NOTE:
• The Form of Offer and Acceptance (C1.1) is on page 69 of this document
(see also Clause F.4.5 on page 15 )
The Preferencing Schedule (HDI Participation) is on page 52 of this document
E CHINNAPPEN
EXECUTIVE DIRECTOR: TRANSPORT, ROADS AND STORMWATER
CIVIC CENTRE,
HERTZOG BOULEVARD
CAPE TOWN
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
TENDER ADVERTISED : Friday, 17 July 2009
CLARIFICATION MEETING
VENUE FOR CLARIFICATION
MEETING
CLOSING DATE
:
:
:
10h00 – 12:00 on Monday, 27 July 2009
(See next page for map of venue)
Webber Wentzel 15th Floor, Convention
Tower, Heerengracht, Foreshore, Cape Town
Friday, 21 August 2009
CLOSING TIME :
CLOSING VENUE :
5 th Floor, Tower Block, Civic Centre,
12 Hertzog Boulevard, Cape Town.
TENDER BOX 58 : The Tender Document (which includes the Form of
Offer and Acceptance) completed in all respects, plus any additional supporting documentation required, must be submitted in a sealed envelope with the name and address of the tenderer, the tender No. and title, the tender box No. and the closing date indicated on the envelope. The sealed envelope must be inserted into the appropriate official tender box before closing time. Note that Volume 2 is a returnable document and that Volume 2A is not a returnable document.
BRIEF DESCRIPTION OF TENDER
: The Control System Contract forms an integral component of the IRT system, which will supply new scheduled bus services in the City of Cape Town.
The scope of this Contract comprises of the supply and installation of electronic hardware and software systems and a six-year management and maintenance function, providing:
• Fleet management – the installation of software to operate IT equipment installed on vehicles by bus manufacturers; the communication system between vehicles and the control centre; supply of HASTUS management package for scheduling of vehicles;
• Passenger information – electronic displays on vehicles and at stations that provide information to passengers about services;
• CCTV communications – CCTV cameras on board vehicles and on stations and their linkage to the control centre;
• Control Centre – installation of control centre hardware, communications systems and software.
General Tender Information
Reference No. 25G/2009/10 i
CITY OF CAPE TOWN
TRANSPORT ROADS AND STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
Volume 1 FIDIC Conditions of Contract for Plant and Design-Build First Edition 1999
Volume 2A
Volume 2B
Returnable tender documents
Non-returnable tender document: Scope of Work, Detailed Specifications & Site
Information
Number Heading Volume
Part T1: Tendering procedures
T1.1 Tender Notice and Invitation to Tender
T1.2 Tender Data
Part T2: Returnable documents
T2.1 List of Returnable Documents
2A
2A
2A
2A
Part C1: Agreements and Contract Data
C1.1 Form of Offer and Acceptance
C1.3
C1.4
Form of Performance Security - Demand Guarantee
Occupational Health and Safety Agreement
Part C2: Pricing data
C2.1 Pricing Instructions
C2.2 Bills/Schedules of Quantities
2A
2A
2A
2A
2A
2A
Number Heading
Part C3: Scope of Work
C3.1 Description of the Works
C3.3 Installation of Works
C3.5 Training
Volume
2B
2B
2B
2B
2B
2B
Contents (Volume 2A and 2B)
Reference No. 25G/2009/10 ii
C3.8
C3.9
C3.10
C3.11
C3.12
C3.13
C3.14
C3.15
Detailed Specification: General
Detailed Specification: Onboard Systems
Detailed Specification: Control Centre
Detailed Specification: Smart Trunk Stations
Detailed Specification: Smart Feeder Station
Detailed Specification: Bus Depots
Detailed Specification: Station - Network Design
Detailed Specification: Communication
C3.17 Detailed Specification: Operations
C3.18 Glossary
Part C4: Site information
C4.1
C4.2
C4.4
C4.5
C4.6
Overview of System
The proposed IRT System (Phase 1)
Future Phases of the IRT System
The Business Structure Of The IRT System
ITS to be provided by Control Centre Contract
C4.7 Communication
Appendix A : City of Cape Tetra Radio Server Interface Specification
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
2B
Contents (Volume 2A and 2B)
Reference No. 25G/2009/10 iii
General Tender Information
Structure of Tender and Contract documents
Detailed Contents (Volume 2A)
Detailed Contents (Volume 2B)
Standard Conditions of Tender
THE TENDER
PART T1: TENDERING PROCEDURES
T1.1 TENDER NOTICE AND INVITATION TO TENDER
PART T2: RETURNABLE DOCUMENTS
T2.1 LIST OF RETURNABLE DOCUMENTS
Schedule 1:
Schedule 2:
Schedule 3:
Schedule 4:
Schedule 5:
Compulsory Enterprise Questionnaire
Certificate of Authority for Joint Ventures
Schedule of Design Experience
Schedule of Implementation Experience
Costs of Staff and other resources from RSA and overseas
Schedule 7: Details of Experience of Key Professional Personnel
Schedule 8: Tenderer’s undertaking to employ Key professional Personnel
Schedule 9: Work Plan and Timelines
Schedule 10: Details of Tenderer’s Workshop Facilities
Schedule 11: Tax Clearance Certificate
Schedule 12: Bargaining Council Certificate
Schedule 13: Financial Statements for Contracts over R10 Million
Schedule 14: Particulars of Contracts awarded to Tenderer during past five years
Schedule 15: Confirmation of WCSD Registration
Schedule 16: Health and Safety Plan
Schedule 17: Declaration in terms of the Municipal Finance Management Act
Schedule 18: Certificate for Municipal Services and Payments to Service Provider
Schedule 19: Authorisation for the Deduction of Outstanding Amounts Owed to Council 49
Schedule 20: Record of Addenda to Tender Documents (Annex K) 50
Schedule 21: Deviations and Qualifications by Tenderer 51
44
45
46
47
48
33
38
39
40 v vii
Page
No. i ii iv
1
2
4
19
20
22
23
25
26
28
30
32
41
42
43
Detailed Contents (Volume 2A and 2B)
Reference No. 25G/2009/10 iv
Schedule 22: Preferencing Schedule (where preferences are granted in respect of HDI
Participation)
Schedule 23: Correspondence with Bus Manufacturers
Schedule 24: Technical Data Sheets
Schedule 25: Price Basis for Imported Equipment (see Part C2 Pricing Data)
THE CONTRACT
PART C1: AGREEMENTS AND CONTRACT DATA (VOLUME 2A)
C1.1 FORM OF OFFER AND ACCEPTANCE
Offer
Acceptance
General Conditions of Contract
Part 1: Contract Data completed by the Employer
Part 2: Contract Data completed by the Contractor
Additional Conditions of Contract
Employer’s Requirements referred to in Conditions of Contract
C1.3 FORM OF PERFORMANCE SECURITY – DEMAND GUARANTEE
Annexure
C1.4 OCCUPATIONAL HEALTH AND SAFETY AGREEMENT
Occupational Health and Safety Conditions
PART C2: PRICING DATA (VOLUME 2A)
Returnable Schedule 25: Price Basis for Imported Equipment
52
58
59
67
68
69
73
102
100
104
105
108
Declaration (In respect of completeness of Tender)
Detailed Contents (Volume 2A and 2B)
Reference No. 25G/2009/10 v
PART C3: SCOPE OF WORK
PART C4: SITE INFORMATION
PART C3: SCOPE OF WORK (VOLUME 2B)
C3.1 Description of the Works
C3.3 Installation of Works
C3.4 Testing and Commissioning
C3.5 Training
C3.6 Project Management
C3.7 Maintenance, Upgrades and Warranties
C3.8 Detailed Specifications: General
C3.9 Detailed Specifications: Onboard Systems
C3.10 Detailed Specifications: Control Centre
C3.11 Detailed Specifications: Smart Trunk Station
C3.12 Detailed Specifications: Smart Feeder Station
C3.13 Detailed Specifications: Bus Depots
C3.14 Detailed Specifications: Station Network Design
C3.14 Detailed Specifications: Communication
C3.15 Detailed Specifications: Maintenance
C3.16 Detailed Specifications: Operations
C3.17 Glossary
PART C4: SITE INFORMATION (VOLUME 2B)
C4.2 The proposed IRT System (Phase 1)
C4.4 Future Phases of the IRT System
C4.5 Description of Business Model
C4.6 ITS to be provided by Control Centre Contract
C4.7 Communication
Detailed Contents (Volume 2A and 2B)
Reference No. 25G/2009/10 vi
Page
No.
66
68
69
73
28
42
60
64
81
82
18
21
22
24
1
5
12
14
107
86
87
CITY OF CAPE TOWN
TRANSPORT ROADS AND STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF IRT
CONTROL CENTRE INSTALLATION AND MAINTENANCE
The Standard Conditions of Tender are contained in Annex F of Board Notice 12 of 2009 in Government Gazette
No. 31823 of 30 January 2009, Construction Industry Development Board (CIDB) Standard for Uniformity in
Construction Procurement (see www.cidb.org.za
), and are reproduced without amendment or alteration for the convenience of tenderers as an Annex attached hereto.
The following Annex is attached hereto :
Annex F Page
(Normative)
No.
Standard Conditions of Tender
F.1 General obligations
F.3 The viii x xii
Tender Data
The Tenderer’s attention is drawn to the tender data in Part T1.2 Tender Data for details that apply specifically to this tender.
Standard Conditions of Tender
Reference No. 25G/2009/10 vii
Annex F
(normative)
Standard Conditions of Tender
F.1.1 Actions
F.1.1.1 The employer and each tenderer submitting a tender offer shall comply with these conditions of tender. In their dealings with each other, they shall discharge their duties and obligations as set out in F.2 and F.3, timeously and with integrity, and behave equitably, honestly and transparently, comply with all legal obligations and not engage in anticompetitive practices.
F.1.1.2 The employer and the tenderer and all their agents and employees involved in the tender process shall avoid conflicts of interest and where a conflict of interest is perceived or known, declare any such conflict of interest, indicating the nature of such conflict. Tenderers shall declare any potential conflict of interest in their tender submissions. Employees, agents and advisors of the employer shall declare any conflict of interest to whoever is responsible for overseeing the procurement process at the start of any deliberations relating to the procurement process or as soon as they become aware of such conflict, and abstain from any decisions where such conflict exists or recuse themselves from the procurement process, as appropriate.
Note: 1) A conflict of interest may arise due to a conflict of roles which might provide an incentive for improper acts in some circumstances. A conflict of interest can create an appearance of impropriety that can undermine confidence in the ability of that person to act properly in his or her position even if no improper acts result.
2) Conflicts of interest in respect of those engaged in the procurement process include direct, indirect or family interests in the tender or outcome of the procurement process and any personal bias, inclination, obligation, allegiance or loyalty which would in any way affect any decisions taken.
F.1.1.3 The employer shall not seek and a tenderer shall not submit a tender without having a firm intention and the capacity to proceed with the contract.
F.1.2 Tender Documents
The documents issued by the employer for the purpose of a tender offer are listed in the tender data.
F.1.3 Interpretation
F.1.3.1
The tender data and additional requirements contained in the tender schedules that are included in the returnable documents are deemed to be part of these conditions of tender.
F.1.3.2
These conditions of tender, the tender data and tender schedules which are only required for tender evaluation purposes, shall not form part of any contract arising from the invitation to tender.
F.1.3.3 For the purposes of these conditions of tender, the following definitions apply: a) conflict of interest means any situation in which: i) someone in a position of trust has competing professional or personal interests which make it difficult to fulfill his or her duties impartially; ii) an individual or organisation is in a position to exploit a professional or official capacity in some way for their personal or corporate benefit; or iii) incompatibility or contradictory interests exist between an employee and the organisation which b) employs that employee.
comparative means the tenderer’s financial offer after all tendered parameters that will affect the value of the financial offer have been taken into consideration in order to enable comparisons to be c) made between offers on a comparative basis practice offering, giving, receiving or soliciting of anything of value to influence the action of the employer or his staff or agents in the tender process; and d) fraudulent practice means the misrepresentation of the facts in order to influence the tender process or the award of a contract arising from a tender offer to the detriment of the employer, including collusive practices intended to establish prices at artificial levels e) organization or not, or a public body f) quality means the totality of features and characteristics of a product or service that bear on its ability to satisfy stated or implied needs.
Annex F
Reference No. 25G/2009/10 viii
F.1.4 Communication and employer’s agent
Each communication between the employer and a tenderer shall be to or from the employer's agent only, and in a form that can be readily read, copied and recorded. Communication shall be in the English language. The employer shall not take any responsibility for non-receipt of communications from or by a tenderer. The name and contact details of the employer’s agent are stated in the tender data.
F.1.5 The employer’s right to accept or reject any tender offer
F.1.5.1
The employer may accept or reject any variation, deviation, tender offer, or alternative tender offer, and may cancel the tender process and reject all tender offers at any time before the formation of a contract. The employer shall not accept or incur any liability to a tenderer for such cancellation and rejection, but will give written reasons for such action upon written request to do so.
F.1.5.2
The employer may not subsequent to the cancellation or abandonment of a tender process or the rejection of all responsive tender offers re-issue a tender covering substantially the same scope of work within a period of six months unless only one tender was received and such tender was returned unopened to the tenderer.
F.1.6 Procurement
F.1.6.1 General
Unless otherwise stated in the tender data, a contract will, subject to F.3.13, be concluded with the tenderer who in terms of F.3.11 is the highest ranked or the tenderer scoring the highest number of tender evaluation points, as relevant, based on the tender submissions that are received at the closing time for tenders.
F.1.6.2.1 Where the tender data require that the competitive negotiation procedure is to be followed, tenderers shall submit tender offers in response to the proposed contract in the first round of submissions. Notwithstanding the requirements of F.3.4, the employer shall announce only the names of the tenderers who make a submission.
The requirements of F.3.8 relating to the material deviations or qualifications which affect the competitive position of tenderers shall not apply.
F.1.6.2.2 All responsive tenderers, or not less than three responsive tenderers that are highest ranked in terms of the evaluation method and evaluation criteria stated in the tender data, shall be invited in each round to enter into competitive negotiations, based on the principle of equal treatment and keeping confidential the proposed solutions and associated information. Notwithstanding the provisions of F.2.17, the employer may request that tenders be clarified, specified and fine-tuned in order to improve a tenderer's competitive position provided that such clarification, specification, fine-tuning or additional information does not alter any fundamental aspects of the offers or impose substantial new requirements which restrict or distort competition or have a discriminatory effect.
F.1.6.2.3
At the conclusion of each round of negotiations, tenderers shall be invited by the employer to make a fresh tender offer, based on the same evaluation criteria, with or without adjusted weightings. Tenderers shall be advised when they are to submit their best and final offer.
F.1.6.2.4 The contract shall be awarded in accordance with the provisions of F.3.11 and F.3.13 after tenderers have been requested to submit their best and final offer.
F.1.6.3 Proposal procedure using the two stage-system
F.1.6.3.1 Option 1
Tenderers shall in the first stage submit technical proposals and, if required, cost parameters around which a contract may be negotiated. The employer shall evaluate each responsive submission in terms of the method of evaluation stated in the tender data, and in the second stage negotiate a contract with the tenderer scoring the highest number of evaluation points and award the contract in terms of these conditions of tender.
F.1.6.3.2 Option 2
F.1.6.3.2.1 Tenderers shall submit in the first stage only technical proposals. The employer shall invite all responsive tenderers to submit tender offers in the second stage, following the issuing of procurement documents.
F.1.6.3.2.2 The employer shall evaluate tenders received during the second stage in terms of the method of evaluation stated in the tender data, and award the contract in terms of these conditions of tender.
Annex F
Reference No. 25G/2009/10 ix
F.2.1 Eligibility
F.2.1.1
Submit a tender offer only if the tenderer satisfies the criteria stated in the tender data and the tenderer, or any of his principals, is not under any restriction to do business with employer.
F.2.1.2 Notify the employer of any proposed material change in the capabilities or formation of the tendering entity
(or both) or any other criteria which formed part of the qualifying requirements used by the employer as the basis in a prior process to invite the tenderer to submit a tender offer and obtain the employer's written approval to do so prior to the closing time for tenders.
F.2.2 Cost of tendering
Accept that, unless otherwise stated in the tender data, the employer will not compensate the tenderer for any costs incurred in the preparation and submission of a tender offer, including the costs of any testing necessary to demonstrate that aspects of the offer complies with requirements.
F.2.3 Check documents
Check the tender documents on receipt for completeness and notify the employer of any discrepancy or omission.
F.2.4 Confidentiality and copyright of documents
Treat as confidential all matters arising in connection with the tender. Use and copy the documents issued by the employer only for the purpose of preparing and submitting a tender offer in response to the invitation.
F.2.5 Reference documents
Obtain, as necessary for submitting a tender offer, copies of the latest versions of standards, specifications, conditions of contract and other publications, which are not attached but which are incorporated into the tender documents by reference.
F.2.6 Acknowledge addenda
Acknowledge receipt of addenda to the tender documents, which the employer may issue, and if necessary apply for an extension to the closing time stated in the tender data, in order to take the addenda into account.
F.2.7 Clarification meeting
Attend, where required, a clarification meeting at which tenderers may familiarize themselves with aspects of the proposed work, services or supply and raise questions. Details of the meeting(s) are stated in the tender data.
F.2.8 Seek clarification
Request clarification of the tender documents, if necessary, by notifying the employer at least five working days before the closing time stated in the tender data.
F.2.9 Insurance
Be aware that the extent of insurance to be provided by the employer (if any) might not be for the full cover required in terms of the conditions of contract identified in the contract data. The tenderer is advised to seek qualified advice regarding insurance.
F.2.10 Pricing the tender offer
F.2.10.1
Include in the rates, prices, and the tendered total of the prices (if any) all duties, taxes (except Value
Added Tax (VAT), and other levies payable by the successful tenderer, such duties, taxes and levies being those applicable 14 days before the closing time stated in the tender data.
F.2.10.2
Show VAT payable by the employer separately as an addition to the tendered total of the prices.
F.2.10.3
Provide rates and prices that are fixed for the duration of the contract and not subject to adjustment except as provided for in the conditions of contract identified in the contract data.
F.2.10.4
State the rates and prices in Rand unless instructed otherwise in the tender data. The conditions of contract identified in the contract data may provide for part payment in other currencies.
Annex F
Reference No. 25G/2009/10 x
F.2.11 Alterations to documents
Do not make any alterations or additions to the tender documents, except to comply with instructions issued by the employer, or necessary to correct errors made by the tenderer. All signatories to the tender offer shall initial all such alterations. Erasures and the use of masking fluid are prohibited.
F.2.12 Alternative tender offers
F.2.12.1
Unless otherwise stated in the tender data submit alternative tender offers only if a main tender offer, strictly in accordance with all the requirements of the tender documents, is also submitted. The alternative tender offer is to be submitted with the main tender offer together with a schedule that compares the requirements of the tender documents with the alternative requirements the tenderer proposes.
F.2.12.2
Accept that an alternative tender offer may be based only on the criteria stated in the tender data or criteria otherwise acceptable to the employer.
F.2.13 Submitting a tender offer
F.2.13.1
Submit one tender offer only, either as a single tendering entity or as a member in a joint venture to provide the whole of the works, services or supply identified in the contract data and described in the scope of works, unless stated otherwise in the tender data.
F.2.13.2
Return all returnable documents to the employer after completing them in their entirety, either electronically (if they were issued in electronic format) or by writing legibly in non-erasable ink.
F.2.13.3
Submit the parts of the tender offer communicated on paper as an original plus the number of copies stated in the tender data, with an English translation of any documentation in a language other than English, and the parts communicated electronically in the same format as they were issued by the employer.
F.2.13.4
Sign the original and all copies of the tender offer where required in terms of the tender data. The employer will hold all authorized signatories liable on behalf of the tenderer. Signatories for tenderers proposing to contract as joint ventures shall state which of the signatories is the lead partner whom the employer shall hold liable for the purpose of the tender offer.
F.2.13.5
Seal the original and each copy of the tender offer as separate packages marking the packages as
"ORIGINAL" and "COPY". Each package shall state on the outside the employer's address and identification details stated in the tender data, as well as the tenderer's name and contact address.
F.2.13.6
Where a two-envelope system is required in terms of the tender data, place and seal the returnable documents listed in the tender data in an envelope marked “financial proposal” and place the remaining returnable documents in an envelope marked “technical proposal”. Each envelope shall state on the outside the employer’s address and identification details stated in the tender data, as well as the tenderer's name and contact address.
F.2.13.7
Seal the original tender offer and copy packages together in an outer package that states on the outside only the employer's address and identification details as stated in the tender data.
F.2.13.8
Accept that the employer shall not assume any responsibility for the misplacement or premature opening of the tender offer if the outer package is not sealed and marked as stated.
F.2.13.9 Accept that tender offers submitted by facsimile or e-mail will be rejected by the employer, unless stated otherwise in the tender data.
F.2.14 Information and data to be completed in all respects
Accept that tender offers, which do not provide all the data or information requested completely and in the form required, may be regarded by the employer as non-responsive.
F.2.15 Closing time
F.2.15.1 Ensure that the employer receives the tender offer at the address specified in the tender data not later than the closing time stated in the tender data. Accept that proof of posting shall not be accepted as proof of delivery.
F.2.15.2
Accept that, if the employer extends the closing time stated in the tender data for any reason, the requirements of these conditions of tender apply equally to the extended deadline.
Annex F
Reference No. 25G/2009/10 xi
F.2.16 Tender offer validity
F.2.16.1
Hold the tender offer(s) valid for acceptance by the employer at any time during the validity period stated in the tender data after the closing time stated in the tender data.
F.2.16.2
If requested by the employer, consider extending the validity period stated in the tender data for an agreed additional period with or without any conditions attached to such extension.
F.2.16.3
Accept that a tender submission that has been submitted to the employer may only be withdrawn or substituted by giving the employer's agent written notice before the closing time for tenders that a tender is to be withdrawn or substituted.
F.2.16.4 Where a tender submission is to be substituted, submit a substitute tender in accordance with the requirements of F.2.13 with the packages clearly marked as "SUBSTITUTE".
F.2.17 Clarification of tender offer after submission
Provide clarification of a tender offer in response to a request to do so from the employer during the evaluation of tender offers. This may include providing a breakdown of rates or prices and correction of arithmetical errors by the adjustment of certain rates or item prices (or both). No change in the competitive position of tenderers or substance of the tender offer is sought, offered, or permitted.
Note: Sub-clause F.2.17 does not preclude the negotiation of the final terms of the contract with a preferred tenderer following a competitive selection process, should the Employer elect to do so.
F.2.18 Provide other material
F.2.18.1
Provide, on request by the employer, any other material that has a bearing on the tender offer, the tenderer’s commercial position (including notarized joint venture agreements), preferencing arrangements, or samples of materials, considered necessary by the employer for the purpose of a full and fair risk assessment.
Should the tenderer not provide the material, or a satisfactory reason as to why it cannot be provided, by the time for submission stated in the employer’s request, the employer may regard the tender offer as non-responsive.
F.2.18.2
Dispose of samples of materials provided for evaluation by the employer, where required.
F.2.19 Inspections, tests and analysis
Provide access during working hours to premises for inspections, tests and analysis as provided for in the tender data.
F.2.20 Submit securities, bonds, policies, etc.
If requested, submit for the employer’s acceptance before formation of the contract, all securities, bonds, guarantees, policies and certificates of insurance required in terms of the conditions of contract identified in the contract data.
F.2.21 Check final draft
Check the final draft of the contract provided by the employer within the time available for the employer to issue the contract.
F.2.22 Return of other tender documents
If so instructed by the employer, return all retained tender documents within 28 days after the expiry of the validity period stated in the tender data.
F.2.23 Certificates
Include in the tender submission or provide the employer with any certificates as stated in the tender data.
F.3.1 Respond to requests from the tenderer
F.3.1.1
Unless otherwise stated in the Tender Data, respond to a request for clarification received up to five working days before the tender closing time stated in the Tender Data and notify all tenderers who drew procurement documents.
Annex F
Reference No. 25G/2009/10 xii
F.3.1.2
Consider any request to make a material change in the capabilities or formation of the tendering entity (or both) or any other criteria which formed part of the qualifying requirements used to prequalify a tenderer to submit a tender offer in terms of a previous procurement process and deny any such request if as a consequence: a) an individual firm, or a joint venture as a whole, or any individual member of the joint venture fails to meet any of the collective or individual qualifying requirements; b) the new partners to a joint venture were not prequalified in the first instance, either as individual firms or as another joint venture; or c) in the opinion of the Employer, acceptance of the material change would compromise the outcome of the prequalification process.
F.3.2 Issue Addenda
If necessary, issue addenda that may amend or amplify the tender documents to each tenderer during the period from the date the tender documents are available until three working days before the tender closing time stated in the Tender Data. If, as a result a tenderer applies for an extension to the closing time stated in the Tender Data, the Employer may grant such extension and, shall then notify all tenderers who drew documents.
F.3.3 Return late tender offers
Return tender offers received after the closing time stated in the Tender Data, unopened, (unless it is necessary to open a tender submission to obtain a forwarding address), to the tenderer concerned.
F.3.4 Opening of tender submissions
F.3.4.1
Unless the two-envelope system is to be followed, open valid tender submissions in the presence of tenderers’ agents who choose to attend at the time and place stated in the tender data. Tender submissions for which acceptable reasons for withdrawal have been submitted will not be opened.
F.3.4.2 Announce at the meeting held immediately after the opening of tender submissions, at a venue indicated in the tender data, the name of each tenderer whose tender offer is opened and, where applicable, the total of his prices, preferences claimed and time for completion for the main tender offer only.
F.3.4.3
Make available the record outlined in F.3.4.2 to all interested persons upon request.
F.3.5
Two-envelope system
F.3.5.1
Where stated in the tender data that a two-envelope system is to be followed, open only the technical proposal of valid tenders in the presence of tenderers’ agents who choose to attend at the time and place stated in the tender data and announce the name of each tenderer whose technical proposal is opened.
F.3.5.2
Evaluate the quality of the technical proposals offered by tenderers, then advise tenderers who remain in contention for the award of the contract of the time and place when the financial proposals will be opened. Open only the financial proposals of tenderers, who score in the quality evaluation more than the minimum number of points for quality stated in the tender data, and announce the score obtained for the technical proposals and the total price and any preferences claimed. Return unopened financial proposals to tenderers whose technical proposals failed to achieve the minimum number of points for quality.
F.3.6 Non-disclosure
Not disclose to tenderers, or to any other person not officially concerned with such processes, information relating to the evaluation and comparison of tender offers, the final evaluation price and recommendations for the award of a contract, until after the award of the contract to the successful tenderer.
F.3.7 Grounds for rejection and disqualification
Determine whether there has been any effort by a tenderer to influence the processing of tender offers and instantly disqualify a tenderer (and his tender offer) if it is established that he engaged in corrupt or fraudulent practices.
F.3.8 Test for responsiveness
F.3.8.1 Determine, after opening and before detailed evaluation, whether each tender offer properly received: a) Complies with the requirements of these Conditions of Tender, b) has been properly and fully completed and signed, and c) is responsive to the other requirements of the tender documents.
Annex F
Reference No. 25G/2009/10 xiii
F.3.8.2
A responsive tender is one that conforms to all the terms, conditions, and specifications of the tender documents without material deviation or qualification. A material deviation or qualification is one which, in the
Employer's opinion, would: a) detrimentally affect the scope, quality, or performance of the works, services or supply identified in the Scope of Work, b) significantly change the Employer's or the tenderer's risks and responsibilities under the contract, or c) affect the competitive position of other tenderers presenting responsive tenders, if it were to be rectified.
Reject a non-responsive tender offer, and not allow it to be subsequently made responsive by correction or withdrawal of the non-conforming deviation or reservation.
F.3.9 Arithmetical errors, omissions and discrepancies
F.3.9.1 Check responsive tenders for discrepancies between amounts in words and amounts in figures. Where there is a discrepancy between the amounts in figures and the amount in words, the amount in words shall govern.
F.3.9.2 Check the highest ranked tender or tenderer with the highest number of tender evaluation points after the evaluation of tender offers in accordance with F.3.11 for: a) b) c) the gross misplacement of the decimal point in any unit rate; omissions made in completing the pricing schedule or bills of quantities; or arithmetic errors in: i) line item totals resulting from the product of a unit rate and a quantity in bills of quantities or schedules of prices; or ii) the summation of the prices.
