FIVE YEAR CAPITAL PLAN 2016/2017 TO 2020/2021 PREPARED BY: SFU FACILITIES DEVELOPMENT FINAL B.O G. APPROVED FOR A.V.E.D.SUBMISSION JULY 9, 2015 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN – 2 0 1 6/ 1 7 – 202 0 / 2 1 INTRODUCTION SFU’s PLANNING FRAMEWORK STRATEGIC INITIATIVES CAPITAL PROJECT OVERVIEW PLANNING ASSUMPTIONS Category 1 - NEW PRIORITY PROJECTS SFU Surrey - Sustainable Energy and Environmental Engineering Program (SE3P) SFU Burnaby - First Peoples House SFU Surrey - Health Systems Innovation and Sustainability SFU Surrey - Business and Creative Technologies SFU Surrey - Innovative Teaching and Other Facilities Category 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS SFU Burnaby - Replacement and Renewal Shrum Science – Biology SFU Burnaby - Renewal Library and Student Learning Commons SFU Burnaby - Renewal Shrum Science – Physics SFU Burnaby - Renewal Convocation Mall SFU Burnaby - Renewal Multi-Purpose Complex – Phase 3 SFU Burnaby - Replacement Data Centre - New Category 3 – STUDENT HOUSING PROJECTS SFU Burnaby – Student Residence Expansion - Phase 1 SFU Burnaby – Student Residence Expansion - Phase 2 APPENDICES 1.0 AVED (Attachment 3) Prioritized list for Proposed Category 1: New Priority Projects, Category 2: Whole Asset Replacement & Renewal Projects, and Category 3: Student Housing Projects 2.0 AVED (Attachment 4) Summary of Major Ongoing/Planned Self-Funded Projects) SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 INTRODUCTION This document presents Simon Fraser University’s 5 year Capital Plan for the construction of new facilities and the renewal of existing facilities and aging infrastructure. The projects described herein are in the process of construction, planning or are under consideration for future implementation, based on forecasted need. The format for this Capital Plan is based on the Ministry of Advanced Education’s (AVED/ the Ministry) request for standardized plan submissions from all public post-secondary institutions. The Ministry’s intention is to develop a Consolidated Capital Plan for capital requirements across institutions. The Capital Plan divides SFU’s capital projects into the Ministry’s project categories of: 1. 2. 3. 4. New Priority Projects, Whole Asset Replacement and Renewal Projects, Student Housing Projects and; Major Ongoing and Planned Self-Funded Projects. SFU looks forward to working with the Ministry to achieve our shared mandate of providing the highest quality teaching, research and community service to the citizens and communities of British Columbia. SFU will continue to support the priorities of the Ministry which include: Health and Safety Operating cost reduction Access to quality education Job creation/Economic benefit Labour market demand expansion Infrastructure sustainability This update to the Five Year Capital Plan reflects Simon Fraser University’s current priorities and is based on the best information and data available at this time. 1|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 SFU’s PLANNING FRAMEWORK The Engaged University The projects identified in this report are selected to support SFU's vision as The Engaged University. The realization of this capital plan would significantly contribute to SFU’s goals by fostering supportive campus environments for students, research and the community. Projects included in this plan will enable SFU to grow in size and stature and achieve the vision to be the leading engaged university, defined by its dynamic integration of innovative education, cutting-edge research, and far-reaching community engagement. SFU Strategic Vision The strategic vision will guide Simon Fraser University’s actions and innovations in the years to come. SFU will be the leading engaged university defined by its dynamic integration of innovative education, cutting-edge research, and far-reaching community engagement. Engaging Students To equip SFU students with the knowledge, skills, and experiences that prepares them for life in an ever-changing and challenging world. Engaging Research To be a world leader in knowledge mobilization building on a strong foundation of fundamental research. Engaging Communities To be Canada’s most community-engaged research university. As part of this vision, SFU has committed to the following underlying principles that will provide guidance to the establishment of the University’s capital priorities as found in this plan: Academic and Intellectual Freedom: SFU will be an open and inclusive university whose foundation is intellectual and academic freedom. Diversity: SFU will foster a culture of inclusion and mutual respect, celebrating the diversity and multi-ethnic character reflected amongst its students, staff, faculty, and our society. Internationalization: SFU will value international knowledge, understanding and engagement, and will seek to engender an active global citizenship among its students, faculty and staff, and to ensure that SFU is an engaged partner and contributor on the international stage. Respect for Aboriginal Peoples and Cultures: SFU will honour the history, culture and presence of Aboriginal peoples. The university will welcome and nurture Aboriginal students and seek opportunities for greater representation of Aboriginal peoples amongst its faculty and staff. 2|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 Supportive and Healthy Work Environment: SFU will recognize, respect and value the essential contribution made by staff and faculty, and will seek to build and sustain a work environment that is equitable, supportive, rewarding and enjoyable. Sustainability: SFU will pursue ecological, social and economic sustainability through its programs and operations. Through teaching and learning, research and community engagement, SFU will seek and share solutions. In its own operations, it will develop and model best practices, from minimizing its ecological footprint, to maximizing its social health and economic strength. SFU Integrated Planning framework below illustrates the interconnections of planning work that SFU is undertaking to ensure that local plans support each other as well as the University's priorities and ultimately SFU’s Mission, Values and Commitments. Figure 1 - Integrated Planning Framework The Academic Plan and the Strategic Research Plan provide the strategic direction for SFU. From these plans flow a number of supporting operational plans including the Facilities Capital Plan. Implementation of this plan is required to meet the University’s vision, mission and values. 3|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 STRATEGIC INITIATIVES This Capital Plan is based on four strategic initiatives that will carry out the University’s mission and support the new vision as an Engaged University. The projects identified in this report support these strategic initiatives. 