books
Building Acquisition/Improvements - 05-109-850-302-520-000
Wall additions
Total Capital Expenditures:
$2,500
$2,500
$4,900
$15,100
$20,000
$2,000
$2,000
$6,500
$6,500
$4,896
$4,896
$35,896
Capital Expenditure Plan April 30, 2012
25
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital expenditure funds for 2012-2013 will be used to pay for our existing copier lease. We will continue to fund our Safari
Montage license through capital funds. We will purchase Math textbooks and our computer technology clerk will also be paid from capital expenditure funds.
Cris Town, Principal, Pinewood
Capital Expenditures Summary
School Administration Operating Leases
General Education Elementary Technology (Salary & Benefits)
General Education Operating Leases
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Mathematics Textbooks
Building Acquisition/Improvements
General Education Equipment Carryover
05-118-050-302-370-000
05-118-203-302-xxx-000
05-118-203-302-370-000
05-118-203-302-530-000
05-118-203-302-555-000
05-118-203-302-821-000
05-118-256-302-460-000
05-118-850-302-520-000
05-118-203-135-530-000
$0
$14,385
$2,094
$0
$0
$1,644
$1,965
$0
$0
Total Capital Expenditures: $20,088
Capital Expenditures Detail
General Education Elementary Technology (Salary & Benefits) - 05-118-203-302-xxx-000
.425 FTE Tech clerk
General Education Operating Leases - 05-118-203-302-370-000
Copier lease - Canon
General Education Software License Fees - 05-118-203-302-821-000
Safari Montage license
Mathematics Textbooks - 05-118-256-302-460-000
Math textbooks
Total Capital Expenditures:
$14,385
$14,385
$2,094
$2,094
$1,644
$1,644
$1,965
$1,965
$20,088
Capital Expenditure Plan April 30, 2012
26
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Red Pine has capital needs in the area of technology for a projector and SMART board in our Band room and a computer upgrade for our tech clerk to run various programs. All of our students have benefited from Reading Eggs and Safari Montage and we want to renew those subscriptions. We need to replace microwaves in the lounge for safety purposes. We want to purchase laptop versus desktop computers, so we will need to cover part of that cost with capital outlay. With those laptops, we will need wireless mice. We will need many projector bulb replacements due to the age and use of the projectors. We will use capital funds to pay for the lease on two copy machines. We are in need of leveled books for our literacy library. The rest of the money will be used for textbooks to benefit all students.
Gary Anger, Principal, Red Pine Elementary
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
General Education Operating Leases
General Education Textbooks
General Education Technology Equipment
General Education Software License Fees
Music Technology Equipment
General Education Equipment Carryover
05-165-050-302-370-000
05-165-050-302-530-000
05-165-203-302-370-000
05-165-203-302-460-000
05-165-203-302-555-000
05-165-203-302-821-000
05-165-258-302-555-000
05-165-203-135-530-000
$1,200
$500
$2,800
$10,014
$12,051
$4,798
$2,300
$0
Total Capital Expenditures: $33,663
Capital Expenditures Detail
School Administration Operating Leases - 05-165-050-302-370-000
Copier lease-office
School Administration Equipment - 05-165-050-302-530-000
2 Microwaves (replacements)
General Education Operating Leases - 05-165-203-302-370-000
Copier lease-workroom
General Education Textbooks - 05-165-203-302-460-000
Grade level textbooks
Literacy Library leveled books
General Education Technology Equipment - 05-165-203-302-555-000
3 Laptops
31 Wireless mice for laptops
Computer upgrade for tech clerk
Projector bulb replacements
Capital Expenditure Plan
27
$1,200
$1,200
$500
$500
$2,800
$2,800
$7,514
$2,500
$10,014
$2,790
$650
$611
$8,000
$12,051
April 30, 2012
Red Pine Elementary Capital Budget (continued)
General Education Software License Fees - 05-165-203-302-821-000
Safari Montage license
Reading Eggs
Music Technology Equipment - 05-165-258-302-555-000
Projector for Band room
SMART board for Band room
Total Capital Expenditures:
2012-13 Capit al Budget
$1,800
$2,998
$4,798
$1,200
$1,100
$2,300
$33,663
Capital Expenditure Plan
28
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Rosemount Elementary will use capital outlay funds for the lease payment of two office/workroom copiers. We will buy more books and audio visual resources for our Media Center. More metal book carts are also needed in the library. As we continue to integrate instruction and technology, we will buy and install a wireless “Smart Slate” for large group lessons in
Band. This budget also allows us to replace our worn entry mats. The second grade teachers have requested folding easels, which they need in the classroom for instruction. We would like to replace our 20-year-old sound system, that we use for
Music and Band concerts, and all of the other programs we have during the school year. This year, in addition to the above, we need to replace and fix the torsion bars on our tables in the cafeteria. They do not spring up and fold in half anymore, the way they should. Lastly, we would like to update our main entrance area with a welcome desk and more inviting atmosphere.
Tom Idstrom, Principal, Rosemount Elementary
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
School Administration Technology Equipment
General Education Elementary Technology (Salary & Benefits)
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
Music Technology Equipment
Media Center Resources
Media Center Equipment
Media Center Technology Equipment
Building Repairs and Maintenance
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-105-050-302-370-000
05-105-050-302-530-000
05-105-050-302-555-000
05-105-203-302-xxx-000
05-105-203-302-370-000
05-105-203-302-460-000
05-105-203-302-530-000
05-105-203-302-555-000
05-105-258-302-555-000
05-105-620-302-470-000
05-105-620-302-530-000
05-105-620-302-555-000
05-105-850-302-350-000
05-105-850-302-520-000
05-105-850-302-530-000
05-105-203-135-530-000
$0
$0
$0
$0
$4,500
$0
$1,560
$800
$700
$9,015
$2,110
$0
$5,000
$850
$5,000
$0
Total Capital Expenditures: $29,535
Capital Expenditures Detail
General Education Operating Leases - 05-105-203-302-370-000
Copier lease - large/high-volume
Copier lease - small/mid-size
General Education Equipment - 05-105-203-302-530-000
6 Student rocking chairs
3 Folding instructional easels with trays for gr 2
General Education Technology Equipment - 05-105-203-302-555-000
4 Digital cameras
$3,000
$1,500
$4,500
$960
$600
$1,560
$800
$800
Capital Expenditure Plan April 30, 2012
29
Rosemount Elementary Capital Budget (continued)
Music Technology Equipment - 05-105-258-302-555-000
1 Wireless Smart Slate for Band
Media Center Resources - 05-105-620-302-470-000
Books and audio visual resources for the Media Center
Media Center Equipment - 05-105-620-302-530-000
2 Large and 2 medium metal book carts
Chairs for the media specialist and library clerk
Building Repairs and Maintenance - 05-105-850-302-350-000
Replace and fix the torsion bars on 15 cafeteria tables
Building Acquisition/Improvements - 05-105-850-302-520-000
Sound system for Music and Band concerts
Building Equipment - 05-105-850-302-530-000
8 Heavy duty doorway rugs
New welcome desk and display area inside our main entrance
Total Capital Expenditures:
2012-13 Capit al Budget
$5,000
$5,000
$850
$850
$3,000
$2,000
$5,000
$29,535
$700
$700
$9,015
$9,015
$1,610
$500
$2,110
Capital Expenditure Plan
30
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital expenditure funds for the 2012-13 school year will be used for copier lease, textbooks for curriculum, technology clerk support, computers and the site license for Safari Montage.
Michael Guthrie, Principal, Shannon Park Elementary
Capital Expenditures Summary
School Administration Operating Leases
School Administration Technology Equipment
General Education Elementary Technology (Salary & Benefits)
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
General Education Equipment Carryover
05-119-050-302-370-000
05-119-050-302-555-000
05-119-203-302-xxx-000
05-119-203-302-460-000
05-119-203-302-530-000
05-119-203-302-555-000
05-119-203-302-821-000
05-119-620-302-470-000
05-119-203-135-530-000
$7,000
$0
$12,790
$4,269
$0
$3,000
$1,800
$0
$0
Total Capital Expenditures: $28,859
Capital Expenditures Detail
School Administration Operating Leases - 05-119-050-302-370-000
Copier lease - office workroom
General Education Elementary Technology (Salary & Benefits) - 05-119-203-302-xxx-000
.25 FTE Tech clerk
General Education Textbooks - 05-119-203-302-460-000
Textbooks for curriculum (math workbooks, etc.)
General Education Technology Equipment - 05-119-203-302-555-000
Assistive Technology (student devices)
General Education Software License Fees - 05-119-203-302-821-000
Safari Montage license
Total Capital Expenditures:
$7,000
$7,000
$12,790
$12,790
$4,269
$4,269
$3,000
$3,000
$1,800
$1,800
$28,859
Capital Expenditure Plan April 30, 2012
31
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital funds will be used to continue paying for the leases on our office copiers. We plan to use the remaining funds to pay for a Tech clerk (.875 FTE).
Rhonda Smith, Principal, Southview Elementary
Capital Expenditures Summary
School Administration Operating Leases
General Education Elementary Technology (Salary & Benefits)
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-108-050-302-370-000
05-108-203-302-xxx-000
05-108-203-302-460-000
05-108-203-302-530-000
05-108-203-302-555-000
05-108-203-302-821-000
05-108-620-302-470-000
05-108-850-302-520-000
05-108-850-302-530-000
05-108-203-135-530-000
$3,821
$26,959
$0
$0
$0
$0
$0
$0
$0
$0
Total Capital Expenditures: $30,780
Capital Expenditures Detail
School Administration Operating Leases - 05-108-050-302-370-000
2 Copier leases: Savin 8035 and IR7095
General Education Elementary Technology (Salary & Benefits) - 05-108-203-302-xxx-000
.875 FTE Tech clerk
Total Capital Expenditures:
$3,821
$3,821
$26,959
$26,959
$30,780
Capital Expenditure Plan
32
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital funds will be used to fund a portion of a technology clerk position, pay our copier lease and our Safari Montage license.
Mary Jelinek, Principal, Thomas Lake Elementary
Capital Expenditures Summary
School Administration Operating Leases
General Education Elementary Technology (Salary & Benefits)
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
Media Center Technology Equipment
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-113-050-302-370-000
05-113-203-302-xxx-000
05-113-203-302-460-000
05-113-203-302-530-000
05-113-203-302-555-000
05-113-203-302-821-000
05-113-620-302-470-000
05-113-620-302-555-000
05-113-850-302-520-000
05-113-850-302-530-000
05-113-203-135-530-000
$4,000
$12,007
$0
$0
$0
$1,798
$0
$0
$0
$0
$0
Total Capital Expenditures: $17,805
Capital Expenditures Detail
School Administration Operating Leases - 05-113-050-302-370-000
Canon copier lease
General Education Elementary Technology (Salary & Benefits) - 05-113-203-302-xxx-000
.355 FTE Tech clerk
General Education Software License Fees - 05-113-203-302-821-000
Safari Montage license
Total Capital Expenditures:
$4,000
$4,000
$12,007
$12,007
$1,798
$1,798
$17,805
Capital Expenditure Plan April 30, 2012
33
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital outlay allocation will be used for the lease payment on the large copy machine, to purchase textbooks for instruction, and new books for our resource room, media center and kindergarten classrooms. Technology purchases will include four computers and monitors, and a SMART board. Building and equipment improvements of new entrance mats and new springs for our existing lunchroom tables will complete our capital expenditures.
Tami Staloch-Schultz, Principal, Westview Elementary
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
General Education Textbooks
General Education Media Resources
General Education Equipment
General Education Technology Equipment
Art Equipment
Music Equipment
Media Center Resources
Media Center Technology Equipment
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-107-050-302-370-000
05-107-050-302-530-000
05-107-203-302-460-000
05-107-203-302-470-000
05-107-203-302-530-000
05-107-203-302-555-000
05-107-212-302-530-000
05-107-258-302-530-000
05-107-620-302-470-000
05-107-620-302-555-000
05-107-850-302-520-000
05-107-850-302-530-000
05-107-203-135-530-000
$2,513
$1,000
$4,000
$2,628
$0
$4,500
$0
$0
$1,000
$0
$2,580
$1,778
$0
Total Capital Expenditures: $19,999
Capital Expenditures Detail
School Administration Operating Leases - 05-107-050-302-370-000
Copier lease
School Administration Equipment - 05-107-050-302-530-000
Emergency/contingency fund
General Education Textbooks - 05-107-203-302-460-000
Textbooks
General Education Media Resources - 05-107-203-302-470-000
Resource room books
Kindergarten classroom library books
General Education Technology Equipment - 05-107-203-302-555-000
Computer and SMART boards for classrooms
Capital Expenditure Plan
34
$2,513
$2,513
$1,000
$1,000
$4,000
$4,000
$628
$2,000
$2,628
$4,500
$4,500
April 30, 2012
Westview Elementary Capital Budget (continued)
Media Center Resources - 05-107-620-302-470-000
Library books
Building Acquisition/Improvements - 05-107-850-302-520-000
Replace lunchroom table springs
Building Equipment - 05-107-850-302-530-000
Replace entrance mats at front and side door
Total Capital Expenditures:
2012-13 Capit al Budget
$1,000
$1,000
$2,580
$2,580
$1,778
$1,778
$19,999
Capital Expenditure Plan
35
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Woodland Elementary's capital outlay allocation will be used for our high volume copier lease and a software license for
Safari Montage. Additional dollars have been set aside to cover a portion of our technology clerk's salary and benefits.