F.3.9.3 Notify the tenderer of all errors or omissions that are identified in the tender offer and either confirm the tender offer as tendered or accept the corrected total of prices.
F.3.9.4 Where the tenderer elects to confirm the tender offer as tendered, correct the errors as follows: a) If bills of quantities or pricing schedules apply and there is an error in the line item total resulting from the product of the unit rate and the quantity, the line item total shall govern and the rate shall be b) corrected. Where there is an obviously gross misplacement of the decimal point in the unit rate, the line item total as quoted shall govern, and the unit rate shall be corrected.
Where there is an error in the total of the prices either as a result of other corrections required by this checking process or in the tenderer's addition of prices, the total of the prices shall govern and the tenderer will be asked to revise selected item prices (and their rates if bills of quantities apply) to achieve the tendered total of the prices.
F.3.10 Clarification of a tender offer
Obtain clarification from a tenderer on any matter that could give rise to ambiguity in a contract arising from the tender offer.
F.3.11 Evaluation of tender offers
F.3.11.1 General
Appoint an evaluation panel of not less than three persons. Reduce each responsive tender offer to a comparative offer and evaluate them using the tender evaluation methods and associated evaluation criteria and weightings that are specified in the tender data.
F.3.11.2 Method 1: Financial offer
In the case of a financial offer: a) b)
Rank tender offers from the most favourable to the least favourable comparative offer.
Recommend the highest ranked tenderer for the award of the contract, unless there are compelling and c) justifiable reasons not to do so.
Re-rank all tenderers should there be compelling and justifiable reasons not to recommend the highest ranked tenderer and recommend the highest ranked tenderer, unless there are compelling and justifiable reasons not to do so and the process set out in this subclause is repeated.
F.3.11.3 Method 2: Financial offer and preference
In the case of a financial offer and preferences:
Annex F
Reference No. 25G/2009/10 xiv
a) b)
Score each tender in respect of the financial offer made and preferences claimed, if any, in accordance with the provisions of F.3.11.7 and F.3.11.8.
Calculate the total number of tender evaluation points
(T
EV
) in accordance with the following formula: c) d) e)
T
EV
= N
FO
+ N
P where: N
FO is the number of tender evaluation points awarded for the financial offer made in accordance with F.3.11.7;
N
P
is the number of tender evaluation points awarded for preferences claimed in accordance with F.3.11.8.
Rank tender offers from the highest number of tender evaluation points to the lowest.
Recommend the tenderer with the highest number of tender evaluation points for the award of the contract, unless there are compelling and justifiable reasons not to do so.
Rescore and re-rank all tenderers should there be compelling and justifiable reasons not to recommend the tenderer with the highest number of tender evaluation points, and recommend the tenderer with the highest number of tender evaluation points, unless there are compelling and justifiable reasons not to do so and the process set out in this subclause is repeated.
F.3.11.4 Method 3: Financial offer and quality
In the case of a financial offer and quality: a) b)
Score each tender in respect of the financial offer made and the quality offered in accordance with the provisions of F.3.11.7 and F.3.11.9, rejecting all tender offers that fail to score the minimum number of points for quality stated in the tender data, if any.
Calculate the total number of tender evaluation points (T
EV
) in accordance with the following formula:
T
EV
= N
FO
+ N
Q where: N
FO is the number of tender evaluation points awarded for the financial offer made in accordance with F.3.11.7;
N
Q is the number of tender evaluation points awarded for quality offered in accordance with
F.3.11.9. c) d) e) c) d) e)
Rank tender offers from the highest number of tender evaluation points to the lowest.
Recommend tenderer with the highest number of tender evaluation points for the award of the contract, unless there are compelling and justifiable reasons not to do so.
Rescore and re-rank all tenderers should there be compelling and justifiable reasons not to recommend the tenderer with the highest number of tender evaluation points and recommend the tenderer with the highest number of tender evaluation points, unless there are compelling and justifiable reasons not to do so and the process set out in this subclause is repeated.
F.3.11.5 Method 4: Financial offer, quality and preferences
In the case of a financial offer, quality and preferences: a) Score each tender in respect of the financial offer made, preference claimed, if any, and the quality offered in accordance with the provisions of F.3.11.7 to F.3.11.9, rejecting all tender offers that fail to b) score the minimum number of points for quality stated in the tender data, if any.
Calculate the total number of tender evaluation points (T
Ev unless otherwise stated in the Tender Data:
) in accordance with the following formula,
T
EV
= N
FO
+ N
P +
N
Q where: N
FO is the number of tender evaluation points awarded for the financial offer made in accordance with F.3.11.7;
N p is the number of tender evaluation points awarded for preferences claimed in accordance with F.3.11.8;
N
Q
is the number of tender evaluation points awarded for quality offered in accordance with
F.3.11.9.
Rank tender offers from the highest number of tender evaluation points to the lowest.
Recommend the tenderer with the highest number of tender evaluation points for the award of the contract, unless there are compelling and justifiable reasons not to do so.
Rescore and re-rank all tenderers should there be compelling and justifiable reasons not to recommend the tenderer with the highest number of tender evaluation points and recommend the tenderer with the highest number of tender evaluation points, unless there are compelling and justifiable reasons not to do so and the process set out in this subclause is repeated.
Annex F
Reference No. 25G/2009/10 xv
F.3.11.6 Decimal places
Score financial offers, preferences and quality, as relevant, to two decimal places.
F.3.11.7 Scoring Financial Offers
Score the financial offers of remaining responsive tender offers using the following formula:
N
FO
= W
1
x A where:
N
FO is the number of tender evaluation points awarded for the financial offer. is the maximum possible number of tender evaluation points awarded for the financial W
1 offer as stated in the Tender Data.
A is a number calculated using the formula and option described in Table F.l as stated in the
Tender Data.
Table F.1: Formulae for calculating the value of A
Formula
1
Comparison aimed at achieving
Highest price or discount
Option 1 a
A = P/Pm A = (1 + (P - Pm))
Pm
2 A = Pm/P commission/ fee Pm a
Pm is the comparative offer of the most favourable comparative offer.
P is the comparative offer of the tender offer under consideration.
F.3.11.8 Scoring preferences
Confirm that tenderers are eligible for the preferences claimed in accordance with the provisions of the tender data and reject all claims for preferences where tenderers are not eligible for such preferences.
Calculate the total number of tender evaluation points for preferences claimed in accordance with the provisions of the tender data.
F.3.11.9 Scoring quality
Score each of the criteria and subcriteria for quality in accordance with the provisions of the Tender Data.
Calculate the total number of tender evaluation points for quality using the following formula:
N
Q
= W
2
x S
O
/M
S where:
S
O is the score for quality allocated to the submission under consideration;
M s
is the maximum possible score for quality in respect of a submission; and
W
2 is the maximum possible number of tender evaluation points awarded for the quality as stated in the tender data.
F.3.12 Insurance provided by the employer
If requested by the proposed successful tenderer, submit for the tenderer's information the policies and/or certificates of insurance which the conditions of contract identified in the contract data, require the employer to provide.
F.3.13 Acceptance of tender offer
Accept the tender offer, if in the opinion of the employer, it does not present any unacceptable commercial risk and only if the tenderer: a) is not under restrictions, or has principals who are under restrictions, preventing participating in the employer's procurement,
Annex F
Reference No. 25G/2009/10 xvi
b) c) d) can, as necessary and in relation to the proposed contract, demonstrate that he or she possesses the professional and technical qualifications, professional and technical competence, financial resources, equipment and other physical facilities, managerial capability, reliability, experience and reputation, expertise and the personnel, to perform the contract, has the legal capacity to enter into the contract, is not insolvent, in receivership, bankrupt or being wound up, has his affairs administered by a court or a judicial officer, has suspended his business activities, or is subject to legal proceedings in respect of any of the foregoing, complies with the legal requirements, if any, stated in the tender data, and is able, in the opinion of the employer, to perform the contract free of conflicts of interest. e) f)
F.3.14 Prepare contract documents
F.3.14.1
If necessary, revise documents that shall form part of the contract and that were issued by the employer as part of the tender documents to take account of: a) addenda issued during the tender period, b) inclusion of some of the returnable documents, c) other revisions agreed between the employer and the successful tenderer.
F.3.14.2
Complete the schedule of deviations attached to the form of offer and acceptance, if any.
F.3.15 Complete adjudicator's contract
Unless alternative arrangements have been agreed or otherwise provided for in the contract, arrange for both parties to complete formalities for appointing the selected adjudicator at the same time as the main contract is signed.
F.3.16 Notice to unsuccessful tenderers
F.3.16.1 Notify the successful tenderer of the employer’s acceptance of his tender offer by completing and returning one copy of the form of offer and acceptance before the expiry of the validity period stated in the tender data, or agreed additional period.
F.3.16.2
After the successful tenderer has been notified of the employer’s acceptance of the tender, notify other tenderers that their tender offers have not been accepted.
F.3.17 Provide copies of the contracts
Provide to the successful tenderer the number of copies stated in the Tender Data of the signed copy of the contract as soon as possible after completion and signing of the form of offer and acceptance.
F.3.18 Provide written reasons for actions taken
Provide upon request written reasons to tenderers for any action that is taken in applying these conditions of tender, but withhold information which is not in the public interest to be divulged, which is considered to prejudice the legitimate commercial interests of tenderers or might prejudice fair competition between tenderers.
Annex F
Reference No. 25G/2009/10 xvii
Pages
T1.1 Tender Notice and Invitation to Tender.................................................. 2
T1.2 Tender Data ........................................................................................4 – 18
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1
Tendering procedures
CITY OF CAPE TOWN
TRANSPORT ROADS AND STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
The
CITY OF CAPE TOWN
,
TRANSPORT ROADS AND STORMWATER
, invites tenders for
TENDER NO.
25G/2009/10: DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
Tenderers must be registered on the Western City of Cape Town’s SAP Vender Database.
Tenderers who are not registered on the City of CapeTown’s Database are not precluded from submitting tenders, but must be registered prior to the evaluation of tenders in order for their tenders to be responsive.
Preferences are offered to tenderers who tender a contract participation goal in respect of Historically
Disadvantaged Individuals (HDI) Participation.
The physical address for collection of tender documents is:
Tender Office, 5 th Floor, Tower Block, Civic Centre, 12 Hertzog Boulevard, Cape Town.
Documents may be collected during working hours between 08:30 – 13:00 and 14:00 – 16:00 from Friday, 17
July 2009.
A non-refundable tender deposit of R100.00 payable by crossed cheque made out in favour of the City of Cape
Town, is required on collection of the tender documents.
Queries relating to the issue of these documents may be addressed to Mr Alan Mark van Heerden, Tel No. (021)
400 2505, Fax No. 021 419 7659, email Alan.vanHeerden@capetown.gov.za.
A non-compulsory
clarification meeting with representatives of the Employer will take place at the offices of
Webber Wentzel 15th Floor, Convention Tower, Heerengracht, Foreshore, Cape Town on Monday, 27 July 2009 starting at 10:00.
The closing time for receipt of tenders is
10:00
on
Friday 21 August 2009.
Telegraphic, telephonic, telex, facsimile, e-mail and late tenders will not be accepted.
Tenders may only be submitted on the tender documentation that has been issued.
Requirements for sealing, addressing, delivery, opening and assessment of tenders are stated in the Tender
Data.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.1
Tender Notice and Invitation to Tender
CITY OF CAPE TOWN
TRANSPORT ROADS AND STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
Venue for Clarification Meeting to be held at 10:00 on 27 July 2009
Address: Webber Wentzel 15th Floor, Convention Tower, Heerengracht, Foreshore, Cape Town, 8001 P O Box
3667, Cape Town, 8000. Phone: +27 21 431 7000.
Parking will be made available for tenderers in the Convention Centre's Parking Area 3. Those tenderers who wish to make use of the provided parking facilities, should access Convention Tower through Parking Area 3 of the Convention Centre.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
CITY OF CAPE TOWN
TRANSPORT ROADS AND STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
The conditions of tender are the Standard Conditions of Tender as contained in Annex F of Board Notice 12 of
2009 in Government Gazette No. 31823 of 30 January 2009, Construction Industry Development Board (CIDB)
Standard for Uniformity in Construction Procurement (see www.cidb.org.za
), which are reproduced without amendment or alteration for the convenience of tenderers as an Annex to this Tender Document attached to page viii.
The Standard Conditions of Tender make several references to the Tender Data for details that apply specifically to this tender. The Tender Data shall have precedence in the interpretation of any ambiguity or inconsistency between it and the standard conditions of tender. Each item of data given below is cross-referenced to the clause in the Standard Conditions of Tender to which it mainly applies.
The following variations, amendments and additions to the Standard Conditions of Tender as set out in the Tender Data below shall apply to this tender: number
F.1 General
F.1.1 Actions
Add the following:
For the purpose of the tender adjudication and award of the contract the Employer is the City of
Cape Town, represented by the Executive Director: Transport Roads and Stormwater.
The City of Cape Town is in the process of establishing the Cape Town Public Transport Entity , a municipal entity established in terms of the Municipal Systems Act, Act 32 of 2000, to undertake the administration of public transport services on its behalf in the City of Cape Town. On the establishment of the Cape Town Public Transport Entity it will take over the responsibilities of
Employer in terms of this contract independently of the City of Cape Town through a cession of the contract from the City of Cape Town to the Cape Town Public Transport Entity.
If on the date of award of the contract the Cape Town Public Transport Entity is already legally constituted and has the capacity to do so it will act as the Employer and will conclude the agreement with the successful tenderer. It will thereafter perform duties as the Employer.
F.1.2 Tender Documents
Add the following:
“The following documents form part of this tender:
VOLUME 1:
The Conditions of Contract for Plant and Design-Build for Electrical and
Mechanical Works and for Building and Engineering Works Designed by the
Contractor, First Edition 1999 (Yellow Book), available separately from the
International Federation of Consulting Engineers (FIDIC).
This publication is available and tenderers must obtain copies at their own cost from the South African Institution of Civil Engineering (SAICE) (tel 011 805 5947) or the South African Association of Consulting Engineers (SAACE) (tel
011 463 2022).
Volume 1 may also be inspected, by appointment, at the offices of the Employer/Employer’s Agent during normal office hours.
The tender documents issued by the Employer comprise:
VOLUME 2A:
The returnable portion of the Tender Document (this document), in which is bound:
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
The Tender
Part T1: Tendering procedures
T1.1 Tender notice and invitation to tender
T1.2 Tender data
Part T2: Returnable Documents
T2.1 List of returnable documents
T2.2 Returnable schedules
The Contract
Part C1: Agreements and Contract Data
C1.1 Form of offer and acceptance
C1.2 Contract data
C1.3 Form of Performance Security - Demand Guarantee
C1.4 Occupational Health and Safety Agreement
Part C2: Pricing Data
C2.1 Pricing instructions
C2.2 Bills/Schedules of Quantities
VOLUME 2B: The balance of the Tender Document, in which is bound:
Part C3: Scope of Work
C3.1 Description of the Works
C3.2 Engineering Design
C3.3 Installation of Works
C3.4 Testing and Commissioning
C3.5 Training
C3.6 Project Management
C3.7 Maintenance and upgrades
C3.8 Detailed Specifications: General
C3.9 Detailed Specifications: Onboard Systems
C3.10 Detailed Specifications: Control Centre
C3.11 Detailed Specifications: Smart Trunk Station
C3.12 Detailed Specifications: Smart Feeder Station
C3.13 Detailed Specifications: Bus Depots
C3.14 Detailed Specifications: Communication
C3.15 Detailed Specifications: Maintenance
C3.16 Detailed Specifications: Operations
C3.17 Glossary
Part C4: Site information
C4.1 Overview of System
C4.2 The proposed IRT System (Phase 1)
C4.3 Services Types
C4.4 Future Phases of the IRT System
C4.5 Description of Business Model
C4.6 ITS to be provided by Control Centre Contract
C4.7 Communication
C4.8 Drawings and Details
Volume 2A is deemed the “Returnable Documents” which must be returned to the Employer in terms of submitting a tender offer. Volume 2B is non-returnable.
F.1.4 Communication and Employer’s Agent
Add the following:
Attention is drawn to the fact that verbal information, given by the Employer/Employer’s Agent during site visits/clarification meetings or at any other time prior to the award of the Contract, will not be regarded as binding on the Employer. Only information issued formally by the Employer in writing to tenderers will be regarded as amending the Tender Documents.
The Employer’s Agent, for the purposes of any communication between the Employer and tenderer, is represented by:
Dr Christoff Krogscheepers
ITS Engineers
Postnet Suite 127
Private Bag X7
Tyger Valley
7536
Tel No. (021) 948 7106
Fax No. (021) 948 7098
Email christoff@itse.co.za
.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.2.1 Eligibility
Add the following to F.2.1.1:
Only those tenderers who satisfy the following criteria are eligible to submit tenders:
F.2.1.1.1
City of Cape Town (CoCT) SAP Vendor Database Registration
Only those tenderers who are registered on the City of Cape Town’s SAP Vendor Database as a service provider prior to the evaluation of submissions are eligible to have their tenders evaluated.
The Employer will only enter into a formal contract with a tenderer who is registered on the City of
Cape Town’s SAP Vendor Database. In the case of Joint Venture partnerships this requirement will apply individually to each party of the Joint Venture.
Tenderers who wish to register on the City of Cape Town’s SAP Vendor Database may collect registration forms from the Manager: Supplier Management, 8 th Floor, Civic Centre (Tel 021
400 4413).
F.2.1.1.2
Completion of information on the tendering entity
The tenderer must submit information as indicated below. Employer will use this information, supplemented by other information provided by the tenderer, to evaluate and score quality of tenders.
Experience of South African component of tendering entity
The design and implementation experience of the local South African component of tenderer’s resources on similar projects must be appended to Schedules 3 and 4 Part T2.2 Returnable
Schedules.
Experience of Overseas component of tendering entity
The design and implementation experience that the overseas component of tenderer’s resources has had on similar projects must be appended to Schedules 3 and 4, Part T2.2 Returnable
Schedules.
Split of work between local and overseas professional staff components
The tender must submit an assessment of the extent of the design and implementation functions that will be undertaken by professional staff resources originating from the tenderer’s South African and overseas components. These should be provided in man-hours of key professional staff, support staff and any other human resources must in addition be provided. The figures should include tenderer’s own resources, either as a sole entity or a joint venture, and any sub-contractors.
The analysis must be completed in Schedule 5, Part T2.2 Returnable Schedules.
Split of projected contract claims between local and overseas
The tender must submit an assessment of the projected contract claims in Rands for resources that will be acquired from the tenderer’s South African and overseas components respectively. These should be provided for (i) human resources and (ii) for equipment, parts and software to be purchased for installation. The figures should include the tenderer’s own resources, either as a sole entity or a joint venture, and any sub-contractors.
The analysis must be appended to Schedule 5, Part T2.2 Returnable Schedules.
Work Plan
The tenderer must append a work plan as part of the Schedule 9, Part T2.2 Returnable Documents.
The document will be used to provide evidence that the tenderer has a sound understanding of the
Scope of Work and how this will be applied in the Contract. During the evaluation process described under F.3.11.9 scores for Quality will be assigned based on the clarity, logic and proof that the tenderer will be able to discharge his obligations. The Work Plan should include concepts of the design of the system and should be drafted for reading by persons not necessarily qualified in the electronics field. The Work Plan including timeline information should not exceed 25 A4 pages in 11-pitch Arial or equivalent.
F.2.1.1.3
Key Personnel
Abbreviated Curriculum Vitae each the Key professional Personnel listed below and all Support
Personnel (including those provided by sub-contractors), limited to two A4 pages and including a photograph, must be submitted as part of Schedule 7, Part T2.2: Returnable Schedules. Full
Curriculum Vitae may in addition be appended to Schedule 7.
The term “professional” as used above refers to a person who is registered with a recognized institution or council. The proof of qualifications and registration numbers of these key professional
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
personnel must be indicated on the Curriculum Vitae.
The tenderer must include an undertaking that it will have the key personnel listed below in its permanent employment at the close of tender. Alternatively, a signed undertaking from a specialist consultant/firm having the required personnel, stating that they will undertake the necessary work on behalf of the tenderer in terms of a sub-consultant agreement, will be acceptable. Such undertaking must be attached to Schedule 8, Part T2.2 Returnable Schedules.
Contractor’s representative
The Contractor’s representative as defined in Clause 1.1.2.5 of the Conditions of Contract and to be appointed to undertake the Contract on behalf of the tenderer must have at least fifteen (15) years experience with leading the design and/or implementation process of a similar system contemplated in the tender, and must be a professional project manager or engineer registered with a recognized professional South African or overseas institution of council. The person to be appointed as
Contractor’s Representative must lead the tendering entity’s submission of the tender.
Lead design professional
The lead design professional must have at least ten (10) years experience with leading the design process of a similar system contemplated in the tender, and must be a professional electrical or electronics engineer registered with a recognized professional South African or overseas tertiary institution.
Lead installation professional
The lead implementation professional must have at least ten (10) years experience with leading the installation process of a similar system contemplated in the tender, and must be a professional electrical or electronics engineer registered with a recognized professional South African or overseas body. The lead installation professional may also undertake the tasks required of the lead design professional.
Operations Manager
The Operations Manager must have at least ten (10) years experience with managing of a similar system contemplated in the tender, or can demonstrate that he has the competency to undertake the function. He/she must be registered with a recognized professional South African or overseas body in a discipline that is compatible with the function, which should be one of the technical sciences. The lead installation professional may also undertake the tasks required of the lead design professional or lead installation professional.
Maintenance Manager
The Maintenance Manager must have at least ten (10) years experience with maintaining, installing or developing a similar system contemplated in the tender, and must be a professional electrical or electronics engineer registered with a recognized professional South African or overseas body. The
Maintenance may also undertake the tasks required of the lead design professional or lead installation professional.
F.2.1.1.4 Minimum number of points for Quality
In order to be considered for an appointment in terms of this tender, tenderers must achieve the minimum number of evaluation points for quality as stated in F.3.11.9.
F.2.7
Clarification meeting
Add the following:
Arrangements for the clarification meeting will be as stated in the Tender Notice and Invitation to
Tender.
The clarification meeting will not be compulsory.
F.2.12
F.2.12.1
Alternative tender offers
Add the following to F.2.12.1:
The Tenderer may submit alternative tenders which alter the Scope of the Works and which in his opinion are suitable and advantageous to the Employer. The Employer/Employer’s Agent will examine such proposals but shall not be bound to accept any such tenders.
All such alternative tenders shall be fully detailed and submitted on separate complete sets of
Tender Documents and shall be clearly marked as alternative tenders. All alternative tenders shall be accompanied by a covering letter clearly stating where the alternative tender differs from the
Tender.
No alternative tender will be considered unless a Tender free of qualifications and strictly on the basis of the Tender Documents is also submitted.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.2.12.2
All proposed technical characteristics as well as the modified Pricing Data shall be submitted with the alternative tender in order to allow the Employer/Employer’s Agent to fully evaluate the offer and identify any deviation from specified requirements.
If subsequently required, the Tenderer shall submit fully detailed drawings and calculations of the alternative tender in the form set out by the Employer/Employer’s Agent.
Tenderers are required to indicate alternative tender offers in Schedule 21: Alterations/
Amendments by Tenderer in T2.2 Returnable Schedules.
If a tenderer submits tenders for both this Tender and Tender no. 24G/2009/10 for the Design,
Supply, Delivery, Installation, Testing, Commissioning, and Maintenance of the IRT Automated
Fare Collection Hardware and Software, and Provision of Certain Related Services, any price discounts that the tenderer wishes to include in its offer to the Employer in the event of the tenderer being awarded both such tenders, shall be submitted by the tenderer under each such tender as an alternative tender.
Submitting a tender offer
Add the following to F.2.13.1:
F.2.13
F2.13.2
F.2.13.3
F.2.13.4
Where the Tenderer cannot tender in all respects in accordance with the foregoing provisions, such deviations shall be clearly and separately listed in Schedule 21: Deviations and Qualifications by
Tenderer in T2.2 Returnable Schedules, or in a Tenderer’s covering letter.
The Employer/Employer, through his Agent, will examine such deviations but shall not be bound to accept any such deviations or qualifications.
The sum tendered in the Tender Offer shall be deemed to include for all such deviations or qualifications listed or referred to in Schedule 21: Deviations and Qualifications by Tenderer.
Deviations which are contained in literature, detailed or general descriptions, drawings, equipment lists, etc. provided with the Tender but which are not clearly and separately listed as described above will not be accepted by the Employer and the Tender shall be deemed to comply in all respects with the foregoing provisions and all costs in this regard shall be for the Contractor's account. ii)
Options
The Tenderer may submit options for alternative materials or equipment to that specified for any of the items in the Schedules of Quantities, which in his opinion are suitable and advantageous to the
Employer. The Employer/Employer through his Agent, will examine such options but shall not be bound to accept any such options.
Such options shall be offered as separately priced items in a Tenderer’s covering letter which must accompany the Tender under the heading “Options”. Such options shall NOT be listed in Schedule
21: Alterations/Amendments by Tenderer.
The sum tendered in the Tender Offer shall be deemed to exclude all such Options.
Add the following to F.2.13.2:
Note that Volume 2B is a non-returnable document but will form part of the Contract agreement.
Add the following to F.2.13.3:
Parts of each tender offer communicated on paper shall be submitted as an original, plus 0
(nought) copies, unless otherwise stated in the Tender Document.
Add the following after the first sentence of F.2.13.4:
The tender shall be signed by a person duly authorised to do so. Tenders submitted by joint ventures of two or more firms shall be accompanied by the document of formation of the joint venture, authenticated by a notary public or other official deputed to witness sworn statements, in which is defined precisely the conditions under which the joint venture will function, its period of duration, the persons authorised to represent and obligate it, the participation of the several firms forming the joint venture, and any other information necessary to permit a full appraisal of its functioning.
Add the following to F.2.13.5:
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.2.13.5 The Employer’s address for delivery of tender offers and identification details to be shown on each tender offer package are:
Location of tender box:
Physical address :
Tender Box 58.
Tender Office, 5 th
Floor, Tower Block, Civic Centre,
12 Hertzog Boulevard, Cape Town.
Identification details : Tender number 25G/2009/10
Title of tender: Design, Supply, Delivery, Installation, Testing,
Commissioning and Maintenance of the IRT Control Centre
Hardware and Software Systems
Sealed tenders with the Tenderer’s name and address and the endorsement “ TENDER NO.
25G/2009/10: DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING
AND MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
SYSTEMS " on the envelope, must be placed in the appropriate official tender box at the abovementioned address.
F.2.13.6
Add the following to F.2.13.6:
Two-envelope procedure
A two-envelope procedure will not be followed.
F.2.15
F.2.15.1
Closing time
Add the following to F.2.15.1:
The closing time for submission of tender offers is as stated in the Tender Notice and Invitation to
Tender.
F.2.16
Telephonic, telegraphic, telex, facsimile or e-mailed tender offers will not be accepted.
Tender offer validity
Add the following to F.2.16.1:
The tender offer validity period is 120 days.
F.2.16.1
F.2.17 Clarification of tender offer after submission
Add the following:
A tender will be rejected as non-responsive if the Tenderer fails to provide any clarification requested by the Employer within the time for submission stated in the Employer’s written request for such clarification. A tender will also be rejected as non-responsive if the Tenderer fails, within the stated number of days of having been notified in writing by the Employer, to comply with the requirements of F.4.4.
F.2.18
F.2.18.1
Provide other material
Add the following to F.2.18.1:
Provide, where the tendered amount inclusive of VAT exceeds R10 million : i) audited annual financial statements for 3 years, or for the period since establishment if established during the last 3 years, if required by law to prepare annual financial statements for auditing; ii) a certificate signed by the tenderer certifying that the tenderer has no undisputed commitments for municipal services towards a municipality or other service provider in respect of which payment is overdue for more than 30 days; iii) particulars of any contracts awarded to the tenderer by an organ of state during the past five years, including particulars of any material non-compliance or dispute concerning the execution of such contract; iv) a statement indicating whether any portion of the goods or services are expected to be sourced from outside the Republic, and, if so, what portion and whether any portion of payment from the municipality or municipal entity is expected to be transferred out of the
Republic.
