SECTION 00300 BID FORMS 00310

advertisement
SECTION 00300
BID FORMS
00310
Bid Proposal Form
00320
Quantity Schedule
SECTION 00310
BID PROPOSAL FORM
POUDRE SCHOOL DISTRICT
BID PROPOSAL FORM
TO:
Board of Education
Poudre School District
c/o Planning, Design & Construction
2445 LaPorte Avenue
Fort Collins, CO 80521
FROM:
PROJECT IDENTIFICATION: Werner Elementary School Parking Lot and Play Area Site Improvement Project
ACKNOWLEDGMENTS:
The undersigned Bidder acknowledges examination of the following:
a)
Contract Documents
• Drawings dated February 2013
• Contract Documents and Specifications dated February 2013
• Schedule restrictions outlined in the Instructions to Bidders, Agreement and
General Conditions
b)
Project Sites/Existing Conditions
c)
Receipt of Addenda Numbers: #
#
#
, dated
, dated
, dated
AGREEMENTS: The undersigned Bidder agrees to the following:
a)
b)
c)
d)
e)
f)
g)
h)
To hold bid open for 45 calendar days from date of Bid Opening.
To enter into and execute the Construction Agreement within fifteen (15) calendar days of award,
including identified Bonds of Insurance.
To accomplish the Work in accordance with the Contract Documents.
Poudre School District reserves the right to reject any or all bids and to waive informalities.
Poudre School District reserves the right to award separate or single contracts.
Poudre School District reserves the right to award the contract on the basis of either cost or
schedule.
The Contractor agrees to pay the Poudre School District Liquidated Damages according to the
terms, amount(s) and date(s) defined in the Instructions to Bidders, Agreement and General
Conditions.
To reinstate or omit Alternates at the amounts submitted herein for sixty days after Contract Date.
TOTAL BASE BID PRICE:
Werner Elementary School Phase #1:
Dollars ($
)
Dollars ($
)
Werner Elementary School Phase #2:
Werner Elementary School Phase #3:
Dollars ($
)
Section 00310 Page 1
UNIT PRICING:
Unit Price #1:
Remove Turf Sod
Dollars ($
)
Per SF
Unit Price #2:
Remove Concrete
Dollars ($
)
Per SF
Unit Price #3:
Remove Asphalt Speed Humps
Dollars ($
)
Per SF
Unit Price #4:
Remove Asphalt Pavement
Dollars ($
)
Per SF
Unit Price #5:
New Concrete Speed Humps
Dollars ($
)
Per SF
Unit Price #6:
New Vertical Curb and Gutter
Dollars ($
)
Per LF
Unit Price #7:
New 4-ft Concrete Drain Pans, Apron and Transition
Dollars ($
)
Per SF
Unit Price #8:
New 3.5-ft Concrete Drain Pan
Dollars ($
)
Per SF
Unit Price #9:
New 6-ft Concrete Drain Pan, Apron and Ramp Transition
Dollars ($
)
Per SF
Unit Price #10:
New Concrete Sidewalk
Dollars ($
)
Per SF
Unit Price #11:
Aggregate Base Course
Dollars ($
)
Per TON
Unit Price #12:
Hot Bituminous Pavement
Dollars ($
)
Per TON
Unit Price #13:
Fly Ash Stabilization
Dollars ($
)
Per SY
Unit Price #14:
Rock Socks
Dollars ($
)
Per EA
Unit Price #15:
Straw Wattles
Dollars ($
)
Per LF
Unit Price #16:
Signage – Handicap Parking Signs
Dollars ($
)
Per EA
BID CONDITIONS:
1.
In compliance with your Invitation to Bid dated
, and subject to all conditions thereof, the
undersigned
a **(Corporation, Limited Liability Company, Partnership, Joint
Venture, or Sole Proprietor)** authorized to do business in the State of Colorado hereby proposes to
furnish and do everything required by the Contract Documents to which this refers for the construction of all
items shown in the Drawings, listed on the following Quantity Schedule and in the Measurement and
Payment Section (01270).
Section 00310 Page 2
2.
The undersigned Bidder does hereby declare and stipulate that this proposal is made in good faith, without
collusion or connection with any other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the Invitation to Bid and Instructions to Bidders,
the Agreement, the detailed Specifications, and the Drawings pertaining to the Work to be done, all of
which have been examined by the undersigned.
3.
All the various phases of Work enumerated in the Drawings and Contract Documents with their individual
jobs and overhead, whether specifically mentioned, included by implication or appurtenant thereto, are to
be performed by the CONTRACTOR and included in the Total Bid Price.
4.
The foregoing prices shall include all labor, materials, transportation, shoring, removal, dewatering,
overhead, profit, insurance, etc., to cover the complete Work in place of the several kinds called for.
5.
Unit Prices provided on this Bid Proposal Form will be used in conjunction with actual quantities of work
performed to determine the price of additional work requested by the OWNER, in writing, that is not
included in the present Drawings or Contract Documents.
6.
Bidder acknowledges that the OWNER has the right to delete items of Work or change quantities at his
sole discretion without affecting the Agreement or prices of any item so long as the deletion or change
does not exceed twenty-five percent (25%) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
Signature
Date
Title
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest
Address
Telephone
Section 00310 Page 3