1. Expansion – SFU Surrey To meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley, it is necessary to expand the Surrey campus beyond its current capacity of 2,500 funded students (FTE). Future development phases will accommodate new academic programs in Energy, Health and Creative Technologies, and will build on a foundation of innovative education and entrepreneurism. The University is looking to accommodate the next forecasted enrollment growth of 2,500 FTE and allow SFU Surrey to keep pace with this growing demand. Within the BC economy there are many sectors, which need educated, job-ready, entrepreneurial graduates; SFU is prioritizing clean energy engineering, health and creative technologies. From the October 18, 2012 SFU Presentation to the Select Standing Committee on Finance and Gov’t Services SFU’s top growth priority is the expansion of the Surrey campus. Since 2006 the population of Surrey has increased 18.6% - double that of Greater Vancouver. This region now represents over half the grade 12 enrolments in the Lower Mainland (see graph 1) yet it has only 126 postsecondary seats for every thousand 18-to-29-year-old versus the provincial average of 244 seats. The transition rate from high school to post-secondary in South Fraser communities is also traditionally lower than those of Richmond, Vancouver, and the North Shore. The need for post-secondary education capacity has only increased, especially in light of the Province’s Skills for Growth: British Columbia’s Labour Market Strategy to 2020. Without a significant increase in post-secondary participation rates, BC will experience major skills shortages by 2020. Due to new employment opportunities and retirement of current workers, an estimated 1.1 million jobs will open in this decade and, by 2020, 80% of all new jobs in BC will require a post-secondary degree. Given that only 67% of the current workforce has such training, 90% of new labour market entrants – most obviously including current grade school students – will need to transition into the post-secondary system to meet labour market needs and maintain a competitive economy. In 2011, the Select Standing Committee on Finance and Government Services made the unanimous recommendation that the Province recommit to the expansion of SFU Surrey and this year’s committee has heard strong support from the Surrey Board of Trade and the Downtown Business Improvement Association for this action. 4|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 SFU Surrey will: 2. Improve transition rates to postsecondary education, Fuel BC’s future labour force Build research capacity in the South Fraser and BC Revitalize a new city centre Mobilize new knowledge and engage with communities Renewal and Rehabilitation – SFU Burnaby The SFU Burnaby campus suffers from an on-going deferred maintenance problem that continues to get worse. The rehabilitation and renewal of significantly compromised and aging facilities and infrastructure at the Burnaby campus is required to extend the useful life of facilities and to improve the sustainability and functionality of these facilities. The condition of major infrastructure systems impact access to reliable and safe academic facilities. The Data Centre and Shrum Biology are whole asset replacement projects, required to replace inadequate facilities in disparate locations across campus. These projects will provide new purpose-built facilities and will be followed by future renewal projects. Aged and deteriorated instructional spaces, building envelope and mechanical/electrical systems in the Library, Physics and Multi-Purpose buildings compromise learning and research activities. The extracurricular experience of students and the community are also compromised by the poor condition of the Convocation Mall. Addressing these critical deferred maintenance and capital renewal requirements directly supports SFU’s vision. 3. Community Engagement One aspect of being an Engaged University is the need to have facilities that attract students and support the community. New and improved facilities that enhance the student experience and the local community are key parts of achieving this vision. Expansion of and improvements to student residences, recreation and athletics facilities, and a new art gallery are all projects that will help SFU to engage students from around the world as well as improve the life of the local communities. As well, in Burnaby a First People’s House will meet a specific goal of better engaging the aboriginal community. 4. Sustainability and Climate Action SFU Facilities Services has a broad portfolio of activities that aim to reduce the University’s environmental footprint through conservation efforts and efficiency improvements. Na area of operational focus is to implement infrastructure improvements to achieve reductions in energy use and greenhouse gas emissions, and to increase waste and water conservation. Where possible the re-use of existing structures is the decision of choice. In addition to physical upgrades, emphasis is also placed on "soft tissue" changes such as behavioral change programs and improved communications to engage the community. These projects and change programs 5|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 build a culture of sustainability in support of SFU Sustainability Policy (GP 38) and the SFU Energy Conservation Commitment. Project goals are aligned with Provincial government mandates and objectives including carbon neutrality, provincial greenhouse gas emissions reductions, and infrastructure renewal. Major capital projects are designed to high energy performance standards and target LEED Gold. The emphasis on renewal of the buildings at Burnaby is intended to reduce the impact on the environment by improving the operational efficiency of existing buildings and avoiding unnecessary waste. CAPITAL PROJECT OVERVIEW Over the past few years, SFU has experienced exceptional growth in support of the accessibility agenda of the Province of British Columbia. Total student FTE enrollment has grown by 59% during the period from 2001/02 to 2012/13 with undergraduate domestic students growing by 38%, undergraduate international students by 426% and graduate students by 60%. The space inventory during this time has not kept pace, increasing by only approximately 47%. Consequently, this Capital Plan includes new building projects to accommodate past growth and to add system capacity at the Surrey campus. It includes whole asset replacement and renewal projects for the Burnaby campus to address deferred maintenance requirements, improve the overall condition of the campus and ensure reliable facilities infrastructure and services. In addition, the University has included nine self-funded projects to address building and facilities needs that are not typically funded by AVED (e.g. Athletics and Recreation, Student Residences, etc.), but which are necessary to support students and operate the University. New Building Projects for Planned Enrollment Expansion - Surrey This plan outlines SFU’s future needs for capital funding to support SFU planned enrollment expansion. The expansion plan outlined in this document will help accommodate FTE growth, especially at the Surrey campus. FTE growth at the Surrey campus is a priority for SFU. The goal for this location is to carry out the mandate to become a fully comprehensive campus. SFU Surrey was established to help meet the predicted demographic demand for post-secondary access in the south Fraser Valley. The existing facilities have reached capacity much earlier than projected. Course offerings in the sciences and in areas of technology such as mechatronics have proven to be very attractive with significant increases in enrollment demand. Unfortunately, without expansion of the Surrey campus, qualified students from the immediate area who intend on enrolling at SFU Surrey cannot be accommodated. This capital plan describes four consecutive projects for the Surrey campus including: Energy Systems Engineering 6|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 Health Systems Innovation and Sustainability Business and Creative Technologies Innovative Teaching and Other Facilities New Building Projects – SFU Burnaby A First Peoples House is the only project request in the New Building Project category for the Burnaby Campus. Other new buildings are planned as self-funded projects, including a new athletic and recreation field house and stadium, a new student union building, an art museum and a central bio-mass heating plant. These are to be funded from various sources including a student levy to be approved through a referendum, donations and partnerships with private developers/operators. Whole Asset Replacement and Renewal Projects – Burnaby Replacement and renewal of existing facilities is an identified priority of government and is of particular concern for the SFU Burnaby campus that turns 50 years old this year. Aging campus facilities and infrastructure are FCI = Deferred Maintenance + Capital Renewal experiencing ever-increasing issues related Current Replacement Value to health and safety deficiencies, lack of functionality and unreliable