Lisa Carlson, Principal, Woodland Elementary
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
General Education Elementary Technology (Salary & Benefits)
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Music Equipment
Media Center Resources
Building Equipment
General Education Equipment Carryover
05-117-050-302-370-000
05-117-050-302-530-000
05-117-203-302-xxx-000
05-117-203-302-370-000
05-117-203-302-460-000
05-117-203-302-530-000
05-117-203-302-555-000
05-117-203-302-821-000
05-117-258-302-530-000
05-117-620-302-470-000
05-117-850-302-530-000
05-117-203-135-530-000
$0
$0
$14,259
$2,000
$0
$0
$0
$1,800
$0
$0
$0
$0
Total Capital Expenditures: $18,059
Capital Expenditures Detail
General Education Elementary Technology (Salary & Benefits) - 05-117-203-302-xxx-000
.475 FTE for Tech clerk
General Education Operating Leases - 05-117-203-302-370-000
Copier lease - high volume
General Education Software License Fees - 05-117-203-302-821-000
Safari Montage license
Total Capital Expenditures:
$14,259
$14,259
$2,000
$2,000
$1,800
$1,800
$18,059
Capital Expenditure Plan April 30, 2012
36
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital expenditure funds will be used for our existing lease payment obligation for our three copiers. Funds will be allocated to maintain yearly rSchool Today software subscription. The outdoor landscape will be updated with steps installed from the upper level parking lot to the lower entrance. The media center will have funds available to purchase new books. The balance of funds will be allocated for contingency use.
Richard Wendorff, Principal, Black Hawk Middle School
Capital Expenditures Summary
School Administration Operating Leases
General Education Operating Leases
General Education Textbooks
General Education Technology Equipment
General Education Software License Fees
Media Center Resources
Building Site/Grounds Improvements
General Education Equipment Carryover
05-232-051-302-370-000
05-232-208-302-370-000
05-232-208-302-460-000
05-232-208-302-555-000
05-232-208-302-821-000
05-232-620-302-470-000
05-232-850-302-510-000
05-232-208-135-530-000
$1,725
$4,868
$0
$19,019
$1,310
$3,000
$10,000
$0
Total Capital Expenditures: $39,922
Capital Expenditures Detail
School Administration Operating Leases - 05-232-051-302-370-000
Copier lease - office
General Education Operating Leases - 05-232-208-302-370-000
Copier leases - staff
General Education Technology Equipment - 05-232-208-302-555-000
Contingency
General Education Software License Fees - 05-232-208-302-821-000 rSchool software
Media Center Resources - 05-232-620-302-470-000
Media books
Building Site/Grounds Improvements - 05-232-850-302-510-000
Landscape-steps
Total Capital Expenditures:
Capital Expenditure Plan
37
$1,725
$1,725
$4,868
$4,868
$19,019
$19,019
$1,310
$1,310
$3,000
$3,000
$10,000
$10,000
$39,922
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Building maintenance items include painting, and other building improvements. Technology equipment includes LED projector bulbs, SMART boards, Senteo System and two computers. Art includes kiln repair. Tech Ed includes steel stools and a jig saw. Music includes music stands and a cart for stands. Science includes hands-on lab equipment. Capital lease equipment is for copier leases. Tech Coordinator was also included.
Trevor Johnson, Principal, Dakota Hills Middle School
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
Tech Equipment-Admin
General Education Operating Leases
General Education Technology Equipment
General Education Coordinator of Technology (Salary & Benefits)
Art Repairs and Maintenance
Art Equipment
English Textbooks
English Equipment
Health/Physical Education Equipment
Family/Consumer Science Equipment
Industrial Education Equipment
Music Equipment
Natural Sciences Textbooks
Natural Sciences Equipment
Natural Sciences Technology Equipment
Social Sciences/Studies Equipment
Media Center Equipment
Health Services Technology Equipment
Building Acquisition/Improvements
General Education Equipment Carryover
05-225-051-302-370-000
05-225-051-302-530-000
05-225-051-302-555-000
05-225-208-302-370-000
05-225-208-302-555-000
05-225-208-302-xxx-000
05-225-212-302-350-000
05-225-212-302-530-000
05-225-220-302-460-000
05-225-220-302-530-000
05-225-240-302-530-000
05-225-250-302-530-000
05-225-255-302-530-000
05-225-258-302-530-000
05-225-260-302-460-000
05-225-260-302-530-000
05-225-260-302-555-000
05-225-270-302-530-000
05-225-620-302-530-000
05-225-720-302-555-000
05-225-850-302-520-000
05-225-208-135-530-000
$0
$0
$1,050
$1,358
$0
$582
$3,896
$0
$0
$616
$3,645
$0
$15,000
$2,800
$24,264
$0
$0
$0
$700
$0
$0
$0
Total Capital Expenditures: $53,911
Capital Expenditures Detail
General Education Operating Leases - 05-225-208-302-370-000
Printer lease
General Education Technology Equipment - 05-225-208-302-555-000
LED projector bulbs
Computer for office
General Education Coordinator of Technology (Salary & Benefits) - 05-225-208-302-xxx-000
.23 FTE Tech Coordinator
Capital Expenditure Plan
38
$15,000
$15,000
$2,000
$800
$2,800
$24,264
$24,264
April 30, 2012
Dakota Hills Middle School Capital Budget (continued)
Art Repairs and Maintenance - 05-225-212-302-350-000
Safety check and replace kiln heat coils
Industrial Education Equipment - 05-225-255-302-530-000
12 24" Steel stools
Jig saw
Music Equipment - 05-225-258-302-530-000
20 Music stands
Cart for stands
Natural Sciences Equipment - 05-225-260-302-530-000
3 Ohaus
3 Compact scale
Natural Sciences Technology Equipment - 05-225-260-302-555-000
2 SMART boards for Science
Senteo system for Science
Health Services Technology Equipment - 05-225-720-302-555-000
Computer for nurse
Building Acquisition/Improvements - 05-225-850-302-520-000
Painting walls and building improvements
Total Capital Expenditures:
2012-13 Capit al Budget
$700
$700
$500
$550
$1,050
$940
$418
$1,358
$291
$291
$582
$2,328
$1,568
$3,896
$616
$616
$3,645
$3,645
$53,911
Capital Expenditure Plan
39
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital dollars will be spent to purchase mobile technology for student use. All grade levels will have access to a mobile lab for classroom use. Additional capital dollars will be used to replace furniture. Furniture upgrades will include student chairs, office chairs, waiting room furniture and cots for the nurse's office.
Noel Mehus, Principal, Falcon Ridge Middle School
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
General Education Textbooks
General Education Equipment
General Education Technology Equipment
English Equipment
Family/Consumer Science Equipment
Health Services Equipment
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
Building Technology Equipment
General Education Equipment Carryover
05-286-051-302-370-000
05-286-051-302-530-000
05-286-208-302-460-000
05-286-208-302-530-000
05-286-208-302-555-000
05-286-220-302-530-000
05-286-250-302-530-000
05-286-720-302-530-000
05-286-850-302-510-000
05-286-850-302-520-000
05-286-850-302-530-000
05-286-850-302-555-000
05-286-208-135-530-000
$0
$4,504
$0
$6,000
$37,830
$0
$3,000
$2,000
$0
$0
$0
$0
$0
Total Capital Expenditures: $53,334
Capital Expenditures Detail
School Administration Equipment - 05-286-051-302-530-000
10 Office chairs
Waiting room furniture
General Education Equipment - 05-286-208-302-530-000
300 Student chairs
General Education Technology Equipment - 05-286-208-302-555-000
Apple MacBook Air Learning Lab (20 laptops/mobile charging cart/wireless access point)
2 Apple MacBook Air 5-pack
2 Apple MacBook Air
10 Ethernet adapters
Lecture room LCD projector and storage rack
HP duplex laser printer
Family/Consumer Science Equipment - 05-286-250-302-530-000
2 Stoves
Refrigerator
Capital Expenditure Plan
40
April 30, 2012
$2,000
$2,504
$4,504
$6,000
$6,000
$21,599
$9,990
$1,810
$290
$3,281
$860
$37,830
$2,000
$1,000
$3,000
Falcon Ridge Middle School Capital Budget (continued)
Health Services Equipment - 05-286-720-302-530-000
3 Cots - nurse's office
Total Capital Expenditures:
2012-13 Capit al Budget
$2,000
$2,000
$53,334
Capital Expenditure Plan
41
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Rosemount Middle School is using 80 percent of its capital budget to help fund technology staffing. The remaining allocation will be used for existing copy machine leases.
Mary Thompson, Principal, Rosemount Middle School
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
School Administration Technology Equipment
General Education Equipment
General Education Technology Equipment
General Education Coordinator of Technology (Salary & Benefits)
Art Equipment
Health/Physical Education Equipment
Family/Consumer Science Equipment
Music Equipment
Natural Sciences Textbooks
Social Sciences/Studies Software License Fees
Athletic Boys Equipment
Media Center Resources
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-239-051-302-370-000
05-239-051-302-530-000
05-239-051-302-555-000
05-239-208-302-530-000
05-239-208-302-555-000
05-239-208-302-xxx-000
05-239-212-302-530-000
05-239-240-302-530-000
05-239-250-302-530-000
05-239-258-302-530-000
05-239-260-302-460-000
05-239-270-302-821-000
05-239-294-302-530-000
05-239-620-302-470-000
05-239-850-302-520-000
05-239-850-302-530-000
05-239-208-135-530-000
$11,806
$0
$0
$0
$0
$59,841
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Total Capital Expenditures: $71,647
Capital Expenditures Detail
School Administration Operating Leases - 05-239-051-302-370-000
Copier leases
General Education Coordinator of Technology (Salary & Benefits) - 05-239-208-302-xxx-000
.55 FTE Tech coordinator
Total Capital Expenditures:
$11,806
$11,806
$59,841
$59,841
$71,647
Capital Expenditure Plan April 30, 2012
42
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital expenditure funds will be used for our existing copier lease, to purchase one SMART board for World Languages and one for Learning Disability, and laptop and desk computers for student use with our mobile and classroom labs.
Dan Wilharber, Principal, Scott Highlands Middle School
Capital Expenditures Summary
School Administration Operating Leases
General Education Equipment
General Education Technology Equipment
General Education Coordinator of Technology (Salary & Benefits)
Athletic All Sports Equipment
Media Center Resources
General Education Equipment Carryover
05-293-051-302-370-000
05-293-208-302-530-000
05-293-208-302-555-000
05-293-208-302-xxx-000
05-293-292-302-530-000
05-293-620-302-470-000
05-293-208-135-530-000
$10,308
$0
$41,319
$0
$0
$0
$0
Total Capital Expenditures: $51,627
Capital Expenditures Detail
School Administration Operating Leases - 05-293-051-302-370-000
Copier lease
General Education Technology Equipment - 05-293-208-302-555-000
2 SMART boards
34 Laptop and desktop computers
Total Capital Expenditures:
$10,308
$10,308
$3,256
$38,063
$41,319
$51,627
Capital Expenditure Plan
43
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
VMS capital funds will be used for copier lease payments and equipment for technology. The capital budget supports teaching and learning by providing durable items beyond the scope of department budgets.
David G. McKeag, Principal, Valley Middle School
Capital Expenditures Summary
School Administration Operating Leases
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
General Education Contracted Services
Athletic All Sports Equipment
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
General Education Equipment Carryover
05-298-051-302-370-000
05-298-208-302-370-000
05-298-208-302-460-000
05-298-208-302-530-000
05-298-208-302-555-000
05-298-208-302-821-000
05-298-208-302-305-000
05-298-292-302-530-000
05-298-850-302-510-000
05-298-850-302-520-000
05-298-850-302-530-000
05-298-208-135-530-000
$1,836
$8,303
$0
$0
$18,327
$0
$0
$3,000
$0
$0
$0
$0
Total Capital Expenditures: $31,466
Capital Expenditures Detail
School Administration Operating Leases - 05-298-051-302-370-000
Copier lease - color/office
General Education Operating Leases - 05-298-208-302-370-000
Copier lease - large-volume
Copier lease - Canon/teacher
General Education Technology Equipment - 05-298-208-302-555-000
Office printers
SMART board w/projector
Security camera system
Athletic All Sports Equipment - 05-298-292-302-530-000
Replacement purchase for damaged uniforms
Total Capital Expenditures:
$1,836
$1,836
$6,540
$1,763
$8,303
$1,500
$5,000
$11,827
$18,327
$3,000
$3,000
$31,466
Capital Expenditure Plan April 30, 2012
44
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Apple Valley High School will continue to pay our copy machine leases using capital expenditure dollars. We also plan to renovate our varsity softball field, install walls and doors on two open math classrooms, purchase twenty new football helmets, purchase one new commercial push mower, new books for the media center, new wireless microphones for our theater, adult and child manikins for our Safety Ed classes, a copper kiln and a glass fusing kiln for Art, about twenty new
Mac laptops for teachers, two SMART Boards for one classroom and one computer lab, and a variety of smaller tech related equipment items (LC projectors, projector replacement bulbs, document cameras, etc).
