FORM OF PROPOSAL – Revised – 4/5/16 BID REQUEST NO. 16-7120-CP Chillers’ Replacements Contractor Metropolitan Community College 3200 Broadway Kansas City, MO 64111 Attn: Diane Pacheco, Purchasing Manager Contact Phone # Email By submission of the attached proposal, we certify that we have examined the site of the project or have otherwise satisfied ourselves as to the existing conditions, size of areas, etc., as provided on the drawings and in the specifications for the Chillers’ Replacements BASE BID ALTERNATE (OPTIONAL) Longview (2 chillers replaced) MOBILIZATION/PERMITS/BONDS: $ $ REMOVAL OF CURRENT UNITS: $ $ Cost adjustment for Salvage $ $ INSTALL NEW UNITS: $ $ FORCE ACCOUNT: $ TOTAL: 30.000.00 $ $ $ Maple Woods (1 chiller replaced) MOBILIZATION/PERMITS/BONDS: $ $ REMOVAL OF CURRENT UNITS: $ $ Cost adjustment for Salvage $ $ INSTALL NEW UNITS: $ $ FORCE ACCOUNT: $ TOTAL: 20.000.00 $ $ $ REMOVAL OF CURRENT UNITS: $ $ Cost adjustment for Salvage $ $ INSTALL NEW UNITS: $ $ FORCE ACCOUNT: $ Penn Valley – H S I – removed from bid ©2013 Metropolitan Community College $ 20,000.00 $ Penn Valley (main campus) (1 chiller replaced) MOBILIZATION/PERMITS/BONDS: $ TOTAL: 30,000.00 20.000.00 $ $ 20,000.00 “FORCE ACCOUNT” - It is anticipated that there may be some work not included in the item list covered under this specification. Because of this potential, a “Force Account” shall be initialized by the Owner to which this work may be charged. Any amount remaining in the account at the end of the project shall not be due the Contractor but rather shall be deducted from the Contract sum by way of a change order. Work under this account shall only be performed after written authorization has been received from Owner’s Representatives. At the end of the project, any such additional work for which written authorization has been received will be included in a change order initiated by the Contractor and approved by the Owner, and such change order, with copies of the written authorization attached, shall be submitted to the Owner for acceptance. DESCRIPTION OF ABBREVIATIONS Sq.Ft. = Square Feet Ln.Ft. = Linear Feet Cu.Yd = Cubic Yard Ea. = Each A/R = As Required N/A = Not Applicable Lbs. = Pounds R/R = Remove & Replace TFAW = Total for All Work TOTAL FOR ALL BASE BID WORK ITEMS NUMERIC DOLLAR AMOUNT (all 5 chillers with force accounts) WRITTEN DOLLAR AMOUNT Vendor Questionnaire 1. Please give us some information about your company’s history and direct industry experience 1. Please include any service plan details that you would like to add 2. Please include at least three (3) references ©2016 Metropolitan Community College 2 Bid No. 16-7120-CP March 15, 2016 ADDENDA The Contractor acknowledges receipt and the consequent review of the following Addenda covering revisions to the drawings and/or specifications, and the cost, if any, of such revisions has been included in the price herein before quoted: Addendum No. Date Addendum No. Date Addendum No. Date Addendum No. Date REQUIRED INFORMATION – GENERAL CONDITIONS The Contractor shall enter the percent of mark-up for overhead and profit if he/she is requested to perform work beyond the base bid and any selected alternates on a time and materials basis. Overhead % Profit % ©2016 Metropolitan Community College 3 Bid No. 16-7120-CP March 15, 2016 Chillers’ Replacements Bid Request No. 16-7120-CP March 14, 2016 The attached list of Subcontractors and material suppliers will be used by the undersigned for this contract. If the work is to be done by the Contractor, so state. List only one per category. DESCRIPTION OF WORK MANUFACTURER /SUPPLIER ©2016 Metropolitan Community College INSTALLER 4 VALUE ($) OF BASE BID SUBCONTRACTOR WORK Bid No. 16-7120-CP March 15, 2016 Chillers’ Replacements Bid Request No. 16-7120-CP March 14, 2016 ON THIS SHEET, THE CONTRACTOR WILL PROVIDE A COMPLETE BREAKDOWN OF MOBILIZATION COSTS: ©2016 Metropolitan Community College 5 Bid No. 16-7120-CP March 15, 2016 Chillers’ Replacements Bid Request No. 16-7120-CP March 14, 2016 Signature Name and Title (Typed) Company (Typed) Address (Typed) Telephone (Typed) Date and Certification signature by Notary Public is required) State of Subscribed to before me this County of of day , 20 Notary Public: Signature: Printed Name: My Commission Expires: Seal ***** ©2016 Metropolitan Community College 6 Bid No. 16-7120-CP March 15, 2016