and inefficient SFU Burnaby has 35 academic related buildings. building systems. In total, over half of the Based on the VFA audit – six are in good condition capital projects described in this plan are (FCI <0.20), nine are in fair condition (FCI 0.20 targeted to the renewal or replacement of ><0.50) and twenty are in poor condition (FCI existing facilities and infrastructure. >0.50). The total estimated deferred maintenance Reductions in capital funding from the and capital renewal cost for poor condition Province contribute significantly to the buildings is approximately $592,000,000 deferred maintenance backlog and the ($28,000,000 higher than 1 year ago). demand for renewal. The cost of repair of infrastructure, if not adequately maintained, will far exceed the cost of an appropriate level of maintenance throughout the life of our facilities. As a result, SFU building and infrastructure will reach the end of their useful life sooner and necessitate the need for more significant renewal works than would have otherwise been anticipated. The Ministry supported VFA audit of facilities condition illustrates this need. Currently, according to the FCI (Facilities Condition Index) 57% of SFU Burnaby buildings (55 % of the Burnaby space inventory) are in ‘poor’ condition. It is important to recognize that this audit does not include the deferred maintenance needs of residences, other ancillary buildings, roads, utilities, and campus infrastructure. Based on these findings, renewal is urgently required to support the vision, mission and values of the University and to: improve learning conditions for students improve research delivery areas improve community social spaces 7|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 mitigate the cost of deferred maintenance ensure that our facilities are fiscally and environmentally sustainable. In the 2014/15 5 year Capital Plan the highest priority infrastructure renewal project for Burnaby was the urgent need to rehabilitate the road system. Gagliardi Way, the entrance road to the campus, and University Drive West were in terrible condition despite annual repairs. The rebuild of the roadway was completed in the fall/winter of 2014. This project was self-funded, The highest priority academic renewal project for the Burnaby campus is the whole asset replacement followed by the renovation of the second phase of the Shrum Science building – Biology. Due to challenges and excessive cost, disruption and logistical challenges of renewing the building, a new building is needed for the research operations of Biological Sciences. Renewal and reconfiguration of the existing space to serve the teaching needs of three Life Sciences Departments that collectively comprise 70% of the majors in the Faculty of Science is also required, as a subsequent phase. This project follows the recent completion of Phase 1 - Chemistry renewal project. The entire project is a multi-year plan intended to renovate and rehabilitate the Shrum Science Centre on the Burnaby campus. These facilities are at the end of their functional life and require significant work to bring them up to current life safety and functional standards. Renewal of the Physics and Kinesiology portions of the Shrum Science Centre need to take place in the next subsequent phases. The Library building is also in need of a major renewal. The building was built in 1968 and has inadequate, outdated and aging mechanical and electrical systems, and has significant shortcomings in terms of building code, seismic and accessibility compliance. Convocation Mall needs to be rebuilt to address structural deficiencies, inadequate snow load capacity and envelope failures. This outdoor facility is the heart of the campus and accommodates many university activities. The Multi-Purpose Complex is suffering from a poorly designed and failing building envelope that is increasingly prone to leaks leading to mould growth and building deterioration. In 2015, SFU allocated $16,000,000 to address the Multi-Purpose Complex’s envelope and subsurface drainage related deficiencies. Additional AVED funding would address mechanical, electrical, life safety, code and seismic-related upgrades. The current capital plan also includes the whole asset replacement of the Burnaby campus Data Centre. Data systems, currently located in Strand Hall and the Water Tower building, are insufficient in size, have inadequate and unreliable power, an HVAC system that no longer meets current demands and aging technology in racks and servers. A new low level secure facility is the most cost effective solution and is required to accommodate the modernization of the data computing centre. 8|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 Student Housing Projects A residence master plan has just been completed by the university. It supports the expansion of current student housing and associated facilities. Expansion will proceed in two phases. Phase 1 will see the expansion of approximately 350 beds following the demolition of the Louis Riel House. Total expansion will increase beds from 1767 to 3,250. Ongoing/Planned/Self-Funded Projects SFU has nine ongoing or planned self-funded projects valued in excess of $175,000,000. SFU is currently considering a partnership with a private utility company to develop a bio-mass central heat plant as an alternative to a gas fired replacement capital project. An art museum is planned to house SFU’s outstanding art collection. SFU is pursuing alternate funding opportunities and partnerships with private developers/operators for projects to add recreation and athletic facilities. SFU is upgrading its Data Centre for highly soughtafter Compute Canada accreditation as an advanced research computing facility. SFU is also working with the Simon Fraser Student Society to construct a new student union building and stadium on the Burnaby campus. At SFU Vancouver, a 52 unit Graduate Residence and Innovation Centre for the Beedie School of Business is currently under construction. The University continues to seek opportunities for partnerships, funding from alternative sources such as the Canadian Foundation for Innovation/British Columbia Knowledge Development Fund (CFI/BCKDF) program and contributions from donors and other fundraising for resources consistent with the University’s mission. Where possible, such opportunities may be integrated with traditional government-funded programs. PLANNING ASSUMPTIONS It is assumed that the facilities and infrastructure necessary to accommodate normal and/or targeted enrollment growth will be funded by AVED in accordance with the BC Space Standards, using an appropriate Unit Rate Budgeting methodology that recognizes elemental unit costs and reasonable projections of cost escalation. Estimates of the costs for future developments are preliminary for planning purposes only. At the time of project approval, funding an appropriate adjustment for change of scope and escalation will be required. All future projects will be executed in accordance with campus planning principles, design standards and functional requirements, and the government mandate to achieve LEED Gold, or equivalent, for new construction and LEED Silver for major renovation and renewal projects. As well, the University will honour the Wood First Initiative and will comply with The Capital Asset Management Framework, the Greenhouse Gas Reductions Target Act, and the Capital Asset Reference Guide. 9|P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 The projects described in the balance of this plan use reasonable parametric assumptions. It is anticipated that revisions to the space projections, costs and schedules will be required as additional planning information becomes available. The plan attempts to address those areas that are currently in a deficit position or where the condition of a building or infrastructure asset is compromised to the point of requiring renewal, rehabilitation or replacement. 