Steve Degenaar, Principal, Apple Valley High School
Capital Expenditures Summary
School Administration Operating Leases
School Administration Equipment
School Administration Technology Equipment
General Education Operating Leases
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
General Education Bldg Acquisition/Improvements
Art Equipment
Business Technology Equipment
Limited English Proficiency Technology Equipment
English Equipment
English Technology Equipment
Foreign Language Technology Equipment
Health/Physical Education Equipment
Health/Physical Education Technology Equipment
Family/Consumer Science Equipment
Industrial Education Equipment
Industrial Education Technology Equipment
Mathematics Technology Equipment
Music Equipment
Music Technology Equipment
Natural Sciences Equipment
Natural Sciences Technology Equipment
Software License Fees-Science
Social Sciences/Studies Textbooks
Social Sciences/Studies Technology Equipment
Fine Arts Equipment
Athletic All Sports Equipment
Special Needs WED Non-Disabled Technology Equipment
Special Education Equipment
Special Education Technology Equipment
Media Center Resources
Media Center Equipment
Media Center Technology Equipment
Building Contracted Services
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
Capital Expenditure Plan
45
05-397-052-302-370-000
05-397-052-302-530-000
05-397-052-302-555-000
05-397-211-302-370-000
05-397-211-302-530-000
05-397-211-302-555-000
05-397-211-302-821-000
05-397-211-302-520-000
05-397-212-302-530-000
05-397-215-302-555-000
05-397-219-302-555-000
05-397-220-302-530-000
05-397-220-302-555-000
05-397-230-302-555-000
05-397-240-302-530-000
05-397-240-302-555-000
05-397-250-302-530-000
05-397-255-302-530-000
05-397-255-302-555-000
05-397-256-302-555-000
05-397-258-302-530-000
05-397-258-302-555-000
05-397-260-302-530-000
05-397-260-302-555-000
05-397-260-302-821-000
05-397-270-302-460-000
05-397-270-302-555-000
05-397-291-302-530-000
05-397-292-302-530-000
05-397-385-302-555-000
05-397-420-302-530-000
05-397-420-302-555-000
05-397-620-302-470-000
05-397-620-302-530-000
05-397-620-302-555-000
05-397-850-302-305-000
05-397-850-302-510-000
05-397-850-302-520-000
05-397-850-302-530-000
$0
$4,800
$3,600
$3,000
$4,450
$1,150
$1,000
$0
$3,600
$5,000
$0
$0
$1,200
$0
$0
$0
$1,200
$10,795
$0
$0
$0
$0
$1,750
$2,000
$2,050
$0
$7,200
$10,000
$4,000
$2,050
$0
$2,050
$3,000
$0
$19,150
$0
$6,750
$13,960
$0
April 30, 2012
Apple Valley High School Capital Budget (continued)
General Education Equipment Carryover 05-397-211-135-530-000
Total Capital Expenditures:
Capital Expenditures Detail
School Administration Technology Equipment - 05-397-052-302-555-000
Desktop computer
General Education Operating Leases - 05-397-211-302-370-000
Copier leases
Art Equipment - 05-397-212-302-530-000
Copper kiln
Glass fusing kiln
Business Technology Equipment - 05-397-215-302-555-000
2 Laptops
Limited English Proficiency Technology Equipment - 05-397-219-302-555-000
LC Projector-Room 215C
English Technology Equipment - 05-397-220-302-555-000
4 Laptops
Foreign Language Technology Equipment - 05-397-230-302-555-000
3 Laptops
Health/Physical Education Equipment - 05-397-240-302-530-000
2 Infant manikins
2 Adult manikins
Health/Physical Education Technology Equipment - 05-397-240-302-555-000
SMART board for Health room 188
2 Laptops
Family/Consumer Science Equipment - 05-397-250-302-530-000
Range
Industrial Education Equipment - 05-397-255-302-530-000
Wood lathe
Capital Expenditure Plan
46
2012-13 Capit al Budget
$0
$113,755
$4,800
$4,800
$3,600
$3,600
$600
$2,400
$3,000
$2,050
$2,400
$4,450
$1,150
$1,150
$1,000
$1,000
April 30, 2012
$1,200
$1,200
$10,795
$10,795
$650
$1,100
$1,750
$2,000
$2,000
$2,050
$2,050
Apple Valley High School Capital Budget (continued)
Mathematics Technology Equipment - 05-397-256-302-555-000
3 Laptops
Music Equipment - 05-397-258-302-530-000
Tuba for Band
Natural Sciences Technology Equipment - 05-397-260-302-555-000
Laptop
Social Sciences/Studies Technology Equipment - 05-397-270-302-555-000
6 Laptops
Fine Arts Equipment - 05-397-291-302-530-000
4 Wireless microphones
Fog machine
Replace dressing room lights with LED
Athletic All Sports Equipment - 05-397-292-302-530-000
20 Football helmets
Special Needs WED Non-Disabled Technology Equipment - 05-397-385-302-555-000
Work Program LC projector-Room 226
Special Education Technology Equipment - 05-397-420-302-555-000
SMART board-Room 228
Media Center Resources - 05-397-620-302-470-000
New books
Media Center Technology Equipment - 05-397-620-302-555-000
SMART board in Lab 2
Mac minicomputer
5 HP P4014 laser printers
15 LC lamps
3 Document cameras
4 LC projectors
5 Mac minis for Studio
Building Site/Grounds Improvements - 05-397-850-302-510-000
Renovate softball field
Replace isolation valves BB/stadium irrigation system
Capital Expenditure Plan
47
2012-13 Capit al Budget
$3,600
$3,600
$5,000
$5,000
$1,200
$1,200
$7,200
$7,200
$7,200
$1,500
$1,300
$10,000
$4,000
$4,000
$2,050
$2,050
$2,050
$2,050
$3,000
$3,000
$2,050
$1,100
$3,400
$3,750
$1,650
$1,700
$5,500
$19,150
$5,000
$1,750
$6,750
April 30, 2012
Apple Valley High School Capital Budget (continued)
Building Acquisition/Improvements - 05-397-850-302-520-000
Walls and doors-Rooms 209 & 211
Commercial push mower
Paint outside walls of the AVHS theater
Total Capital Expenditures:
2012-13 Capit al Budget
$8,000
$850
$5,110
$13,960
$113,755
Capital Expenditure Plan
48
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Eagan High School will be completing technology components to nine Science classrooms with sound enhancement and digital presenters. In addition the final five classrooms needing to be equipped for the 21st century will be fully equipped and wired bringing the entire building's teaching rooms into full compliance. The annual subscription fee for library access to
Discovery Education software is included again this year. We will be updating our Adobe Creative Suite software in a building-wide site license as it is used in many classes and by students and faculty. Funds have been allocated for replacement of classroom video projectors (some in the building are 10 years old), replacing security cameras which are starting to fail, replacing digital presenters (some in the building are 10 years old) and purchasing more Kindle eTouch readers to have a classroom set for ELL students. A set of five Echo Smartpens with notebooks for Special Education students is also included. Also included is a 10-unit iPad charging and locked storage cart for the center-based CID program. Building improvements include two demountable walls in classrooms, removing a large sink and fume hood in what used to be a processing station for photography film projects, adding rubberized track/running flooring to a hallway for
Physical Education class use and electrical work in a center-based classroom that is being remodeled by Special Education.
The Gymnastics team will be receiving a replacement floor mat as required in new National Federation rules and a new carpet for the floor exercise competition use. The Wrestling program will receive partial funding of a practice scoreboard and timer with the remainder of the cost being covered by the parent boosters. Some funding towards replacing the school's outdoor 4-wheel gator (used for field grooming, sidewalk plowing, equipment hauling) is included, with the remainder of the cost being covered by the fundraised or donated money from the athletic teams and booster groups. Building equipment including tools for custodial use and heavy-duty folding tables are in the plan. Tech Education will receive a replacement
2-speed planer for student use. Computers being purchased using levy funding supplemented by our capital outlay include
MacBook Pro laptops for instructional use with teachers and students as well as the replacement of a computer lab set of iMacs.
Dr. Polly Reikowski, Principal, Eagan High School
Capital Expenditures Summary
School Administration Operating Leases
School Administration Technology Equipment
School Administration Software License Fees
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Art Equipment
Art Technology Equipment
Business Technology Equipment
Limited English Proficiency Technology Equipment
English Textbooks
Foreign Language Textbooks
Foreign Language Technology Equipment
Health/Physical Education Textbooks
Health/Physical Education Equipment
Health/Physical Education Technology Equipment
Family/Consumer Science Equipment
Industrial Education Equipment
Mathematics Technology Equipment
Music Equipment
Natural Sciences Textbooks
Natural Sciences Equipment
Social Sciences/Studies Textbooks
Athletic All Sports Equipment
Media Center Equipment
Media Center Technology Equipment
Capital Expenditure Plan
49
05-341-052-302-370-000
05-341-052-302-555-000
05-341-052-302-821-000
05-341-211-302-530-000
05-341-211-302-555-000
05-341-211-302-821-000
05-341-212-302-530-000
05-341-212-302-555-000
05-341-215-302-555-000
05-341-219-302-555-000
05-341-220-302-460-000
05-341-230-302-460-000
05-341-230-302-555-000
05-341-240-302-460-000
05-341-240-302-530-000
05-341-240-302-555-000
05-341-250-302-530-000
05-341-255-302-530-000
05-341-256-302-555-000
05-341-258-302-530-000
05-341-260-302-460-000
05-341-260-302-530-000
05-341-270-302-460-000
05-341-292-302-530-000
05-341-620-302-530-000
05-341-620-302-555-000
$0
$0
$0
$0
$20,156
$13,880
$0
$6,742
$0
$396
$0
$0
$0
$0
$800
$0
$0
$0
$0
$7,120
$0
$0
$0
$0
$0
$0
April 30, 2012
Eagan High School Capital Budget (continued)
Media Center Software License Fees
Guidance Equipment
Guidance Technology Equipment
Building Acquisition/Improvements
Building Equipment
Building Technology Equipment
General Education Equipment Carryover
05-341-620-302-821-000
05-341-710-302-530-000
05-341-710-302-555-000
05-341-850-302-520-000
05-341-850-302-530-000
05-341-850-302-555-000
05-341-211-135-530-000
Total Capital Expenditures:
Capital Expenditures Detail
General Education Technology Equipment - 05-341-211-302-555-000
24 MacBook laptops, 13-in. for instructional use - after levy funding has been applied
3 MacBook laptops, 15-in. for instructional use - after levy funding has been applied
2 iMacs for computer labs in Rooms 156 and 222 - after levy funding has been applied
10 Digital classroom projectors
4 Visual digital presenters
Mobile charging and lockable storage cart for 10 iPads in CID center-based classroom
5 Livescribe 2 GB Echo Smartpens and 30 notebooks for use in note taking by Special Education
General Education Software License Fees - 05-341-211-302-821-000
Building site license for Adobe Creative Suite software
100 Microsoft Office 2011 software licenses
Intermodulation analysis software
Art Technology Equipment - 05-341-212-302-555-000
35 iMac computers for computer lab replacement in Graphics Room lab - after levy funding has been applied
Limited English Proficiency Technology Equipment - 05-341-219-302-555-000
4 Kindle eTouch readers to add to existing and create an ELL classroom set
Industrial Education Equipment - 05-341-255-302-530-000
DeWalt 2-speed planer
Athletic All Sports Equipment - 05-341-292-302-530-000
Gymnastics floor mat
Gymnastics carpet for floor exercise
Partial funding of wrestling room scoreboard and timer (Boosters to cover the remainder of cost)
Media Center Software License Fees - 05-341-620-302-821-000
Discovery Education United Streaming, including Health Issues, annual license subscription
2012-13 Capit al Budget
$3,100
$0
$0
$52,984
$6,826
$3,000
$0
$115,004
$396
$396
$800
$800
$1,620
$5,000
$500
$7,120
$3,555
$2,046
$119
$11,000
$1,996
$700
$740
$20,156
$9,230
$4,100
$550
$13,880
$6,742
$6,742
$3,100
$3,100
Capital Expenditure Plan
50
April 30, 2012
Eagan High School Capital Budget (continued)
Building Acquisition/Improvements - 05-341-850-302-520-000
Removals of a large sink, cabinet and fume hood in the Art/Photo area
12-Ft. Demountable wall and installation in the Art/Photo area
8-Ft. Demountable wall in classroom 124
Partial funding of rubberized flooring for indoor running area in hallway
Adding and moving outlets and switches in a center based Special Education classroom
Audio-enhancement equipment and installation for nine Science classrooms
5-21st Century Classrooms to be fully equipped with video, sound, presentation equipment and wiring
Building Equipment - 05-341-850-302-530-000
Gator vehicle for buildings and grounds use
Custodial tools replacement and new
7 Heavy-duty folding tables for building use
Building Technology Equipment - 05-341-850-302-555-000
10 Security cameras
Total Capital Expenditures:
2012-13 Capit al Budget
$780
$2,014
$1,610
$3,000
$950
$18,630
$26,000
$52,984
$5,000
$557
$1,269
$6,826
$3,000
$3,000
$115,004
Capital Expenditure Plan
51
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
The foundation of Eastview’s capital budget each year is used to support copier lease payments, the Campus Student
System license, software updates and the media center database software license fees. Additional capital budget plans include: replacement of the engineering lab saw; updating custodial tools; replacement and reconditioning of football helmets and the repair and replacement of wallpaper. We are also attempting to repair and update the performing arts center sound system; after 15 years the technology quality and flexibility of use is no longer adequate to support a 21st century theater program.
