Vehicle to Grid A Control Area Operators Perspective David Hawkins California Independent System Operator December 13, 2001 British Columbia Figure 4 Existing System Alberta Total Capacity in MW as of 1/1/00 Generation = 158,889 Trans Path = 87,934 MidColumbia WA E. WA/ W. MT MT Colstrip Snake Oregon ID SE ID JB WY N. NV Northern California I PDC Utah CHB C IPP D Colorado Central CA S. NV SP15 Coal Hydro Gas Wind Other Southern California Marketplace Nav Glen Palo Verde Four Corners AZ NM Mexico Key ISO Roles • Frequency Monitoring & Time Error Control • Scheduling of Power Transfers • Grid Planning • Real-Time Dispatch • Financial Settlements • Ancillary Services Management • Transmission Congestion Management • Outage scheduling - Trans. & Generation Match Generation Output to Loads M ISO M Energy INFO: Schedules from Generators Energy M 1. Bilateral INFO: Schedules from Loads 2. Markets (Day-ahead, Hourahead) 1. Consumption 3. Real-Time Instructions Every 10 minutes Stamped Read Meter Every 30 days A) Profile B) Interval meters Daily Load Curve - Dec. 12th Control Area Operation - ACE • ACE = Area Control Error = Zero (Ideal) • ACE = Change in Generation (DG) - Change in Load (DL) Scheduled Imports Gen. Load changes Control Area Loads Scheduled Exports Generation changes should equal How Balancing Energy Works Balancing Energy Purchased in 10-minute increments as needed in Real Time Preferred Operation Point Hour Ending 07:00 Hour Ending 08:00 Hour Ending 09:00 = Typical morning energy ramp-up by hour = Typical balancing energy needed to fill-in energy needs during morning ramp-up 5 M in . In ter vals 287 276 265 254 243 232 221 210 199 188 177 60.00 166 60.02 155 144 133 122 111 100 89 78 67 56 45 34 289 281 273 265 257 249 241 233 225 217 209 201 193 185 177 169 161 153 145 137 129 121 113 105 97 89 81 73 65 57 49 41 33 25 17 9 1 Megawatts 0 23 12 1 Hz AC E - D ec. 11th 600 400 200 -200 -400 -600 -800 5 Min. Intervals F r eq u en cy - D ec. 11th 60.06 60.04 60 Hz 59.98 59.96 59.94 59.92 59.90 Real Time Use of Ancillary Services and Supplemental Energy AGC Control Regulation Spinning Non-Spinning Replacement Supplemental Energy* Energy Bids Imbalance Energy Merit Order Stack $/MWh Dec Inc Regulation via Load vs. Generators • Advantages – Fast response to AGC signals - improved freq. control – Reduces wear & tear on generators – Could also provide Freq. Response Service & Line Overload Relief • Disadvantages & ? – Impact on Distribution systems – Lack of visibility to EMS computer system – Lack of experience in dealing with Distributed Resources Grid Regulation with Electric Vehicles Grid Operator GPS Power Command Internet Aggregator Wireless Provider Driver Usage Profile and Preferences Power Response New Wind Generation The State would like to encourage construction of new wind generation facilities • Primary objective is to encourage the building of 2000-3000 MW of additional Wind and Solar Generation • State needs alternatives to gas fired plants • Wind Generation tends to peak between 10PM and 2AM when the loads are low and CA doesn’t need the power • EV Load would be an ideal complement to Wind Generation power production 0.0 Tim e 16:56 15:56 14:56 13:56 12:56 11:56 10:56 9:56 8:56 7:56 6:56 5:56 4:56 3:56 2:56 1:56 0:56 23:56 22:56 21:56 1200.0 20:56 1400.0 19:56 18:56 17:56 16:56 One Hour Ahead, MW Wind Generation - Dec. 11-12 Wind Gen, M W F orecast, M W 95% R ange 95% R ange 1000.0 800.0 600.0 400.0 200.0 Future Directions • Continue testing and validation of the concept of sending dispatch notices to Electric Vehicles and evolve the model for services provided by loads. • Identify software / infrastructure requirements • Investigate the potential for Frequency Response Services • Evaluate impact on Distribution Systems and deployment limitations