Each party to a Consortium/Joint Venture shall submit separate certificates/statements in the above regard.
F.2.23
F.2.23.1
Certificates
Add the following:
The tenderer is required to submit the following:
Tax Clearance Certificate
Tenderers that are local South African companies and South African companies that form part of a joint venture shall be registered and in good standing with the South African Revenue Service
(SARS) and shall submit documentary evidence in the form of an original valid Tax Clearance
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.2.23.2
F.3
F.3.4
F.3.4.1
F.3.8
F.3.11
F.3.11.1
F.3.11.5
Certificate issued by SARS or proof that he or she has made arrangements with SARS to meet his or her outstanding tax obligations.
Each party to a Consortium/Joint Venture that is a South African entity shall submit a separate Tax
Clearance Certificate, or proof that he or she has made the necessary arrangements with SARS.
Bargaining Council Certificate
Where applicable, a certificate of compliance issued by the relevant Bargaining Council.
Each party to a Consortium/Joint Venture shall submit separate certificates in the above regard.
The Employer’s undertakings
Opening of tender submissions
Add the following to F.3.4.1:
The time and location for opening of the tender offers is:
Time: Tenders will be opened immediately after the closing time for receipt of tenders as stated in the Tender Notice and Invitation to Tender, or as stated in any Addendum extending the closing date.
Location: Tender Office, 5 th Floor, Tower Block, Civic Centre, 12 Hertzog Boulevard , Cape Town.
Test for responsiveness
Add the following:
Tenders will be considered non-responsive if, inter alia:
the tender is not in compliance with the Scope of Work and the Technical Specifications set out in Part C3;
the tenderer is not registered on the City of Cape Town’s SAP Vendor Database prior to the evaluation of submissions;
the tenderer has failed to clarify or submit any supporting documentation within the time for submission stated in the employer’s written request.
Evaluation of tender offers
General
Add the following:
In terms of Council’s current Supply Chain Management Policy this project has been identified as a
Major Project (over R2 000 000,00) targeting enterprises with equity ownership by Historically
Disadvantaged Individuals (HDIs) performing as prime contractors, joint venture partnerships, subcontractors, suppliers, manufactures, and/or service providers.
As the Project Works required for this tender is considered to be of a complex nature, requiring considerable expertise with respect to the specialized processes, controls and equipment specified in the scope of work, it is considered essential that Tenderers should be suitably qualified and experienced and have the necessary capability and resources. The procedure for the evaluation of responsive tenders therefore, is
Method 4
: Financial offer, quality and preferences.
Method 4: Financial offer, quality and preferences
Replace F.3.11.5 b) with the following:
The procedure for the evaluation of responsive tenders is Method 4 . The total score for financial offer, quality and preference will be calculated as follows:
N
T
= W
C
+ N
P
where,
N
T
W
C
N
P
=
=
=
Total Score awarded to the tenderer under consideration (max 100) ,
Score for quality and financial offer
(max 90)
,
Score for preference (max 10) , and where W
C
= W
3
x [1 + (S – S m
)] where,
S m
W
3
= the number of tender evaluation points available for quality and financial offer and equals
90
,
S = the sum of percentage scores for quality and financial offer of the submission under consideration,
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
S m
= the sum of percentage scores for quality and financial offer of the submission scoring the highest number of points.
Add the following: f) If, after tenders have been brought to a comparative level, two or more tenders score equal total evaluation points, the recommended tenderer shall be the one scoring the highest preference points.
F.3.11.7 Scoring financial offers
Replace F.3.11.7 with the following:
The formula for calculating the value of A shall be
Formula 2 (Option 2)
.
The score for financial offer is calculated using the following formula for each responsive tender under consideration:
N
FO
= W
1
x A where,
N
FO
W
1
= the percentage score achieved for financial offer,
= the percentage score given to financial offer and equals
55
, and where A = P m
P
where,
P
P m
= the comparative offer of the most favourable tender offer,
= the comparative offer of the tender offer under consideration.
F.3.11.8 Scoring Preferences
Add the following:
Points will be awarded to tenderers who complete the following Preferencing Schedule which is included in T2.2 : Returnable Schedules:
Schedule 15: Preferencing Schedule (where preferences are granted in respect of HDI
Participation) and attached Annex A
Points for Preference
A maximum of 100 minus (W
C
) tender evaluation points will be awarded for preference (NOP) with responsive tenders scoring points in accordance with the criteria listed below.
HDI Participation
A maximum of 10 tender evaluation points (NOP) will be awarded for HDI Participation with responsive tenders under consideration scoring points according to the formula:
F.3.11.9
N
P
Where N
P
= x CPG
1
100 number of tender evaluation points awarded for HDI participation
NOP
CPG
1
= tendered Contract Participation Goal in respect of HDI Participation (from
Schedule 15)
The conditions associated with the granting of preferences in respect of HDI Participation
(described in the Preferencing Schedule) shall apply to this Contract.
Scoring quality (functionality)
Replace F.3.11.9 with the following:
The score for quality is to be calculated using the following formula for each responsive tender under consideration :
W
Q
W
Q
W
2
S
O
M
S
= W
2
x S
O
M
S
where,
= the percentage score achieved for quality,
= the percentage score given to quality and equals 45 ,
= the score for quality allocated to the submission under consideration,
= the maximum possible score for quality in respect of a submission (50 points) .
IMPORTANT NOTE: Tenderers that receive a score for S
O excluded from further participation in the evaluation process. of 40 or less
F.3.11.9.1 Composition of the Tendering Entity as input to award of quality points
South African registered company and established office
quality points will be
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
The entity or at one of the participants of a joint venture constituting the entity submitting a tender, should preferably, at the date of submission of the tender, have a company registered in South
Africa. The tendering entity or one of its participants must at the date of award of the contract, have an established office through which all communication with the Employer will flow, and where a significant portion of design work and all aspects of administration of the contract and its implementation in terms of the contract will be carried out. The address of the local office, if established at the time of tender submission, must be indicated on Schedule 1, Part T2.2:
Returnable Schedules, and which will be regarded as the domicilium citandi et executandi for the purposes of any contract arising from this tender submission. In the case where the address of a local office is not available at the time of tender submission the tenderer is to provided his overseas address.
The tenderer is required under Clause F.1.1.2 to submit information on the experience of the local
South African component of tenderer’s resources on similar projects to be appended to Schedules 3 and 4 Part T2.2 Returnable Schedules.
Overseas component of tendering entity
Tenderers are encouraged to secure an overseas component having proven experience on similar systems already in operation, to form part of the tendering entity.
The tenderer is required under Clause F.1.1.2 to submit information on the experience that the overseas component of tenderer’s resources has had on similar projects to be appended to
Schedules 3 and 4, Part T2.2 Returnable Schedules.
Split of work between local and overseas professional staff components
The tender is required to submit an assessment of the extent of the design and implementation functions that will be undertaken by professional staff resources originating from the tenderer’s
South African and overseas components. These are to be provided in man-hours of key professional staff, support staff and any other human resources must in addition be provided. The figures include tenderer’s own resources, either as a sole entity or a joint venture, and any subcontractors.
The tenderer is required under Clause F.1.1.2 to submit information on the analysis to be appended to Schedule 5, Part T2.2 Returnable Schedules.
Split of contract claims between local and overseas
The tender is required to submit an assessment of the projected contract claims in Rands for resources that will be acquired from the tenderer’s South African and overseas components respectively. These are to be provided for (i) human resources and (ii) for equipment, parts and software to be purchased for installation. The figures should include the tenderer’s own resources, either as a sole entity or a joint venture, and any sub-contractors.
The tenderer is required under Clause F.1.1.2 to submit information on the analysis to be appended to Schedule 5, Part T2.2 Returnable Schedules.
F.3.11.9.2 Criteria for awarding of quality points
The table below will be used by the Bid Evaluation Committee to determine the score for quality allocated to the submission under consideration, that score being
S
O
=
S
1
+
S
2
+
S
3
+
S
4
+
S
5
+
S
6
+
S
7.
Item Subcriteria Description
Maximum score
Experience of tenderer through evidence of having undertaken similar work and having resources and skills available for the project
Establishment, qualifications and demonstration of
1.1 S
1 experience and professional capacity in South Africa in relation to the scope of work
International experience and capacity outside South
Africa and which will complement the tenderer’s 1.2 S
2 capability in relation to the scope of work
Work Plan: quality of technical proposal, technical merit and response to the proposed scope of work/project design/implementation under headings below
2.1
2.2
2.3
2.4
S
3
S
4
S
5
S
6
Bus scheduling and tracking systems
Passenger information systems
CCTV communication systems
Control centre
10
10
5
5
5
5
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
3 S
7
Demonstration of a working model proving functionality of system being offered to meet objectives and scope of work
10
M
S
Total maximum quality score summation of S
1
– S
7
50
The minimum
S
O
score for quality is
40
. Tenderers that fail to achieve the minimum score for quality will be rejected.
Where the entity tendering is a Joint Venture the tender must be accompanied by a statement describing exactly what aspects of the work will be undertaken by each party to the joint venture
(appended to Schedule 2, Part T2.2: Returnable Schedules).
A more detailed explanation of the quality criteria to be applied during the evaluation of tenders is given below:
Item 1: Experience of tenderer through evidence of having undertaken similar work and having resources and skills available for the project – S
1 and S
2
Tenders will be evaluated based on the proven experience of the tenderer on other successful projects of the same or similar type as that forming this Contract. Sub-criterion S
1
will require the tenderer to show evidence of their establishment in South Africa, their offices and systems and the qualifications, key professional staff and support staff that they will make available for the execution of the design and implementation components of the project. The score will be based on the proven capacity of the local team put forward toward contributing to the success of the project.
S
2 will similarly be scored based on the qualifications of key professional staff and support staff sourced from the overseas component of the overall team.
The tenderer is required to submit a statement describing which aspects of the work will be undertaken by the local component and the overseas component of the project team, and to estimate the man-days of the local and overseas components of the project team that will undertake the design and implementation components respectively. Scores assigned for subcriterion
S will be reduced by 2 points where the component of local resources is less than 50%
1 and 4 points where the component of local resources is less than 33% of the total team’s proposed man-days, in accordance with the information provided in Schedule 5, Part T2.2 Returnable
Schedules.
Item 2: Work Plan: quality of technical proposal, technical merit and response to the proposed Scope of Work/Project Design – S
3 to S
6
The technical proposal must be included in the work plan required as part of the Schedule 9, Part
T2.2 Returnable Documents. The document will be evaluated under sub-criteria items S
3 to S
6 primarily to enable evidence to be scored demonstrating that the tenderer has a sound understanding of the Scope of Work and how this will be applied in the Contract. Scores will be assigned based on the clarity, logic and proof that the tenderer will be able to discharge his obligations. The technical proposal should include concepts of the design of the system and should be drafted for reading by persons not necessarily qualified in the electronics field.
Item 3: Demonstration of a working model proving functionality of system being offered to meet objectives and scope of work – S
7
Tenderers will be required to demonstrate the functionality of the systems and subsystems being offered. The objective of this part of the evaluation will be to provide the Employer with confidence that tenderers have the expertise, capability and experience to meet the objectives, functionality and specifications of the contract. The process of considering such examples will have a direct bearing on the score for subcriterion other subcriteria.
S
7 but will also indirectly influence the scores allocated to
The tenderer must in his tender propose the manner and process of providing the appropriate demonstration, and will be responsible for costs of developing any prototype, model or working system that will meet the requirements of providing the Employer with the confidence in his capabilities. The demonstration must take place in Cape Town on a date to be made known to the tenderer within 14 days after the submission of tenders, and should allow for a period not exceeding 3 hours. Where the demonstration takes the form of a presentation a suitable venue will be provided by the Employer.
F.3.11.10
Add the following new subclause:
Evaluation programme
The evaluation procedure is envisaged to be undertaken over a period not exceeding 120 days measured from the date of submission of the tender to the date on which a decision is made by the
Employer on the tenderer that will be awarded the contract.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.3.11.11
F3.13
F.3.13.1
Add the following new subclause:
Risk Analysis
Notwithstanding compliance with the requirements of the tender, the employer will perform a risk analysis in respect of the following: a) reasonableness of the financial offer b) reasonableness of unit rates and prices c) the tenderer’s ability to fulfill its obligations in terms of the tender document, that is, that the tenderer can demonstrate that he/she possesses the necessary professional and technical qualifications, professional and technical competence, financial resources, equipment and other physical facilities, managerial capability, reliability, experience, reputation, personnel to perform the contract, etc.
No tenderer will be recommended for an award unless the tenderer has demonstrated that he/she has the resources and skills required.
Acceptance of tender offer
Add the following to F.3.13.1:
Tender offers will only be accepted if: a) the tenderer is registered and in good standing with the South African Revenue Service (SARS) and has submitted evidence in the form of an original valid Tax Clearance Certificate issued by
SARS or proof that he or she has made arrangements with SARS to meet his or her outstanding tax obligations; b) the tenderer is registered and verified on the Western Cape Supplier Database; c) the tenderer or any of its directors is not listed on the Register of Tender Defaulters in terms of the Prevention and Combating of Corrupt Activities Act of 2004 as a person prohibited from doing business with the public sector; d) the tenderer has not: i) abused the Employer’s Supply Chain Management System; or ii) failed to pay municipal rates and taxes or service charges and such rates, taxes and charges are in arrears for more than three months; or iii) failed to perform on any previous contract and has been given a written notice to this effect; e) the tenderer has completed the Compulsory Enterprise Questionnaire and there are no conflicts of interest which may impact on the tenderer’s ability to perform the contract in the best interests of the employer or potentially compromise the tender process.
F.3.18 Provide copies of the contract
Add the following:
The number of paper copies of the signed contract to be provided by the Employer is one.
F.4 Additional Conditions of Tender
The additional conditions of tender are:
F.4.1
Compliance with Occupational Health and Safety Act 1993
Tenderers are to note the requirements of the Occupational Health and Safety Act No. 85 of 1993 and the Construction Regulations 2003 issued in terms of Section 43 of the Act. The tenderer shall be deemed to have read and fully understood the requirements of the above Act and Regulations and to have allowed for all costs in compliance therewith.
In this regard the Tenderer shall submit with his tender, appended to Schedule 16: Health and Safety
Plan in Part T2.2 Returnable Schedules, a detailed Health and Safety Plan in respect of the Works in order to demonstrate the necessary competencies and resources to perform the construction work all in accordance with the Act and Regulations. Such Health and Safety Plan shall cover inter-alia the following details:
(1) Management Structure, Site Supervision and Responsible Persons including a succession plan.
(2) Contractor’s induction training programme for employees, sub-contractors and visitors to the Site.
(3) Health and safety precautions and procedures to be adhered to in order to ensure compliance with the Act, Regulations and Safety Specifications.
(4) Regular monitoring procedures to be performed.
(5) Regular liaison, consultation and review meetings with all parties.
(6) Site security, welfare facilities and first aid.
(7) Site rules and fire and emergency procedures.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
Tenderers are to note that the Contractor is required to ensure that all sub-contractors or others engaged in the performance of the contract also comply with the above requirements.
The Contractor shall prepare and maintain a Health and Safety File in respect of the project, which shall be available for inspection on Site at all times and handed over to the Employer on Final Completion of the project.
The Contractor is required to submit to the Employer the Occupational Health and Safety Agreement
(included in C1.4 of the Contract Document) and a letter of good standing from the Compensation
Commissioner, or a licensed compensation insurer, within 14 days from the Commencement Date of the contract.
F.4.2 Eligibility with respect to expanded public works programme
This Contract does not qualify for consideration as an Expanded Public Works Programme project.
F.4.3
Claims arising after submission of tender
No claim for any extras arising out of any doubt or obscurity as to the true intent and meaning of anything shown on the Contract Drawings or contained in the Conditions of Contract, Scope of Work and
Pricing Data, will be admitted by the Employer/Employer’s Agent after the submission of any tender and the Tenderer shall be deemed to have:
1) inspected the Contract Drawings and read and fully understood the Conditions of Contract,
2) read and fully understood the whole text of the Scope of Work and Pricing Data and thoroughly acquainted himself with the nature of the works proposed and generally of all matters which may influence the Contract,
3) acquainted himself with any limitations or restrictions that may be imposed by the Municipal or other
Authorities in regard to access and transport of materials and equipment to and from the site and made the necessary provisions for any additional costs involved thereby, and
4) requested the Employer or his duly authorised agent to make clear the actual requirements of anything shown on the Contract Drawings or anything contained in the Scope of Work and Pricing
Data, the exact meaning or interpretation of which is not clearly intelligible to the Tenderer.
5) received any Addenda to the tender documents which have been issued in accordance with the
Employer’s Supply Chain Management Policy.
Before submission of any tender, the Tenderer should check the number of pages, and if any are found to be missing or duplicated, or the figures or writing indistinct, or if the Pricing Data contain any obvious errors, the Tenderer must apply to the Employer/Employer’s Agent at once to have the same rectified, as no liability will be admitted by the Employer/Employer’s Agent in respect of errors in any tender due to the foregoing.
F.4.4 Imbalance in tendered rates
In the event of tendered rates or lump sums being declared by the Employer to be unacceptable to it because they are either excessively low or high or not in proper balance with other rates or lump sums, the Tenderer may be required to produce evidence and advance arguments in support of the tendered rates or lump sums objected to. If, after submission of such evidence and any further evidence requested, the Employer is still not satisfied with the tendered rates or lump sums objected to, it may request the Tenderer to amend these rates and lump sums along the lines indicated by it.
The Tenderer will then have the option to alter and/or amend the rates and lump sums objected to and such other related amounts as are agreed on by the Employer, but this shall be done without altering the tender offer as tendered or, if applicable, the corrected total of prices in accordance with F.3.9.3.
Should the Tenderer fail to amend his Tender in a manner acceptable to the Employer, the Employer may reject the Tender.
F.4.5
Invalid
Tenders shall be considered invalid and shall be endorsed and recorded as such in the tender opening record, by the responsible official who opened the tender, in the following circumstances: a) if the tender offer is not submitted on the Form of Offer and Acceptance bound into this tender document (form C1.1, Part C1: Agreements and Contract Data); b) c) d) if the tender is not completed in non-erasable ink; if the Form of Offer and Acceptance has not been signed; if the Form of Offer and Acceptance is signed, but the name of the tenderer is not stated or is indecipherable.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.4.6
Negotiations with preferred tenderers
The Employer may negotiate the final terms of a contract with tenderers identified through a competitive tendering process as preferred tenderers provided that such negotiation: a) b) c) does not allow any preferred tenderer a second or unfair opportunity; is not to the detriment of any other tenderer; and does not lead to a higher price than the tender as submitted.
Minutes of any such negotiations shall be kept for record purposes.
F.4.7
General supply chain management conditions applicable to tenders
In terms of its Supply Chain Management Policy the City may not consider a tender unless the provider who submitted the tender: a) has furnished the City with that provider’s:
• full
• identification number or company or other registration number; and
• tax reference number and VAT registration number, if any; b) has whether:
• the provider is in the service of the state, or has been in the service of the state in the previous twelve months;
• if the provider is not a natural person, whether any of the directors, managers, principal shareholders or stakeholders is in the service of the state, or has been in the service of the state in the previous twelve months; or
• whether a spouse, child or parent of the provider or of a director, manager, share holder or stakeholder referred to above is in the service of the state, or has been in the service of the state in the previous twelve months.
Irrespective of the procurement process followed, the City is prohibited from making an award to a person:
• who is in the service of the state;
• if the person is not a natural person, a juristic entity of which any director, manager or principal shareholder or stakeholder is in the service of the state; or
• who is an advisor or consultant contracted with the City.
In this regard, tenderers shall complete Schedule 1, Part T2.2 Returnable Schedules: Compulsory
Enterprise Questionnaire. Failure to complete this schedule may result in the tender not being considered.
F.4.8
Combating abuse of the Supply Chain Management Policy
In terms of the City’s Supply Chain Management Policy, the Employer may reject the tender of any tenderer if that tenderer or any of its directors has: a) failed to pay municipal rates and taxes or municipal service charges and such rates, taxes and charges are in arrears for more than three months; b) failed, during the last five years, to perform satisfactorily on a previous contract with the City or any other organ of state after written notice was given to that tenderer that performance was unsatisfactory; c) abused the supply chain management system of the City or has committed any improper conduct in relation to this system; d) been convicted of fraud or corruption during the past five years; e) wilfully neglected, reneged on or failed to comply with any government, municipal or other public sector contract during the past five years; or f) been listed with the Register of Tender Defaulters in terms of section 29 of the Prevention and
Combating of Corrupt Activities Act (No. 12 of 2004) or has been listed on National Treasury’s database as a person or juristic entity prohibited from doing business with the public sector.
In this regard, tenderers shall complete Schedule 17, Part T2.2 Returnable Schedules: Declaration in terms of the Municipal Finance Management Act. Failure to complete this schedule may result in the tender not being considered.
F.4.9
UIF
The Tenderer shall submit to Council a letter from the Industrial Council indicating his good standing with regard to UIF payments upon being requested to do so.
F.4.10 Registration with Bargaining Council
Tenderers must be registered with a relevant Bargaining Council (if such be in place) and provide the applicable Certificate of Compliance in terms of the relevant Government Gazette.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.4.11
Price variations
The Contract Price shall be subject to adjustment for changes in cost in accordance with the Conditions of Contract as amended and amplified in the Appendix to tender and Particular Conditions in Part C1.2
Contract Data.
F.4.12
Information to be provided with the tender
Tenderers must provide the information listed in Schedule 23, Part T2.2 Returnable Schedules:
Correspondence with Bus Manufacturers, with their tenders.
F.4.13 Key dates for contract programme
The Tenderer’s attention is drawn to the contract commencement date, time for completion of the Works, and time for access to and procession of the Site in the Appendix to Tender in Part C1.2 Contract Data.
F.4.14 Tender documents, or parts thereof, in electronic format
The Employer shall not formally issue tender documents in electronic format as contemplated in F.2.13.2 and F.2.13.3 and shall only issue tender documents in hardcopy. An electronic version of the issued tender documents will be made available to the tenderer on a compact disk supplied with the tender documents, its use being subject to the following:
(a) Electronic copies of the contract document, or parts thereof, will only be provided to tenderers who have been issued with the tender documents as contemplated in F.1.2 in hardcopy.
(b) The electronic version shall not be regarded as a substitute for the issued tender documents.
(c) The Employer shall not accept tenders submitted in electronic format. Tenderers may not complete and submit a printed copy of the electronic version of the tender document or part thereof. Only those tenders that have been completed on the issued hard copy tender document shall be considered.
(d) The Employer accepts no responsibility or liability arising from any reliance on or use of the electronic version provided in terms of this clause. The Employer further does not guarantee that the electronic version corresponds with the issued tender documents in all respects. Tenderers are alerted to the fact that electronic versions of the tender documents may not reflect any notices or addenda that amend the tender document.
(e) Any non-compliance with these provisions, including effecting any unauthorised alterations to the tender document as contemplated in F.2.11, shall render the tender invalid. The Employer reserves the right to take any action against such tenderer allowed in law including, in circumstances where the tender had already been awarded, the right to cancel the contract.
(f) In utilising the electronic version of the tender document or parts thereof, the tenderer is deemed to have read, understood and accepted all of the above conditions.
F.4.15
Joint ventures, consortia or partnerships
F.4.15.1 Where the tenderer is an unincorporated consortium, a joint venture or a partnership, the tenderer must append a copy of the partnership, consortium or joint venture agreement to Schedule 2, Part
T2.2: Returnable Schedules. The agreement must be properly executed and authorised by a notary public or other official deputed to witness sworn statements and must also, as a minimum, include provisions:
F.4.15.1.1 reflecting the full legal name, principal address or place of business, place of incorporation and registered number of incorporation of each party to the agreement;
F.4.15.1.2 reflecting the name under which the business of the joint venture, consortium or partnership shall be carried on;
F.4.15.1.3 nominating one member of the tenderer as the Lead Member for the purposes of this tender;
F.4.15.1.4 authorizing the Lead Member to undertake all such financial administration of the contract as may be required for purposes of payment of the contractor by the Employer;
F.4.15.1.5 imposing joint and several liability on each of the parties to the consortium, partnership or joint venture for all obligations in relation to this tender and, if the tenderer is successful in the tender process, all obligations under the contract;
F.4.15.1.6 reflecting exactly what aspects of the work will be undertaken by, and the percentage of the contribution to be made to the contract by, each party to the joint venture, consortium or partnership.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
F.4.15.2 If the successful tenderer is an unincorporated consortium or a joint venture or a partnership, the tenderer will not be required to incorporate a separate legal entity in order to contract with the City.
The contracting party may be an unincorporated consortium or joint venture or a partnership, provided that all the consortium or joint venture parties or the partners are jointly and severally responsible for all obligations in the contract.
F4.16 Participation of overseas entities
Tenderers are encouraged to include participation of overseas entities with the requisite expertise for purposes of this Tender in their tenders, either as a member(s) of the tenderer and/or as suppliers and/or as sub-contractors.
In structuring such participation, tenderers' attention is drawn to various requirements of the tender which apply to each member of a joint venture, consortium or partnership, such as registration on the City's SAP Vendor Database.
F4.17
Award of tender subject to section 33 of the MFMA
The award of the Tender by the City's Bid Adjudication Committee will be subject to the Council of the City approving the contract in terms of section 33 of the MFMA. Tenderers should be aware that, notwithstanding the legal requirement to complete the “Section 33 process” in respect of this tender, in order to meet its programme requirements the Employer/City reserves the right to award a part of the tender prior to this process being completed, with the remainder by the Employer with due consideration to the requirements of the applicable legislation.
Thus the tenderer should take into account the circumstances whereby there may be a delay of some months between award of the first part of the Tender that extends for a period of three years, followed by the award of a subsequent part of the Tender that extends for a further period beyond three years. The initial appointed will be to supply and install the full system in phases and against milestones after which the contractor will be required to maintain and manage the system for a period up to three years after the initial appointment. The appointment will then terminate with an option to reinstate the contract to allow continued maintenance and operations of the system for a further three years.
F.4.18 Assignment
In December 2008, the City resolved, in terms of section 78(4) of the Local Government: Municipal
Systems Act No, 32 of 2000 ("the Municipal Systems Act) and subject to the outcome of the process prescribed by section 84 of the Local Government: Municipal Finance Management Act No. 56 of
2003 ("MFMA") to support the establishment of a municipal entity (the “Cape Town Public Transport
Entity” or PT Entity) for the provision of certain municipal public transport services. The City has embarked on the process prescribed by section 84 of the MFMA and anticipates being in a position either to approve or to disapprove the establishment of the PT Entity during the second half of 2009.
If the City does establish the PT Entity, then it will consider assigning to the PT Entity (as contemplated in section 81 of the Municipal Systems Act) various municipal public transport responsibilities, including the responsibility to procure IRT-related contractors and to conclude agreements with those contractors.
As at the date of issuing this Invitation to Tender, the City has not determined whether or not it will establish an PT Entity.
If the City does establish the PT Entity, then it may wish to assign its rights and obligations under the contract to the PT Entity. The contract will give the City the right to effect such assignment without the consent of the Control Centre Contractor.
Part T1: Tendering procedures
Reference No. 25G/2009/10
T1.2
Tender Data
Pages
T2.1 List of Returnable Documents .......................................................20 – 21
T2.2 Returnable Schedules .....................................................................22 – 70
Part T2: Returnable Documents
Reference No. 25G/2009/10
T2
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
The tenderer must complete the following Returnable Documents:
Pages
1:
2:
3:
4:
5:
6:
7:
COMPULSORY ENTERPRISE QUESTIONNAIRE .......................................................................23 - 24
CERTIFICATE OF AUTHORITY FOR JOINT VENTURES ..................................................................25
SCHEDULE OF DESIGN EXPERIENCE ......................................................................................26 – 27
SCHEDULE OF IMPLEMENTATION EXPERIENCE....................................................................28 – 29
COSTS OF STAFF AND OTHER RESOURCES FROM RSA AND OVERSEAS…....................30 – 31
SCHEDULE OF SUBCONTRACTORS .................................................................................................32
DETAILS OF EXPERIENCE OF KEY PROFESSIONAL PERSONNEL ......................................33 – 37
8:
9:
TENDERERS UNDERTAKING TO EMPLOY KEY PROFESSIONAL PERSONNEL..........................38
WORK PLAN AND TIMELINES.............................................................................................................39
10: DETAILS OF TENDERER’S WORKSHOP FACILITIES.......................................................................40
11: TAX CLEARANCE CERTIFICATE ........................................................................................................41
13: FINANCIAL STATEMENTS FOR CONTRACTS OVER R10 MILLION................................................43
14: PARTICULARS OF CONTRACTS AWARDED TO TENDERER DURING PAST FIVE YEARS.........44
15: CONFIRMATION OF REGISTRATION ON CoCT SAP VENDOR DATABASE ..................................45
16: HEALTH AND SAFETY PLAN...............................................................................................................46
17: DECLARATION IN TERMS OF THE MUNICIPAL FINANCE MANAGEMENT ACT ...........................47
18: CERTIFICATE FOR MUNICIPAL SERVICES AND PAYMENTS TO SERVICE PROVIDER .............48
• Joint Venture Agreement (if applicable) - append to Schedule 2.