Dr. Randall W. Peterson, Principal, Eastview High School
Capital Expenditures Summary
School Administration Operating Leases
General Education Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
General Education Software License Fees
Industrial Education Equipment
Natural Sciences Textbooks
Natural Sciences Equipment
Social Sciences/Studies Textbooks
Athletic All Sports Building Improvements
Athletic All Sports Equipment
Athletic Boys Equipment
Media Center Technology Equipment
Media Center Software License Fees
Building Acquisition/Improvements
Building Equipment
Building Technology Equipment
General Education Equipment Carryover
05-388-052-302-370-000
05-388-211-302-370-000
05-388-211-302-460-000
05-388-211-302-530-000
05-388-211-302-555-000
05-388-211-302-821-000
05-388-255-302-530-000
05-388-260-302-460-000
05-388-260-302-530-000
05-388-270-302-460-000
05-388-292-302-520-000
05-388-292-302-530-000
05-388-294-302-530-000
05-388-620-302-555-000
05-388-620-302-821-000
05-388-850-302-520-000
05-388-850-302-530-000
05-388-850-302-555-000
05-388-211-135-530-000
$0
$10,000
$0
$0
$0
$31,600
$2,000
$0
$0
$0
$0
$0
$5,000
$0
$14,400
$13,643
$2,000
$30,000
$0
Total Capital Expenditures: $108,643
Capital Expenditures Detail
General Education Operating Leases - 05-388-211-302-370-000
4 copier leases
General Education Software License Fees - 05-388-211-302-821-000
Campus student system license
Adobe Suite update
Industrial Education Equipment - 05-388-255-302-530-000
Engineering Lab saw replacement
$10,000
$10,000
$19,600
$12,000
$31,600
$2,000
$2,000
Capital Expenditure Plan April 30, 2012
52
Eastview High School Capital Budget (continued)
Athletic Boys Equipment - 05-388-294-302-530-000
Football helmet replacement
Media Center Software License Fees - 05-388-620-302-821-000
Media Center software license
Personal Learning Plan
Building Acquisition/Improvements - 05-388-850-302-520-000
Wallpaper repair/replace
Building Equipment - 05-388-850-302-530-000
Custodial tools
Building Technology Equipment - 05-388-850-302-555-000
Performing Arts Center sound system
Total Capital Expenditures:
2012-13 Capit al Budget
$5,000
$5,000
$12,400
$2,000
$14,400
$13,643
$13,643
$2,000
$2,000
$30,000
$30,000
$108,643
Capital Expenditure Plan
53
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Copier leases, technology equipment, software license fees, and textbooks make up the Rosemount High School 2012-2013 capital outlay requests.
John Wollersheim, Principal, Rosemount High School
Capital Expenditures Summary
School Administration Operating Leases
General Education Operating Leases
General Education Technology Equipment
Major Software Purchases-Second Ed
Textbooks-Business
Foreign Language Textbooks
Family/Consumer Science Textbooks
Family/Consumer Science Equipment
Mathematics Textbooks
Music Equipment
Natural Sciences Equipment
Social Sciences/Studies Textbooks
Media Center Software License Fees
Building Site/Grounds Improvements
Building Equipment
Building Technology Equipment
General Education Equipment Carryover
05-338-052-302-370-000
05-338-211-302-370-000
05-338-211-302-555-000
05-338-211-302-556-000
05-338-215-302-460-000
05-338-230-302-460-000
05-338-250-302-460-000
05-338-250-302-530-000
05-338-256-302-460-000
05-338-258-302-530-000
05-338-260-302-530-000
05-338-270-302-460-000
05-338-620-302-821-000
05-338-850-302-510-000
05-338-850-302-530-000
05-338-850-302-555-000
05-338-211-135-530-000
$7,777
$25,411
$63,738
$1,976
$2,500
$2,024
$2,404
$750
$2,920
$11,300
$4,896
$500
$6,234
$0
$6,290
$0
$0
Total Capital Expenditures: $138,720
Capital Expenditures Detail
School Administration Operating Leases - 05-338-052-302-370-000
Xerox copier lease, main office, IR3035
2 Xerox copier leases, Sft Res/Guid, IR3035
General Education Operating Leases - 05-338-211-302-370-000
2 Canon IR7105 copier leases
General Education Technology Equipment - 05-338-211-302-555-000 iMac costs not covered by levy purchases
16 Projector replacements
36 MacBook Pro 13”
36 Mini display port to VGA adapters
3 HP Probooks
7 HP Compaq 8200 SFF
AV equipment repair bundle
HP P4015 N network laser jet printer
10 Tablets
Classroom AV request
Capital Expenditure Plan
54
$2,782
$4,995
$7,777
$25,411
$25,411
$1,719
$10,272
$35,204
$929
$2,739
$4,312
$1,850
$1,090
$2,893
$2,730
$63,738
April 30, 2012
Rosemount High School Capital Budget (continued)
Major Software Purchases-Second Ed - 05-338-211-302-556-000
36 Microsoft Office 2011
10 Microsoft Office 2010
Textbooks-Business - 05-338-215-302-460-000
50 Accounting working papers
Foreign Language Textbooks - 05-338-230-302-460-000
20 CIS Spanish V books
Family/Consumer Science Textbooks - 05-338-250-302-460-000
23 Parenting textbooks
12 Child Development textbooks
Family/Consumer Science Equipment - 05-338-250-302-530-000
Refrigerator
Mathematics Textbooks - 05-338-256-302-460-000
25 Elementary Stats textbooks
8 AP Stats textbooks
Music Equipment - 05-338-258-302-530-000
20 Marching Band uniforms
25 Student chairs
25 Music stands
Natural Sciences Equipment - 05-338-260-302-530-000
8 EI Precision balances
Social Sciences/Studies Textbooks - 05-338-270-302-460-000
6 Textbooks
Media Center Software License Fees - 05-338-620-302-821-000
Online research databases
Building Equipment - 05-338-850-302-530-000
13 Radios
Security camera new addition/lower level locker bay exit doors
Total Capital Expenditures:
2012-13 Capit al Budget
$1,476
$500
$1,976
$2,500
$2,500
$2,024
$2,024
$8,000
$2,100
$1,200
$11,300
$4,896
$4,896
$1,470
$934
$2,404
$750
$750
$2,200
$720
$2,920
$500
$500
$6,234
$6,234
$3,250
$3,040
$6,290
$138,720
Capital Expenditure Plan
55
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Capital allocation will be used to purchase computers, printers and computer related equipment for student and staff use. In addition, funds will be used to pay Campus license fee.
Dan Bodette, Principal, School of Environmental Studies
Capital Expenditures Summary
School Administration Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
Software License Fees-Second Ed
Media Center Resources
Building Site/Grounds Improvements
Building Acquisition/Improvements
General Education Equipment Carryover
05-360-052-302-370-000
05-360-211-302-460-000
05-360-211-302-530-000
05-360-211-302-555-000
05-360-211-302-821-000
05-360-620-302-470-000
05-360-850-302-510-000
05-360-850-302-520-000
05-360-211-135-530-000
$16,492
$3,000
$0
$0
$0
$0
$0
$0
$0
Total Capital Expenditures: $19,492
Capital Expenditures Detail
General Education Technology Equipment - 05-360-211-302-555-000
7 Mac laptops
LED projector bulbs
Software License Fees-Second Ed - 05-360-211-302-821-000
Campus license
Total Capital Expenditures:
$12,600
$3,892
$16,492
$3,000
$3,000
$19,492
Capital Expenditure Plan
56
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Dakota Ridge has capital needs in the areas of door replacements, window coverings and kick plate covers on doors.
Nandy Rieck, Coordinator, Dakota Ridge
Capital Expenditures Summary
School Administration Operating Leases
General Education Textbooks
General Education Equipment
General Education Technology Equipment
Media Center Resources
Building Site/Grounds Improvements
Building Acquisition/Improvements
Building Equipment
05-399-408-302-370-000
05-399-408-302-460-000
05-399-408-302-530-000
05-399-408-302-555-000
05-399-620-302-470-000
05-399-850-302-510-000
05-399-850-302-520-000
05-399-850-302-530-000
$0
$0
$0
$0
$0
$0
$6,500
$0
Total Capital Expenditures: $6,500
Capital Expenditures Detail
Building Acquisition/Improvements - 05-399-850-302-520-000
2 Steel doors
Anti-glare window treatments
Kick plate on doors
Total Capital Expenditures:
$2,000
$2,500
$2,000
$6,500
$6,500
Capital Expenditure Plan
57
April 30, 2012
58
59
60
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Emergency needs funds allow unexpected problems with critical systems to be maintained throughout the school year.
Anti-virus software protects the district from viruses and malware protects the network. A web filtering solution provides some protection to students and staff from inappropriate material as well as provide compliance with CIPA in order to stay eligible for certain federal/state funds. Infrastructure maintenance will allow the storage area network (SAN) to be upgraded to faster, higher-capacity hard drives and a faster connection between servers and the SAN. It will also allow a virtual server environment to be configured minimizing the need to purchase additional servers saving on hardware and support costs as well as lowering power-consumption and cooling needs.
Ed Heier, Coordinator of Technology, District Office
Capital Expenditures Summary
Technology Support Building Acquisition/Improvements
Technology Support Equipment
Technology Support Major Software
Technology Support Technology Equipment
05-005-145-302-520-000
05-005-145-302-530-000
05-005-145-302-556-000
05-005-145-302-555-000
$10,000
$15,000
$184,000
$110,000
Total Capital Expenditures: $319,000
Capital Expenditures Detail
Technology Support Building Acquisition/Improvements - 05-005-145-302-520-000
Emergency needs
Technology Support Equipment - 05-005-145-302-530-000
Emergency needs
Technology Support Major Software - 05-005-145-302-556-000
Sophos-Tren Micro Anti-Virus-2 yr agreement
Web Filter Solution-2 yr agreement
Infrastructure maintenance (SAN/Virtualization) software
Technology Support Technology Equipment - 05-005-145-302-555-000
Emergency needs
Infrastructure maintenance (SAN/Virtualization) hardware
Total Capital Expenditures:
$10,000
$10,000
$15,000
$15,000
$67,000
$87,000
$30,000
$184,000
$10,000
$100,000
$110,000
$319,000
Capital Expenditure Plan April 30, 2012
61
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
2012-13 capital expenditures include the office copier lease and updates to the shop area with storage shelves, storage cabinets, storage racks, workbench tops, shop drills and sanders.
Dave Schmitz, Coordinator, Alternative Learning Center
Capital Expenditures Summary
School Administration Operating Leases
General Education Operating Leases
General Education Equipment
General Education Technology Equipment
Building Acquisition/Improvements
General Education Equipment Carryover
05-610-052-302-370-000
05-610-211-302-370-000
05-610-211-302-530-000
05-610-211-302-555-000
05-610-850-302-520-000
05-610-211-135-530-000
$0
$3,500
$6,500
$0
$0
$0
Total Capital Expenditures: $10,000
Capital Expenditures Detail
General Education Operating Leases - 05-610-211-302-370-000
Office copier lease
General Education Equipment - 05-610-211-302-530-000
Storage shelf and cabinet
Tool cabinets
Storage racks
Workbench tops
Wall mount storage racks
Shop tools (drills, sanders)
Total Capital Expenditures:
$3,500
$3,500
$1,086
$1,992
$400
$359
$280
$2,383
$6,500
$10,000
Capital Expenditure Plan
62
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
As the school district continues to maintain progress within the Instrumental Music program, district musical instruments need replacing and repair.
Mark Parr, Director of Secondary Education, District Office
Capital Expenditures Summary
Music Equipment 05-200-258-302-530-000 $60,000
Total Capital Expenditures: $60,000
Capital Expenditures Detail
Music Equipment - 05-200-258-302-530-000
Band instruments
Total Capital Expenditures:
$60,000
$60,000
$60,000
Capital Expenditure Plan
63
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
There is inadequate space in the district-owned buildings to meet all of the district's needs. For 2012-13, the district intends to continue existing leases for the following facilities: Rahncliff Learning Center, Early Childhood Learning Center, Dakota Ridge
School, School of Environmental Studies, Area Learning Center/Transition Plus/Pathways building; additions at Diamond
Path, Northview, Parkview, Pinewood and Red Pine Elementary schools. A new building was purchased in 2010 for Adult
Basic Education and Early Childhood Family Education. The hockey and figure skating programs rent time for additional ice time for practice and games.
Jeff Solomon, Director of Finance & Operations, District Office
Capital Expenditures Summary
Building Leases
Building Leases - Ice Rental
05-005-850-302-370-000
05-005-850-302-372-000
$2,969,173
$237,000
Total Capital Expenditures: $3,206,173
Capital Expenditures Detail
Building Leases - 05-005-850-302-370-000
Building leases
Building Leases - Ice Rental - 05-005-850-302-372-000
Ice rental
Total Capital Expenditures:
$2,969,173
$2,969,173
$237,000
$237,000
$3,206,173
Capital Expenditure Plan
64
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
The 2012-13 capital contingency for schools will be used to respond to unexpected enrollment changes, scheduling issues or other unforeseen conditions. Needs for additional furnishings will be identified at the beginning of the year and as the year progresses.