10 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 NEW PRIORITY PROJECTS SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS INSTITUTION CAMPUS/CITY PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY SFU S UR R E Y SUSTAINABLE ENERGY AND ENVIRONMENTAL ENGINEERING PROGRAM (SE3P) 1 1 OF 5 Current Situation 1.0 To meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley, it is critical to expand the Surrey campus. Surrey’s fall semester applications have increased, from 1,000 in 2007 to over 2,500 in 2013. Since opening its doors in 2002, SFU’s Surrey campus has grown to more than the 2,500 FTE in 32,257 GASM (347,211 sq.ft.) with no room for expansion. The next phases of development at Surrey Campus: Sustainable Energy and Environmental Engineering Program in the Faculty of Applied Sciences; Science, Health System Innovation and Sustainability; Business and Creative Technologies; and Innovative Teaching and Other Facilities, will accommodate the next forecasted enrollment growth of 2,500 FTE and allow SFU Surrey to keep pace with growing demand. Applied Sciences students feed into the high-demand technology sector in B.C. and expansion at Surrey campus will provide manpower required for some of the estimated 100,000 new jobs expected from LNG, as well as future jobs required in the sustainable energy sector. Competition to enter Applied Sciences programs has grown substantially: for every full-time student seat, 5 applications are received. Applied Sciences is consistently oversubscribed with a Program FTE growth of 39% since 2010/11. This has led to rising GPA requirements for incoming students, most recently 92% for international students and 85% for domestic students entering Surrey campus programs, with the expectation of further increasing GPA cut-off rates for 2016. Applied Sciences graduate research space for engineering programs requires wet laboratories with direct ventilation and specialized piped utilities, high headroom clearances, structural support for heavy equipment, flexible testing and assembly areas, installation of occupational health and safety equipment and distribution of services that are necessary for safety. Due to space constraints and lack of building infrastructure for hosting safe research labs, Applied Sciences has been leasing space at industry sites for students to carry out their research programs and to build large workshop projects. Applied Sciences closed student enrollments in summer 2015 due to capacity constraints. 11 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS 2.0 3.0 Project Description This project is fully described in the Concept Plan report submitted to AVED 1in November 2014. This project has an estimated size of 11,000 GSM (118,000 Sq. Ft) and is the first phase in the four-phase expansion of the SFU Surrey campus. The new building will house the Sustainable Energy and Environmental Engineering Program (SE3P), and an additional lecture theatre required to accommodate current academic programs and community events in Surrey. The proposed SE3P addresses the critical need for skilled engineers in the growing energy and clean tech sectors (in BC/Canada). These engineers are expected to lead the sustainable exploitation of traditional and new energy resources and imminent transition to low-carbon energy systems through innovation, entrepreneurship, and sustainable thinking. The building will provide space required to serve the needs of 320 undergraduate FTEs and 100 graduate FTEs in the Sustainable Energy and Environmental Engineering Program (SE3P), plus 20 graduate FTEs in computer science programs. The facilities will house purpose-built space for engineering teaching labs, equipment rooms and research labs, as well as academic and staff support spaces. This innovative project also includes a 400-seat lecture theatre, which will serve Surrey students, primarily for teaching large first- and second-year undergraduate classes, and the Surrey Central community. Project Objectives Sustainable Energy and Environmental Engineering is a multidisciplinary specialization that will support the mandate of the provincial government’s Top 60 jobs by 2022, and train energy engineering specialists and managers required by the burgeoning liquefied natural gas industry. In the BC 2022 Labour Market Outlook report, the province foresees 8,300 engineering job openings requiring post-secondary training by the year 2022. SE3P will be the first dedicated undergraduate sustainable energy engineering program in Western Canada and the first Canadian Engineering Accreditation Board accredited undergraduate energy engineering program. It will use an integrated approach to sustainable energy engineering education, blending essential elements of environmental impact, economics, management and entrepreneurship with a strong core of traditional energy-related engineering sciences and design. This will result in a program training well-rounded energy engineers for the oil and gas sector, innovative fuel cell technology and beyond. According to Globe Foundation and Skills for Growth Report of BC Government, over 50,000 skilled technical workers in clean energy are needed over the next 10-15 years. In addition, the Electricity Sector Council of Canada estimates nearly 60% of the current workforce in the electricity industry will retire by 2020. The industry will need to recruit 45,000 new workers in the next five years to deal with refurbishing existing systems, and building new and renewable energy infrastructure. 1 Note: The original name of the proposed program was Energy Systems Engineering (ESE) and it is now Sustainable Energy and Environmental Engineering Program (SE3P). 12 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS 4.0 Options Considered Extensive investigation of partnerships with private developers and the Surrey Development Corporation have not resulted in any viable facilities alternative. The nature of engineering science teaching and research requires hands-on experience in a laboratory setting. Alternative means of teaching and research without lab experience is not practical. Specialized lab facilities, especially for wet labs, are not generally available in the marketplace, and those that may be are typically not designed to meet the building code requirements for assembly use as required for university teaching functions. 5.0 Project Outcomes 6.0 Infrastructure Improvements: o The project will allow for expansion of 320 undergraduate spaces and 120 graduate spaces in engineering and computer science programs in Surrey. It will also provide support space for existing programs. o The project expands purpose-built space for advanced research, lab work and student projects so undergraduate and graduate students gain practical, handson skills that can be readily applied in industry. o A new SFU building in Surrey Centre will support expansion of the campus within the City of Surrey’s revitalized downtown and expand opportunities for community partnerships through use of the 400-seat lecture theatre. Strategic Alignment: o This project is needed to meet the increasing enrollment demand from the fastgrowing university-aged population in the south Fraser Valley. SE3P commits to partnering with post-secondary institutions in the South Fraser region, such as Kwantlen Polytechnic University and University of the Fraser Valley, to provide additional spaces to train engineering students. o This project will accommodate growth and labour market demand driven capacity created by a growing LNG industry, and by the need for sustainable energy solutions in other industries, such as construction/building, natural resources, remediation, utilities and transportation. o The project provides the opportunity for industry-based collaborations for which SFU Surrey has a strong reputation. The programs offered in this building will provide the training and education required to meet BC’s labour market needs and maintain a competitive economy. SFU is the only BC research university with plans to significantly grow its undergraduate student population. o The expansion of Surrey’s campus buildings and academic programs will support the institution’s vision for the integration of innovative education, cutting edge research and far-reaching community engagement. SFU Surrey has been a living example of what it means to be an “engaged university”. Project Cost/Funding Total project costs are $85,400,000. This total includes 18% non-provincial costs for site acquisition and the development of parking in the building. The total AVED Capital contribution for this project is $70,000,000. 