• An original valid Tax Clearance Certificate issued by the South African Revenue Service – attach to Schedule 11.
• Certificate of Compliance issued by the relevant Bargaining Council (if applicable) – attach to
Schedule 12.
• Health and Safety Plan – attach to Schedule 16.
19. AUTHORISATION FOR THE DEDUCTION OF OUTSTANDING AMOUNTS OWED TO COUNCIL.49
20: RECORD OF ADDENDA TO TENDER DOCUMENTS (ANNEX K).....................................................50
21: DEVIATIONS AND QUALIFICATIONS BY TENDERER ..................................................................... 51
Preferencing Schedule
22: PREFERENCING SCHEDULE (where preferences are granted in respect of HDI
Participation)
Information to be provided with the Tender
23: CORRESPONDENCE
Technical Data Sheets
24: TECHNICAL
Price Basis for Imported Equipment (included in C2: Pricing Data)
25: PRICE BASIS FOR IMPORTED EQUIPMENT.....................................................................................70
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.1
List of Returnable Documents
NB: TENDERERS MUST COMPLETE THESE SCHEDULES/DATA SHEETS/FORMS IN BLACK INK
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.1
List of Returnable Documents
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 1 : COMPULSORY ENTERPRISE QUESTIONNAIRE
The following particulars must be furnished. In the case of a joint venture, separate enterprise questionnaires in respect of each partner must be completed and submitted.
Section 1: Name of enterprise: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Address of enterprise: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section 2: VAT registration number, if any: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section 3: CIDB registration number, if any: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section 4: Particulars of sole proprietors and partners in partnerships
Name* Identity number* Personal income tax number*
* Complete only if sole proprietor or partnership and attach separate page if more than 3 partners
Section 5: Particulars of companies and close corporations
Company registration number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Close corporation number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tax reference number . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section 6: Record of service of the state
Indicate by marking the relevant boxes with a cross, if any sole proprietor, partner in a partnership or director, manager, principal shareholder or stakeholder in a company or close corporation is currently or has been within the last 12 months in the service of any of the following:
a member of any municipal council
a member of any provincial legislature
a member of the National Assembly or the
National Council of Province
a member of the board of directors of any municipal entity
• an official of any municipality or municipal entity an employee of any provincial department, national or provincial public entity or constitutional institution within the meaning of the Public Finance
Management Act, 1999 (Act 1 of 1999)
a member of an accounting authority of any national or provincial public entity
an employee of Parliament or a provincial legislature
If any of the above boxes are marked, disclose the following:
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
Name of sole proprietor, Name of institution, public office, board partner, director, manager, or organ of state and position held principal shareholder or stakeholder
Status of service
(tick appropriate column)
12 months
*insert separate page if necessary
Section 7: Record of spouses, children and parents in the service of the state
Indicate by marking the relevant boxes with a cross, if any spouse, child or parent of a sole proprietor, partner in a partnership or director, manager, principal shareholder or stakeholder in a company or close corporation is currently or has been within the last 12 months been in the service of any of the following: a member of any municipal council a member of any provincial legislature a member of the National Assembly or
an employee of any provincial department, national or provincial public entity or constitutional institution within the meaning of the Public Finance the National Council of Province a member of the board of directors of any municipal entity
an official of any municipality or municipal entity
Management Act, 1999 (Act 1 of 1999)
a member of an accounting authority of any national or provincial public entity
an employee of Parliament or a provincial legislature
Name of spouse, child or parent
Name of institution, public office, board or organ of state and position held
Status of service
(tick appropriate column)
12 months
*insert separate page if necessary
The undersigned, who warrants that he/she is duly authorised to do so on behalf of the enterprise: i) authorizes the Employer to obtain a tax clearance certificate from the South African Revenue Services that my/our tax matters are in order; ii) confirms that the neither the name of the enterprise or the name of any partner, manager, director or other person, who wholly or partly exercises, or may exercise, control over the enterprise appears on the Register of Tender Defaulters established in terms of the Prevention and Combating of Corrupt Activities Act of 2004; iii) confirms that no partner, member, director or other person, who wholly or partly exercises, or may exercise, control over the enterprise appears, has within the last five years been convicted of fraud or corruption; iv) confirms that I/we are not associated, linked or involved with any other tendering entities submitting tender offers and have no other relationship with any of the tenderers or those responsible for compiling the scope of work that could cause or be interpreted as a conflict of interest; v) confirms that the contents of this questionnaire are within my personal knowledge and are to the best of my belief both true and correct.
SIGNED ON BEHALF OF TENDERER
: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 2 : CERTIFICATE OF AUTHORITY FOR JOINT VENTURES
This returnable schedule is to be completed by joint ventures.
We, the undersigned, are submitting this tender offer in joint venture and hereby authorize
Mr/Ms ………………............................................………………………….., authorised signatory of the company, close corporation or partnership ………………….………………………………………………………..., acting in the capacity of lead partner, to sign all documents in connection with the tender offer and any contract resulting from it on our behalf.
NAME OF FIRM ADDRESS DULY AUTHORISED
SIGNATORY
Lead partner
Signature…………………..
Name………………………
Designation………………..
Signature…………………..
Name………………………
Designation………………..
Signature…………………..
Name………………………
Designation………………..
Signature…………………..
Name………………………
Designation………………..
Note :
A copy of the Joint Venture Agreement (refer to F.2.13.1 in Part T1.2) showing clearly the percentage contribution of each partner to the Joint Venture shall be appended to this schedule.
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 3 : SCHEDULE OF DESIGN EXPERIENCE
The tenderer shall insert in the spaces provided below a list of similar completed designs contracts or assignments awarded to him and those currently being undertaken.
EMPLOYER
(NAME, TEL No.
AND FAX No.)
COMPLETED CONTRACTS OR ASSSIGNMENTS
ENGINEER
(NAME, TEL No.
AND FAX No.)
NATURE OF WORK
VALUE
OF
WORK
R(m)
DATE
COMPLETED
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CURRENT CONTRACTS OR ASSIGNMENTS
EMPLOYER
(NAME, TEL No.
AND FAX No.)
ENGINEER
(NAME, TEL No.
AND FAX No.)
NATURE OF WORK
VALUE
OF
WORK
R(m)
ANTICIPATED
COMPLETION
DATE
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . SIGNED ON BEHALF OF TENDERER:
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 4 : SCHEDULE OF IMPLEMENTATON EXPERIENCE
The tenderer shall insert in the spaces provided below a list of similar implementation contracts awarded to him and those currently being undertaken.
COMPLETED CONTRACTS
EMPLOYER
(NAME, TEL No.
AND FAX No.)
ENGINEER
(NAME, TEL No.
AND FAX No.)
NATURE OF WORK
VALUE
OF
WORK
R(m)
DATE
COMPLETED
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CURRENT CONTRACTS
EMPLOYER
(NAME, TEL No.
AND FAX No.)
ENGINEER
(NAME, TEL No.
AND FAX No.)
NATURE OF WORK
VALUE
OF
WORK
R(m)
ANTICIPATED
COMPLETION
DATE
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SIGNED ON BEHALF OF TENDERER: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 5 : COSTS FOR STAFF AND OTHER RESOURCES FROM IN RSA AND OVERSEAS
The tenderer shall insert in the spaces provided below an assessment of the number of man-days and the Rand value of time to be claimed through contract payments as incurred through employing professional and other human resources on the Contract, sourced in South Africa and overseas.
MAN-HOURS AND RAND VALUE CLAIMED FOR CONTRACT STAFF
ITEM DESCRIPTION
PROFESIONAL STAFF
SOURCED IN RSA
PROFESIONAL STAFF
SOURCED OVERSEAS
TOTALS
1 DESIGN
2 INSTALLATION
3
TRAINING
4 OPERATIONS
5 MAINTENANCE
TOTALS
PERCENTAGE 100%
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SIGNED ON BEHALF OF TENDERER:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
The tenderer shall insert in the spaces provided below an assessment of the projected contract payments in
Rands for all equipment, parts, software, leases and other costs for all aspects of the Contract, sourced in South
Africa and overseas.
PROJECTED CONTRACT PAYMENTS: EQUIPMENT, PARTS AND SOFTWARE ETC
R MILLION
SOURCED
OVERSEAS
TOTAL
1 DESIGN
2 INSTALLATION
3 TRAINING
4 OPERATIONS
5 MAINTENANCE
TOTALS
PERCENTAGE
SIGNED ON BEHALF OF TENDERER:
100%
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 6 : SCHEDULE OF SUBCONTRACTORS
We notify you that it is our intention to employ the following Subcontractors for work in this contract.
Acceptance of this tender shall not be construed as approval of all or any of the listed subcontractors.
Should any of the subcontractors not be approved subsequent to acceptance of the tender, this shall in no way invalidate this tender, and the tendered unit rates for the various items of work shall remain final and binding, even in the event of a subcontractor not listed below being approved by the Engineer.
SUBCONTRACTORS
Person/Phone/Fax/Details Of
Organisation/Firm Experience
Items of work (pay items) to be undertaken by the
Subcontractor
TOTAL (Excluding VAT)
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SIGNED ON BEHALF OF TENDERER: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Estimated
Cost of Work
(Rand)
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 7 : DETAILS OF EXPERIENCE OF KEY PROFESSIONAL PERSONNEL
Tenderers shall set out in the Schedule hereunder details of the experience of Key Personnel in work of a similar nature to that for which their Tender is submitted. The tenderer is referred to clause F.2.1.5 of the
Tender Data and shall insert in the spaces provided below details of the Key Personnel required to be in the employment of the tenderer or contracted to the tenderer, in order for the tenderer to be eligible to submit a tender for this project. The Curriculum Vitae of each individual must also be appended to this schedule. The information provided in this schedule will assist in determining whether the tenderer meets the minimum mandatory requirements as specified by the position descriptions in clause F.2.1.5. Additional sheets may be appended to this schedule.
CONTRACTOR’S REPRESENTATIVE
NAME LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
LEAD DESIGN PROFESSIONAL
NAME LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
LEAD IMPLEMENTATION PROFESSIONAL
NAME LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
OPERATIONS MANAGER
NAME LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
MAINTENANCE MANAGER
NAME LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
SUPPORT DESIGN STAFF RESOURCES
NAMES LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SUPPORT IMPLEMENTATION STAFF RESOURCES
NAMES LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
OTHER STAFF RESOURCES
NAMES LIST ALL TERTIARY
EDUCATION
QUALIFICATIONS
OBTAINED
(QUALIFICATIONS
OBTAINED, YEAR,
INSTITUTIONS)
PROFESSIONAL
REGISTRATION
NO (IF
APPLICABLE)
EXPERIENCE: LIST THE
POSITIONS AND DURATION OF
TIME (MONTHS) IN POSITIONS;
AND/OR THE PROJECTS AND
DURATIONS OF PROJECTS
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SIGNED ON BEHALF OF THE TENDERER: …………………………………….
PROPOSED
NUMBER OF
MONTHS
AVAIABLE FOR
CONTRACT
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 8 : TENDERER’S UNDERTAKING TO EMPLOY KEY PERSONNEL
The tenderer must guarantee that the key professionals that will be employed on the Contract will be available at the commencement of the Contract and for the duration of the activity with which they will be employed on Contract. Failure to make this undertaking will disqualify the tender.
I, ……………………………………………… undertake on behalf of the Tenderer to have the following key personnel listed in Schedule 7 in the employment of the Tenderer at date of the close of tender:
SIGNED ON BEHALF OF THE TENDERER: ……………………………………………………………………….
CONTRACTOR’S REPRESENTATIVE
LEAD DESIGN PROFESSIONAL
SUPPORT DESIGN PROFESSIONAL
SUPPORT DESIGN PROFESSIONAL
LEAD IMPLEMENTATION
PROFESSIONAL
IMPLEMENTATION PROFESSIONAL
IMPLEMENTATION PROFESSIONAL
OPERATIONS MANAGER
MAINTENANCE MANAGER
Note: Key details and Curriculum Vitae of these personnel are to form part of Schedule 7.
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 9 : WORK PLAN AND TIMELINES
The tenderer shall append his proposed work plan and methodology and timelines required under Clause
F.3.11.9 of the Tender Data to this Schedule.
The work plan must indicate the approach and methodology that the tenderer intends following in order to reach the required outcomes. The work plan must show that the tenderer has appreciated the Scope of Work, and has good insight as to what actions or activities are required in order to comply with the Employer’s objectives. The proposed work plan is an important document based upon which up to 16 tender evaluation points for quality will be awarded. Tenderers should however endeavour to keep their submissions in this regard to a maximum of
25 pages.
SIGNED ON BEHALF OF THE TENDERER : …………………………………………………………………………
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 10 : DETAILS OF TENDERER’S WORKSHOP FACILITIES
The tenderer shall state below what workshop facilities will be available for this Contract.
...................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
Address of Workshop ..............................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
...................................................................................................................................................................................................
Number of Artisans Normally
Employed by Firm ..................................................................................................................................................................
..................................................................................................................................................................
Number of Technically Qualified
Persons Employed ...........................................................................................................................
SIGNED ON BEHALF OF TENDERER
: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 11 : TAX CLEARANCE CERTIFICATE
An original valid Tax Clearance Certificate from the South African Revenue Service (SARS) shall be attached to this Schedule or proof that the tenderer has made arrangements with SARS to meet his or her outstanding tax obligations.
Each party to a Consortium/Joint Venture shall submit a separate Tax Clearance Certificate, or proof that he or she has made the necessary arrangements with SARS.
SIGNED ON BEHALF OF TENDERER: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 12 : BARGAINING COUNCIL CERTIFICATE
Where applicable, a certificate of compliance issued by the relevant Bargaining Council shall be attached to this schedule.
SIGNED ON BEHALF OF TENDERER: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF
THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 13 : FINANCIAL STATEMENTS FOR CONTRACTS OVER R10 MILLION
Tenderers are referred to Clause F.2.18.1 and shall attach all the required documentation to this Schedule where a tender price exceeds R10 million.
Each party to a Consortium/Joint Venture shall submit a separate set of documents.
SIGNED ON BEHALF OF TENDERER: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 14 : PARTICULARS OF CONTRACTS AWARDED TO TENDERER DURING PAST FIVE YEARS
The tenderer shall insert in the spaces provided below a list of the particulars of any contracts awarded to the tenderer by an organ of state during the past five years, including particulars of any material non-compliance or dispute concerning the execution of such contract.
ORGAN OF STATE
(NAME, TEL No.
AND FAX No.)
DESCRIPTION OF
CONTRACT
DATE
COMPLETED/
CURRENT
DETAILS OF NON-
COMPLIANCE OR DISPUTE,
IF ANY
VALUE
OF
WORK
R(m)
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SIGNED ON BEHALF OF TENDERER: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T2.2
Returnable Schedules Part T2: Returnable documents
Reference No. 25G/2009/10
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 15: CONFIRMATION OF REGISTRATION ON CoCT SAP VENDOR DATABASE
COMPANY NAME
REGISTERED
YES/NO
REGISTRATION NUMBER
IF APPLICABLE
Tenderers who are not registered and verified on the CoCT SAP Vendor Database are not precluded from submitting tenders, but must be registered prior to the evaluation of tenders in order for their tenders to be responsive.
In this regard it is the sole responsibility of tenderers to ensure that this requirement is complied with. In the case of
Joint Venture Partnerships this requirement will apply to each party to the Joint Venture.
SIGNED ON BEHALF OF TENDERER:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 16 : HEALTH AND SAFETY PLAN
Tenderers are to note the requirements of the Occupational Health and Safety Act No. 85 of 1993 and the Construction
Regulations 2003 issued in terms of Section 43 of the Act. The tenderer shall be deemed to have read and fully understood the requirements of the above Act and Regulations and to have allowed for all costs in compliance therewith.
In this regard the tenderer shall prepare and attach a Health and Safety Plan in respect of the Works in order to demonstrate the necessary competencies and resources to perform the construction work all in accordance with the Act and Regulations. Such Health and Safety Plan shall cover inter-alia the following details:
(1) Management Structure, Site Supervision and Responsible Persons including a succession plan.
(2) Contractor’s induction training programme for employees, sub-contractors and visitors to the Site.
(3) Health and safety precautions and procedures to be adhered to in order to ensure compliance with the Act,
Regulations and Safety Specifications.
(4) Regular monitoring procedures to be performed.
(5) Regular liaison, consultation and review meetings with all parties.
(6) Site security, welfare facilities and first aid.
(7) Site rules and fire and emergency procedures.
Tenderers are to note that the Contractor is required to ensure that all sub-contractors or others engaged in the performance of the contract also comply with the above requirements.
The tenderer shall also take into account the additional requirements stated in the Scope of Work when drawing up the
Health and Safety Plan for the contract.
Details of the Health and Safety Plan shall be appended to this Schedule.
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SIGNED ON BEHALF OF TENDERER
: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 17 : DECLARATION IN TERMS OF THE MUNICIPAL FINANCE MANAGEMENT ACT (No. 56 of 2003)
Item Question
1.1 Is the Tenderer or any of its directors listed on the National Treasury’s database as a company or person prohibited from doing business with the public sector?
(Companies or persons who are listed on this database were informed in writing of this restriction by the National Treasury after the audi alteram partem rule was applied).
1.1.1 If so, furnish particulars:
1.2 Is the Tenderer or any of its directors listed on the Register for Tender Defaulters in terms of section 29 of the Prevention and Combating of Corrupt Activities Act (No 12 of 2004)?
(To access this Register enter the National Treasury’s website, www.treasury.gov.za
, click on the icon “Register for Tender Defaulters” or submit your written request for a hard copy
of the Register to facsimile number (012) 3265445).
Yes No
Yes No
Yes No
1.2.1 If so, furnish particulars:
1.3 Was the Tenderer or any of its directors convicted by a court of law (including a court of law outside the Republic of South Africa) for fraud or corruption during the past five years?
Yes No
1.3.1 If so, furnish particulars:
1.4 Does the Tenderer or any of its directors owe any municipal rates and taxes or municipal charges to the municipality / municipal entity, or to any other municipality / municipal entity, that is in arrears for more than three months?
Yes
1.4.1 If so, furnish particulars:
1.5 Was any contract between the Tenderer and the municipality / municipal entity or any other organ of state terminated during the past five years on account of failure to perform on or comply with the contract?
1.5.1 If so, furnish particulars:
CERTIFICATION
I, THE UNDERSIGNED (FULL NAME) …………..……………………………................................................……
CERTIFY THAT THE INFORMATION FURNISHED ON THIS DECLARATION FORM TRUE AND CORRECT.
Yes
No
No
I ACCEPT THAT, IN ADDITION TO CANCELLATION OF A CONTRACT, ACTION MAY BE TAKEN AGAINST ME
SHOULD THIS DECLARATION PROVE TO BE FALSE.
…………………………..
Name
*where the entity tendering is a joint venture, each party to the joint venture must sign a declaration in terms of the Municipal Finance Management Act and attach it to this schedule
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 18 : CERTIFICATE FOR MUNICIPAL SERVICES AND PAYMENTS TO SERVICE PROVIDER
To: THE CITY MANAGER, CITY OF CAPE TOWN
C E R T I F I C A T E F O R M U N I C I P A L S E R V I C E S
A N D P A Y M E N T S T O S E R V I C E P R O V I D E R
Information required in terms of the City’s Supply Chain Management Policy, Clauses 45.1 and 112.2
BID NO: 25G/2009/10: DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
NAME OF THE BIDDER: ………………………………………………………………………………………..
FURTHER DETAILS OF THE BIDDER/S; Proprietor / Director/s / Partners, etc:
Physical Business address of the Bidder Municipal Account number(s)
Identity Number
If there is not enough space for all the names, please attach the additional details to the Bid Document
Name of Director /
Member / Partner
Municipal
Account number(s)
Physical residential address of
Director / Member / Partner
I, ____________________________________________________________________________, the undersigned,
(full name in block letters ) certify that the information furnished on this declaration form is correct and that I/we have no undisputed commitments for municipal services towards a municipality or other service provider in respect of which payment is overdue for more than 30 days.
________________________________________
Signature
THUS DONE AND SIGNED for and on behalf on the Bidder / Contractor at ……………………………………………….. on the ………. day of ……………………….……… 20…….
(PLACE) (DATE) (MONTH) (YEAR)
Please Note:
Even if the requested information is not applicable to the Bidder, the table above should be endorsed Not
Applicable and THIS DECLARATION MUST STILL BE SIGNED
T2.2
Returnable Schedules Part T2: Returnable documents
Reference No. 25G/2009/10
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 19 : AUTHORISATION FOR THE DEDUCTION OF OUTSTANDING AMOUNTS OWED TO COUNCIL
To: THE CITY MANAGER, CITY OF CAPE TOWN
From: _________________________________________________________
(Name of Bidder or consortium)
AUTHORISATION FOR THE DEDUCTION OF OUTSTANDING AMOUNTS OWED TO COUNCIL
Extract from Supply Chain Management Policy, Clause 45.1:
“The City Manager may reject the bid or quote of any person if that person or any of its directors has:
45.1 failed to pay municipal rates and taxes or municipal service charges and such rates, taxes and charges are in arrears for more than three months; …”
I, THE UNDERSIGNED, __________________________________________________________________________,
(FULL NAME IN BLOCK LETTERS
) hereby authorise the City of Cape Town to deduct the full amount outstanding by the business organisation / Director /
Partner, etc from any payment due to us / me.
…………………………………………………………….
Signature
THUS DONE AND SIGNED for and on behalf of the Bidder / Contractor at ……………………………………………….. on the ………. day of ……………………….……… 20…….
(PLACE) (DATE) (MONTH) (YEAR)
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 20 : RECORD OF ADDENDA TO TENDER DOCUMENTS (ANNEX K)
We confirm that the following communications received from the Employer before the submission of this tender offer, amending the tender documents, have been taken into account in this tender offer:
Date
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Attach additional pages if more space is required.
Signed
Name
Tenderer
Date
Position
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 21 : DEVIATIONS AND QUALIFICATIONS BY TENDERER
The Tenderer should record any deviations or qualifications to the requirements of the tender documents in this
Returnable Schedule. Alternatively, a tenderer may state such deviations and qualifications in a covering letter attached to his tender and reference such letter in this schedule.
The Tenderer’s attention is drawn to clause F.3.8 of the Standard Conditions of Tender referenced in the Tender Data regarding the Employer’s handling of material deviations and qualifications, and to clause F.2.13.1(i) Deviations from
Specification in the Tender Data.
If no deviations or modifications are made, the schedule hereunder is to be marked NIL and signed by the Tenderer.
No alternative Tender will be considered unless a Tender free of qualifications and strictly on the basis of the Tender
Documents is also submitted.
PAGE/ITEM CLAUSE/DESCRIPTION
Number of sheets appended by the tenderer to this Schedule ....................... (If nil, enter NIL).
SIGNED ON BEHALF OF TENDERER: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
T2.2
Returnable Schedules Part T2: Returnable documents
Reference No. 25G/2009/10
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 22 : PREFERENCING SCHEDULE
Preferencing Schedule where preferences are granted in respect of HDI Participation
1 Definitions
The following definitions shall apply to this schedule:
Equity ownership: The percentage of an enterprise or business owned by individuals or, in respect of a company, the percentage of the company’s shares that are owned by individuals, who are actively involved in the management of an enterprise or business and exercise control over the enterprise, commensurate with their degree of ownership at the closing date of the tender.
Note:
All claims for HDI equity ownership by an HDI will be considered according to the following criteria:
- equity within private companies will be based on the percentage of equity ownership;
- preference points will not be awarded to public companies and tertiary institutions;
- equity claims for a trust will only be allowed in respect of those persons who are both trustees and beneficiaries and who are actively involved in the management of the Trust; and
- a consortium or joint venture may, based on the percentage of the contract value managed or executed by their
HDI members, be entitled to equity ownership.
Historically disadvantaged individual (HDI): A South African citizen a) who, due to the apartheid policy that had been in place, had no franchise in national elections prior to the introduction of the Constitution of the RSA, 1983 (Act 110 of 1983) or the Constitution of the RSA, 1993 (Act 200 of 1993) (the interim b)
Constitution), or who is a female; or c) who has a disability; provided that a person who obtained South African citizenship on or after the coming to effect of the Interim Constitution, is deemed not to be an HDI;
Prime Contractor : For the purposes of calculating the contract participation goal in respect of HDI participation (CPG
1
) a prime contractor shall be defined as the organisation named on the Form of Offer and Acceptance, whose offer has been accepted by the Employer.
Sub-Contractor : For the purposes of calculating the contract participation goal in respect of HDI participation (CPG
1
) a subcontractor shall be defined as a contractor employed by the Prime Contractor to execute construction work on the site (as defined in the General Conditions of Contract and the Scope of Work) by providing labour only or a combination of labour, plant, equipment and materials.
2 Conditions associated with the granting of preferences
The tenderer undertakes to:
1) achieve the tendered contract participation goal in respect of HDI equity ownership (CPG
1
) by means of one or more of the following:
• by virtue of his/her HDI Ownership percentage as a Prime Contractor (Method 1);
• by virtue of his/her HDI Ownership percentage in a Joint Venture Partnership (Method 2);
• by awarding contracts to HDI Sub-contractors (Method 3);
• by awarding contracts to HDI supplier’s, manufacturers and services providers (Method 4).
Notes:
• Methods 1 and 2 afford the Prime Contractor/Joint Venture Partnership opportunity to obtain preference points for HDI participation based on the award value less the value of all sub-contractors (Method 3) and less the value of suppliers
(materials), manufacturers and service providers, which are claimed in Method 4. Methods 1 and 2 may not be claimed together.
• In Method 3 it is mandatory for the Prime Contractor/Joint Venture Partnership to list all his sub-contractors (irrespective of their HDI equity ownership) and the total value of all the sub-contractors will be deducted from the award value in
Methods 1 or 2 as applicable. This means that, if the total HDI percentage calculated for all sub-contractors in Method 3 is less than that of the Prime Contractor/Joint Venture Partnership, then a lower overall
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
HDI participation percentage will be achieved and the tenderer must tender a lower contract participation goal accordingly.
• The value of work performed by sub-contractors shall be the fully inclusive prices claimed by the sub-contractors
(including labour, plant, equipment, materials, overheads, profits, etc.) but shall exclude VAT and the Prime Contractor’s mark-up.
• Method 4 affords the Prime Contractor/Joint Venture Partnership opportunity to claim additional HDI percentage where his suppliers (materials), manufacturers and services providers’ HDI percentage, in each case, are greater than his own
HDI percentage.
• The value of the suppliers, manufacturers and service providers’ contribution shall be the fully inclusive prices claimed by the suppliers, manufacturers and service providers, but shall exclude VAT and the Prime Contractor’s mark-up.
• The Employer reserves the right to reject a tender if, in the opinion of the Employer, the tenderer will be unable to achieve the contract participation goal tendered, in the performance of the contract.