Julie Olson, Director of Elementary Education, District Office and
Mark Parr, Director of Secondary Education, District Office
Capital Expenditures Summary
General Education Equipment Elementary
General Education Equipment Secondary
05-005-031-136-530-000
05-005-032-136-530-000
$10,000
$20,000
Total Capital Expenditures: $30,000
Capital Expenditures Detail
General Education Equipment Elementary - 05-005-031-136-530-000
Contingency
General Education Equipment Secondary - 05-005-032-136-530-000
Contingency
Total Capital Expenditures:
$10,000
$10,000
$20,000
$20,000
$30,000
Capital Expenditure Plan
65
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
There are numerous times during every school year when emergencies or other critical problems arise which require immediate attention, but which were not anticipated at the time the capital budget was approved (more than 18 months before the end of the school year). The administration carries a “Contingency” budget each year which may be used to pay for these unplanned projects.
Jeff Solomon, Director of Finance & Operations
Capital Expenditures Summary
Building Equipment 05-005-850-134-530-000 $175,000
Total Capital Expenditures: $175,000
Capital Expenditures Detail
Building Equipment - 05-005-850-134-530-000
Contingency
Total Capital Expenditures:
$175,000
$175,000
$175,000
Capital Expenditure Plan
66
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Curriculum materials include the purchase of an online Response to Intervention (RtI) management system which enables teachers to monitor and report student progress, and plan targeted literacy instruction and interventions (grades K-5) and for our Strategic Readers (grades 6-12); instructional materials and resources for the second year of a two-year implementation of the revised Science curriculum which is aligned to the new state standards (grades K-12); instructional materials and resources for the first year of a two-year implementation of the English/Language Arts curriculum, which is aligned to the new standards (grades pre-K-12); curriculum mapping software to use in conjunction with the curriculum review process and to facilitate collaborative planning amongst teachers (grades 6-12); maintenance of media programs, Nettreker and online data bases (grades K-12), maintenance of the online secondary textbook management system utilized by media specialists and teachers to track textbooks district-wide for all subject areas (grades 6-12); instructional materials and resources to support the implementation of the revised Health curriculum (grades 6-12); replacement equipment and instructional materials to support the district's Career Development and Technical Education programs (grades 10-12). An allocation of approximately
$2 per student has been included in this year's capital budget. The money will be used to purchase resources for K-12. This emphasis is on media resources to supplement curricular implementations.
Steve Troen, Director of Teaching & Learning, District Office, and
Renee Ervasti, Coordinator of K-12 Curriculum and ELL, District Office
Capital Expenditures Summary
Gifted and Talented Textbooks Curriculum
English Language Learner Textbooks Curriculum
English Textbooks Curriculum
English Textbooks Curriculum Elementary
English Textbooks Curriculum Secondary
English Software License Fees Curriculum Elementary
English Software License Fees Curriculum K-12
Foreign Language Textbooks Curriculum
Foreign Language Textbooks Curriculum Secondary
Health/Physical Education Textbooks Curriculum Gr K-12
Health/Physical Education Textbooks Curriculum Secondary
Health/Physical Education Equipment Curriculum Elementary
Health/Physical Education Equipment Curriculum Secondary
Mathematics Textbooks Curriculum Elementary
Mathematics Textbooks Curriculum Secondary
Mathematics Equipment Curriculum Elementary
Mathematics Equipment Curriculum Secondary
Mathematics Software License Fees Curriculum Secondary
Computer Science Equipment Curriculum Secondary
Music Textbooks Curriculum Elementary
Music Equipment Curriculum Elementary
Music Equipment Curriculum Secondary
Natural Sciences Textbooks Curriculum Elementary
Natural Sciences Textbooks Curriculum Secondary
Natural Sciences Equipment Curriculum Elementary
Natural Sciences Equipment Curriculum Secondary
Natural Sciences Software Licenses Curriculum Elementary
Natural Sciences Software Licenses Curriculum Secondary
Career Development Textbooks Curriculum
Curriculum Career Development Bldg Acq/Imprv
Curriculum Career Development Equipment
Career Development Technology Equipment Curriculum
Capital Expenditure Plan
67
05-255-218-302-460-000
05-255-219-302-460-000
05-255-220-302-460-000
05-255-220-302-460-100
05-255-220-302-460-200
05-255-220-302-821-100
05-225-220-302-821-000
05-255-230-302-460-000
05-255-230-302-460-200
05-255-240-302-460-000
05-255-240-302-460-200
05-255-240-302-530-100
05-255-240-302-530-200
05-255-256-302-460-100
05-255-256-302-460-200
05-255-256-302-530-100
05-255-256-302-530-200
05-255-256-302-821-200
05-255-257-302-530-200
05-255-258-302-460-100
05-255-258-302-530-100
05-255-258-302-530-200
05-255-260-302-460-100
05-255-260-302-460-200
05-255-260-302-530-100
05-255-260-302-530-200
05-255-260-302-821-100
05-255-260-302-821-200
05-255-371-302-460-000
05-255-371-302-520-000
05-255-371-302-530-000
05-255-371-302-555-000
$0
$0
$0
$1,213,510
$760,791
$0
$78,210
$0
$607,400
$123,710
$0
$0
$0
$0
$102,000
$0
$0
$18,367
$0
$14,815
$31,454
$0
$0
$0
$272,400
$0
$160,000
$0
$0
$0
$0
$0
April 30, 2012
Capital Budgets Curriculum Materials (continued)
Major Software Purch-Car Dev-Second Curr
Curriculum Software License Fees
Curriculum Software License Fees Secondary
Curriculum Technology Equipment
Curriculum Major Software Purchases
Curriculum Software License Fees Sec-Consult/Dev
Media Center Purchased Service Curriculum
Media Center Resources Elementary
Media Center Resources Secondary
Media Center Technology Equipment Curriculum
Media Center Software Licenses Curriculum K-12
Media Center Software Licenses Curriculum Secondary
Guidance Textbooks Curriculum Secondary
Guidance Textbooks Curriculum Elementary
05-255-371-302-556-000
05-255-605-302-821-000
05-255-605-302-821-200
05-055-610-302-555-000
05-255-610-302-556-200
05-255-610-302-821-200
05-255-620-302-305-000
05-005-620-302-470-100
05-005-620-302-470-200
05-255-620-302-555-000
05-255-620-302-821-000
05-255-620-302-821-200
05-255-710-302-460-200
05-255-712-302-460-100
Total Capital Expenditures:
Capital Expenditures Detail
English Textbooks Curriculum Elementary - 05-255-220-302-460-100
Resources (assessment kits, classroom libraries)
Leveled literacy intervention kits
English Textbooks Curriculum Secondary - 05-255-220-302-460-200
Resources with a focus on informational texts and classroom libraries
English Software License Fees Curriculum K-12 - 05-225-220-302-821-000
RtI Language Arts progress management system (gr K-12)
Health/Physical Education Textbooks Curriculum Secondary - 05-255-240-302-460-200
Health and Safety Education (gr 6-12)
Health/Physical Education Equipment Curriculum Secondary - 05-255-240-302-530-200
Health and Safety Education (gr 6-12)
Natural Sciences Textbooks Curriculum Secondary - 05-255-260-302-460-200
Science textbooks
Natural Sciences Equipment Curriculum Elementary - 05-255-260-302-530-100
Science kits (gr K-5)
Natural Sciences Equipment Curriculum Secondary - 05-255-260-302-530-200
Science equipment
Capital Expenditure Plan
68
2012-13 Capit al Budget
$0
$0
$12,800
$0
$0
$0
$0
$30,000
$30,000
$0
$89,000
$6,000
$60,160
$60,413
$3,671,030
$1,019,260
$194,250
$1,213,510
$760,791
$760,791
$78,210
$78,210
$272,400
$272,400
$160,000
$160,000
$607,400
$607,400
$123,710
$123,710
$102,000
$102,000
April 30, 2012
Capital Budgets Curriculum Materials (continued)
Career Development Textbooks Curriculum - 05-255-371-302-460-000
Forensic Science and Emergency Services
Animal Care
Hospitality Management
Curriculum Career Development Equipment - 05-255-371-302-530-000
Medical Health Careers
Music Production
Career Development Technology Equipment Curriculum - 05-255-371-302-555-000
College Pre-Engineering
EVHS Mentor Program
Animal Care
EHS Mentor Program
AVHS Mentor Program
Curriculum Software License Fees Sec-Consult/Dev - 05-255-610-302-821-200
Curriculum mapping system (gr 6-12)
Media Center Resources Elementary - 05-005-620-302-470-100
Media resources (gr K-5)
Media Center Resources Secondary - 05-005-620-302-470-200
Media resources (gr 6-12)
Media Center Software Licenses Curriculum K-12 - 05-255-620-302-821-000
Online database (gr K-12)
Media Center Software Licenses Curriculum Secondary - 05-255-620-302-821-200
Textbook management system
Guidance Textbooks Curriculum Secondary - 05-255-710-302-460-200
Curriculum resources (gr 6-12)
Guidance Textbooks Curriculum Elementary - 05-255-712-302-460-100
Curriculum resources (gr 6-12)
Total Capital Expenditures:
2012-13 Capit al Budget
$30,000
$30,000
$30,000
$30,000
$89,000
$89,000
$6,000
$6,000
$60,160
$60,160
$60,413
$60,413
$3,671,030
$13,263
$3,463
$1,641
$18,367
$13,000
$1,815
$14,815
$16,725
$7,675
$1,311
$2,611
$3,132
$31,454
$12,800
$12,800
Capital Expenditure Plan
69
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
The needs of the various District Support Departments are numerous and varied. By responding to these needs, we increase productivity, maintain a safe working environment and continue to provide effective services.
Stella Y. Johnson, Coordinator of Finance; Barb Nelson, Graphics/Mail Processing Supervisor;
Tom Pederstuen, Director of Human Resources; Jeff Solomon, Director of Finance and Operations;
Scott Gjesdahl, Purchasing/Receiving Supervisor; Mark Parr, Director of Secondary Education;
Ed Heier, Coordinator of Technology; and Randy Dukek, Coordinator of Transportation, District Office
Capital Expenditures Summary
Superintendent's Office Technology Equipment
Communications Contracted Service
Communication Technology Equipment
Graphics Operating Leases
Mail Services Operating Leases
Human Resources Contracted Service
Human Resources Technology Equipment
Finance Technology Equipment
Technology Support Major Software
Technology Support Technology Equipment
Student Information Technology Equipment
Central Receiving Equipment
Secondary Education Lease Payment Principal
Secondary Education Lease Payment Interest
Health Services Technology Equipment
Transportation Operating Leases
Transportation Bldg Acquisition/Improvements
Transportation Equipment
Transportation Technology Equipment
Transportation Major Software
Operations and Maintenance Major Software
Operations and Maintenance Lease Payment Principal
Operations and Maintenance Lease Payment Interest
05-025-020-302-555-000
05-025-107-302-305-000
05-025-107-302-555-000
05-035-120-302-370-000
05-035-125-302-370-000
05-045-135-302-305-000
05-045-135-302-555-000
05-035-140-302-555-000
05-035-145-302-556-000
05-035-145-302-555-000
05-035-147-302-555-000
05-035-150-302-530-000
05-200-211-302-580-000
05-200-211-302-581-000
05-065-720-302-555-000
05-035-760-302-370-000
05-035-760-302-520-000
05-035-760-302-530-000
05-035-760-302-555-000
05-035-760-302-556-000
05-035-810-302-556-000
05-035-810-302-580-000
05-035-810-302-581-000
$0
$0
$0
$11,691
$8,010
$0
$7,172
$4,880
$0
$0
$610
$5,100
$25,763
$1,429
$0
$3,000
$0
$8,000
$40,000
$0
$72,000
$86,640
$7,727
Total Capital Expenditures: $282,022
Capital Expenditures Detail
Graphics Operating Leases - 05-035-120-302-370-000
Canon IR 8095 copier lease
Canon IR 7200 copier lease
Canon IR c5035 copier lease
Mail Services Operating Leases - 05-035-125-302-370-000
Mailing system lease
$7,578
$1,560
$2,553
$11,691
$8,010
$8,010
Capital Expenditure Plan April 30, 2012
70
Capital Budgets District Support Departments (continued)
Human Resources Technology Equipment - 05-045-135-302-555-000
SFE Web Server (for substitute calling system)
Finance Technology Equipment - 05-035-140-302-555-000
8 Computers
Student Information Technology Equipment - 05-035-147-302-555-000
1 Computer
Central Receiving Equipment - 05-035-150-302-530-000
1 Crown electric pallet jack
Secondary Education Lease Payment Principal - 05-200-211-302-580-000
5 High school vehicles annual lease principal
Secondary Education Lease Payment Interest - 05-200-211-302-581-000
5 High school vehicles annual lease interest
Transportation Operating Leases - 05-035-760-302-370-000
Copier machine lease
Transportation Equipment - 05-035-760-302-530-000
Bus wash brushes replacement
Transportation Technology Equipment - 05-035-760-302-555-000
50 GPS bus kit tracking units
Operations and Maintenance Major Software - 05-035-810-302-556-000
Continuum software upgrade
Ccure 9000 card access system update
Operations and Maintenance Lease Payment Principal - 05-035-810-302-580-000
Equipment leases/principal
Operations and Maintenance Lease Payment Interest - 05-035-810-302-581-000
Equipment leases/interest
Total Capital Expenditures:
Capital Expenditure Plan
71
2012-13 Capit al Budget
$18,000
$54,000
$72,000
$86,640
$86,640
$7,727
$7,727
$282,022
$7,172
$7,172
$4,880
$4,880
$610
$610
$5,100
$5,100
$25,763
$25,763
$1,429
$1,429
$3,000
$3,000
$8,000
$8,000
$40,000
$40,000
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
Health and Safety funds will be used for Minnesota Department of Health inspections and remedies of cited deficiencies, playground resurfacing, machine guarding, personal protective equipment, employee training, backflow prevention, hazardous waste disposal, asbestos abatement, asbestos periodic re-inspections, State Fire Marshal inspections, and fire alarm panel inspections and upgrades. Please refer to Appendix A for additional information.