13 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS It is assumed that operating funding would be provided by AVED based on $14,000 per full-time undergraduate and $20,000 per graduate student based on Ministry funding per FTE for Research Universities under the program cost bands provided through the Skills for Jobs Blueprint. 7.0 8.0 Key Risks Completion of development agreement with City of Surrey Budget management Schedule management Project Schedule SFU Surrey – : Sustainable Energy and Environmental Engineering Program 2015/16 2016/17 2017/18 2018/19 2019/2020 SCHEDULE Planning Design Construction Occupancy CASH FLOW $70,000,000 14 | P a g e Jan. 2020 $200,000 $2,800,000 $8,000,000 $38,000,000 $21,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY FIRST PEOPLES HOUSE 1.0 2.0 3.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 1 2 OF 5 Current Situation There were 591 self-identified Aboriginal students attending SFU in 2012-13 including 460 undergraduate students and 131 graduate students. Programs and services to support Aboriginal students are located in various locations around the Burnaby campus. Project Description Development of a facility dedicated to providing space for programs and services for First Nations students on campus. Provide office, common areas and meeting space dedicated to incubator and accelerator programs. The building will include a large ceremonial hall, student lounge, computer lab, study space, SFU Office of First Nations Student Services and office space for Elders. The building program is 2,000 GASM. Project Objectives This project is needed to facilitate the participation of First Nations peoples in postsecondary education on the SFU campus. The project will create a place for Aboriginal students, staff, and faculty, who come from across British Columbia, Canada, and the world, to feel at home and make friends. It will be a place where their cultures and backgrounds are respected and supported. Such a place of pride and culture becomes a tangible recruitment tool and a place to enhance the retention of Aboriginal students, staff, and faculty. The First Peoples House will provide an opportunity to establish the proposed First Peoples Enterprise Accelerator Program (“FPEAP”)which will bring together leading mentors and entrepreneurs-in-residence with key programming and resources to train and mentor First People entrepreneurs, identify and incubate promising new ventures and accelerate emerging and growth stage enterprises of importance to First Peoples, British Columba and Canada. The First Peoples House would be a place where Aboriginal Elders could have an on-campus home to work with students and others. It would be a place where cultural events, celebrations, and workshops could be held for the Aboriginal and campus-wide community. It would be a place to share Aboriginal culture as members of the University and off-campus community would come to the First Peoples House to inquire and learn. It would be an honoured place from which to make connections to local Aboriginal communities and would be a recognized symbol of the SFU commitment to these communities. A centerpiece of the First Peoples House would be a traditional-style Ceremonial Hall. Such a hall would be a place to hold conferences, social and cultural events, 15 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS and celebrations — for example, the special Honoring Feast for SFU Aboriginal graduates. Traditional winter ceremonies and pow-wows could also be held there. It would be a place to welcome special dignitaries to the Burnaby campus. Such a Ceremonial Hall in a beautiful First Peoples House would be a signature room and building on the campus, recognized across the University, city, province, and country. 4.0 5.0 6.0 Options Considered The facility needs to be located at the SFU Burnaby campus to provide access by SFU students. Ideally, it needs to be designed to reflect Aboriginal culture. Renovation of existing facilities on campus was considered, but rejected, as there was no suitable location with enough vacant space. Project Outcomes The project will help to improve the engagement of Aboriginal students and the Aboriginal community, and improve participation and outcomes in post-secondary education for First Nations peoples. The project will showcase the accelerator program and will be closely linked with SFU’s overall support for entrepreneurship and early stage company development, leveraging available facilities, networks and benefits for participating First Peoples entrepreneurs and their communities. Strategic Alignment: o Simon Fraser University is committed to being the leading “engaged” university in Canada, defined by its dynamic integration of innovative education, cutting edge research, and far reaching community engagement. This project will assist the University in realizing this vision with respect to the Aboriginal community including: Engaging Aboriginal students by equipping them with the knowledge, research skills, and experiences to prepare them for life in an ever-changing and challenging world; Engaging research to become a world leader in knowledge mobilization in the service of Aboriginal peoples; Engaging Aboriginal communities in every way possible to contribute to their social, economic, environmental, and cultural well-being. The project aligns with the AVED Aboriginal Service plan to “Increase access, retention, completion and transition opportunities for Aboriginal learners, strengthen partnerships and collaboration in Aboriginal post-secondary education and Increase the receptivity and relevance of post-secondary institutions and programs for Aboriginal learners.” Project Cost/Funding $15 million. This project is expected to be funded partially from AVED and donations. 16 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS 7.0 8.0 Key Risks Budget management Schedule management Acquisition of donor funding Project Schedule SFU Burnaby – First Peoples House 2015/16 2016/17 2017/18 2018/19 SCHEDULE Planning Design Construction Occupancy CASH FLOW $15,000,000 17 | P a g e Mar. 2019 $1,000,000 $8,000,000 $6,000,000 2019/20 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS INSTITUTION CAMPUS/CITY PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY SFU S UR R E Y HEALTH SYSTEMS INNOVATION AND SUSTAINABILITY 1 3 OF 5 1.0 Current Situation To meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley, it is necessary to expand the Surrey campus. Since opening its doors in 2002, SFU’s Surrey Campus has grown to more than the 2,500 FTE in 32,257 GASM (347,211 sq.ft.) with no room for expansion. Surrey Campus was planned on 135 square feet per FTE, which is significantly lower than the Ministry Space Standard that yields approximately 175 square feet per FTE. The next phases of development: Sustainable Energy and Environmental Engineering Program (SE3P) ; Science, Health System Innovation and Sustainability, Business and Creative Technologies and Innovative Teaching and Other Facilities, will accommodate the next forecasted enrollment growth of 2,500 FTE and allow SFU Surrey to keep pace with growing demand. 