• The attention of tenderers is draw to the fact that, in order to achieve HDI Participation goals in respect of subcontractors, suppliers, manufacturers and/or service providers, the Contractor shall ensure that all such are registered and verified on the Western Cape Supplier Database. The Employer shall not accept any claim for achieving HDI participation in respect of the Contractor, sub-contractors, etc. unless they are all registered and verified. For further enquires in this regard contact the TradeWorld WCSD Help Desk on 0861-225577 or 021-680 4600, or e-mail: supplierdatabase@tradeworld.net
2) complete the supporting HDI Contract Participation Goal Calculation (CPG
1
) contained in Annex A attached;
3) complete the Tender Preference Claim in respect of HDI participation contained in Section 4 below;
4) deliver to the Employer, within 5 working days of being requested in writing to do so, a Joint Venture Agreement, should a joint venture be proposed at prime contract level;
5) deliver to the Employer, within 5 working days of being requested in writing to do so, a HDI Participation Declaration Affidavit in respect of all HDI owned enterprises engaged at prime contract level to satisfy Contract Participation Goal undertakings;
6) accept the sanctions set out in Section 3 below should such conditions be breached.
3 SANCTIONS
In the event that the Tenderer fails to substantiate that any failure to achieve the Contract Participation Goal relating to the granting of a preference was due to quantitative under runs, the elimination of items, or any other reason beyond the Contractor’s control which may be acceptable to the Employer, it shall be liable to pay to the Employer a financial penalty calculated in the following manner:
P = 0,15 x (D – Do) x N
A
(100) where D
Do
N
A
P
= tendered Contract Participation Goal percentage.
= the Contract Participation Goal which the Employer’s representative based on the credits passed,
=
= certifies as being achieved upon completion of the Contract.
Net Amount (as per value
(A)
Annex A attached)
Rand value of penalty payable
4 TENDER PREFERENCE CLAIM IN RESPECT OF HDI PARTICIPATION
I / WE HEREBY TENDER A CONTRACT PARTICIPATION GOAL OF
PARTICIPATION (CPG
1
) IN ORDER TO CLAIM A PREFERENCE . ..............% IN RESPECT OF HDI
Where no figures are inserted in the above claim the tendered Contract Participation Goal in respect of HDI Participation
(CPG
1
) will be deemed to be nought. Where discrepancy occurs between the figures on this declaration and any other supporting calculations this declaration shall take precedence.
The undersigned, who warrants that he / she is duly authorised to do so on behalf of the firm, sole proprietor or Joint Venture confirms that he / she understands the conditions under which such preferences are granted and confirms that the tenderer satisfies the conditions pertaining to the granting of tender preferences
.
Signature : ...............................................................................................................................……….....
Name : .......................................................................................................................................………...
Duly authorised to sign on behalf of ............................................................................................………
Telephone : ......................................................................
Fax : ......................................................................... Date : ...............................................................
SUPPORTING HDI CONTRACT PARTICIPATION GOAL CALCULATION
Annex A: HDI Contract Participation Goal calculation attached
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
Annex A
HDI CONTRACT PARTICIPATION GOAL CALCULATION
This annex shall be used by Tenderers to calculate their tendered HDI Contract Participation for a given Contract.
2.
1. TENDER
Sum tendered exclusive of VAT
Less Provisional sums
R
R
.............................................
.............................................
Less allowances, if any, for contingencies and escalation provided by the Employer R .............................................
Net Amount R .............................................
NOTE: The Contract Participation percentage is based on the Net Amount.
ATTAINING THE HDI CONTRACT PARTICIPATION PERCENTAGE
(A)
I/We intend achieving the Contract participation percentage by means of one or a combination of the following methods (tick the box(es) which are applicable):
Method #1 by virtue of my/our HDI Ownership percentage as a Prime Contractor
Method #2 by virtue of my/our HDI Onwership percentage in a Joint Venture partnership
Method #3 by awarding contracts to HDI sub-contractors
(mandatory to complete)
Method #4 by awarding contracts to HDI suppliers, manufacturers and service providers
Refer to notes contained in Section 2: Conditions associated with the granting of preferences in the
Preferencing Schedule where preferences are granted in respect of HDI participation.
3. SUMMARY HDI CONTRACT PARTICIPATION PERCENTAGE
Complete the following in respect of each selected method:
3.1 Method #1: by virtue of my/our HDI ownership percentage as a Prime Contractor
% HDI equity ownership of Prime Contractor
Net Amount (from 1. above)
Less: Value of work performed by sub-contractors (from 3.3
Method #3)
Sub-Total
Less: Value of Contracts that will be awarded to suppliers, manufacturers and service providers (which have a higher percentage HDI ownership than the Prime
Contractor (from 3.4 method #4))
Prime contract value towards HDI participation
.........................................% (B)
.......................................... (A)
(E
1
)
% HDI equity ownership towards participation percentage
(carry to Section 4)
= (B)% x (E
1
)
(A)
=
........................................% (F)
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
3.2 Method #2: by virtue of my/our HDI ownership percentage in a Joint Venture Partnership
Net Amount (from 1. above) (A)
Less: Value of work performed by sub-contractors (from 3.3 Method #3)
( )
Sub-Total
Less: Value of Contracts that will be awarded to suppliers, manufacturers and service providers (which have a higher percentage HDI ownership than the Prime Contractor)
(from 3.4 method #4)
Prime contract value toward HDI participation
( )
(E
2
)
Name of Joint Venture Partner % HDI equity ownership towards participation percentage
% HDI equity ownership
(B)
Value of (E
2
)performed by each JV Partner
(G)
=
(B)
% x (G)
(A)
% %
% %
% %
% %
Total Prime Contract Value towards HDI participation
R
Total Joint Venture % HDI equity ownership towards participation percentage (carry to Section 4.) %
(E
2
(H)
)
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
3.3 Method #3: by awarding contracts to sub-contractors
Note: It is mandatory to list all sub-contractors (irrespective of their HDI equity ownership).
Sub-contractors
(employed by Prime Contractor)
% HDI equity ownership
(I)
Value of work to be undertaken
(J)
% HDI equity ownership towards participation percentage
(I)
% x (J)
(A)
%
%
%
%
%
%
%
%
%
%
(C) Value of work performed by sub-contractors R
Total Sub-Contractors % HDI equity ownership towards participation percentage (carry to Section 4.) % (K)
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
4.
3.4 Method #4: by awarding contracts to HDI suppliers, manufacturers and service providers
HDI suppliers, manufacturers and service providers
(employed by Prime Contractor)
% HDI equity ownership
(L)
Value of contribution
(M)
% HDI equity ownership towards participation percentage
(L) % x (M)
(A)
%
%
%
%
%
%
%
%
%
%
Value of contribution by suppliers, manufacturers and service providers R
Total supplier etc. % HDI Equity ownership towards participation percentage (carry to Section 4.)
(D)
% (N)
TOTAL HDI CONTRACT PARTICIPATION PERCENTAGE
Total for Method #1 (refer 3.1)
OR
Method #2 (refer 3.2)
AND/OR
Method #3 (refer 3.3)
AND/OR
Method #4 (refer 3.4)
TOTAL HDI CONTRACT PARTICIPATION PERCENTAGE CARRIED
TO SECTION 4 OF THE PREFERENCING SCHEDULE (CPG
1
)
..........................................%
..........................................%
..........................................%
..........................................%
..........................................%
(F)
(H)
(K)
(N)
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 23 : CORRESPONDENCE WITH BUS MANUFACTURERS
See Section C3.9 in Volume 2B.
Date of Correspondence Bus Supplier Contact Person
SIGNED ON BEHALF OF TENDERER: …………………………………….
T2.2
Returnable Schedules Part T2: Returnable documents
Reference No. 25G/2009/10
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 24 : TECHNICAL DATA SHEETS
PREAMBLE
The relevant schedule shall be completed for each tender submitted.
Full technical answers shall be provided. The following answers will not be unacceptable and tenderers need to provide sufficient comment in the Schedule to allow evaluation:
“Comply”
“Refer technical data”
“See attached”, etc.
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
1
The Design Process will follow the Systems Design
Process outlined in Specifications
2
A preliminary design on which the tender and the prices for the tender are based is attached to the tender
1
1.a
The AVL shall provide a positional accuracy of +/-
15 meters, 95% of the time.
1.b
The GPS position shall be updated every 5 seconds or less
1.c
Vehicle location computation lag time shall not exceed two (2) seconds
2
2.a
Automated operation that requires no interaction by the operator to trigger announcements
3
3.a
The DVR shall be installed such that it is tamper proof and only authorised personnel can gain access to it
3.b
The DVR shall have enough storage capacity to record 18 hours per day for 3 days at the stated frame rate and resolution for up to four cameras.
4
4.a
5
5.a
Activation of the overt/covert alarm shall initiate continuous tracking of the vehicle with highest priority being given to the vehicle for data communications.
The Mobile Wireless Router (MWR) to be supplied shall be a cellular access platform designed to transport mixed generation Radio Access Network
(RAN) traffic.
Tender
Part T2: Returnable Documents
Reference No: 25G/2009/10 60
T2.2
Returnable Schedules
6
6.a
The wireless LAN access points shall be based on
802.11g technology, and shall be compatible with the wireless LAN cards on the buses.
6.b
A sufficient number of wireless LAN access points shall be provided to provide a minimum 10Mbs coverage throughout all bus parking areas and driveways.
6.c
The complete docking procedure for busses shall not exceed 10 minutes from the time of arrival in the depot.
7
7.a
The bus priority system where possible, should make use of commercially available, off-the-shelf components, with well-established records of reliability and performance, within the region.
7.b
Shall be integrated with other on-board systems, using relevant standards.
7.c
Shall transmit relevant bus information that will be used to prioritize conflicting priority requests.
7.d
8
8.a
Shall validate the data transmitted from the approaching vehicle and identify whether the vehicle in question is authorized in the TSP system or not.
The MDT display must be readable in direct sunlight and must offer a low-glare setting for night time operation.
8.b
The MDT shall be the minimum size feasible within these requirements and human factors design constraints.
8.c
The MDT shall include functionality to send predefined messages to central control.
9
9.a
The ASA system shall provide visual and audio next-stop announcement acceptable to people with disabilities.
9.b
Shall include functionality for automated operation that requires no interaction by the operator to trigger announcements
Tender
Part T2: Returnable Documents
Reference No: 25G/2009/10 61
T2.2
Returnable Schedules
1
1.a
The AVL stop and station database shall utilize a stop identification numbering system as assigned by City of Cape Town
1.b
1.c
The system shall provide for the import of stop and route mapping data using common or industry standard file formats and City of Cape Town standard formats.
The scheduling and routing software should allow for scheduling of typical IRT trunk and feeder services where the trunk vehicles will run along fixed routes.
1.d
The scheduling and routing software should allow for easy and efficient scheduling of subscription and demand-response trips
2
2.a
The central processing system shall provide a realtime AVL interface to external systems to provide the location of all APC/AVL and AVL-only equipped buses
2.b
The AVL map system shall be based on standard digital GIS data provided by the City of Cape Town.
2.c
The AVL shall automatically reconcile VWM data with route, trip and stop information provided by
City of Cape Town scheduling systems.
2.d
The AVL interface shall supply current route variant and block/run/route/trip ID.
2.e
The base polling frequency for updates to the location of each bus shall be no longer than every
60 seconds and in no event greater than every 90 seconds.
2.f
Schedule adherence shall be determined on the vehicles and communicated to the central system for display on the CAD workstations.
2.g
The CAD system shall generate an off-route alarm for vehicles deviating from routes by a configurable distance.
Tender
Part T2: Returnable Documents
Reference No: 25G/2009/10 62
T2.2
Returnable Schedules
3
3.a
The central processing system shall create and manage all VWM and AVL configuration data and reports
3.b
The CAD system shall display the estimate bus loading level, updated in real time as bus locations are polled.
3.c
The system shall alert operators when a bus is operating over its capacity.
3.d
The CAD system shall include the ability to alert operators when a timed transfer will be missed and a decision is needed.
3.e
DRS shall provide predefined reports enabling City of Cape Town to compare system performance against standard industry benchmarks.
3.f
The DRS shall provide a means for City of Cape
Town staff to develop and generate customized reports.
3.g
The DRS shall provide a means for City of Cape
Town staff to develop and generate customized database queries and exports.
3.h
The Traveller Information System shall include an interactive web site for fixed-route services.
3.i
The web site shall have the capacity to display the expected arrival time, based on real-time AVL data, of the next two buses on each route, at any published time point and at any stop along a route.
4
4.a
The central processing system shall be sensitive to and react to any alarms activated by bus drivers, station attendants, CCTV cameras or intruder detection alarms.
4.b
The system shall notify City of Cape Town
Customer Service automatically of significant service disruptions, such as unusual delays, incidents, reroutes, or missed trips.
4.c
The identification of supervisor and support vehicles closest to an individual bus trip selected by the operator. The operator shall be able to assign a response to the closest available support vehicles.
Tender
Part T2: Returnable Documents
Reference No: 25G/2009/10 63
T2.2
Returnable Schedules
5
5.a
The CAD system shall provide an audible and visual alert to Dispatch, Radio Supervisor, and others using the system when an emergency alarm is activated.
5.b
The CAD system shall support both covert alarms and overt alarms.
5.c
When receiving an alarm the CAD system shall zoom and centre the map display on the alarming vehicle at the discretion of the operator.
6
6.a
The DVMS system shall provide operator control of
PTZ drives and camera selection, as well as automated sequences and alarm responses.
6.b
The NVRS shall provide continuous, time scheduled and alarm recording of all cameras connected to the network and fast and easy to use video retrieval.
6.c
Video storage of all cameras shall be for at least 3 days.
7
7.a
The central processing system shall manage the communications with all VWM/AVL equipped vehicles
7.b
The system shall be designed for continuous operation without the need to manually “reboot” computers or devices.
7.c
7.d
System availability shall be 97% or better. For central systems, availability shall be determined by dividing total out-of-service time by total operating time.
Emergency Alarms/intruder detection alarm/etc should be detected within 2 second and streaming video of the affected area must be immediately available.
Tender
Part T2: Returnable Documents
Reference No: 25G/2009/10 64
T2.2
Returnable Schedules
1
1.a
A Digital Video Surveillance System shall provide the operators in the trunk station kiosk and Control
Centre with the means to survey the entire trunk station.
1.b
The cameras must be tamper proof with the necessary alarms and video analytics
1.c
It is preferred that all video streams will be H.264 encoded.
1.d
The ticket kiosk must be provided with one video monitor to display video feed from cameras.
2
2.a
The LCDs shall include functionality to display preset messages and/or real-time dynamic next bus arrivals to PT users.
2.b
When the bus arrival is within a designated number of minutes, the SBS shall emit a tone or chime indicating that arrival is imminent.
2.c
Clearly legible under full range of ambient illumination conditions at full intensity from any viewing distance within 1 meter to 25 meters.
3
3.a
Will be robust and vandal proof with hidden screws.
3.b
Will have 2 separate buttons for information and emergencies.
4
4.a
Will be IP based and connected to the TMC via the
IRT network.
4.b
Will be fully configurable and managed from the
TMC.
Tender
Part T2: Returnable Documents
Reference No: 25G/2009/10 65
T2.2
Returnable Schedules
1
1.a
Will be a small, keyhole sized camera.
1.b
The video recorder will be sufficiently compact to fit into the space available in the VMS enclosure.
1.c
The SD/SDHC memory card will have sufficient capacity to store at least 24 hours of video footage.
2
2.a
Will be robust and vandal proof with hidden screws.
2.b
Will have 2 separate buttons for information and emergencies.
3
3.a
The VMS will employ ultra bright amber text utilising high-performance wide-angle LED’s, with a vandal-resistant screen.
3.b
The entire surface of the VMS will be evenly illuminated with a minimum viewing angle of 110 degrees.
1
1.a
The cameras must be tamper proof with the necessary alarms and video analytics
1.b
It is preferred that all video streams will be H.264 encoded.
Tender
Part T2: Returnable Documents
Reference No: 25G/2009/10 66
T2.2
Returnable Schedules
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT
CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 25 : PRICE BASIS FOR IMPORTED EQUIPMENT
See Part C2: Pricing Data for Returnable Schedule 25 attached to C2.1 Pricing Instructions.
SIGNED ON BEHALF OF TENDERER: …………………………………….
Part T2: Returnable documents
Reference No. 25G/2009/10
T2.2
Returnable Schedules
Pages
C1.1 Form of Offer and Acceptance (Agreement) ..............................72 – 75
C1.2 Contract Data...............................................................................76 – 102
C1.3 Form of Performance Security - Demand Guarantee............103 – 104
C1.4 Occupational Health and Safety Agreement ..........................105 – 106
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1
Agreements and Contract Data
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
The Employer, identified in the Acceptance signature block, has solicited offers to enter into a contract for the procurement of:
CONTRACT NO. 25G/2009/10: DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING
AND MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
The tenderer, identified in the offer signature block, has examined the documents listed in the tender data and addenda thereto as listed in the returnable schedules, and by submitting this offer has accepted the conditions of tender.
By the representative of the tenderer, deemed to be duly authorized, signing this part of this form of offer and acceptance, the tenderer offers to perform all of the obligations and liabilities of the contractor under the contract including compliance with all its terms and conditions according to their true intent and meaning for an amount to be determined in accordance with the conditions of contract identified in the contract data.
THE OFFERED TOTAL OF THE PRICES INCLUSIVE OF VALUE ADDED TAX IS:
Rand. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . (in words);
R . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (in figures)
This offer may be accepted by the Employer by signing the Acceptance part of this Form of Offer and Acceptance and returning one copy of this document to the tenderer before the end of the period of validity stated in the tender data, whereupon the tenderer becomes the party named as the Contractor in the conditions of contract identified in the contract data.
Signature(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Name(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . for the tenderer
(Name and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . address of organization) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Name and signature of witness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Date . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.1
Form of Offer and Acceptance
By signing this part of this Form of Offer and Acceptance, the Employer identified below accepts the tenderer’s offer.
In consideration thereof, the Employer shall pay the Contractor the amount due in accordance with the conditions of contract identified in the contract data. Acceptance of the tenderer’s offer shall form an agreement between the
Employer and the tenderer upon the terms and conditions contained in this agreement and in the contract that is the subject of this agreement.
The terms of the contract are contained in:
Part C1: Agreements and contract data (which includes this agreement)
Part C2: Pricing data
Part C3: Scope of work
Part C4: Site information and drawings and documents or parts thereof, which may be incorporated by reference into Parts 1 to 4 above.
Deviations from and amendments to the documents listed in the tender data and any addenda thereto as listed in the tender schedules as well as any changes to the terms of the offer agreed by the tenderer and the employer during this process of offer and acceptance, are contained in the schedule of deviations attached to and forming part of this agreement. No amendments to or deviations from said documents are valid unless contained in this schedule.
The tenderer shall within two weeks after receiving a completed copy of this agreement, including the schedule of deviations (if any), contact the employer’s agent (whose details are given in the contract data) to arrange the delivery of any bonds, guarantees, proof of insurance and any other documentation to be provided in terms of the conditions of contract identified in the contract data. Failure to fulfill any of these obligations in accordance with those terms shall constitute a repudiation of this agreement.
Notwithstanding anything contained herein, this Agreement comes into effect on the date when the tenderer receives one fully completed original copy of this document, including the schedule of deviations (if any). Unless the tenderer (now Contractor
)
within five working days of the date of such receipt notifies the Employer in writing of any reason why he cannot accept the contents of this agreement, this agreement shall constitute a binding contract between the parties.
Signature(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Name(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . for the
Employer
CITY OF CAPE TOWN
Tower Block, Civic Centre,
12 Hertzog Boulevard
Cape Town
Name and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . signature of witness Date . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.1
Form of Offer and Acceptance
Notes:
1.
2.
3.
The extent of deviations from the tender documents issued by the employer before the tender closing date is limited to those permitted in terms of the conditions of tender.
A tenderer's covering letter shall not be included in the final contract document. Should any matter in such letter, which constitutes a deviation as aforesaid, become the subject of agreements reached during the process of offer and acceptance, the outcome of such agreement shall be recorded here.
Any other matter arising from the process of offer and acceptance either as a confirmation, clarification or change to the tender documents and which it is agreed by the Parties becomes an obligation of the
4. contract shall also be recorded here.
Any change or addition to the tender documents arising from the above agreements and recorded here, shall also be incorporated into the final draft of the Contract.
1 Subject . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2 Subject . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
3 Subject . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
4 Subject . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Details . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
By the duly authorised representatives signing this agreement, the Employer and the tenderer agree to and accept the foregoing schedule of deviations as the only deviations from and amendments to the documents listed in the tender data and addenda thereto as listed in the returnable schedules, as well as any confirmation, clarification or changes to the terms of the offer agreed by the tenderer and the employer during this process of offer and acceptance.
It is expressly agreed that no other matter whether in writing, oral communication or implied during the period between the issue of the tender documents and the receipt by the tenderer of a completed signed copy of this
Agreement shall have any meaning or effect in the contract between the parties arising from this agreement.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.1
Form of Offer and Acceptance
Signature(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Name(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(Name and . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . address of organization/tenderer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Name and signature of witness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Date . . . . . . . . . . . . . . . . . . . . . . . . . . .
Signature(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Name(s) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Capacity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
(Name and CITY OF CAPE TOWN address of Tower Block, Civic Centre, organization) 12
Cape
Name and signature of witness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Date . . . . . . . . . . . . . . . . . . . . . . . . . . .
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.1
Form of Offer and Acceptance
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
GENERAL CONDITIONS OF CONTRACT
The following standardized General Conditions of Contract:
General Conditions which form part of the Conditions of Contract for Plant and Design-Build (First
Edition) 1999 (FIDIC “Yellow Book”)
The Conditions of Contract (Yellow Book) are the Conditions of Contract for Plant and Design-Build for Electrical and Mechanical Works and for Building and Engineering Works Designed by the Contractor, First Edition 1999, available separately from the International Federation of Consulting Engineers (FIDIC).
Copies of these Conditions of Contract (Yellow Book) may be obtained from the South African Institution of Civil
Engineering (SAICE) (tel 011 805 5947) or the South African Association of Consulting Engineers (SAACE) (tel
011 463 2022).
Copies of the Conditions of Contract (Yellow Book) are also available for inspection and scrutiny at the offices of the Employer.
The Annexes and Forms bound in the Conditions of Contract (Yellow Book) shall not apply to this Contract and shall be replaced with the documentation bound into this tender document.
The General Conditions make reference to the Appendix to Tender and Particular Conditions (contained in the
Contract Data) which together with these conditions collectively describe the risks, liabilities and obligations of the contracting parties and the procedures for the administration of the Contract. The Contract Data shall have precedence in the interpretation of any ambiguity or inconsistency between it and the general conditions of contract.
The General Conditions shall be read in conjunction with the variations, amendments and additions set out in the
Appendix to Tender and Particular Conditions below. Each item of data given below is cross-referenced to the
Clause or Sub-Clause in the General Conditions to which it mainly applies.
The Foreword to the Conditions of Contract (Yellow Book) concludes with the following:
“In order to clarify the sequence of Contract activities, reference may be made to the charts on the next two pages and to the Sub-Clauses listed below (some Sub-Clause numbers are also stated in the charts). The charts are illustrative and must not be taken into consideration in the interpretation of the Conditions of Contract.
1.1.3.1 &
1.1.3.2 & 8.1
Base
Date
1.1.6.6 & 4.2
1.1.4.7 &
1.1.3.3 &
14.3
8.2
Interim Payment Certificate
Time for Completion (as extended under 8.4)
1.1.3.4 & 9.1
1.1.3.5 & 10.1 on
Certificate
1.1.3.6 &
1.1.3.7 &
1.1.4.4 &
12.1
11.1
Tests after Completion (if any)
Defects Notification Period (as extended under 11.3)
1.1.3.8 & 11.9 Performance
14.13 Final Payment Certificate”
The charts referred to above are reproduced on the following two pages, amended and amplified where necessary to conform to the Particular Conditions for this Contract. The charts are illustrative and must not be taken into consideration in the interpretation of the Conditions of Contract.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
Issue of the
Tender
Documents
Base
Date
Submission of the
Tender
Contractor receives fully completed Form of Offer and Acceptance on the Commencement Date
8.2 Time for Completion 1
7d ≤ 14d
10.1 Issue of Taking-
Over Certificate
Defects
Notification period 3
11.9 Issue of
Performance
Certificate
28d Delay to the Contractor 2
Notifying of
Defects
≤ 21d
Tender period
4.2, 8.1 and 18.1 Issue of the Performance
Security and
Insurances, and
Commencement of
Work
2.1 Access
to, and possession of, the Site
9.1 Tests on
Completion 4 and Trial
Operation
Period (actual)
Commencement of Trial
Operation Period
(programmed)
Remedying of Defects
4.2 Return of the
Performance
Security
(Modified to suit this Contract)
1. The Time for Completion is stated (in the Appendix to Tender) as a number of days, to which is added any extensions of time under Sub-Clause 8.4.
2. In order to indicate the sequence of events, the above diagram is based upon the example of the Contractor failing to comply with Sub-Clause 8.2.
3. The Defects Notification Period is stated (in the Appendix to Tender) as a number of days, to which is added any extensions under Sub-Clause 11.3.
4. Depending on the type of Works, Tests after Completion may also be required, if provided for in the Contract.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
Each of the monthly (or otherwise) interim payments
14.3 Contractor submits
Statement to the Engineer on or before 20 month th of the
14.6 Engineer issues
Interim Payment
Certificate
14.7 Employer makes the payment to the
Contractor between the
23 rd and 26 th of the ensuing month
No. of days for payment
≤ 21d
The final payment
Engineer verifies
Statement, Contractor submits information ≤ 28d
14.11 Contractor submits draft final statement to the
Engineer ≤ 14d after receipt of Performance Certificate
14.11 Contractor submits Final
Statement and the 14.12 discharge
(Modified to suit this Contract) gives notice of the intention to refer a dispute to a Mediator
20.2 Parties appoint the
Mediator and mediation takes place in accordance with SANS 294 (6.9.2
Mediation)
Mediation unsuccessful
≤ 28d
14.13 Engineer issues Final
Payment
Certificate
14.7 Employer makes payment
20.3 If either
Party dissatisfied or mediation fails a party may initiate court proceedings
Mediation successful
(Modified to suit this Contract)
Parties record agreement
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
APPENDIX TO TENDER
Part 1 : Contract Data completed by the Employer
Item
Employer's name and address ................. 1.1.2.2 & 1.3(b) CITY OF CAPE TOWN, represented by the
Executive Director: Transport Roads and
Stormwater, Tower Block, Civic Centre, 12
Hertzog Boulevard, Cape Town, 8001 and/or such other person or persons duly authorised
Engineer's name and address.................. 1.1.2.4 & 1.3(b) thereto by the Employer in writing; the
Employer is referred to in this Contract
Document by the terms “Employer”, “City of
Cape Town” or “Council” as the context provides.
Dr Christoff Krogscheepers
ITS Engineers
Commencement Date ..............................
Time for Completion of the Works ............
Defects Notification Period ......................
Electronic transmission systems ..............
Governing Law ........................................
Ruling language.......................................
Language for communications .................
Time for access to, and possession of, the
Site ..........................................................
Amount of Performance Security .............
Period for notifying unforseeable errors, faults and defects in the Employer's
Requirements ..........................................
Normal working hours .....................................
Delay penalties for the Works ..................
Maximum amount of Delay penalties ............
1.1.3.2 & 8.1*
1.1.3.3 & 8.2
1.1.3.7 ...........
1.3(a) ...............
1.4....................
1.4....................
1.4....................
2.1* ..................
4.2....................
5.1....................
6.5....................
8.2* & 8.7*
8.7....................
Postnet Suite 127
Private Bag X7
7536 Tyger Valley
Date that the Contractor receives the fully completed Form of Offer and Acceptance.
Milestone 1: Sections of the Works for the
2010 Soccer World Cup shall be completed by 3 May 2010.
Milestone 2: Additional Sections of the Works shall be completed by 1 September 2010.
Milestone 3: The entire Works shall be completed by 16 February 2011.
365 days e-mail
Republic of South Africa
English
English
On or before dates for access to Parts of the
Site listed in sub-clause 2.1 of the Particular
Conditions.
7,5 % of the Accepted Contract Amount
42 days
Between sunrise and sunset
R 5 000,00 per day for Milestone 1
R 2 500,00 per day for Milestone 2
R 2 500,00 per day for Milestone 3
No limit
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
APPENDIX TO TENDER (CONTD)
Adjustments for Changes in Cost ..............
Total advance payment ................................
Number and timing of installments .................
Currencies and proportions.............................
Start repayment of advance payment .........