Kerry Hudgens, Health & Safety Supervisor, Facilities & Grounds, District Services Center Annex.
Capital Expenditures Summary
Physical Hazards Control
Hazardous Substances Removal
Health Safety Environmental Mgmt
Asbestos Removal
Fire Safety
05-xxx-860-347-xxx-000
05-xxx-860-349-xxx-000
05-xxx-860-352-xxx-000
05-xxx-860-358-305-000
05-xxx-860-363-xxx-000
$201,700
$69,000
$266,200
$44,800
$333,800
Total Capital Expenditures: $915,500
Capital Expenditures Detail
Physical Hazards Control - 05-xxx-860-347-xxx-000
Various projects (see appendix A)
Hazardous Substances Removal - 05-xxx-860-349-xxx-000
Various projects (see appendix A)
Health Safety Environmental Mgmt - 05-xxx-860-352-xxx-000
Various projects (see appendix A)
Asbestos Removal - 05-xxx-860-358-305-000
Various projects (see appendix A)
Fire Safety - 05-xxx-860-363-xxx-000
Various projects (see appendix A)
Total Capital Expenditures:
$201,700
$201,700
$69,000
$69,000
$266,200
$266,200
$44,800
$44,800
$333,800
$333,800
$915,500
Capital Expenditure Plan April 30, 2012
72
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
The 2012-13 major maintenance capital funds will be used for the following: district-wide building automation system and security software upgrades; a fence to enclose the dumpsters at Cedar Park Elementary; widen a sidewalk at Echo Park
Elementary; electrical building improvements at Parkview Elementary; and additional parking space at Red Pine Elementary.
Middle school expenditures include additional parking lot lighting and a power lift at Rosemount Middle School and a new Art and Wood Technology work table cabinets at Scott Highlands Middle School. The high school expenditures include: a new
Kromer field groomer, field stripper and commercial washing machine at Apple Valley High School; a new stage curtain track, box office PA system, welder, air compressor, mower blade sharpener and a water line to the stadium concession stand at
Eagan High School; a clothes dryer and metal shelves at Rosemount High School; electrical panel modifications and some district custodial equipment will be replaced at School of Environmental Studies; and playground equipment, blacktop and mulch at Cedar Valley Learning Center.
Mike Schwanke, Coordinator of Facilities and Grounds, District Office
Capital Expenditures Summary
Major Maintenance Site/Grounds Improvements
Major Maintenance Building Acquisition/Improvements
Major Maintenance Equipment
Major Maintenance Technology Equipment
05-xxx-854-302-510-000
05-xxx-854-302-520-000
05-xxx-854-302-530-000
05-xxx-854-302-555-000
$55,000
$14,500
$107,600
$0
Total Capital Expenditures: $177,100
Capital Expenditures Detail
Major Maintenance Site/Grounds Improvements - 05-xxx-854-302-510-000
Blacktop around playground (CVLC)
Remove sod/install playground with timbers/mulch (CVLC)
Fence or wall around garbage containers (CP)
Widen sidewalk on east side of building (EP)
Add parking (RP)
Expand playgrounds (RP)
Waterline to stadium concession stand (EHS)
Major Maintenance Building Acquisition/Improvements - 05-xxx-854-302-520-000
Add receptacles/light switches:3rd gr & remaining 2nd gr rms (PV)
Add more lights in front (RMS)
Perpendicular curtain track for stage (EHS)
Box office announce system (EHS)
Electrical panel modifications (SES)
$6,000
$7,800
$6,000
$7,500
$8,500
$4,200
$15,000
$55,000
$5,000
$3,000
$3,000
$2,500
$1,000
$14,500
Capital Expenditure Plan April 30, 2012
73
Capital Budgets Major Maintenance/Special Projects (continued)
Major Maintenance Equipment - 05-xxx-854-302-530-000
Playground equipment (CVLC)
Power lift (RMS)
Replace cabinets under tables in Art rooms (SHMS)
Replace cabinets under tables in Wood Technology rooms (SHMS)
Clothes dryer (RHS)
Purchase metal shelving for basement storage (RHS)
Welder Miller Matic 251 + tank and wire (Air Gas) (EHS)
Mower blade sharpener (EHS)
Kromer B200 riding field groomer (w/hose and reel) (AV)
Jaydee striper (field striper) (AV)
Washing machine (AV)
Air compressor for the grounds shop – 2 stage 60 gallons (EHS)
District wide custodial equipment
Total Capital Expenditures:
2012-13 Capit al Budget
$9,000
$6,000
$6,800
$4,400
$5,000
$2,000
$2,600
$800
$25,000
$4,500
$5,000
$1,500
$35,000
$107,600
$177,100
Capital Expenditure Plan
74
April 30, 2012
Capital Expenditure Plan
ISD 196 - Rosemount - Apple Valley - Eagan
2012-13 Capital Budget
Narrative Summary
TIES, an education technology consortium, provides the district with computer services for student accounting, staff development, human resources, payroll and financial information. These fees are calculated based on the district’s enrollment and usage.
Ed Heier, Coordinator of Technology, District Office
Capital Expenditures Summary
Technology Support License Fees 05-035-145-302-822-000 $734,400
Total Capital Expenditures:
Capital Expenditures Detail
Technology Support License Fees - 05-035-145-302-822-000
TIES fees
Total Capital Expenditures:
$734,400
$734,400
$734,400
$734,400
Capital Expenditure Plan
75
April 30, 2012
76
77
78
Facility Name ProjectName Budget
363-06-13-324-01 Fire Safety-Alarm Panel Inspections (Alternative Learning Center)
Facility Total:
$3,000.00
$3,000.00
347-01-13-397-01
347-16-13-397-01
349-03-13-397-01
363-06-13-397-01
MN Food Code Inspections
Machine Guarding/ (Apple Valley High School) Welding Shop Mac
Backflow Prevention (Apple Valley High)
Fire Safety-Alarm Panel Inspections (Apple Valley High School)
Facility Total:
$1,200.00
$4,000.00
$800.00
$5,000.00
$11,000.00
349-03-13-324-01 Backflow Prevention (ATP)
Facility Total:
$400.00
$400.00
347-01-13-232-01
349-03-13-232-01
363-06-13-232-01
MN Food Code Inspections
Backflow Prevention (Black Hawk Middle)
Fire Safety-Alarm Panel Inspections (Black Hawk Middle School)
Facility Total:
$1,500.00
$800.00
$2,000.00
$4,300.00
347-01-13-112-01
347-13-13-112-01
349-03-13-112-01
363-02-13-112-01
363-06-13-112-01
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Cedar Park Elementary)
Fire Safety-Inspections (Cedar Park Elementary)
Fire Safety-Alarm Panel Inspections (Cedar Park Elementary Scho
Facility Total:
$1,000.00
$800.00
$400.00
$1,200.00
$2,000.00
$5,400.00
347-13-13-org-01
349-03-13-ORG-01
363-06-13-org-01
Playground Resurfacing (Mulch)
Backflow Prevention (Cedar Valley Learning Center)
Fire Safety-Alarm Panel Inspections (Cedar Valley Learning Center
Facility Total:
$500.00
$400.00
$1,000.00
$1,900.00
347-01-13-225-01
349-03-13-225-01
363-06-13-225-01
MN Food Code Inspections
Backflow Prevention (Dakota Hills Middle)
Fire Safety-Alarm Panel Inspections (Dakota Hills Middle School)
Facility Total:
$1,500.00
$800.00
$3,000.00
$5,300.00
347-01-13-399-01
347-13-13-399-01
349-03-13-399-01
363-06-13-399-01
MN Food Code Inspection
Playground Resurfacing (Mulch)
Backflow Prevention (Dakota Ridge)
Fire Safety-Alarm Panel Inspections (Dakota Ridge)
Facility Total:
$700.00
$500.00
$400.00
$2,000.00
$3,600.00
79
Facility Name
347-01-13-116-01
347-01-13-116-01
347-13-13-116-01
349-03-13-116-01
363-06-13-116-01
347-01-13-110-01
347-13-13-110-01
349-03-13-110-01
363-02-13-110-01
363-06-13-110-01
349-03-13-004-01
363-06-13-004-01
349-03-13-006-01
363-06-13-006-01
349-03-13-002-01
352-18-13-002-01
352-26-13-005-01
363-06-13-002-01
349-03-13-003-01
352-18-13-003-02
363-06-13-003-01
352-18-13-006-03
ProjectName Budget
MN Food Code Inspections
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Deerwood Elementary)
Fire Safety-Alarm Panel Inspections (Deerwood Elementary School
Facility Total:
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Diamond Path Elementary)
Fire Safety-Inspections (Diamond Path Elementary School)
Fire Safety-Alarm Panel Inspections (Diamond Path Elementary Sc
Facility Total:
Backflow Prevention (District Office)
Fire Safety-Alarm Panel Inspections (District Office)
Facility Total:
Backflow Prevention (District Office East)
Fire Safety-Alarm Panel Inspections (District Office East)
Facility Total:
Backflow Prevention (District Service Center)
IAQ Sampling (annual voc testing for print room)
Food Safety Training
Fire Safety-Alarm Panel Inspections (District Service Center )
Facility Total:
Backflow Prevention (District Service Center Annex)
IAQ Sampling (Grounds Shop Exhaust Testing, DSCA)
Fire Safety-Alarm Panel Inspections (District Service Center Annex
Facility Total:
IAQ Sampling (Transportation IAQ Testing)
Facility Total:
$400.00
$1,000.00
$1,400.00
$400.00
$1,000.00
$1,000.00
$1,000.00
$3,400.00
$400.00
$2,000.00
$1,000.00
$3,400.00
$1,000.00
$1,000.00
$1,000.00
$1,000.00
$800.00
$400.00
$2,000.00
$5,200.00
$1,000.00
$800.00
$400.00
$1,200.00
$2,000.00
$5,400.00
$400.00
$1,000.00
$1,400.00
80
Facility Name
347-19-13-005-02
347-19-13-005-03
347-19-13-005-04
349-01-13-002-01
349-04-13-005-01
349-04-13-005-02
349-04-13-005-02
349-04-13-005-04
349-12-13-005-01
349-12-13-005-03
349-12-13-005-04
352-02-13-005-01
352-03-13-005-01
352-04-13-005-01
352-05-13-005-01
352-06-13-005-01
352-08-13-005-01
352-10-13-005-01
352-11-13-005-01
347-06-13-005-01
347-06-13-338-01
347-06-13-338-01
347-06-13-338-01
347-06-13-341-01
347-06-13-388-01
347-06-13-397-01
347-08-13-005-01
347-08-13-005-02
347-08-13-005-03
347-08-13-005-04
347-09-13-005-01
347-09-13-005-01
347-09-13-005-02
347-09-13-005-03
347-10-13-005-01
347-10-13-005-01
347-10-13-005-02
347-10-13-005-03
347-11-13-005-01
347-11-13-005-02
347-11-13-005-03
347-11-13-005-04
347-12-13-005-01
347-12-13-005-01
347-16-13-005-01
347-16-13-005-01
347-17-13-005-01
347-18-13-005-01
347-19-13-005-01
ProjectName
Working at Heights/Fall Protection
Working at Heights/Fall Protection
Working at Heights/Fall Protection
Working at Heights/Fall Protection
Working at Heights/Fall Protection
Working at Heights/Fall Protection
Working at Heights/Fall Protection
PPE-Foot Protection (elementary schools)
PPE-Foot Protection (middle schools)
PPE-Foot Protection (high schools)
PPE-Foot Protection (transportation)
PPE-Hand Protection (maintenance & Grounds)
PPE-Hand Protection (middle school)
PPE-Hand Protection (elementary school)
PPE-Hand Protection high school)
PPE-Eye Protection (DSCA custodial and maintenance staff)
PPE-Eye Protection (elementary schools)
PPE-Eye Protection (middle schools)
PPE-Eye Protection (high schools)
PPE-Hearing Protection (High School)
PPE-Hearing Protection (Elementary School)
PPE-Hearing Protection (Middle School)
PPE-Hearing Protection
Body Protection (Maintenance and Grounds)
Respiratory Protection/Certified Pool Operator (Middle Schools)
Machine Guarding (14 drill presses )
Machine Guarding (7 spindle sanders)
Flammable Storage Cabinets
OSHA-Aerial Lift Inspection
OSHA-Elevator Inspection (elementary schools)
OSHA-Elevator Inspection (middle schools
OSHA-Elevator Inspection (high school)
OSHA-Elevator Inspection (district offices)
UST Removal
Hazardous Waste Disposal (District Offices/Speciality Schools)
Hazardous Waste Disposal (High Schools)
Hazardous Waste Disposal (Middle Schools)
Hazardous Waste Disposal (Elementary Schools)
UST Annual Inspection
UST-Cathodic Testing (Middle Schools)
UST Annual Inspections (Elementary Schools)
AED supplies (batteries and pads)
BBP-Program Management & Training
BBP-HBV Vaccinations
CAFM-Annual Maintenance Agreement
Community Right to Know Program
Confined Space Management Program
Employee Right To Know
Health and Safety Management Assistance-Metro ECSU
81
Budget
$500.00
$500.00
$1,000.00
$1,000.00
$2,000.00
$1,500.00
$2,000.00
$2,000.00
$1,000.00
$9,700.00
$3,400.00
$3,000.00
$6,000.00
$5,000.00
$1,000.00
$7,000.00
$5,000.00
$10,000.00
$700.00
$6,000.00
$7,000.00
$3,000.00
$2,500.00
$2,500.00
$2,000.00
$2,000.00
$1,000.00
$1,000.00
$1,000.00
$1,000.00
$5,000.00
$5,000.00
$1,500.00
$10,000.00
$8,000.00
$6,000.00
$6,000.00
$6,000.00
$2,000.00
$4,000.00
$3,000.00
$7,000.00
$8,000.00
$4,000.00
$5,000.00
$2,000.00
$500.00
$3,000.00
$3,500.00
Facility Name
352-12-13-005-01
352-13-13-005-01
352-15-13-005-01
352-17-13-005-01
352-19-13-005-01
352-20-13-005-01
352-20-13-005-02
352-21-13-005-01
352-22-13-005-01
352-23-13-005-01
352-23-13-005-02
352-24-13-005-01
358-03-13-005-01
358-04-13-005-01
358-05-13-005-01
358-05-13-005-02
358-05-13-005-03
358-05-13-005-04
363-01-13-005-01
363-01-13-005-02
363-01-13-005-03
363-02-13-005-01
363-02-13-005-01
363-02-13-005-02
363-02-13-005-03
363-02-13-005-04
363-04-13-005-01
363-05-13-005-01
347-01-13-341-01
349-03-13-341-01
363-06-13-341-01
347-13-13-097-01
349-03-13-097-01
363-06-13-097-01
347-01-13-388-01
349-03-13-388-01
363-06-13-388-01
ProjectName
EMS-District Staff
EMS Equipment & Supplies
BBP/ERK Training Online
Hearing Conservation Management Program
Integrated Pest Management Program (notification only)
Electrical Safety / Lockout Tagout Management Program
Electrical Safety / Lockout Tagout Management Program
Respiratory Protection Management Program
Safety Committee Management Program
Science Lab Safety Program (High Schools)
Science Lab Safety Program (Middle Schools)
Asbestos Thrid Year Inspection Program
Asbestos Inspector Training
Asbestos Sampling (portables demolition)
Asbestos Perodic Inspection Program (High School)
Asbestos Perodic Inspection Program (Middle School)
Asbestos Perodic Inspection Program (Elementary Schools)
Asbestos Perodic Inspection Program (District Offices)
Fire Safety-Projects (Fire Marshal orders-High Schools)
Fire Safety-Projects (Fire Marshal orders-Middle Schools)
Fire Safety-Projects (Fire Marshal orders-Elementary Schools)
Fire Safety-Extinguisher Inspection/High Schools
Fire Safety-Inspections (ALC and ECLC)
Fire Safety-Extinguisher Inspection (Middle Schools)
Fire Safety-Extinguisher Inspection (Elementary Schools)
Fire Safety-Extinguisher Inspection (DO's and Specialty Bldgs.)