2.0 Project Description This project is the second phase in the four phase expansion of the SFU Surrey campus. Together these projects will provide facilities to accommodate an additional 2,500 FTE’s, growing the campus to a total of 5,000 FTE’s. This project will provide space for science, health and technology programs and will be comprised of classrooms, research and teaching laboratories, academic and support spaces, and a data centre to serve the SFU Surrey campus. The collection of five programs associated with the Faculty of Health Science and the Faculty of Applied Science will provide opportunities for up to 660 undergraduate FTE’s and 185 graduates FTE’s in programs including Mechatronics (which will share part of Phase 1 lab space), Health Systems Innovation, Population Health Promotion, Indigenous Health Development, eHealth Innovation and Informatics, Health Technology Development and Assessment. Students in all concentrations will be offer the opportunity to complete a minor in “innovation and entrepreneurship from the Beedie School of Business. The estimated size of this project is 13,600 GSM. 3.0 Project Objectives The expansion will add programs to train students for careers in health, mechatronics and applied sciences where job growth in BC is expected to grow by 2.4 %/1.6% by 2020 and where an estimated 90,000/60,000 new or replacement workers will be needed according to the BC Labour Market Outlook 2010-2020. Science, Health and Technology programs will be offered to support other academic initiatives to provide disciplinary breadth and academic choice for students completing programs and degrees in Surrey. 18 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS The purpose of this program is to train the leaders of the future who will develop and translate innovative ideas into evidence-informed practices that improve the planning, delivery, and outcomes of health care. The programs will prepare students to be problem-solvers, innovators, advocates, administrators, and leaders to meet health system-related needs in Surrey, British Columbia, and beyond. The program will generate evidence and translate evidence-informed ideas into improved systems of health promotion, disease prevention, and health care delivery. No other university or college in BC has developed a multi-disciplinary program focused on innovation for the future of this breadth or depth. 4.0 Options Considered 5.0 The nature of science teaching and research requires hands on experience in a laboratory setting. Alternative means of teaching and research without lab experience is not practical. Specialized lab facilities are not generally available in the marketplace and those that might be typically are not designed to meet the building code requirements for assembly use as required for university teaching functions. Locations distant from the Burnaby campus are also not practical. Extensive investigation of partnerships with private developers and the Surrey Development Corporation have not resulted in any viable facilities alternative. The project supports development a university campus as part of the new Surrey downtown civic centre precinct. Project Outcomes The project will allow for expansion of new graduate and undergraduate programs in science, health and technology at the Surrey campus, and provide support space for existing programs. The project will enhance the development of the Surrey Central City community. Strategic Alignment: o This project will accommodate growth and labour market demand driven capacity. The project provides the opportunity for industry based collaborations for which SFU Surrey has a strong reputation. The programs offered in this building will provide the training and education required to meet BC’s labour market needs and maintain a competitive economy. SFU is the only BC research university with plans to significantly grow its undergraduate student population. o The expansion of Surrey’s campus buildings and academic programs will support the institution’s vision for the integration of innovative education, cutting edge research and far-reaching community engagements. SFU Surrey has been a living example of what it means to be an “engaged university”. o This project is needed to meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley. 19 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS 6.0 Project Cost/Funding 7.0 Key Risks 8.0 $90 million This project is expected to be funded by AVED. There are on-going discussions with other institutional and municipal bodies regarding the possibility of making this part of a larger development on the site. It is assumed that operating funding would be provided by AVED based on standard funding per FTE formula. Budget management Schedule management Completion of property acquisition Project Schedule SFU Surrey – Health Systems Innovation and Sustainability 2016/17 2017/18 2018/19 2019/20 2020/21 SCHEDULE Planning Design Construction Occupancy CASH FLOW $90,000,000 20 | P a g e Mar. 2021 $1,000,000 $8,000,000 $40,000,000 $41,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS INSTITUTION CAMPUS/CITY PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY SFU S UR R E Y BUSINESS AND CREATIVE TECHNOLOGIES 1 4 OF 5 1.0 Current Situation 2.0 To meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley, it is necessary to expand the Surrey campus. Since opening its doors in 2002, SFU’s Surrey Campus has grown to more than the 2,500 FTE in 32,257 GASM (347,211 sq.ft.) with no room for expansion. Surrey Campus was planned on 135 square feet per FTE, which is significantly lower than the Ministry Space Standard that yields approximately 175 square feet per FTE. The next phases of development: Sustainable Energy and Environmental Engineering Program (SE3P) ; Science, Health System Innovation and Sustainability, Business and Creative Technologies and Innovative Teaching and Other Facilities, will accommodate the next forecasted enrollment growth of 2,500 FTE and allow SFU Surrey to keep pace with growing demand. Project Description 3.0 Surrey’s next building will be the third phase of a four phase expansion that will provide space required to serve the needs of 2,500 additional FTE’s within a comprehensive and full service campus of 5,000 FTE’s. This phase will provide for creative technologies studies and will have specialized facilities such as a games studies laboratory with for students, large screen and mobile screen interfaces, a 3-D printing laboratory with industrial strength flooring, an innovation laboratory for student teams, an innovative consultation space with video conference capability to link student teams to industry mentors. The project will provide classrooms, research and teaching laboratories, and academic and staff support spaces. This project will provide space required to serve the needs of up to 420 undergraduate FTE’s and 202 graduate FTE’s in Business Innovation and Entrepreneurship and Creative Technologies The estimated size of this project is 13,000 GSM. Project Objectives Entrepreneurship and innovation are fundamental to economic growth and prosperity in Canada. Students at SFU with undergraduate degrees outside of Business would benefit from an accessible Minor in Business offered at the Surrey campus focused on venture development (entrepreneurship) and innovation within organizations (intrapraneurship). Business majors in this concentration will select into one of two broad themes of Science and Technology Entrepreneurship or Social Entrepreneurship. Students in the Business major concentrating in entrepreneurship and Innovation could work to 21 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS 4.0 5.0 earn space in Surrey Incubator through competition. Limited spaces would be provided for both Technology as well as Social Entrepreneurship. Creative technologies will reshape the way we experience the world in the 21st century. The convergence of media, entertainment and communication will bring together historically separate industries, disrupting usual business methods. Development in social media, big data, gamification and the creative economy will transform the way businesses reach, engage, and manage their employees and customers. The projected annual growth in employment in the tech sector is 3,000 to 4,000 new jobs, many with requirements for new skill sets. Unfortunately, according to a 2012 analysis from BCTIA, BC is well behind the Canadian average in producing graduates in this area. SFU programs will answer the need for creative technologies workers across the economy. 