Repayment amortisation of advance payment
Percentage of retention during contract period……………………………………………
Limit of Retention Money ................................
Plant and Materials for payment when shipped en route to the Site ........................
Plant and Materials for payment when delivered to the Site ....................................
Minimum amount of Interim Payment
Certificates..................................................
Currency/currencies of payment.....................
Periods for submission of insurance:
(a) evidence of insurance................................
(b) relevant policies .........................................
Maximum amount of deductibles for insurance of the Employer's risks
Minimum amount of third party insurance
Disputes ..........................................................
Name of entity or official for appointment of
Mediator ...................................................
Percentage of retention during period of
Operations Agreement ...............................
Limit of Operations Retention Money .............
Amount of Performance Security during period of Maintenance Agreement ...........
Percentage of retention during period of
Maintenance Agreement ............................
Limit of Maintenance Retention Money ..........
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
13.8..................
14.2...................
14.2...................
14.2(a) ..............
14.2(a) ..............
14.2(b) ..............
14.3(d)*.............
14.3(d)*.............
14.5(b) ..............
14.5(c) ..............
14.6...................
14.15.................
18.1...................
18.1...................
18.2(d) ..............
18.3...................
20......................
20.2* .................
23.6.2* ..............
This Contract shall be subject to Contract
Price Adjustment in strict accordance with
Sub-Clause 13.8.1 and 13.8.2 of the
Particular Conditions.
None
Not applicable
Not applicable
Not applicable
Not applicable
10% reducing to 5 % upon the issue of a
Taking-Over Certificate.
No limit
None (Sub-Clause deleted)
None (Sub-Clause deleted)
No minimum
Rand, as named in that section of the Form of
Offer and Acceptance called “Offer”
14 days
14 days
Not applicable
R10 000 000,00
Dispute resolution shall be by mediation failing which by court proceedings
President of the South African Institution of
Electrical Engineers
10 %
23.3.2* ..............
24.9* ................
24.10.2* ............
No limit
10 % of the Accepted Contract Amount for the
Maintenance Agreement
10 %
24.10.2* ............ No limit
* See Particular Conditions
C1.2
Contract Data
Part 2 : Contract Data completed by the Contractor
Contractor’s name and address...................... 1.1.2.3 & 1.3(b).
Percentage for adjustment of Provisional
Sums ............................................................... 13.5(b)(ii) .......... %
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
PARTICULAR CONDITIONS
The Particular Conditions are:
Sub-Clause 1.1 Definitions
1.1.1 The Contract
1.1.1.1 is deleted and replaced by:
“ Contract ” means the Form of Offer and Acceptance, Contract Data, these Conditions, the Employer’s
Requirements, the Specifications, the Drawings, the Schedules, and the further documents (if any) which are listed in the Form of Offer and Acceptance, and further includes drawings and documents or parts thereof which any of the aforesaid documents incorporate by reference.
1.1.1.2 is deleted and replaced by:
“ Contract Agreement ” means the document called “Form of Offer and Acceptance”.
1.1.1.3 is deleted and replaced by:
“
Letter of Acceptance
” means that section of the Form of Offer and Acceptance called “Acceptance”.
1.1.1.4 is deleted and replaced by:
“ Letter of Tender ” means that section of the Form of Offer and Acceptance called “Offer”.
1.1.1.5 is deleted and replaced by:
“
Employer’s Requirements
” means the document entitled Scope of Work, as included in the Contract, and any additions and modifications to such document in accordance with the Contract. Such document specifies the purpose, scope, and/or design and/or other technical criteria, for the Works, and includes the Detailed
Specifications. The Employer’s Requirements are contained in Part C3: Scope of Work and Part C4: Site
Information, and are included in a separate volume (Volume 2A).
1.1.1.6 is deleted and replaced by:
“
Schedules
” means the document(s) entitled schedules, completed by the Contractor and submitted with his tender offer, as included in the Contract. Such document(s) shall include the Returnable Schedules and the
Schedules of Quantities, and may include data, lists and schedules of rates and/or prices.
1.1.1.7 is deleted and replaced by:
“ Contractor’s Proposal ” means the information which the Contractor submitted with the Form of Offer and
Acceptance, as included in the Contract. Such information shall include the information listed in Schedule 17 in
Part T2.2 Returnable Schedules and may also include the Contractor’s preliminary design.
1.1.1.8 is deleted and replaced by:
“
Tender
” means that section of the Form of Offer and Acceptance called “Offer” and all other documents which the Contractor submitted as Returnable Documents, as included in the Contract.
1.1.1.9 is deleted and replaced by:
“
Appendix to Tender
” means the completed section entitled Appendix to Tender included in this Contract Data.
Add the following Sub-Clause after Sub-Clause 1.1.1.10:
1.1.1.11
“
Returnable Schedules
” means the Schedules contained in Part T2.2 of the Tender Data and Part C2.1 of the
Pricing Data, and “Schedules of Quantities” means the document contained in Part C2.2 of the Pricing Data, as included in the Contract.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
1.1.2 Parties and Persons
1.1.2.3 is deleted and replaced by:
“
Contractor
” means the person(s) named as Contractor in that section of the Form of Offer called “Offer” accepted by the Employer and the legal successors in title to this person(s).
1.1.2.9 is deleted and replaced by:
“
Mediator
” means the person appointed under Sub-Clause 20.2.
1.1.3 Dates, Tests, Periods and Completion
1.1.3.1 is deleted and replaced by:
“ Base Date ” means the date 7 days prior to the latest date for the submission of the Tender.
1.1.3.2 is deleted and replaced by:
“
Commencement Date
” means the date the Contractor receives the fully completed Form of Offer and
Acceptance.
1.1.4 Money and Payments
1.1.4.1 is deleted and replaced by:
“ Accepted Contract Amount ” means the amount accepted in that section of the Form of Offer and Acceptance called “Acceptance” for the execution and completion of the Works and the remedying of any defects.
1.1.4.6 is deleted and replaced by:
“ Foreign Currency ” means a currency in which part (if any) of the Contract Price is payable, but not the Local
Currency.
Add the following Sub-Clause after Sub-Clause 1.1.4.12:
1.1.4.13 “ Contract Price Adjustment ” means the adjustment to be included in the Contract Price for fluctuations in the Cost of Plant and Materials, Site installation and General items, Health and
Safety, Environmental Management, Sundries, etc. and Variations in Rates of Exchange, Customs
Surcharge and Customs Duty, all as provided for in Sub-Clause 13.8.
1.1.6 Other Definitions
Add the following Sub-Clause after Sub-Clause 1.1.6.9:
1.1.6.10 “
Letter of Notification
” means the letter of formal notification, signed by the Employer, of the decision of the Supply Chain Management Bid Adjudication Committee sent to all tenderers. The notification of the decision does not form part of the Employer’s Acceptance of the successful tenderer’s Form of Offer and no rights shall accrue.
Sub-Clause 1.5 Priority of Documents
Deleted and replaced by:
The documents forming the Contract are to be taken as mutually explanatory of one another. For the purposes of interpretation, the priority of the documents shall be in accordance with the following sequence:
(a) the Form of Offer and Acceptance,
(b) the Appendix to Tender within the Contract Data,
(c) the Particular Conditions within the Contract Data,
General Conditions,
(e) the Employer’s Requirements, and
Schedules.
If an ambiguity or discrepancy is found in the documents, the Engineer shall issue any necessary clarification or instruction.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
Sub-Clause 1.6 Contract Agreement
Deleted and replaced by:
The Parties shall enter into a Contract Agreement after the Contractor is called upon to do so by the Employer.
The Agreement shall be the fully completed Form of Offer and Acceptance contained in the Contract Document.
Sub-Clause 1.8 Care and Supply of Documents
Delete “six copies” in the second sentence of the first paragraph and replace with “three copies”.
Sub-Clause 2.1 Right of Access to the Site
Delete sub-paragraph (b) and replace with:
(b) payment, which shall be included in the Contract Price, as follows:
An item has been included in the Schedules of Quantities to cover Cost in the event of the Employer failing to give the Contractor access to, and possession of, the Site or one or more of the Sections of the Site within the time stated in the Appendix to Tender.
The period of delay which may be allowed by the Engineer and paid for under this sub-paragraph shall be agreed margins of latitude to cover delays, normally beyond control of the Employer, for which the Contractor may be compensated by the stipulated amount. These delays shall not be regarded as an instruction to suspend the work in terms of Sub-Clause 8.8 of the Conditions of Contract.
The amount tendered shall include for all additional Cost incurred by such delays, including financing, storage, labour, handling, protection, insurance, overheads, etc., and profit. Should no delays be experienced in terms of this sub-paragraph, the sum included in the Schedules of Quantities therefor shall be deducted.
For Contracts subject to Adjustment for Changes in Cost (Sub-Clause 13.8) the abovementioned amount shall be regarded as “extra over” any Contract Price Adjustment.
Add the following:
The Parts of the Site constituting the Site as further described in clause C3.4 of the Scope of Works shall consist of the following locations where the contractor will be required to install equipment and further undertake the requirements of the Contract:
Centre
(ii) Smart Trunk Stations
(iii) Smart Feeder Stations
Depots
Access to, and possession of, Parts of the Site will be granted for the purpose of executing the specified Works.
The Employer will give the Contractor access to, and possession specific Parts of the Site of at certain times to be agreed between the Employer and the Contractor, within the time stated below, provided that all drawings and other information required to be submitted for acceptance in terms of the Contract have been accepted by the
Engineer.
Milestone 1 – 2010 tournament 2010-05-05
With regard to the Parts of Site requiring access for the performance of Milestone 1, access is expected to be provided to the Contractor on or before the following dates:
Access to vehicles
Type
18m
12m
Vehicles delivered
4
1
Date on or before when access will be provided to the Contractor
2009-11-02
8.8m 4
18m 3
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
12m
8.8m
18m
12m
8.8m
18m
12m
8.8m
18m
12m
8.8m
TOTAL
Access to trunk stations
1
3
4
1
4
5
1
5
1
55
45
137
2010-01-08
2010-02-05
2010-02-26
2010-04-01
Trunk stations
Granger Bay (1 Platform)
Hertzog-Civic (9 Platforms)
Stadium (4 Platforms)
Cape Town International Airport (2 Platforms)
Bayside Centre (2 Platforms)
Atlantis (3 Platforms)
Access to Inner City feeder stations
None
Date on or before when access will be provided to the Contractor
2001-12-08
2010-02-26
2010-02-26
2010-02-26
2010-02-26
2010-02-26
Traffic Management Centre
The TMC will be accessible on the Commencement Date.
Milestone 2 – 2010-09-01
Only those vehicles, trunk stations and the TMC, which will be made accessible to the Contractor prior to
Milestone 1, are at minimum required to be completed for Milestone 2.
Milestone 3 – 2011-02-16
With regard to the Parts of Site requiring access for the performance of Milestone 3, access is expected to be provided to the Contractor on or before the following dates:
Access to vehicles
Type Vehicles delivered
18m
12m
8.8m
30
93
6
Date on or before when access will be provided to the Contractor
2010-09-01
TOTAL 129
Access to trunk stations
Woodstock (1 Platform)
Paarden Island (2 Platforms)
Neptune (2 Platforms)
Section (2 Platforms)
Vrystaat (2 Platforms)
Zoar Vlei (1 Platform)
Lagoon (1 Platform)
Woodbridge (1 Platform)
Milnerton (1 Platform)
Trunk stations
Racecourse Road (1 Platform)
Date on or before when access will be provided to the Contractor
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
Sunset Beach (1 Platform)
Access to feeder stations
2010-12-31
Route/Area
Seapoint - CBD Garden Centre
Seapoint – CBD – Vredehoek
City Bowl Circle Line
Hout Bay – Camps Bay – CBD – V&A Waterfront
Melkbos F13
Atlantis F08 – F12
Bayside F14 – F16
Salt River F18 – F19
Feeder stations in both directions
50
8
38
64
20
186
96
82
Date on or before when access will be provided to the Contractor
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
2010-12-31
TOTAL 544
Access to depots
Depot
CBD
Potsdam
Sub-Clause 2.4 Employer’s Financial Arrangements
Delete this Sub-Clause.
Sub-Clause 2.5 Employer’s Claims
Insert “or by law” after “Contract” in the first sentence of the first paragraph.
Date on or before when access will be provided to the Contractor
2010-12-31
2010-12-31
Sub-Clause 3.1 Engineer’s Duties and Authority
Add the following at the end of second paragraph: “except in the upholding of good engineering principles and practice”.
The requirements for the Engineer to obtain the approval of the Employer before exercising a specified authority are:
1. Giving consent for work to be carried out on days of rest or outside normal working hours in terms of Sub-
Clause 6.5 (b).
2. The approval of a revised programme and supporting report in order to expedite progress in terms of Sub-
Clause 8.6.
3. Suspending progress of part or the whole of the Works in terms of Sub-Clause 8.8.
4. Determining the extent required for rectifying loss or damage to the Works resulting from Employer’s Risks in terms of Sub-Clause 17.4.
5. Instructing the Contractor to employ additional resources besides the Operations Manager to undertake operational functions in the Control Centre in terms of Sub-Clause 23.2 during the period of the Operations
Agreement.
Sub-Clause 3.4 Replacement of the Engineer
Delete and replaced by:
The Employer shall have the right to replace the Engineer.
Sub-Clause 4.2 Performance Security
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
Delete the first sentence of the second paragraph and replace with:
The Contractor shall deliver the Performance Security to the Employer within 14 days from the Commencement
Date . The Form of Performance Security - Demand Guarantee shall contain the wording of the document included in Part C1.3 of the Contract Data.
Sub-Clause 4.3 Contractor’s Representative
Delete “prior to the Commencement Date” in the first sentence of the second paragraph and replace with “within
14 days from the Commencement Date”.
Sub-Clause 4.4 Subcontractors
Delete “28 days’ notice” in sub-paragraph (c) and replace with “14 days’ notice”.
Sub-Clause 4.8 Safety Procedures
The Contractor’s attention is also drawn to Sub-Clause 4.22 (c), and to the Health and Safety Specification in the
Employer’s Requirements.
Sub-Clause 4.17 Contractor’s Equipment
Add the following:
The Contractor shall provide all necessary storage facilities on Site.
Sub-Clause 4.18 Protection of the Environment
The Contractor’s attention drawn to the Environmental Management requirements of Clause C3.1.2.4 of the
Scope of Works in the Employer’s Requirements.
Sub-Clause 4.22 Security of the Site
Add the following Sub-Clause:
(c) The Contractor shall in connection with the Works provide and maintain at his own cost all lights, guards, fencing, watching and other appropriate security measures when and where necessary or required by the
Engineer or by any competent statutory or other authority for the protection and security of the Works and the Contractor's Equipment, or for the safety and convenience of the public and for the protection of life and property.
Add the following:
The Contractor must secure all sections of the site as defined in sub-clause 2.1 of the Particular Conditions. The
Contractor may be given access to sections of the site (such as top station structures) while the contractor for that project is in progress prior to that contractor’s handover. In such an event the Contractor must, subject to agreement with the Engineer, make his own security arrangements and provide additional security measures, if necessary, that are in the view of the Contractor and his insurer to protect his Works until handover.
The Contractor will be entitled to claim only for the security measures that are required under the relevant pay items provided for and priced under the P&G section of the Schedule of Quantities.
Sub-Clause 4.23 Contractor’s Operations on Site
Add the following:
The Contractor shall protect and cover up all works as may be required and take all other precautions necessary to avoid causing damage of new and existing equipment, buildings and structures. This shall inter alia apply when activities such as painting, welding, soldering, grinding and so forth must be performed on the Site. The
Contractor shall, on completion, remove all protective covers and shall at his cost rectify all damage to finishes to the satisfaction of the Engineer.
Sub-Clause 5.1 General Design Obligations
Add the following at the end of the first paragraph:
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
The Contractor’s design shall comply with Clause 3.1 Description of Works in the Scope of Works in the
Employer’s Requirements.
In the third paragraph:
Delete “Upon receiving notice under Sub-Clause 8.1” in the first sentence of the third paragraph and replace with
“Subject to the provisions of Sub-Clause 8.1”.
Sub-Clause 5.2 Contractor’s Documents
Delete the content of sub-paragraph (a) (iii) in the sixth paragraph and replace with: the Contractor shall be entitled to an extension of the Time for Completion upon the expiry of the review periods for all the Contractor’s Documents;
Add the following:
Without limiting the provisions of this Sub-Clause, the requirements relating to the information and drawings to be submitted by the Contractor to the Engineer prior to the purchase and manufacture of any plant and equipment shall be as stated in the Part C3.2 Engineering Design of the Scope of Work in the Employer’s Requirements.
Sub-Clause 5.5 Training
Add the following:
Particular training requirements are specified in Part C3.5 Training of the Scope of Work in the Employer’s
Requirements.
Sub-Clause 6.5 Working Hours
Add the following:
The days of rest are Saturdays, Sundays and all gazetted public holidays.
Sub-Clause 6.7 Health and Safety
The Contractor’s attention is also drawn to F4.1 in T1.2 Tender Data and to the Health and Safety Specification in the Employer’s Requirements, which shall take precedence in case of conflict with this Sub-Clause.
Add the following:
The Employer and the Contractor shall enter into an agreement to complete the work required for the construction of the Works in terms of the provisions of Section 37(2) of the Occupational Health and Safety Act (No. 85 of
1993) and the Construction Regulations promulgated thereunder.
The Contractor shall provide proof to the Employer, within 14 days from the Commencement Date, that he has paid all contributions required in terms of the Compensation for Occupational Injuries and Diseases Act (No. 130 of 1993).
Sub-Clause 7.3 Inspection
Add the following after the last paragraph:
The Contractor shall ensure that equipment complies with the specified requirements before arranging for the
Engineer’s Factory Inspection Tests (FAT) specified in Part C3.4 Testing and Commissioning of the Scope of
Work in the Employer’s Requirements. The Contractor shall then make all arrangements for the Engineer to perform the inspections to meet specifications in Parts C3.9 – C3.14 Detailed Specifications.
The purpose of these inspections is to reduce the risk of non-compliant equipment being transported to Site. The inspections do not reduce the Contractor’s responsibility for complying with the Contract.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
The Contractor shall carry all costs related to any inspection outside the City of Cape Town, including the
Engineer’s travelling and associated costs, but not the cost of the Engineer’s time-related fees.
Sub-Clause 7.4 Testing
Add the following :
The following testing procedures specified in clause C3.4 of the Scope of Works in the Employer’s Requirements shall apply:
(i) Testing Stage 1: Factory Acceptance Test (FAT);
(ii)
(iii)
(iv)
Testing Stage 2: System Integration Test (SIT);
Testing Stage 3: Onsite Integration Testing (OIT); and
Testing Stage 4: System Acceptance Testing (SAT).
Sub-Clause 8.1 Commencement of Work
Delete the first paragraph and replace with the following:
The Commencement Date shall be as stated in the Appendix to Tender, and shall be not later than 120 days after the latest date for submission of tenders, unless the tender offer validity period is extended by the Tenderer upon request of the Employer in terms of F.2.16.2 in Annex F.
The Contractor shall commence executing the Works within 14 days from the Commencement Date.
Notwithstanding the above, the Contractor will not be permitted to commence executing the Works before the
Form of Performance Security - Demand Guarantee and required insurances and other specified items have been submitted and approved.
Sub-Clause 8.2 Time for Completion
Delete sub-paragraph (a) and replace with:
(a) achieving the passing of the Tests on Completion and the 28 day Trial Operation Period referred to in Sub-
Clause 9.1, and
Add the following:
(c) requiring to achieve the following Milestones, failing which the penalty clauses provided for in the Appendix to Tender will be invoked:
Milestone 1: 2010 tournament – on or before 2010-05-05
(i) Installation of components and software systems on all vehicles as required to deliver a functional basic vehicle tracking system; and
(ii) Installation of a functional control centre in the TMC to undertake vehicle tracking and monitoring.
Milestone 2: on or before 2010-09-01
(i) Installation of all system components and software on vehicles to which access is given for Milestone 1, as required under the Contract;
(ii) Installation of all hardware and software systems to deliver a fully functional control centre in the TMC; and
(iii) Installation of all systems and software in trunk and feeder stations to which access is given to the
Contractor for Milestone 1.
Milestone 3: on or before 2011-02-16
Completion of remaining installation on all vehicles, stations, TMC and depots.
Sub-Clause 8.3 Programme
Delete the first sentence of the first paragraph and replace with :
The Contractor shall submit a detailed time programme to the Engineer within 14 days from the Commencement
Date.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
Add the following after the first paragraph:
The Contractor shall incorporate the programming restrictions in Sub-Clause 2.1 of these Particular Conditions into the programme.
Sub-Clause 8.7 Delay Damages
Delete “Damages” in the title and “damages” in the body of this Sub-Clause and replace with “Penalties” in the title and “penalties” in the body, respectively.
Sub-Clause 9.1 Contractor’s Obligations
Add the following before the fourth paragraph of this Sub-Clause:
The following testing procedures specified in clause C3.4 of the Scope of Works shall apply:
(i) Testing Stage 1: Factory Acceptance Test (FAT) and
(ii) Testing Stage 2: System Integration Test (SIT) shall constitute the pre-commissioning tests;
(iii) Testing Stage 3: Onsite Integration Testing (OIT) shall constitute the commissioning tests; and
(iv) Testing Stage 4: System Acceptance Testing (SAT) shall constitute the trial operation.
Add the following before the last paragraph of this Sub-Clause:
The Contractor shall provide all necessary test equipment, materials and tools and competent staff for the performance of the specified performance acceptance tests and shall submit for the approval of the Engineer certified copies of the calibration certificates for the test equipment.
When all Test Stages 1, 2 and 3 specified in clause C3.4 of the Scope of Works have been successfully completed to the satisfaction of the Engineer, Test Stage 4 will constitute the Trial Operation Period and shall start and consist of a continuous period of operation of 28 days free from trouble. During the Trial Operation
Period the Contractor’s Operations Manager shall carry out all necessary operations management and any adjustments required. The Entity’s Control Centre personnel will assist the Contractor in operating the Control
Centre and all other systems during this period and at this time the Contractor shall train the Entity’s Control
Centre personnel in operating the Control Centre Systems, and in operational requirements and procedures.
At the end of the Trial Operation Period the Contractor shall arrange for an acceptance inspection to be carried out together with the Engineer for the purpose of taking over the Works and the issuing of the Taking-Over certificate in terms of Clause 10.
Sub-Clause 10.1 Taking Over of the Works and Sections
Add the following before the first paragraph:
At the end of the Trial Operation Period an inspection shall be undertaken by the Contractor and the Engineer for the purpose of taking over the Works in terms of this Clause 10.
Amend the first paragraph as follows:
Delete: “, or is deemed to have been issued” in (ii).
Delete the last paragraph.
Sub-Clause 10.1 Taking Over of Works and Sections
Add the following after the first paragraph:
For the purpose of issuing a Taking-Over Certificate for a Section of the Works, Sections of Works are defined as a sub-set of vehicles, a sub-set of stations, one of the depots or the TMC.
Sub-Clause 10.2 Taking Over of Parts of the Works
Add the following after the first paragraph:
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
For the purpose of issuing a Taking-Over Certificate of a Part of the Works, Parts of Works are defined as follows and are further described in Part C3: Scope of Works in the Employer’s Requirements:
(i) Computer Aided Scheduling and Dispatching (CASD) system;
(ii) Automatic Vehicle Location (AVL) systems;
(iii) Automatic Passenger Counter (APC) system;
(iv) Advanced Traveller Information (ATI) and Communication systems; and
(vi) Data Management System; and
(vii) Bus (transit) signal priority (TSP) system
Sections of the Works are defined, for the purpose of issuing a partial Taking-Over Certificate, as a set of vehicles, a set of stations, depots or the TMC.
Sub-Clause 10.3 Interference with Tests on Completion
Delete paragraphs 1 and 2 and replace with:
The Contractor is entitled to an extension of time and costs if prevented from carrying out the Tests on
Completion by a cause for which the Employer is responsible.
Delete sub-paragraph (b) and replace with:
(b) payment, which shall be included in the Contract Price, as follows:
An item has been included in the Schedules of Quantities to cover Cost in the event that the Contractor cannot commence testing and commissioning within the contractually agreed period, and the resultant delay in the commencement of the Defects Notification Period, from causes not attributable to the Contractor.
The period of delay which may be allowed by the Engineer and paid for under this sub-paragraph shall be agreed margins of latitude to cover delays, normally beyond control of the Employer, for which the Contractor may be compensated by the stipulated amount. These delays shall not be regarded as an instruction to suspend the work in terms of Sub-Clause 8.8 of the Conditions of Contract.
The amount tendered shall include for all additional Cost incurred by such delays, including financing, storage, labour, handling, protection, insurance, overheads, etc., and profit. Should no delays be experienced in terms of this sub-paragraph, the sum included in the Schedules of Quantities therefor shall be deducted.
For Contracts subject to Adjustment for Changes in Cost (Sub-Clause 13.8) the abovementioned amount shall be regarded as “extra over” any Contract Price Adjustment.
Sub Clause 11.3 Extension of Defects Notification Period
Delete the last sentence in the first paragraph.
Sub-Clause 13.1 Right to Vary
Delete the last sentence in the first paragraph.
Sub-Clause 13.8 Adjustment for Changes in Cost
Deleted and replaced by:
13.8.1
General
The Accepted Contract Amount shall be deemed to have included amounts to cover the contingency of all other rises and falls in costs not covered by the provisions of this or other
Clauses.
If provision has been made in the Appendix to Tender for prices to be subject to adjustment, such adjustments claimed by the Contractor shall be made in accordance with the Sub-Clauses referred to therein.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
The following general provisions shall apply in all cases:
(a) The Base Date shall be as defined in Sub-Clause 1.1.3.1.
(b) Adjustments for changes in cost shall be calculated as if the Works are executed within the time for completion and no additional costs due to any work being executed outside the time for completion shall be payable unless the Engineer allows an extension of time in accordance with Sub-Clause 8.4.
(c) Claims for adjustments for changes in cost shall be supported by such documentary evidence that may be required by the Engineer. Failure to render this information may result in the rejection of claims for price adjustment.
(d) The value of imported Plant and Materials shall be as defined in Sub-Clause 13.8.2.2.4.
(e) No claims for adjustments for changes in cost will be accepted which are submitted later than 28 days after the date of issue of the Taking-Over Certificate.
13.8.2
13.8.2.1
13.8.2.1.1
Contract Price Adjustment
Contract Price Adjustment shall be as defined in Sub-Clause 1.1.4.13.
Plant and Materials Manufactured in South Africa
13.8.2.1.2
Adjustment to the Contract price for the supply, delivery and storage of Plant and Materials manufactured in the Republic of South Africa, shall be allowed only for variations in the cost of labour and material based on the indices published by the Steel and Engineering Industries
Federation of South Africa (SEIFSA) using the method described in Sub-Clause 13.8.2.1.2.
The following SEIFSA tables shall be regarded as relevant to Electrical Works in this Contract:
Table C3
Table G
Index of actual labour cost
Statistics SA production price index, Electrical Engineering Materials.
Method of Price Adjustment
Adjustment of the total values inserted in the Schedules of Quantities for the supply, delivery and storage of Plant and Materials manufactured in the Republic of South Africa shall be based on the following:
(a) The estimated proportions (represented by the coefficients “b”, “c”, in the formulae in subparagraph (b) below) of the total values shall be adjusted on the basis of the increase or decrease between the indices in the relevant tables at the Base Date and these indices at a date 42 days prior to the valuation date, for each month in which the Plant and Materials are contractually delivered to Site, by multiplying the monthly values certified by the relevant Adjustment Factor in the formulae in sub-paragraph (b) below.
(b) the applicable formulae are:
Electrical Plant and Materials
A = a + b
L n + c n - 1
L o E o where A a
=
=
Adjustment Factor rounded off to the sixth decimal place
0.10 b = 0.55 )
Fixed coefficient (non-adjustable portion) c = 0.35 ) Coefficients (sum of these coefficients shall be 0,90)
L n = Current labour index in Table C3
L o = Base labour index in Table C3
E n = Current electrical engineering materials index in Table G
E o = Base electrical engineering materials index in Table G
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
13.8.2.2
13.8.2.2.1
13.8.2.2.2
“Current” indices are those applicable 42 days prior to date of claim, as stated in
“Base” indices are those applicable at Base Date, as stated in sub-paragraph (a)
above
(c) The value of any Plant and Materials imported from outside South Africa inserted in
Schedule 25 and subject to Sub-Clause 13.8.2.2.2(a) shall be deducted from the total values to be adjusted by the SEIFSA Index adjustment. Any Plant and
Materials not inserted in Schedule 25 shall be deemed to be manufactured in South
Africa for the purposes of Contract Price Adjustment.