Fire Safety-Fire Alarm System Monitoring (Do's and Speciality Bldn
Fire Safety-Emergency Exit/Lighting Maintenance (Do's and Speci
Facility Total:
Budget
$200,000.00
$3,000.00
$3,000.00
$1,000.00
$200.00
$3,000.00
$500.00
$1,000.00
$500.00
$5,000.00
$6,000.00
$5,000.00
$500.00
$4,800.00
$3,000.00
$4,000.00
$7,000.00
$2,000.00
$9,500.00
$9,500.00
$9,500.00
$1,500.00
$1,200.00
$1,500.00
$2,500.00
$1,500.00
$5,000.00
$10,000.00
$482,000.00
MN Food Code Inspections
Backflow Prevention (Eagan High)
Fire Safety-Alarm Panel Inspections (Eagan High School)
Facility Total:
Playground Resurfacing (Mulch)
Backflow Prevention (Early Childhood Learning Center)
Fire Safety-Alarm Panel Inspections (Early Childhood Learning Ce
Facility Total:
MN Food Code Inspections
Backflow Prevention (Eastview High)
Fire Safety-Alarm Panel Inspections (Eastview High School)
Facility Total:
$1,200.00
$800.00
$5,000.00
$7,000.00
$500.00
$400.00
$1,000.00
$1,900.00
$1,200.00
$800.00
$3,000.00
$5,000.00
82
Facility Name
347-01-13-114-01
347-13-13-114-01
349-03-13-114-01
363-06-13-114-01
363-04-13-005-04
363-05-13-005-04
363-07-13-005-03
363-09-13-005-01
363-10-13-005-03
347-01-13-286-01
349-03-13-286-01
363-06-13-286-01
347-01-13-164-01
347-13-13-164-01
349-03-13-164-01
347-01-13-111-01
347-13-13-111-01
349-03-13-111-01
363-02-13-111-01
363-06-13-111-01
349-12-13-005-02
363-04-13-005-02
363-05-13-005-02
363-07-13-005-02
363-09-13-005-03
363-10-13-005-01
347-01-13-115-01
347-13-13-115-01
349-03-13-115-01
363-02-13-115-01
363-06-13-115-01
ProjectName Budget
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Echo Park Elementary)
Fire Safety-Alarm Panel Inspections (Echo Park Elementary Schoo
Facility Total:
$1,000.00
$800.00
$400.00
$2,000.00
$4,200.00
Fire Safety-Fire Alarm System Monitoring (Elementary Schools)
Fire Safety-Emergency Exit/Lighting Maintenance (Elementary Sch
Fire Safety-Annual Kitchen System Inspection (Elementary School)
Fire Safety-Annual Sprinkler Testing/Repair (Elementary Schools)
Fire Safety-Overhead Fire Door Inspections/Smoke Hatch Inspecti
Facility Total:
$10,000.00
$10,000.00
$1,000.00
$7,000.00
$3,000.00
$31,000.00
MN Food Code Inspections
Backflow Prevention (Falcon Ridge Middle)
Fire Safety-Alarm Panel Inspections (Falcon Ridge Middle School)
Facility Total:
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Glacier Hills Elementary)
Facility Total:
$1,500.00
$800.00
$2,000.00
$4,300.00
$1,000.00
$800.00
$400.00
$2,200.00
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Greenleaf Elementary)
Fire Safety-Inspections (Greenleaf Elementary School)
Fire Safety-Alarm Panel Inspections (Greenleaf Elementary School
Facility Total:
UST-Cathodic Testing (High Schools)
Fire Safety-Fire Alarm System Monitoring (High Schools)
Fire Safety-Emergency Exit/Lighting Maintenance (High Schools)
Fire Safety-Annual Kitchen System Inspection (High School)
Fire Safety-Annual Sprinkler Testing/Repair (High Schools)
Fire Safety-Overhead Fire Door Inspections/Smoke Hatch Inspecti
Facility Total:
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Highland Elementary)
Fire Safety-Inspections (Highland Elementary School)
Fire Safety-Alarm Panel Inspections (Highland Elementary School)
Facility Total:
$1,000.00
$800.00
$400.00
$1,200.00
$2,000.00
$5,400.00
$4,000.00
$10,000.00
$10,000.00
$1,000.00
$7,000.00
$5,500.00
$37,500.00
$1,000.00
$800.00
$400.00
$1,200.00
$2,000.00
$5,400.00
83
Facility Name
363-04-13-005-03
363-05-13-005-03
363-07-13-005-01
363-09-13-005-02
363-10-13-005-02
347-01-13-106-01
347-13-13-106-01
349-03-13-106-01
363-01-13-106-01
363-06-13-106-01
347-01-13-120-01
347-13-13-120-01
349-03-13-120-01
363-06-13-120-01
347-01-13-109-01
347-13-13-109-01
349-03-13-109-01
363-06-13-109-01
347-01-13-118-01
347-13-13-118-01
349-03-13-118-01
363-06-13-118-01
347-16-13-096-01
349-03-13-096-01
363-06-13-096-01
347-01-13-165-01
347-13-13-165-01
349-03-13-165-01
363-06-13-165-01
ProjectName Budget
Fire Safety-Fire Alarm System Monitoring (Middle Schools)
Fire Safety-Emergency Exit/Lighting Maintenance (Middle Schools
Fire Safety-Annual Kitchen System Inspection (Middle School)
Fire Safety-Annual Sprinkler Testing/Repair (Middle School)
Fire Safety-Overhead Fire Door Inspections/Smoke Hatch Inspecti
Facility Total:
$10,000.00
$10,000.00
$1,000.00
$7,000.00
$5,000.00
$33,000.00
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Northview Elementary)
Fire Safety-Projects (Fire Alarm System Upgrade)
Fire Safety-Alarm Panel Inspections (Northview Elementary School
Facility Total:
$1,000.00
$800.00
$400.00
$40,000.00
$2,000.00
$44,200.00
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Oakridge Elementary)
Fire Safety-Alarm Panel Inspections (Oakridge Elementary School)
Facility Total:
$1,000.00
$800.00
$400.00
$2,000.00
$4,200.00
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Parkview Elementary)
Fire Safety-Alarm Panel Inspections (Parkview Elementary School)
MN Food Code Inspections
Facility Total:
Facility Total:
$1,000.00
$800.00
$400.00
$2,000.00
$4,200.00
$1,000.00
$1,000.00
$800.00
$400.00
$2,000.00
$3,200.00
Playground Resurfacing (Mulch)
Backflow Prevention (Pinewood Elementary)
Fire Safety-Alarm Panel Inspections (Pinewood Elementary School
Facility Total:
Machine Guarding/(Rahn Cliff Learning Center) Auto and Welding
Backflow Prevention (Rahn Cliff Learning Center)
Fire Safety-Alarm Panel Inspections (Rahn Cliff Learning Center)
Facility Total:
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Red Pine Elementary)
Fire Safety-Alarm Panel Inspections (Red Pine Elementary School)
Facility Total:
$500.00
$400.00
$1,000.00
$1,900.00
$1,000.00
$800.00
$400.00
$2,000.00
$4,200.00
84
Facility Name
347-01-13-105-01
347-13-13-105-01
349-03-13-105-01
358-01-13-105-01
358-01-13-105-01
363-06-13-105-01
347-01-13-338-01
347-16-13-338-01
349-03-13-338-01
358-01-13-338-01
363-02-13-338-01
363-06-13-338-01
347-01-13-239-01
349-03-13-239-01
363-06-13-239-01
347-01-13-360-01
349-03-13-360-01
363-02-13-360-01
363-06-13-360-01
347-01-13-293-01
349-03-13-293-01
363-02-13-293-01
363-06-13-293-01
347-01-13-119-01
347-13-13-119-01
349-03-13-119-01
363-01-13-119-01
363-06-13-119-01
ProjectName Budget
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Rosemount Elementary)
Asbestos Removal (Rosemount Elementary School)
Asbestos Removal (Rosemount Elementary School)
Fire Safety-Alarm Panel Inspections (Rosemount Elementary Scho
Facility Total:
$1,000.00
$800.00
$400.00
$11,500.00
$2,000.00
$2,000.00
$17,700.00
MN Food Code Inspections
Machine Guarding/ (Rosemount High School) Auto and Welding S
Backflow Prevention (Rosemount High)
Asbestos Removal (Rosemount High School)
Fire Safety-Inspections (Rosemount High School)
Fire Safety-Alarm Panel Inspections (Rosemount High School)
Facility Total:
MN Food Code Inspections
Backflow Prevention (Rosemount Middle)
Fire Safety-Alarm Panel Inspections (Rosmount Middle School)
Facility Total:
$1,200.00
$3,000.00
$800.00
$5,000.00
$5,500.00
$5,000.00
$20,500.00
$1,500.00
$800.00
$2,000.00
$4,300.00
MN Food Code Inspections
Backflow Prevention (School of Enviromental Science)
Fire Safety-Inspections (School of Environmental Science)
Fire Safety-Alarm Panel Inspections (School of Environmental Scie
Facility Total:
$1,000.00
$800.00
$5,500.00
$3,000.00
$10,300.00
MN Food Code Inspections
Backflow Prevention (Scott Highland Middle)
Fire Safety-Inspections (Scott Highland Middle School)
Fire Safety-Alarm Panel Inspections (Scott Highland Middle School
Facility Total:
$1,500.00
$800.00
$3,200.00
$2,000.00
$7,500.00
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Shannon Park Elementary)
Fire Safety-Projects (Fire Alarm System Upgrade)
Fire Safety-Alarm Panel Inspections (Shannon Park Elementary Sc
Facility Total:
$1,000.00
$800.00
$400.00
$40,000.00
$2,000.00
$44,200.00
85
Facility Name
347-01-13-108-01
347-02-13-108-01
347-13-13-108-01
349-03-13-108-01
363-02-13-108-01
363-06-13-108-01
347-01-13-113-01
347-13-13-113-01
349-03-13-113-01
363-06-13-113-01
347-01-13-298-01
347-16-13-293-01
347-16-13-298-01
349-03-13-298-01
363-02-13-298-01
363-06-13-298-01
347-01-13-107-01
347-13-13-107-01
349-03-13-107-01
358-01-13-107-01
363-02-13-107-01
363-06-13-107-01
347-01-13-117-01
349-03-13-117-01
349-03-13-117-01
363-06-13-117-01
ProjectName Budget
MN Food Code Inspections
MDH-Food Service Deficiency Corrections-Sneeze Guards
Playground Resurfacing (Mulch)
Backflow Prevention (Southview Elementary)
Fire Safety-Inspections (Southview Elementary)
Fire Safety-Alarm Panel Inspections (Southview Elementary Schoo
Facility Total:
$1,000.00
$25,000.00
$800.00
$400.00
$1,200.00
$2,000.00
$30,400.00
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Thomas Lake Elementary)
Fire Safety-Alarm Panel Inspections (Thomas lake Elementary Sch
Facility Total:
MN Food Code Inspections
Machine Guarding/ (Rosemount Middle ) Air Handling Unit Belt Gu
Machine Guarding (Valley Middle School) Air Handling Belt Guardi
Backflow Prevention (Valley Middle)
Fire Safety-Inspections (Valley Middle School)
Fire Safety-Alarm Panel Inspections (Valley Middle School)
Facility Total:
$1,000.00
$800.00
$400.00
$2,000.00
$4,200.00
$1,500.00
$9,000.00
$7,800.00
$800.00
$3,200.00
$2,000.00
$24,300.00
MN Food Code Inspections
Playground Resurfacing (Mulch)
Backflow Prevention (Westview Elementary)
Asbestos Removal (Westview Elementary School)
Fire Safety-Inspections (Westview Elementary)
Fire Safety-Alarm Panel Inspections (Westview Elementary School
Facility Total:
$1,000.00
$800.00
$400.00
$5,000.00
$1,200.00
$2,000.00
$10,400.00
MN Food Code Inspections
Backflow Prevention (Woodland Elementary)
Backflow Prevention (Woodland Elementary)
Fire Safety-Alarm Panel Inspections (Woodland Elementary School
Facility Total:
Grand Total
$1,000.00
$400.00
$400.00
$2,000.00
$3,800.00
$915,500.00
86
87
88
Facility
870-13-05-01
870-13-05-02
870-13-05-04
872-13-397-02
873-13-397-02
875-13-397-07
877-13-397-05
879-13-397-10
880-13-397-02
882-13-397-03
884-13-397-03
877-13-232-06
877-13-232-13
874-13-112-07
883-13-112-14
874-13-225-11
875-13-225-04
875-13-225-06
875-13-225-08
875-13-225-10
879-13-225-02
883-13-225-09
872-13-399-07
873-13-399-07
Description
Surveys (Roof, Walls, Hardscape)
Consultants - Design / Engineer / Con. Adm.