182,000 job openings in BC are expected by 2020 in the Business, Finance and Administration occupations according to the BC Labour Market Outlook 2010-2020. Options Considered Extensive investigation of partnerships with private developers and the Surrey Development Corporation have not resulted in any viable facilities alternative. The project supports development a university campus as part of the new Surrey downtown civic centre precinct. Project Outcomes The project will allow for expansion of new graduate and undergraduate business and other programs at the Surrey campus, and provide support space for existing programs. The project will help to enhance the development of the Surrey Central City community. Strategic Alignment: o This project will accommodate growth and labour market demand driven capacity. The project provides the opportunity for industry based collaborations for which SFU Surrey has a strong reputation. The programs offered in this building will provide the training and education required to meet BC’s labour market needs and maintain a competitive economy. SFU is the only BC research university with plans to significantly grow its undergraduate student population. o The expansion of Surrey’s campus buildings and academic programs will support the institutions vision for the integration of innovative education, cutting edge research and far-reaching community engagements. SFU Surrey has been a living example of what it means to be an “engaged university”. o This project is needed to meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley. 22 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS 6.0 7.0 8.0 Project Funding $90 million This project is expected to be funded by AVED. There are on-going discussions with other institutional and municipal bodies regarding the possibility of making this part of a larger development on the site. It is assumed that operating funding would be provided by AVED based on standard funding per FTE formula. Key Risks Budget management Schedule management Completion of property acquisition Project Schedule SFU Surrey Business and Creative Technologies 2017/18 2018/19 2019/20 2020/21 2021/22 SCHEDULE Planning Design Construction Occupancy CASH FLOW $90,000,000 23 | P a g e Mar. 2022 $1,000,000 $8,000,000 $40,000,00 $41,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS INSTITUTION CAMPUS/CITY PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY SFU S UR R E Y INNOVATIVE TEACHING AND OTHER FACILITIES 1 5 OF 5 1.0 Current Situation 2.0 To meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley, it is necessary to expand the Surrey campus. Since opening its doors in 2002, SFU’s Surrey Campus has grown to more than the 2,500 FTE in 32,257 GASM (347,211 sq.ft.) with no room for expansion. Surrey Campus was planned on 135 square feet per FTE, which is significantly lower than the Ministry Space Standards that yield approximately 175 square feet per FTE. The next phases of development: Sustainable Energy and Environmental Engineering Program (SE3P) ; Science, Health System Innovation and Sustainability, Business and Creative Technologies and Innovative Teaching and Other Facilities, will accommodate the next forecasted enrollment growth of 2,500 FTE and allow SFU Surrey to keep pace with growing demand. Project Description Surrey’s next building will be the last phase of a four phase expansion that will provide space required to serve the needs a total of 2,500 additional FTE within a comprehensive and full service campus of 5,000 FTE. This phase will provide for innovative teaching programs and graduate and research facilities and will include classrooms, research and teaching laboratories, and academic offices. This project will provide space required to serve the needs of 490 under graduate students and facilities for other graduate students in bridge programs. The estimated size of this project is 5,500 GSM. 3.0 Project Objectives The building will provide space for students in Faculty of Environment, Education and Science. The programs will be intertwined and SFU will seek to develop community partnerships and integrated educational pathways that improve employment prospect for graduates. 4.0 Options Considered The nature of integrated teaching and research requires hands on experience in a laboratory setting. Alternative means of teaching and research without lab experience is not practical. Specialized lab facilities are not generally available in the marketplace and those that might be typically are not designed to meet the building code requirements for assembly use as required for university teaching functions. Locations distant from the Burnaby campus are also not practical. 24 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS Extensive investigation of partnerships with private developers and the Surrey Development Corporation have not resulted in any viable facilities alternative. The project supports development a university campus as part of the new Surrey downtown civic centre precinct. 5.0 Project Outcomes The project will allow for expansion of facilities to support students at the Surrey campus and provide support space for existing programs. The project will help to enhance the development of the Surrey Central City community. Strategic Alignment: o This project will accommodate growth and labour market demand driven capacity. The project provides the opportunity for industry based collaborations for which SFU Surrey has a strong reputation. The programs offered in this building will provide the training and education required to meet BC’s labour market needs and maintain a competitive economy. o The expansion of Surrey’s campus buildings and academic programs will support the institutions vision for the integration of innovative education, cutting edge research and far-reaching community engagements. SFU Surrey has been a living example of what it means to be an “engaged university”. o This project is needed to meet the increasing enrollment demand from the fast growing university student aged population in the south Fraser Valley. 6.0 7.0 Project Funding $36 million This project is expected to be funded by AVED. There are on-going discussions with other institutional and municipal bodies regarding the possibility of making this part of a larger development on the site. It is assumed that operating funding would be provided by AVED based on standard funding per FTE formula. Key Risks Budget management Schedule management Completion of property acquisition 25 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 1 – NEW PRIORITY PROJECTS 8.0 Project Schedule SFU Surrey – Innovative Teaching and Other Facilities SFU Surrey – Graduate Facilities 2017/18 2018/19 2019/20 2020/21 2021/22 2015/16 2016/17 2017/18 2018/19 2019/20 Planning Design Construction Occupancy CASH FLOW $36,000,000 26 | P a g e Mar. 2022 $500,000 $3,500,000 $16,000,000 $16,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 CATEGORY 2 RENEWAL/REPLACEMENT AND INFRASTRUCTURE PROJECTS SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS INSTITUTION CAMPUS/CITY PROJECT TITLE SFU B UR NA BY WHOLE ASSET REPLACMENT AND RENEWAL - SHRUM SCIENCE - BIOLOGY PROJECT CATEGORY 2 PROJECT PRIORITY 1 OF 6 1.0 Current Situation The Biology Wing of the Shrum Science Centre was constructed in 1965 with additions in the 1970’s and 1980’s. It has 10,305 GASM (110,922 sq.ft.) of space. The main building is in very poor condition with a current Facilities Condition Index (FCI) assessment of 1.04 and a VFA estimate of $72M in deferred maintenance and capital renewal needs. The Department of Biological Sciences is spread over multiple buildings in Shrum Science Centre, TASC2 and the South Science Building. The quality of the space and the diffuse