Plant and Materials Imported from Outside South Africa
Permissible
Adjustment to the Contract price for the supply, delivery and storage of any Plant and Materials imported from outside the Republic of South Africa will be permitted only in respect of the following variables:
(a) Variations in Rates of Exchange as detailed in Sub-Clause 13.8.2.2.2, and
(b) Variations in Customs Surcharge and Customs Duty as detailed in Sub-Clause 13.8.2.2.3
Variations in Rates of Exchange
Adjustment for variations in rates of exchange shall be based on the following:
(a) The Tenderer shall have completed Schedule 25 for all imported Plant and Materials intended to be subject to variations in rates of exchange, subject to the following: i. the value in foreign currency inserted in column (A) shall be subject to Sub-Clause
13.8.2.2.2(e) when recalculating the Rand value, ii. the rate of exchange inserted in column (B) shall be the spot selling rate quoted by Council’s main banker, ABSA on the Base Date, rounded to the second decimal place, iii. if the rate of exchange inserted by the Tenderer differs from the ABSA rate referred to above, then the ABSA rate shall apply and the Rand value in columns
(C) and (F) shall be recalculated accordingly, without altering the price in the
Schedules of Quantities for the relevant items, and iv. if a quotation from a supplier or sub-contractor provides for variations in rates of exchange, the Contractor may only claim for variations in rates of exchange if he binds the supplier or sub-contractor to the same provision to take out forward cover as described in sub-paragraph (b) below.
(b) The Contractor (or supplier or sub-contractor) shall within five working days from the date of placing a firm order on an overseas supplier, cover or recover forward by way of a contract with a bank which is an authorised foreign exchange dealer, the foreign exchange component of the cost of any imported Plant and Materials inserted by the Tenderer in
Schedule 25.
(c) When the Contractor (or supplier or sub-contractor) so obtains forward cover, the
Contractor shall immediately notify the Employer of the rate obtained and furnish the
Employer with a copy of the foreign exchange contract note.
(d) Based on the evidence provided in sub-paragraph (c), the value in Rand inserted in column
(C) of Schedule 25 shall be recalculated using the forward cover rate obtained, and any increase or decrease in the Rand value defined in Sub-Clause 13.8.2.2.4 shall be adjusted accordingly.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
13.8.2.2.3
(e) In the event of the value in foreign currency inserted in column (A) of Schedule 18 exceeding the value in the Contractor’s (or supplier’s or sub-contractor’s) forward cover contract, the adjustments shall be calculated only upon the value in the forward cover contract.
Variations in Customs Surcharge and Customs Duty
(a) Any increase or decrease in the Rand value between the amounts of Customs Surcharge and Customs Duty inserted in Schedule 25 and those amounts actually paid to the
Customs and Excise Authorities, which are due to changes in the percentage rates applicable or to the foreign exchange rate used by the authorities, shall be adjusted accordingly.
(b) The Tenderer shall state the Customs Duty Tariff Reference applicable to each item and the Contractor shall advise the Engineer of any changes which occur.
13.8.2.2.4 Value of Imported Plant and Materials
Subject to Sub-Clause 13.8.2.2.2 (a), the Rand value of imported Plant and Materials inserted in Schedule 25 (column (F)) shall be the value in foreign currency (column (A)) converted to
South African Rand (column (C)) by using the spot selling rate quoted by Council’s main banker, ABSA on the Base Date rounded to the second decimal place (column(B)), to which shall be added any Customs Surcharge and Customs Duty applicable at that date (columns (D) and (E)).
13.8.2.3 Site Installation and General Items
Adjustment of the total values inserted in the Schedules of Quantities for Site installation and
General items, Health and Safety, Environmental Management, Sundries, and for any other items so described or implied in the Schedules of Quantities to be adjusted under this Sub-
Clause, shall be based on the following:
(a) No Contract price adjustment shall be applied to the total values in respect of providing the
Performance Security - Demand Guarantee and Insurances.
(b) The estimated proportion (represented by the 0.90 coefficient in the formula in subparagraph (c) below) of the total values shall be adjusted on the basis of the increase or decrease between SEIFSA
Table C3(A)
Index of actual labour cost (field force) where subsistence allowance is paid, at the Base Date and this index at the valuation date, for each month in which the work is contractually executed, by multiplying the monthly values certified by the Adjustment Factor in the formula in sub-paragraph (c) below.
(c)
Site Installation and General Items
A = 0.10 + 0.90 L n - 1
L o where A =
0.10 =
L
L n = o =
“Base” index is that applicable at Base Date, as stated in sub-paragraph (b) above
Adjustment Factor rounded off to the sixth decimal place
Fixed coefficient (non-adjustable portion)
Current labour index in Table C3(A)
Base labour index in Table C3(A)
“Current” index is that applicable at the valuation date, as stated in sub-
Sub-Clause 14.1 The Contract Price
Delete sub-paragraphs (c) and (d) and replace with:
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
(c) Prices entered in the Schedules of Quantities, together with any schedule of rates for which provision is made in a Schedule, will be used for calculating the value of completed works for the purpose of interim payments or for determining the value of changes, omissions and additions for variation instructions when in the opinion of the Engineer such prices are applicable.
(d) The amounts of work and material given in the Schedules of Quantities are not to be considered as limiting or extending the amount of work to be done or material to be supplied by the Contractor.
(e) The percentage completion of the amounts of work and materials given in the Schedules of Quantities shall be determined by the Engineer for interim payment certificates when checking the Contractor’s Statement referred to in Sub-Clauses 14.3 and 14.6.
Sub-Clause 14.2 Advance Payment
Delete this Sub-Clause.
Sub-Clause 14.3 Application for Interim Payment Certificates
Replace “in six copies” in the first line of the first paragraph with “in three copies”.
Delete sub-paragraphs (a) to (g) and replace with:
(a) The estimated contract value of any approved materials, goods, plant and equipment which has been delivered to Site but has not yet been installed, provided the conditions for delivery and storage specified in the Employer’s Requirements are followed to the complete satisfaction of the Engineer;
No such payment will be made for materials, goods, plant and equipment stored elsewhere and no materials, goods, plant and equipment may be delivered to Site before possession of the Site is given to the Contractor.
Variation from this condition will only be considered under special circumstances and approval in advance must be obtained from the Engineer;
(b) The estimated contract value of any general, installation, testing and commissioning work executed, including the value of any other items so described in the Schedules of Quantities to be adjusted together with this work, as determined from time to time until the commencement of the Defects Notification Period;
(c) any amounts to be added and deducted for changes in legislation and changes in Cost, in accordance with
Sub-Clause 13.7 and Sub-Clause 13.8;
(d) any amount to be deducted for retention, calculated by applying the percentage of retention stated in the
Appendix to Tender to the total of the above amounts;
(e) any other additions or deductions which may have become due under the Contract or otherwise, including those under Clause 20; and
(f) the deduction of amounts certified in all previous Payment Certificates.
Sub-Clause 14.4 Schedule of Payments
Delete this Sub-Clause.
Sub-Clause 14.5 Plant and Materials intended for the Works
Delete this Sub-Clause.
Sub-Clause 14.6 Issue of Interim Payment Certificates
Delete “within 28 days” in the second sentence of the first paragraph and replace with “within 21 days”.
Sub-Clause 14.7 Payment
Delete sub-paragraphs (a) to (c) and replace with:
(a) the amount certified in each Interim Payment Certificate within the number of days after the Engineer receives the Statement and supporting documents, whereby invoices dated on or before the 20 th of a particular month will be paid between the 23 rd
and 26 th
of the ensuing month.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
(b) the amount certified in the Final Payment Certificate within 28 days after the Employer receives this
Payment Certificate.
Sub-Clause 14.9 Payment of Retention Money
Delete “Promptly” in the first sentence of the second paragraph and replace with “ Within 14 days”.
Delete “certified and paid promptly” in the second sentence of the second paragraph and replace with “certified by the Engineer for payment within 14 days to the Contractor”.
Delete the last paragraph and replace with:
The relevant contract value for each Section shall be determined by the Engineer, based on the Schedules of
Quantities and any variations and adjustments thereto.
Sub-Clause 14.10 Statement at Completion
Delete “Within 84 days” in the first paragraph and replace with “Within 21 days”.
Replace “six copies of” in the first paragraph with “three copies of.
Sub-Clause 14.11 Application for Final Payment Certificate
Delete “Within 56 days” in the first paragraph and replace with “Within 14 days”.
Replace “six copies of” in the first paragraph with “three copies of”.
Delete the second sentence of the last paragraph and replace with:
Thereafter, if the dispute is finally resolved under Clause 20 Claims, Disputes and Arbitration, the Contractor shall then prepare and submit to the Employer (with a copy to the Engineer) a Final Statement.
Sub-Clause 14.15 Currencies of Payment
Delete “damages” in sub-paragraph (b) and replace with “penalties”.
Sub-Clause 15.2 Termination by Employer
Delete “or” at the end of sub-paragraph (e) and add the following sub-paragraphs after sub-paragraph (f):
(g) fails to provide the required Performance Security and insurances within the prescribed time,
(h) committed a corrupt or fraudulent act during the procurement process or the execution of the contract, or
(i) an official or other role player committed any corrupt or fraudulent act during the procurement process or in the execution of the contract that benefited the Contractor,
Delete “(e) or (f)” in the second sentence of the second paragraph and replace with “(e), (f), (h) or (i)”.
Sub-Clause 16.1 Contractor’s Entitlement to Suspend Work
Delete “Sub-Clause 2.4 or” in first paragraph.
Sub-Clause 16.2 Termination by Contractor
Delete sub-paragraph (a).
Sub-Clause 17.3 Employer’s Risks
Delete sub-paragraphs (a) to (h) and replace with:
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
(a) war, invasion, act of foreign enemies, hostilities or warlike operations (whether war be declared or not) or civil war,
(b) insurrection,
(c) mutiny, military rising, military or usurped power, martial law or state of siege, or any other event or cause which determines the proclamation or maintenance of martial law or state of siege,
(d) any event which, at the Base Date, is defined as a risk in terms of insurance offered by the South African
Special Risks Insurance Association,
(e) any occurrence for which a fund has been established in terms of the War Damage Insurance and
Compensation Act, as amended,
(f) the
(g)
(h) pressure waves caused by aircraft or other aerial devices travelling at sonic or supersonic speeds, ionising radiation or contamination by radioactivity from any nuclear fuel or from any nuclear waste from the combustion of nuclear fuels,
(i) the use of or occupation by the Employer or the Employer’s Personnel or the Employer’s agents or other contractors (not employed by the Contractor) of any part of the Works without mutual agreement,
(j) the design, specification or instruction of the Engineer, Employer or any of their employees or agents, or defects in the materials supplied by the Employer for incorporation in the Works,
(k) the confiscation, commandeering, nationalisation, requisition or destruction of or damage to property by an order of government, or any public or local authority, and
(l) the fact that the value of materials, as supplied by the Employer for incorporation in the Works, exceeds the value thereof as specified by or on behalf of the Employer at the time of delivery thereof by the
Employer.
Sub-Clause 18.1 General Requirements for Insurances
Add the following:
The Contractor shall be liable for the payment of the deductibles in respect of each claim settlement in terms of the policies effected by the Contractor.
In respect of Subcontractors, the Contractor shall be deemed to have complied with the provisions of the requirements relating to insurance by ensuring that the Subcontractors have effected such insurance.
Save as otherwise provided in the Contract, nothing herein contained shall oblige the Contractor to effect any insurance which is not generally obtainable from a registered insurer in South Africa.
The insurances shall be effected with an insurance company registered in South Africa and the terms thereof shall be subject to approval by the Employer, which approval shall not be unreasonably withheld.
If required, the Contractor shall provide proof to the Engineer that the Contractor is in good standing with respect to duties, taxes, levies and contributions required in terms of legislation applicable to the work in this Contract.
Sub-Clause 18.2 Insurance for Works and Contractor’s Equipment
Add the following sub-paragraph:
(f) which are to be effected and maintained by the Contractor and endorsed to note the interests of the
Employer are:
(i) transit insurance, including whilst in temporary storage and intended for incorporation in the Contract en route to Site,
(ii) professional indemnity insurance; the Contractor shall ensure that all design work to be undertaken by the Contractor or on behalf of the Contractor is undertaken by registered professionals who carry
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
adequate professional indemnity insurance to cover their liability for professional negligence. Proof of such insurance shall be submitted to the Engineer on demand, and
(iii) where the Contract involves manufacturing and/or fabrication of the Works or part thereof at premises other than the Site, the Contractor shall satisfy the Employer that all materials and equipment for incorporation in the works are adequately insured during manufacture and/or fabrication. In the event of the Employer having an insurable interest in such works during manufacture or fabrication then such interest shall be noted by endorsement to the Contractor's Policies of Insurance.
Sub-clause 18.3 Insurance against Injury to Persons and Damage to Property
Add the following sub-paragraph:
(e) shall include a cross-liability clause such that the insurance shall apply to the Contractor and to the Employer as separate insured parties.
Sub-Clause 18.4 Insurance of Contractor’s Personnel
Add the following:
The insurance shall be in terms of the provisions of the Compensation for Occupational Injuries and Diseases Act
No. 130 of 1993.
Add the following new Sub-Clause:
Sub-Clause 18.5 Special Risks Insurance
The Contractor shall effect and maintain the following insurance in the joint names of the Employer and the
Contractor:
A Coupon Policy for Special Risks Insurance issued by the South African Special Risks Insurance Association.
Delete Sub-Clauses 20.2 to 20.8 inclusive and replace with the following new Sub-Clauses:
Sub-Clause 20.2 Mediation
The Appendix to Tender provides for dispute resolution by mediation. Any dispute or difference which arises between the Contractor and the Employer out of or in connection with the Contract, including any determination or other decision of the Employer, shall be referred by either Party to a mediator for mediation in accordance with the provisions of SANS 294,
Construction Procurement Processes, Methods and Procedures
(6.9.2 Mediation, reproduced below). Where the parties fail to agree on a mediator, the mediator shall be appointed by the entity or official named in the Appendix to Tender.
“6.9.2 Mediation
6.9.2.1
The mediator shall be selected by agreement between the parties or, failing such agreement, by a mutually agreed upon person. Mediation shall be conducted without legal representation with the costs being borne equally by the parties.
6.9.2.2 The mediator shall convene a hearing of the parties and may hold separate discussions with any party. The mediator shall assist the parties in reaching a mutually acceptable settlement of their differences through means of reconciliation, interpretation, clarification, suggestion and advice. The parties shall record such agreement in writing and thereafter they shall be bound by such agreement.
6.9.2.3
The mediator shall be authorized to end the mediation process whenever, in his opinion, further efforts at mediation would not contribute to a resolution of the dispute between the parties.
6.9.2.4
If either party is dissatisfied with the opinion expressed by the mediator or should the mediation fail, then such party may require that the dispute be settled in terms of the contract.”
Sub-Clause 20.3 Court Proceedings
The Appendix to Tender provides for the court proceedings to finally resolve disputes, and disputes shall be determined by court proceedings in a South African court of law.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
ADDITIONAL CONDITIONS OF CONTRACT
The additional Conditions of Contract are:
The Contractor is to provide all labour, material, workmanship, components, equipment, software, software licenses and everything that is or may be necessary in and for the execution and entire completion of the Contract in accordance with the Conditions of Contract and Employer’s Requirements.
The Contractor shall treat the details of the Works comprised in this Contract as private and confidential (save in so far as may be necessary for the purposes hereof) and shall not publish or disclose the same or any particulars thereof in any trade or technical paper elsewhere without the prior written consent of the Engineer.
23.1 Period of Operations Agreement
The Operations Agreement shall commence on the date of the issue of the Taking-Over certificate for
Milestone 1 and operations by the Contractor shall be undertaken for a continuous period, subject to a determination by the Employer, until either:
(i)
(ii) a minimum of 12 (twelve) months after the date of commencement of the Operations
Agreement; a maximum of 24 (twenty-four) months after the date of commencement of the Operations
Agreement, subject to a 3-month notice period by the Employer to terminate the Agreement after the initial 12 month period referred to in sub-clause (1).
Contractor’s obligations in terms of the Operations Agreement 23.2
The Employer will assign the responsibility for the functions of the Control Centre listed below to the
Contractor’s Representative who shall report to a designated official of the City or the CEO of the Entity in regard to the performance of this function. The personnel responsible for undertaking to implement the Operations Agreement will be employed by the Contractor and these staff members will report to
Operations Manager. The Operations Manager and such support staff will fall under the direct responsibility of the Contractor’s Representative.
The Operations Manager and his supporting staff shall operate the Control Centre and related systems, and maintain a high level of service compliance in line with international best practice for BRT operation centers. The operations staff will at all times work in close cooperation with City staff and other contractors/personnel working on the IRT system. The functions of the operations staff will include, amongst others:
(i) Managing and Monitoring the compliance of vehicle operating schedules developed by the City or the Entity, and undertaking actions where required;
(ii) Communicating with drivers and other staff of vehicle operating entities to pass instructions on operational actions. and Operating the passenger information systems at stations and in buses;
(iv)
(v)
Monitoring of CCTV at stations and along the routes and coordinating any actions where required; and
Compiling reports and undertaking administrative functions as required.
23.3 Entity personnel to be available
A full-time staff of 6 (six) dedicated personnel not including the Operations Manager will be employed by the Contractor and shall be available for 2 (two) shifts per day and 7 (seven) days per week. All personnel will be based in the Control Centre.
The Contractor shall employ for the period of the Operations Agreement only such persons as are careful, competent and efficient and the Engineer shall be at liberty to object to and request the
Contractor to remove from the Control centre any person employed by the Contractor and reporting to the Operations Manager in the execution of the Operations Agreement who in the opinion of the
Engineer misconducts himself or is incompetent or negligent in the proper performance of his duties.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
23.4 Training and supervising of Entity personnel
The Contractor shall train personnel to be employed by the Entity to take over the functions of the
Control Centre prior to the end of the period of the issuing the Taking-Over Certificate, and ensure that an effective and smooth phasing in of the Control Centre takes place. Similarly, at the end of the period of the Operations Agreement the Operations Manager must properly hand over responsibility for the
Control centre to the designated staff member of the Entity who will continue fulfilling this role from that date onwards. The training procedures are covered in the Scope of Work and Detailed Specifications.
23.5 Reporting
The Contractor’s representative shall submit the report to the Engineer before the last working day of each month, setting out the activities of the month and listing KPI’s on performance. The list of KPI’s is to be jointly agreed by the Contractor’s representative and the Engineer prior to the commencement of the Operations Agreement, and may be adjusted by the Engineer in consultation with the Contractor’s
Representative from time to time during the period of the Operations Agreement.
23.6 Operations Agreement Price and Payment
Agreement
The Contractor shall submit, as part of the Bill of Quantities for this Contract, separate tender prices for period of the Operations Agreement. The price submitted for the Operations Agreement shall form part of the total tender price.
23.6.2 Payment and Retention Money
Interim payment certificates are payment will be dealt with according to clauses 14.3 and 14.6 and 14.7 of the Conditions of Contract and payment will be made on a monthly basis. The Employer shall withhold
10% of the value of each monthly Contractor’s claim, and the total amount retained will be paid at the time of payment of the final payment at the end of the Operations Agreement.
23.6.3 Adjustments for Changes in Cost
Clause 13.8 as provided in these Conditions of Contract shall apply to adjustments in the cost of labour that may be required.
24.1 Period of Maintenance Agreement
The Maintenance Agreement shall commence on the date of the issue of the Taking-Over certificate and be undertaken for a continuous period of 72 (seventy-two) months.
24.2 Assignment
The Contractor shall not cede or assign this Agreement or any part thereof or any benefit, obligation or interest therein or thereunder without the prior written consent of the Engineer, which shall not unreasonably be withheld.
24.3 Maintenance Personnel to be available
The personnel responsible for undertaking to implement the Maintenance Agreement shall report to a
Maintenance Manager who will fall under the direct responsibility of the Contractor’s Representative. A full-time staff of at least 1 (one) maintenance specialist for Phase 1A approved by the Engineer will be required for the full duration of the maintenance period. At least one specialist staff member shall be available at all times to respond to emergency calls and be at the location of the fault or incident within
60 (sixty) minutes of the official logging of the fault with the Contractor. The contractor will provide additional personnel to comply with the requirements outlined in Volume 2B, Section C13.6.
The Contractor shall employ during the period of the Maintenance Agreement only such persons as are careful, competent and efficient and the Engineer shall be at liberty to object to and require the
Contractor to remove from this Contract forthwith any person employed by the Contractor in the execution of the Maintenance Agreement who in the opinion of the Engineer misconducts himself or is incompetent or negligent in the proper performance of his duties, and such person shall not be again employed upon the contract without the permission of the Engineer.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
24.4 Contractor’s obligations in term of the Maintenance Agreement
The Contractor shall undertake:
(i)
(ii)
Emergency repairs and restoration of equipment and software;
All maintenance, repairs and replacement of defective equipment and software installed during the contract (Responsive Maintenance);
(iii)
(iv)
(v)
The installation and provision of proprietary software updates of all systems installed under the contract; and
Supplementary training of staff previously trained to operate updated software installed.
Planned Maintenance and Preventive Maintenance to comply to Current Best Practice.
The Parts of Site are divided into 4 (four) categories, as described below:
Control centre
The Contractor shall ensure the ongoing supply, installation and repair of all components for the uninterrupted operation of the Control Centre. The Contractor shall ensure the proper operation of all subsystems of the Control centre, without a disruption of operation, commencing on date of issue of the
Taking-Over certificate.
Stations
The Contractor shall ensure the ongoing supply, installation and repair of all components installed at IRT stations, stops and sections between stations installed under the Contract. The Contractor shall ensure the proper operation of all hardware and software systems installed under the Contract, without a disruption of service, commencing on the date of issue of the Taking-Over certificate.
Depots
The Contractor shall ensure the ongoing supply, installation and repair of all components installed at
Depots installed under the Contract. The Contractor shall ensure the proper operation of all hardware and software systems installed under the Contract, without a disruption of service, commencing on the date of issue of the Taking-Over certificate.
Vehicles
The Contractor shall ensure the ongoing functionality of software and communications systems linking equipment installed in vehicles with the Control Centre, as well as other on-board systems, commencing on the date of issue of the Taking-Over certificate.
Replacement defective or damaged parts 24.5
24.6
The Contractor shall be responsible for replacements or parts or components due to defects, accidents, theft, vandalism and force majeure. After the Defects Notification Period the Contractor shall claim the costs for such parts or components under pay items included in the Bills of Quantities.
Reporting and response times
The Contractor shall report all hardware or software failures to the Engineer, the Maintenance Manager and the official of the City or the Entity designated by the CEO of the Entity within a maximum time period as outlined in Section C3.16 in the Technical Specifications.
24.7 Performance inspections and reporting
To ensure compliance with Agreement, a monthly inspection shall be conducted of all Parts of Work.
This shall comprise of a checklist to be compiled according to the requirements of the Engineer, which shall be updated, as may be necessary from time to time to time to time. Inspections are to be undertaken by the Maintenance Manager. The Contractor’s representative shall submit the report to the
Engineer before the last working day of each month.
Penalties for non-compliance to submit monthly reports on performance inspections shall be 0.1% (zero point one percent) of the value of the following month’s payment for every one day the report is late.
24.8 Penalties non-compliance
The Employer shall have the right to impose penalties, based on the failure of the Contractor to undertake reporting and/or repairs within the times specified. Failure to do so will result in such affected problem areas being subject to penalties. These penalties shall apply to the following month’s payment,
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
irrespective of the fact that the non-compliance had been subsequently rectified, and shall not be reversed.
24.9 Performance
The Contractor shall obtain (at his cost) a Performance Security for the proper performance under the
Maintenance Agreement, in the amount of 10% of the amount tendered for the Maintenance of the
Works. The Contractor shall deliver the Performance Security to the Employer on the date that the
Performance Security for the installation of the works following the Issue of the Performance certificate has been returned to the Employer.
The Employer shall return the Performance Security for the period of the Maintenance Agreement on the last day of the expiration of the period during which the Maintenance Agreement is in force.
24.10 Maintenance Agreement Price and Payment
24.10.1 Maintenance Agreement Price
The Contractor shall submit, as part of the Bill of Quantities for this Contract, separate tender prices for period of the Maintenance Agreement. The amount tendered for the Maintenance Agreement shall form part of the total tender price.
24.10.2 Payment and Retention Money
Interim payment certificates will be dealt with according to clauses 14.3 and 14.6 and 14.7 of the
Conditions of Contract and payment will be made on a monthly basis. The Employer shall withhold 10% of the value of each monthly Contractor’s claim, and the total amount retained will be paid at the time of payment of the final payment at the end of the Maintenance Agreement.
24.10.3 Adjustments for Changes in Cost
Clause 13.8 as provided in the these Conditions of Contract shall apply to adjustments in the cost of labour and any equipment and software that may be required to restore defects or damage for which the
Contractor is not liable.
EMPLOYER’S REQUIREMENTS REFERRED TO IN CONDITIONS OF CONTRACT
The matters referred to in some or all of the following Sub-Clauses may be included in the Employer’s
Requirements and are not repeated in the Contract Data, unless otherwise indicated:
1.8
1.13
2.1
4.1
4.6
4.7
Number of copies of Contractor’s Documents*
Permissions being obtained by the Employer
Phased possession of foundations, structures, plant or means of access*
Intended purposes for which the Works are required
Other contractors (and other) on the Site
Setting-out points, lines and levels of reference
Third
4.18
4.19 Electricity, water, gas and other services available on the Site
4.20 Employer’s Equipment and free-issue material
5.1 Criteria for design personnel*
5.2
5.4
5.5
Contractor’s Documents required, and whether for approval**
Technical standards and building regulations
Operational training for the Employer’s Personnel*
5.6
5.7
As-built drawings and other records of the Works
Operation and maintenance manuals
Facilities
Samples
Testing during manufacture and/or construction* 7.4
9.1
9.4 Damages for failure to pass Tests on Completion
12.1 Tests after Completion
12.4 Damages for failure to pass Tests after Completion
*These Sub-Clauses are/are also referred to in the Contract Data.
**See also Part C3.2 Engineering Design in Scope of Work
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.2
Contract Data
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
Brief description of Contract: DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING,
COMMISSIONING AND MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND
SOFTWARE SYSTEMS (CONTRACT NO. 25G/2009/10)
Name and address of Beneficiary: CITY OF CAPE TOWN, TRANSPORT ROADS AND STORMWATER,
Tower Block, Civic Centre, 12 Hertzog Boulevard, Cape Town (whom the Contract defines as the Employer)
We have been informed that __________________ (hereinafter called the “Principal”) is your contractor under such Contract, which requires him to obtain a performance security.
At the request of the Principal, we ( name of approved financial institution ) _________________ hereby irrevocably undertake to pay you, the Beneficiary/Employer, any sum or sums not exceeding in total the amount of _____________ (the “guaranteed amount”, say: _________________________) upon receipt by us of your demand in writing and your written statement stating:
(a) that the Principal is in breach of his obligation(s) under the Contract, and
(b) the respect in which the Principal is in breach.
Any demand for payment must contain your Director: Transport Roads and Stormwater signature which must be authenticated by your bankers or by a notary public. The authenticated demand and statement must be received by us at this office on or before ( the date 70 days after the expected expiry of the Defects
Notification Period for the Works) _________________ (the “expiry date”), when this guarantee shall expire and shall be returned to us.
We have been informed that the Beneficiary may require the Principal to extend this guarantee if the performance certificate under the Contract has not been issued by the date 28 days prior to such expiry date. We undertake to pay you such guaranteed amount upon receipt by us, within such period of 28 days, of your demand in writing and your written statement that the performance certificate has not been issued, for reasons attributable to the Principal, and that this guarantee has not been extended.