Project Management
Facility Total
Ceiling tile and grid replacement
Carpet - replace 1998
Lighting fixture replacement
Mill and overlay bus drop-off, sealcoat south pathway
Diffuser repair/replacement
Repair/replace fogged windows
Replace gymnasium bleachers
Replace elevator sump
Facility Total
Crack fill main lot
Concrete sidewalk replacement
Facility Total
Replace water heater
Panic hardware replacement
Facility Total
Replace shower pedestal
Main foyer stairwell lighting replacement
Lighting replacement - academic area
Lighting replacement - gymnasium hallway
Media center lighting replacement
Replace building automation system
Doors and hardware repair/replacement
Facility Total
Classroom painting
Carpet - replace 1997 (year 1 of 2)
Facility Total
Revised Budget
$6,720.00
$437,000.00
$113,500.00
$557,220.00
$35,000.00
$104,985.00
$33,000.00
$99,771.00
$15,000.00
$2,600.00
$300,000.00
$2,000.00
$592,356.00
$2,450.00
$5,000.00
$7,450.00
$12,000.00
$5,000.00
$17,000.00
$15,000.00
$7,000.00
$10,000.00
$15,000.00
$30,000.00
$400,000.00
$16,000.00
$493,000.00
$16,000.00
$102,000.00
$118,000.00
Friday, March 23, 2012
89
871-13-05-01
872-13-05-01
873-13-05-01
874-13-05-01
875-13-05-01
875-13-05-02
876-13-05-01
877-13-05-01
878-13-05-03
879-13-05-01
880-13-05-01
881-13-05-01
882-13-05-01
883-13-05-01
884-13-05-01
884-13-05-02
885-13-05-01
Facility
878-13-116-04
881-13-116-04
883-13-116-18
Description
Repair/replace playground border
Interior lockset replacement
Replace panic hardware - main entrance
Facility Total
872-13-110-09
883-13-110-17
Ceiling tile and grid replacement
Panic hardware replacement - playground doors
Facility Total
885-13-005-05 EFIS repair
Facility Total
877-13-005-04
883-13-005-19
Mill and overlay main employee parking, N bus lot
Replace south exit door
Facility Total
Roof Repairs
Int/Ext painting and Other Finishes
Flooring repairs / replacement
Plumbing - domestic water systems
Electrical Maintenance
Lighting fixture replacements
Electronics - clocks, p.a., alarms, bells
Pavement, sidewalks, curbs
Grounds/ Athletic Fields
HVAC repairs and deferred maintenance
Window - repair / replace
Priority 1, 2, 3 upgrades
Gyms / Pools - repairs
Doors and Hardware renovations
Elevator repairs
Theater repairs
Exterior wall repair
Facility Total
Revised Budget
$10,100.00
$6,000.00
$5,000.00
$21,100.00
$52,000.00
$5,000.00
$57,000.00
$20,000.00
$20,000.00
$139,750.00
$2,700.00
$142,450.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Friday, March 23, 2012
90
Facility
874-13-341-03
875-13-341-09
876-13-341-04
877-13-341-17
879-13-341-06
879-13-341-14
883-13-341-08
885-13-341-03
872-13-388-05
872-13-388-06
873-13-388-06
879-13-388-12
879-13-388-15
882-13-388-02
883-13-388-07
872-13-114-08
877-13-114-03
880-13-114-04
883-13-114-15
872-13-286-13
873-13-286-08
883-13-286-13
872-13-164-03
872-13-164-10
883-13-164-05
883-13-164-06
878-13-111-02
Description
Water softener repairs
Replace corridor lighting
PA system repair
Tennis court repairs (50/50 city & district)
Replace refrigerant monitor
Replace cooling tower motor
Doors and hardware repair/replacement
Through wall flashing - window
Facility Total
Wallpaper replacement
Int/Ext painting and Other Finishes
Carpet - replace 1997 (year 4 of 4)
Repair/replace boiler burner controls
Replace cooling tower motor
Refinish gym floor - south aux.
Doors and hardware repair/replacement
Facility Total
Paint gymnasium
Crack fill/seal coat main lot and service lot
Replace window seals
Panic hardware replacement
Facility Total
Wallpaper replacement
Carpet - replace 1996 (year 4 of 4)
Replace door hinges
Facility Total
Paint exterior light poles
Paint window headers
Service cafeteria partition wall
Replace restroom partitions
Facility Total
Repair/replace playground border
Facility Total
Revised Budget
$15,000.00
$70,000.00
$35,000.00
$125,000.00
$12,000.00
$5,000.00
$20,000.00
$150,000.00
$432,000.00
$55,000.00
$34,000.00
$116,000.00
$15,000.00
$5,000.00
$12,000.00
$23,500.00
$260,500.00
$10,000.00
$14,961.00
$2,100.00
$5,000.00
$32,061.00
$29,000.00
$121,000.00
$3,000.00
$153,000.00
$3,000.00
$3,900.00
$10,000.00
$15,000.00
$31,900.00
$10,100.00
$10,100.00
Friday, March 23, 2012
91
Facility
874-13-115-05
876-13-115-02
871-13-106-06
879-13-106-13
877-13-120-09
878-13-109-06
883-13-109-04
874-13-118-06
877-13-118-14
878-13-118-08
879-13-118-08
883-13-118-12
876-13-165-03
871-13-105-05
877-13-105-02
877-13-105-12
879-13-105-05
Description
Victaulic fittings
Replace clock and PA system
Facility Total
Partial Roof Replacement 1993
Repair PRV's
Facility Total
Mill and overlay main all parking lots
Facility Total
Repair/replace playground border
Panic hardware replacement
Facility Total
Victaulic fittings
Mill and overlay visitor lot, overlay pathways
Playground structure repair
Replace building automation system
Mortise lock repair
Facility Total
Replace clock and PA system
Facility Total
Partial Roof Replacement 1993
Crack fill main lot
Concrete sidewalk replacement
Repair PRV's
Facility Total
$5,000.00
$53,213.00
$19,750.00
$200,000.00
$4,000.00
$281,963.00
$21,000.00
$21,000.00
$275,000.00
$525.00
$5,000.00
$7,000.00
$287,525.00
Revised Budget
$3,500.00
$21,000.00
$24,500.00
$310,000.00
$6,000.00
$316,000.00
$152,250.00
$152,250.00
$10,100.00
$5,000.00
$15,100.00
Friday, March 23, 2012
92
Facility
871-13-338-04
872-13-338-04
873-13-338-05
874-13-338-02
874-13-338-08
874-13-338-09
875-13-338-03
875-13-338-05
875-13-338-11
877-13-338-16
879-13-338-11
881-13-338-05
882-13-239-06
883-13-338-03
883-13-338-10
885-13-338-02
885-13-338-04
Description
871-13-239-03
874-13-239-10
874-13-239-12
875-13-239-14
879-13-239-04
882-13-239-07
Partial Roof Replacement 1990, 91
Cooridor ceiling tile and grid replacement
Carpet - replace 1998
Faucet repairs
Plumbing - replace restroom fixtures
Replace food lab plumbing
Replace IMC lighting
Replace switch gear
Replace circuit breaker panels (2)
Mill and overlay drive, west 1/2 of center lot
Repair/replace boiler burner controls
Interior lockset replacement
Backwash valve
Casework renovation - food lab
Doors and hardware repair/replacement
Exterior waterproofing
Penthouse wall panel
Facility Total
Partial Roof Replacement 1990, 91, 92
Replace shower pedestal
Replace water heater and storage tank
Replace master motor control panel
Replace building automation system - pool area
Retile pool
Facility Total
872-13-293-12
873-13-293-03
874-13-293-13
875-13-293-13
879-13-293-09
881-13-239-02
882-13-293-05
Ceiling Replacement
Carpet - replace 1996
Replace pumps
Lighting replacement - media hallway
Water tower coating
Interior lockset replacement
Replace chlorine meter
Facility Total
877-13-119-08
878-13-119-05
882-13-119-04
883-13-119-11
Reconstruct playground
Play structure maintenance
Replace gymnasium wall partition
Mortise lock repair
Facility Total
Friday, March 23, 2012
93
$350,000.00
$15,000.00
$50,000.00
$50,000.00
$250,000.00
$50,000.00
$765,000.00
$40,000.00
$66,000.00
$5,800.00
$20,000.00
$5,000.00
$8,000.00
$1,500.00
$146,300.00
$45,000.00
$1,100.00
$65,000.00
$4,000.00
$115,100.00
Revised Budget
$170,000.00
$56,000.00
$75,000.00
$2,400.00
$29,000.00
$4,700.00
$12,000.00
$30,000.00
$50,000.00
$190,675.00
$15,000.00
$10,000.00
$1,000.00
$19,000.00
$20,000.00
$320,000.00
$125,000.00
$1,129,775.00
Facility
877-13-108-11
878-13-108-07
872-13-113-11
880-13-113-03
883-13-113-16
873-13-298-04
874-13-298-04
875-13-298-12
877-13-298-07
878-13-298-01
879-13-298-07
883-13-298-02
871-13-107-02
879-13-107-03
881-13-117-03
Description
Crack fill/seal coat drop-off lot
Repair/replace playground border
Facility Total
Paint doors and frames in gym
Replace window seals
Panic hardware replacement
Facility Total
Carpet - replace 1998
Replace locker room mixing valve
Replace circuit breaker panel - boys locker room
Mill and overlay bus drop off (1/2 lot)
Ballfield backstops repairs
Water tower coating
Locker repairs
Facility Total
Partial Roof Replacement 1990, 92
Hydronic system repairs
Facility Total
Interior lockset replacement
Facility Total
Grand Total
Revised Budget
$4,475.00
$10,100.00
$14,575.00
$3,000.00
$1,850.00
$5,000.00
$9,850.00
$92,000.00
$1,000.00
$25,000.00
$109,625.00
$2,000.00
$5,000.00
$1,200.00
$235,825.00
$165,000.00
$7,000.00
$172,000.00
$6,000.00
$6,000.00
$6,637,900.00
Friday, March 23, 2012
94