Transmission Conference December 15, 2004, Pittsburgh Transmission Operation: Time for Paradigm Shift? Felix Wu The University of Hong Kong and University of California, Berkeley Restructuring Unbundling Customer Service Distribution Transmission Generation Customer Service Distribution Broker/ Merchant Transmission Function System Operations Generation Generation competition Transmission open access Customer choice Transmission Operation Traditional practice Congestion management … … Is the traditional transmission operation evolved for the vertically integrated monopoly compatible to the restructured industry? Old Paradigm Philosophy » Preventive control » (n-1) criterion Operational planning » Setting limits – Physical – Stability, …. Real-time operation » Security-constrained dispatch » Contingency analysis and re-dispatch Justification (n-1) criterion » Obligation to serve Preventive control » Reliability justification for capital investment » Cost redistribution within a company » Technology not possible for post-contingency control Prediction: Blackout will happen again. Can blackout be avoided? Yes. old approach alternative approach August 14, 2003 blackout happened. Load Shedding Power balance Protective relays disconnect » Fundamental physical law » Spatial and temporal Power imbalance » Generators » Transmission lines Cascading outages causes » Overload » Instability Control strategy » Remove imbalance result in blackout Load shedding is the most effective measure for blackout prevention Alternative Approach Value of service (load demand) Preventive control = $$ » Supply-side measures Load shedding = $$ » Demand-side measures Value balance » Stochastic Post-contingency control Feasibility (1) Post-contingency control » Control center: RTU/SCADA EMS Control Center Communications Device Power Station S y s te m S e rv e r A lt e r n a t e S y s te m S e rv e r A lt e r n a t e C o m m u n ic a t io n s G a te w a y C o m m u n ic a t io n s G a te w a y D u a l R e d u n d a n t S y s te m N e tw o rk Bridge to A d v a n ce d A p p lic a t io n s S e rv e r Corporate LAN F a ilo v e r L o g ic State Monitor Encoder / Decoder Control Driver D is p a t c h e r s W it h W o r k s t a t io n s SCADA Remote Terminal » New: PMU/WAMS Control Center Measuring Device Feasibility (2) Load shedding » Traditional: Under-frequency, under voltage » New: Direct load control Value of service » Interruptible load » Priority service Conclusion The philosophy underlining traditional transmission operation is rooted in an industry that is a vertically integrated monopoly. A fresh look at the transmission reliability practice seems warranted. We propose a new approach based on: » Value of service » Post-contingency control Post-contingency control is on the verge of being technically feasible. There were programs on the value of service. Center for Electrical Energy System The University of Hong Kong http://www.eee.hku.hk/~cees