This guarantee shall be governed by the laws of the Republic of South Africa and shall be subject to the
Uniform Rules for Demand Guarantees, published as number 458 by the International Chamber of
Commerce, except as stated above.
Date_____________________ Signature(s)______________________________________________
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.3
Performance Security - Demand Guarantee
ANNEXURE
LIST OF APPROVED FINANCIAL INSTITUTIONS
The following financial institutions are currently (as at 26 November 2008) approved for issue of contract guarantees to the City:
National Banks:
ABSA Bank Ltd.
Development Bank of Southern Africa
FirstRand Bank Ltd.
Gensec Bank Ltd.
Imperial Bank Ltd.
Infrastructure Finance Corporation
Investec Bank Ltd.
Land & Agricultural Bank of SA
Mercantile Bank Ltd.
Nedbank Ltd.
Standard Bank of SA Ltd.
SA Bank of Athens
International Banks (with branches in SA):
ABN AMRO Bank n.v.
Barclays Bank plc.
Citibank n.a.
Commerzbank Aktiengesellschaft
Credit Agricole-Indosuez
Deutsche Bank AG
JP Morgan Chase Bank
Societe Generale
Standard Chartered Bank
Insurance companies:
ABSA Insurance
AIG South Africa
Auto & General
Coface s.a.
Compass Insurance Co.
Constantia Insurance Co.
Credit Guarantee Insurance Co.
Emerald Insurance Co.
Federated Employers Mutual Assurance Co.
Guardrisk Insurance Co.
Home Loan Guarantee Co.
Lion of Africa Insurance Co.
Lombard Insurance
MUA Insurance
Mutual & Federal Insurance Co.
New National Assurance Co.
Regent Insurance Co.
Zurich Insurance Co.
C1.3
Performance Security - Demand Guarantee Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
AGREEMENT MADE AND ENTERED INTO BETWEEN THE CITY OF CAPE TOWN (HEREINAFTER CALLED
THE “EMPLOYER”) AND
……………………....................………………………………….............…………………………. ,
(Contractor/Mandatary/Company/CC Name)
IN TERMS OF SECTION 37(2) OF THE OCCUPATIONAL HEALTH AND SAFETY ACT, ACT No. 85 OF 1993
AS AMENDED.
I, ……………………………………....……………………………................…………………………. , representing
……………………....................………………………………….............…………………………. , as an employer in its own right, do hereby undertake to ensure, as far as is reasonably practicable, that all work will be performed, and all equipment, machinery or plant used in such a manner as to comply with the provisions of the Occupational
Health and Safety Act (OHSA) and the Regulations promulgated thereunder.
I furthermore confirm that I am/we are registered with the Compensation Commissioner and that all registration and assessment monies due to the Compensation Commissioner have been fully paid or that I/We are insured with an approved licensed compensation insurer.
COID ACT Registration Number:
OR Compensation Insurer: ........................................................ Policy No.: .....................................................
I undertake to appoint, where required, suitable competent persons, in writing, in terms of the requirements of
OHSA and the Regulations and to charge him/them with the duty of ensuring that the provisions of OHSA and
Regulations as well as the Council’s Special Conditions of Contract, Way Leave, Lock-Out and Work Permit
Procedures are adhered to as far as reasonably practicable.
I further undertake to ensure that any subcontractors employed by me will enter into an occupational health and safety agreement separately, and that such subcontractors comply with the conditions set.
I hereby declare that I have read and understand the appended Occupational Health and Safety Conditions and undertake to comply therewith at all times.
I hereby also undertake to comply with the Occupational Health and Safety Specification and Plan.
Signed at .......................................on the......................................day of....................................20….
____________________
Signed at ...................................... on the.....................................day of......................................20 ....
_______________________ ____________________
Witness
City of Cape Town
C1.4
Health and Safety Agreement Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
OCCUPATIONAL HEALTH AND SAFETY CONDITIONS
1.
2.
3.
4.
5.
6.
The Chief Executive Officer of the Contractor shall assume the responsibility in terms of Section 16(1) of the Occupational Health and Safety Act (as amended). Should the Contractor assign any duty in terms of
Section 16(2), a copy of such assignment shall immediately be provided to the representative of the
Employer as defined in the Contract.
All work performed on the Employer’s premises shall be performed under the supervision of the construction supervisor who understand the hazards associated with any work that the Contractor performs on the site in terms of Construction Regulations 2003.
The Contractor shall appoint a Competent Person who shall be trained on any occupational health and safety aspect pertaining to them or to the work that is to be performed.
The Contractor shall ensure that he familiarises himself with the requirements of the Occupational Health and Safety Act and that he, his employees, and any sub-contractors, comply with them.
Discipline in the interests of occupational health and safety shall be strictly enforced.
Personal protective equipment shall be issued by the Contractor as required and shall be worn at all times where necessary.
7.
8.
Written safe work procedures and appropriate precautionary measures shall be available and enforced, and all employees shall be made conversant with the contents of these practices.
No substandard equipment/machinery/articles or substances shall be used on the site.
9. All incidents referred to in terms of Section 24 of the Occupational Health and Safety Act shall be reported by the Contractor to the Department of Labour and the Employer.
10 The Employer hereby obtains an interest in the issue of any formal inquiry conducted in terms of Section
32 of the Occupational Health and Safety Act and into any incident involving a Contractor and/or his employees and/or his sub-contractor/s.
11. No use shall be made of any of the Employer’s machinery/plant/equipment/substance/personal protective equipment or any other article without prior arrangement and written approval.
12. No alcohol or any other intoxicating substance shall be allowed on the site. Any person suspected of being under the influence of alcohol or any other intoxicating substance shall not be permitted access to, or
13. Prior to commencement of any work, verified copies of all documents mentioned in the agreement, must be presented to the Employer. allowed to remain on the site.
Part C1: Agreements and Contract Data
Reference No. 25G/2009/10
C1.4
Health and Safety Agreement
Pages
C2.2 Schedules of Quantities ...........................................................111 – 125
Part C2: Pricing Data
Reference No. 25G/2009/10
C2
Pricing Data
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
1. The Schedules of Quantities contain only brief descriptions to identify the salient items required and the
Tenderer is referred to the Scope of Work and drawings for the full requirements.
2. The prices and rates to be inserted in the Schedules of Quantities are to be the full inclusive prices for the work described under the several items. Such prices and rates shall cover all costs and expenses that may be required in and for the execution of the work described, and shall cover the cost of all general risks, liabilities, and obligations set forth or implied in the documents on which the tender is based, as well as overhead charges and profit. Reasonable prices shall be inserted as these will be used as a basis for assessment of payment for additional work that may have to be carried out.
3. A price or rate is to be entered against each item in the Schedules of Quantities, whether the quantities are stated or not. An item against which no price is entered will be considered to be covered by the other prices or rates in the Schedules of Quantities.
4. Except where rates only are required, insert all amounts to be included in the total tendered price in the
"Amount" column and show the corresponding total tendered price. The total tendered price shall govern in the event of any arithmetical errors (refer to F3.9 in Annex F attached to page vii).
5. The units of measurement described in the Schedules of Quantities are metric units, as well as the following:
No. = number
Item /Sum =
Prov sum =
Days = lump sum
Provisional sum
“Day” as defined in the Conditions of Contract
6. Items have been provided where any further items considered necessary by the Tenderer can be priced. The
Tenderer must provide full details of what has been allowed for with his Tender under these items.
7. If any change in design is contemplated during the course of the Contract, the Contractor will be required to provide the Engineer with a detailed breakdown of the contract price involved with a similarly detailed breakdown of the suggested revised price together with supporting quotations and other relevant documentation to satisfy the Engineer that the revised price is built up in a similar manner to the original contract price.
8. The Tenderer is referred to Sub-Clause 4.11, Sufficiency of the Accepted Contract Amount, of the General
Conditions of Contract (“General Conditions”).
9. The Tenderer is referred to Sub-Clause 14.1, The Contract Price, of the General Conditions as amended in the Particular Conditions in Part C1.2 Contract Data.
10. References to the Conditions of Contract in the Schedules of Quantities shall mean the General Conditions read in conjunction with the Appendix to Tender and Particular Conditions, all as set out in Part C1.2 Contract
Data.
11. The Tenderer is referred to F2.13.1 in Part T1.2 Tender Data regarding the pricing of Variations from
Specification and/or Options.
Part C2: Pricing Data
Reference No. 25G/2009/10
C2.1
Pricing Instructions
12. The Tenderer is referred to Sub-Clause 13.8 of the Particular Conditions in Part C1.2 Contract Data regarding Contract Price Adjustment and Variations in Rates of exchange; regarding the latter, the Tenderer is specifically referred to the Contractor’s obligation to take out forward cover. Returnable Schedule 19 is attached hereto and must be completed by the Tenderer in conjunction with pricing the relevant items in the
Schedules of Quantities. The Tenderer’s attention is also drawn to Sub-Clauses 2.1(b) and 10.3 (b) of the
Particular Conditions.
13. The Rand value of imported equipment listed in Schedule 25 shall be carried forward from column (F) and included in the price of each of the relevant items in the Schedules of Quantities.
Part C2: Pricing Data
Reference No. 25G/2009/10
C2.1
Pricing Instructions
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
SCHEDULE 25: PRICE BASIS FOR IMPORTED EQUIPMENT
Part C2: Pricing Data
Reference No. 25G/2009/10
C2.1
Returnable Schedule 19
CITY OF CAPE TOWN
TRANSPORT ROADS & STORMWATER
CONTRACT NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF THE
IRT CONTROL CENTRE HARDWARE AND SOFTWARE SYSTEMS
CONTENTS
SCHEDULE NO. 1 General Obligations and Site Establishment
SCHEDULE NO. 2 Dayworks and Environmental Management Plan
SCHEDULE NO. 3 Design, Testing and Documentation
SCHEDULE NO. 4 Housing and Offices for Engineer's Site Personnel
SCHEDULE NO. 5 On-Board Systems
SCHEDULE NO. 6 Stations and Stops
SCHEDULE NO. 7 Control Centre
SCHEDULE NO. 8 Depots
SCHEDULE NO. 9 Maintenance
SCHEDULE NO. 10 Operations and Training
TOTAL
DECLARATION
PAGES
109
110
111
112
113
114
115
116
117
118
119
120
121
Part C2: Pricing Data
Reference No. 25G/2009/10
C2.2
Schedules of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 1: General Obligations and Site Establishment
UNIT QTY RATE AMOUNT ITEM DESCRIPTION
The rates and lump sums to be filled in hereunder must make provision for all the general time and value related expenses and cost of the contract
1.1
Fixed Obligations
Performance Security in accordance with FIDIC clause 4.2 of the
Conditions of Contract
1.2
Establishment and De-establishment on site
1.3
Supervision during installation
Sum
Sum
Sum
1.4
Attendance at 2-Weekly Progress Meetings during project implementation Sum
1.5
Attendance at Monthly Meetings during defects liability period
1.6
Other General expenses incurred in complying with the requirements of the
Scope of Work not included above (Specify):-
Sum
Sum
1.7
1.8
1.9
1.10
1.11
Time Related Obligations
Insurance of the Works in accordance with FIDIC clause 18.2 of the
Conditions of Contract
Third Party Insurance in accordance with FIDIC clause 18.3 of the
Conditions of Contract
Insurance against accident in accordance with FIDIC clause 18.4 of the
Conditions of Contract
Office and Workshop accommodation
Other General expenses incurred in complying with the requirements of the
Scope of Work not included above (Specify):month 16 month 16 month 16 month 16 month 16
1.12
Health and safety obligation: Compliance with Construction Regulations including submission and implementation of a health & safety plan month 16
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 109
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 2: Dayworks and Environmental Management Plan
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
2.1
Personnel during normal working hours (Dayworks)
(a) Unskilled labour
(b) Semi-skilled labour
(c) Skilled labour
(d) Artisan (Welder of similar)
(e) Ganger
(f) Flagmen
(g) Electrician
(h) Fibre optics Technician
(i) Electronics Technician
(j) Programmer
(k) Network Engineer
(l) Systems Engineer h h h h h h h h h h h h
10
10
50
50
50
100
100
50
10
50
20
20
2.2
Environmental Management Plan a)
Environmental Management: Compliance with the requirements of an
Environmental Management Plan and the relevant legislation (Fidic Clause
4.18) month 16 b) Penalty for serious violations:
(HAZMAT Spills, dumping and pollution of water sources) c) Penalty for violations:
(Littering, urinating & defacating, illegal fires, persistent fuel and oil leaks, excess dust and noise, intoxicating substances on site, speeding)
No
No -
-R 10,000.00
-R 1,000.00
Rate Only
Rate Only
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 110
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 3: Design, Testing and Documentation
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
The design process is an essential part of the implementation of this project. The contractor will be required to do all designs and illustrate that the proposed design can meet the City's requirements as outlined in Volume 2B.
A preliminary design on which the tender is based must also be completed and provided with the tender
3.1
High level design done according to paragraph C3.2.1.1
a) On-board systems according to Paragraph C3.9
b) Control Centre according to Paragraph C3.10
c) Trunk Stations according to Paragraph C3.11
d) Feeder Stations according to Paragraph C3.12
e) Bus Depots according to Paragraph C3.13
f) Maintenance according to Paragraph C3.16
Sum
Sum
Sum
Sum
Sum
Sum
3.2
Detail design done according to paragraph C3.2.1.2
a) On-board systems according to Paragraph C3.9
b) Control Centre according to Paragraph C3.10
c) Trunk Stations according to Paragraph C3.11
d) Feeder Stations according to Paragraph C3.12
e) Bus Depots according to Paragraph C3.13
f) Maintenance according to Paragraph C3.16
Sum
Sum
Sum
Sum
Sum
Sum
3.3
Implementation and testing according to Paragraph C3.4
a) Prototype (unit) or sub system testing (Reliability Testing) b) Factory Acceptance Tests (FAT’s)
Sum
Sum c) System Integration Test (SIT) d) Onsite Integration Testing (OIT)
Sum
Sum e) Site Acceptance Tests (SAT’s) f)
Sum
Provisional Sum for travel arrangements for engineer to attend acceptance
Prov Sum tests. Payable against proof of invoice
3.4
Documentation (Paragraph C3.2.2) a) Material selection documentation b) Installation manuals c) Training manuals d) Test documentation e) As-built documentation f) Operation and maintenance documentation g) O&M manuals h) User manuals i) System administration manual j) As Built Drawings
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
Sum
R 100,000.00
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 111
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 4: Housing and Offices for Engineer's Site Personnel
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
4.1
Office Accommodation for one person (15sqm) over contract period with access to boardroom facilities, ablutions and parking. Office will be neatly finished with airconditioning and sufficient light.
Month 16
4.2
Office Furniture a) Desk complete with drawers and locks b) Desk Chair c) Conference Table d) Chairs for Conference Table e) Bookcase f) Filling Cabinet
4.3
Office Equipment and Services a)
Cost of cell phone calls, pro-rata usage for contract administration purposes and cell phone rental
No
No
No
No
No
No
Prov Sum b)
Provision of telephone services with fax facilities, including cost of calls and fax transmissions in connection with contract administration and telephone and fax rental
Prov Sum
1
1
1
12
1
1 c)
Contractors handling cost, profit and all other charges in respect of item
4.3 (a) d)
Contractors handling cost, profit and all other charges in respect of item
4.3 (b) e) Provision of Photostat Facilities
%
% month 16
R 15,000.00
R 15,000.00
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 112
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 5: On-Board Systems
ITEM DESCRIPTION UNIT QTY SUPPLY EQUIPMENT
RATE AMOUNT
INSTALL EQUIPMENT
RATE AMOUNT
The rates must make provision for all specified equipment and miscellaneous auxiliary materials in order to handover the complete installation as specified and includes hardware and all related software for each subsystem and integration between systems.The pay items listed must be priced according to the contractor's design which will satisfy the technical requirements outlined in Volume 2B.
5.1
Vehicle logic unit (VLU) - Including all systems integration required for equipment supplied and installed by the bus manufacturer - (C3.9.5)
No.
5.2
Mobile wireless router (GSM/UMTS) -
(C3.9.5) If not integrated in the VLU
No.
5.3
Wireless LAN (Wi-Fi) - (C3.9.5)
(If not integrated in VLU)
5.4
Tetra Radio Unit - (C3.9.5)
(If not integrated in VLU)
5.5
Automatic vehicle location (AVL) system integration - (C3.9.6)
No.
No.
No.
5.6
Mobile data terminal (MDT) - (C3.9.7)
5.7
Media server and integration with supplied and installed displays (by bus manufacturer)
- (C3.9.5.1)
No.
No.
5.8
Digital video recorder (DVR) and integration with cameras provided and installed by others - (C3.9.11)
No.
5.9
Signal Priority Emitter - (C3.9.12)
5.10
Traffic Signal priority receivers (to be installed in traffic signal controllers) -
(C3.9.12)
No.
No.
5.11
Integration with equipment provided by Bus
Manufacturer
Sum
5.12
Any other items as may be necessary to complete the installation
Detail Items below:
Sum
245
245
245
245
245
245
85
245
85
50
…………………………………………………
…………………………………………………
…………………………………………………
…………………………………………………
…………………………………………………
…………………………………………………
……………..
TOTAL CARRIED FORWARD TO SUMMARY PAGE
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 113
C2.2
Schedule of Quantities
CITY OF CAPE TOWN
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
NAME OF TENDERER__________________________________________
ITEM DESCRIPTION UNIT QTY SUPPLY EQUIPMENT
RATE AMOUNT
INSTALL EQUIPMENT
RATE AMOUNT
The rates must make provision for all specified equipment and miscellaneous auxiliary materials in order to handover the complete installation as specified and includes hardware and all related software for each subsystem and integration between systems.The pay items listed must be priced according to the contractor's design which will satisfy the technical requirements outlined in Volume 2B.
Trunk Stations - C3.11
6.1
On-station server PC and required software
6.2
Kiosk network switch
6.3
Supporting platform network switches
6.4
Network video recorder (NVR) with control software
6.5
CCTV Control and Video Display in Kiosk
No.
No.
No.
No.
No.
17
17
19
8
17
No.
No.
17
17
6.6
GSM/UMTS modem
6.7
Fibre patch panels
6.8
Internal passenger information display
(a) LCD type display
(b) LED type display - 2 lines
(c) LED type display - 3 lines
No.
No.
No.
144
1
1
6.9
Internal LCD infotainment display (Optional)
6.10
IP CCTV cameras, enclosure, wiring and sundry materials for a complete installation
6.11
Emergency and information IP intercom
6.12
6.13
IP based intruder detection system per station platform
Any other items as may be necessary to complete the installation. Detail below:
No.
No.
No.
No.
Sum
1
180
36
36
……………………………………………………
……………………………………………………
……………………………………………………
Feeder Stops - C3.12
6.14
Single sided LED information display
6.15
Double sided LED information display
6.16
Small/Keyhole CCTV camera
6.17
GSM/UMTS modem
6.18
Power supply, battery and battery charger
6.19
Steel enclosure
6.20
Emergency and information IP intercom
6.21
Network switch
6.22
Video encoder and recorder
6.23
Any other items as may be necessary to complete the installation. Detail below:
……………………………………………………
…………..
……………………………………………………
…………..
……………………………………………………
…………..
TOTAL CARRIED FORWARD TO SUMMARY PAGE
Sum
No.
No.
No.
No.
No.
No.
No.
No.
No.
54
54
109
109
109
109
109
109
109
Contract
Part C2: Pricing Data
Reference No 25G/2009/10
114
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 7: Control Centre
ITEM DESCRIPTION UNIT QTY SUPPLY EQUIPMENT
RATE AMOUNT
INSTALL EQUIPMENT
RATE AMOUNT
The rates must make provision for all specified equipment and miscellaneous auxiliary materials in order to handover the complete installation as specified and includes hardware and all related software for each subsystem and integration between systems.The pay items listed must be priced according to the contractor's design which will satisfy the technical requirements outlined in Volume 2B.
7.1
Central processing system (C3.10.7.1) Sum 1
7.2
Bus monitoring subsystem (C3.10.7.2) Sum 1
7.3
Computer aided dispatch subsystem (C3.10.7.2) Sum 1
7.4
Bus scheduling subsystem (C3.10.7.2) Sum
7.5
Database and reporting subsystem (C3.10.7.3) Sum
7.6
Traveller information website (C3.10.7.4)
7.7
Infotainment content management system
(C3.10.7.1)
Sum
Sum 1
7.8
Digital video management system (C3.10.7.5) Sum 1
7.9
Communications server (C3.10.7.6)
7.10 Data backup system (C3.10.6.2)
7.11 Infrastructure server (e-mail etc) (C3.10.6.2)
7.12 Internet and firewall server (C3.10.7.6)
7.13 TETRA network linkup system (C3.15.6)
7.14 DLP (100") display for video wall (C3.10.2)
7.15 DLP (50") display for video wall (C3.10.2)
Sum
Sum
Sum
Sum
Sum
Sum
Sum
7.16 40" LCD displays for video wall (C3.10.2)
7.17 Video wall management system (C3.10.7.2)
7.18 Workstations
(a)
Security surveillance display and CCTV keyboard and joystick (C3.10.6.1)
Sum
Sum
No.
(b) System operator workstation (C3.10.6.1)
(c) IP call servicing workstation (C3.10.6.1)
No.
No.
7.19
Network Switches, WLAN and related support devices (C3.10.7.6)
Sum
7.20
Network cabling including connectors and sundry material for a complete installation
(C3.10.7.6)
Sum
7.21 IP telephone system for workstations (C3.10.6.1) Sum
7.22
7.23
Support office equipment (printer, plotter, fax machine, scanner etc) (C3.10.6.2)
Any other items as may be necessary to complete the installation. Detail below:
…………………………………………………
Sum
Sum
12
1
5
5
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
…………………………………………………
TOTAL CARRIED FORWARD TO SUMMARY PAGE
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 115
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 8: Depots
ITEM DESCRIPTION UNIT QTY SUPPLY MATERIASum
RATE AMOUNT
SUPPLY LABOUR
RATE AMOUNT
The rates must make provision for all specified equipment and miscellaneous auxiliary materiaSum in order to handover the complete installation as specified and includes hardware and all related software for each subsystem and integration between systems.The pay items listed must be priced according to the contractor's design which will satisfy the technical requirements outlined in Volume 2B.
DEPOT SYSTEMS (INSTALLED) - C3.13
Hardware
8.1
Depot Server Computer No.
8.2
Gigabit fibre optic backbone network switch No.
8.3
ADSL modem
8.4
Workstations
No.
No.
8.5
IP telephone system (excludes call centre)
8.6
Network cabling including connectors and sundry material for a complete installation
No.
Sum
8.7
8.8
IP CCTV cameras, enclosure, wiring and sundry materiaSum for a complete installation
Network Video Recorder (NVR) with control software
Software
8.9
Video view/review and security application
8.10
Any other items as may be necessary to complete the installation. Detail below:
…………………………………………………
…………………………………………………
…………………………………………………
…………………………………………………
No.
No.
No.
Sum
2
1
2
2
2
4
20
2
2
TOTAL CARRIED FORWARD TO SUMMARY PAGE
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 116
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 9: Maintenance
ITEM DESCRIPTION UNIT QTY SUPPLY MATERIALS
RATE AMOUNT
SUPPLY LABOUR
RATE AMOUNT
Maintenance shall be provided and performed according to the definitions and guidelines specified in Section C3.16
DEFECTS LIABILITY, EQUIPMENT GUARANTEES, MAINTENANCE AND REPAIR - C3.16
9.1
Equipment Guarantees
Guarantee of all equipment against defects and failure for a period of 1 year from date of acceptance of the system
Sum
9.2
Responsive Maintenance and Repair
(a)
Maintenance and Repair - Year 1: from date of final acceptance of the system.
(b)
(c)
(d)
Year 2
Year 3
Year 4
(e)
(f)
(g)
Year 5
Year 6
Provisional Sum for Spares
9.3
Preventative Maintenance
(a)
Monthly cost of all preventive maintenance costs as specified in Section C3.16.
On-Board System
(b) Central Control System
(c) Advanced Traveller Information System
(d) Data and Video Transmission System
(e) Visual Surveillance System month month month month month
9.4
Maintenance Management Software in accordance with Section C3.16.2
No.
month month month month month month
Prov
12
12
12
12
12
12
Sum
1
72
72
72
72
72
9.5
Penalties : Maintenance response times
Penalties payable for non-compliance with the minimum maintenance response times as listed in
Table 2 under section C3.16.2.
(a)
(b)
(c)
Priority Level 1
Priority Level 2
Priority Level 3
No.
No.
No.
1
1
1
-R5,000.00
-R2,000.00
-R1,000.00
R500,000.00
Rate Only
Rate Only
Rate Only
TOTAL CARRIED FORWARD TO SUMMARY PAGE
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 117
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 10 - Operations and Training
ITEM DESCRIPTION UNIT QTY RATE AMOUNT
The rates to be filled in hereunder must make provision for all labour required to fulfil the detail operational an training requirements as specified and should include the total cost of labour
10.1
Operations Manager (x1) Months 24
10.2.1
Operator A (x3)
10.2.2
Operator B (x3)
Months
Months
10.3
Contractor's handling cost, profit and all other charges in respect of above personnel
%
24
24
Training according to C3.5
10.4
Onboard operations Course/Class
10.5
Operations Course/Class
10.6
Maintenance Course/Class
10.7
System administration Course/Class
10.8
Radio system Course/Class
10.9
Reporting Course/Class
10.10
IT training Course/Class
10.11
Follow-up training
No.
No.
No.
No.
No.
No.
No.
No
2
2
2
2
2
2
2
1
TOTAL CARRIED FORWARD TO SUMMARY PAGE
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 118
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
Schedule 1
Schedule 2
Schedule 3
Schedule 4
Schedule 5
Schedule 6
Schedule 7
Schedule 8
Schedule 9
General Obligations and Site Establishment
Dayworks and Environmental Management Plan
Design, Testing and Documentation
Housing and Offices for Engineer's Site Personnel
On-Board Systems
Stations and Stops
Control Centre
Depots
Maintenance
Schedule 10 Operations and Training
SUB TOTAL
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 119
C2.2
Schedule of Quantities
TENDER NO. 25G/2009/10
DESIGN, SUPPLY, DELIVERY, INSTALLATION, TESTING, COMMISSIONING AND
MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND SOFTWARE
ITEM DESCRIPTION UNIT QTY
CONTINGENCIES
The following items will be deducted in part or whole if not required :-
RATE
Allow for Contingencies to be spent as the Engineer may direct.
Prov Sum
Allow for any additional Cost and profit required per day in the event of access to, and possession of, the Site not being available as per Sub-Clause 2.1(b) of the Conditions of Contract.
Days 35
Allow for any additional Cost and profit required per day in the event of a delay in the testing and commissioning at
Site and the resultant delay in the commencement of the
Defects Notification Period from causes not attributable to the Contractor, as per Sub-Clause 10.3 (b) of the
Conditions of Contract.
Days 35
Allow for all costs and expenses in leaving Site and returning at a later date due to causes not attributable to the Contractor.
Lump Sum
TOTAL
AMOUNT
R 5,000,000.00
TOTAL Excluding VAT
VAT @ 14%
TOTAL CARRIED FORWARD TO FORM OF OFFER AND ACCEPTANCE
Contract
Part C2: Pricing Data
Reference No 25G/2009/10 120
C2.2
Schedule of Quantities
DECLARATION (In respect of completeness of Tender)
City of Cape Town
Tower Block, Civic Centre
12 Hertzog Boulevard
CAPE TOWN
I/We, the undersigned, do hereby declare that these are the properly priced Schedules of Quantities forming Part
C2.2 of this Contract Document which contains 138 pages numbered i to xvii and 1 to 121 in consecutive order in
Volume 2A and the number of pages in consecutive order in Volume 2B as stated on page i thereof, upon which my/our tender for
TENDER NO. 25G/2009/10: DESIGN, DESIGN, SUPPLY, DELIVERY, INSTALLATION,
TESTING, COMMISSIONING AND MAINTENANCE OF THE IRT CONTROL CENTRE HARDWARE AND
SOFTWARE SYSTEMS has been based.
------------------------------------------------------------------------
SIGNATURE OF TENDERER/S
-----------------------------------------------------------
DATE
Part C2: Pricing Data
Reference No. 25G/2009/10
C2.2
Schedules of Quantities