locations of departmental members and operations are a barrier to the continued growth in collaborative and interdisciplinary excellence in both teaching and research. The building is comprised primarily of undergraduate laboratories, and research labs and classrooms that no longer comply with modern academic facility design standards. It also has significant deficiencies with respect to current seismic and building code requirements. The Department has a shortfall in space, based on the Council of Ontario Universities (COU) formula .The total actual space inventory is, which is 76% of the entitlement. The shortfall is greatest in office space, but there are also shortages in research and teaching space. It should be noted that space figures for teaching and research include common space and large holding facilities (e.g. greenhouses, insectary facilities) and our percentage of entitlement would be lower if these are excluded. Biological Sciences is the largest Department in the Faculty of Science. The undergraduate program comprises 709 undergraduate FTEs, and 110 graduate, 10 teaching faculty and 36 research faculty. The cost to renew to the existing building to current science standards would far exceed cost of constructing a new purpose-built facility. As well, the logistical challenges and costs of disruption and relocation of occupants would be great. A retrofit of the existing space would not allow researchers with similar interests to be co-located; there simply is not enough space to do so. A new building could be purpose-built to improve the level of engagement within and across research groups in Biological Sciences. 2.0 Project Description This project would allow for a whole asset replacement (Phase 1) of Biology followed by a second phase (Phase 2) building renewal/ renovation of the existing facility. 27 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS Phase 1- Whole Asset Replacement - Biology Research Facility o Phase one of this project is a new biology research building to support contemporary academic research, graduate students and faculty offices. The building would consolidate space for various buildings. The facility would be approximately 9,300 GASM (100,000 sq.ft.). The project cost would be $75M. Phase 2- Renewal - Biology Teaching Laboratories and Classrooms o Once vacated, the second phase of the project includes renewal of all major building systems and infrastructure elements. Laboratory areas will be redesigned following the model of the Chemistry renewal project that was completed in 2011. The renovation standard will be contemporary, modular and flexible to allow for easy adaptation to changing research and academic needs. Shrum Biology would be partially outfitted to include: o Biology Undergrad labs and classrooms and offices existing in Shrum o Classrooms and programs from other buildings o New Offices Undergraduate teaching labs will be consolidated to provide flexibility in class size and to allow sharing of support spaces. Improvements will be made to general circulation and emergency exit routes. All areas will be upgraded to current code guidelines and will provide appropriate life safety systems. The renewal work will take place in the majority of the building. The lecture theatres at the north end of the building that comprise approximately 30% of the space will have minimal improvements to finishes only. A portion of the existing Shrum B complex will be demolished. The Phase 2 project falls outside the timeframe of this 5 Year Capital Plan. 3.0 Project Objectives The objective is to continue with the phased renewal of the Shrum Science Complex begun with the Chemistry renewal project completed in 2011. The project will support SFU’s strategic vision of innovative education and cutting edge research by improving learning conditions for students and improving research delivery areas. Renewal will address the deferred maintenance backlog and mitigate the ongoing cost of short term maintenance repairs and continued risk of systems failures and their impact on the education and research activities in the Biology building. The science programs train students for careers in the natural and applied sciences where job growth in BC is expected be 1.6% by 2020, and where an estimated 60,000 new or replacement workers will be needed according to the BC Labour Market Outlook 2010-2020. 28 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 4.0 5.0 Options Considered A renewal only option was considered, but the cost of temporary accommodation during the project construction timeframe would require in excess of $30M. A renovated lab building is estimated to cost $77M, for a total cost in excess of $110M. The cost of this option would likely exceed the cost of the proposed whole asset replacement plus renewal. Locations distant from the Burnaby campus are not practical. The nature of science teaching and research requires hands on experience in a laboratory setting. Also, an alternative means of teaching and research without lab experience is not practical. Specialized lab facilities are not generally available in the marketplace and those that might be typically are not designed to meet the building code requirements for assembly use as required for university teaching functions. Project Outcomes The project will resolve significant deferred maintenance requirements and provide an improved environment to support teaching for undergraduate and graduate academic programs. The renewed facilities will provide support for enhanced research activities. The building will contribute to sustainability by re-using an existing building, improving energy efficiency and reducing greenhouse gases. Infrastructure Improvements: o Space utilization will be improved by developing larger open teaching labs and research labs that will allow greater sharing of centralized support spaces and greater flexibility in accommodating various class sizes and expansion/contraction of research projects. Cost Effectiveness: o The project will result in a building that will meet LEED Gold standard. Energy consumption will be reduced through modern and more efficient building systems. Strategic Alignment: o The improved Biology building supports the Ministry Service Plan objective of building on current strengths to enhance the quality of our post-secondary education. o The project aligns with the institutional priorities of providing a dynamic integration of innovative education, cutting-edge research and equipping SFU students with the knowledge, skills, and experiences that prepares them for life in an ever-changing and challenging world. 6.0 Project Cost/Funding $75 million This project is to be funded by AVED. There is little expected cost impact on operating or program costs as there is no expansion of program delivery anticipated. 29 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 7.0 8.0 Key Risks Construction logistics of renewing a wing of a larger occupied facility mega structure Relocation of occupants for duration of project Design limitations of existing structure on requirements of modern university laboratory building Budget management Schedule management Project Schedule SFU Burnaby – Renewal Biology 2016/17 2017/18 2018/19 2019/20 2020/21 SCHEDULE Planning Design Construction Occupancy Sept. 2020 CASH FLOW $75,000,000 30 | P a g e $3,000,000 $3,500,000 $25,000,000 $30,000,000 $14,500,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY RENEWAL – LIBRARY AND STUDENT LEARNING COMMONS 1.0 2.0 3.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 2 2 OF 6 Current Situation The W.A.C. Bennett Library facility is a key public building on the Burnaby campus that is now over 48 years old. The building is 23,000 GSM and is comprised primarily of study areas, book storage and some administrative offices on the top floor. This building is in poor condition with a current Facilities Condition Index assessment of 1.05 The building requires a major infrastructure upgrade to extend the life of the building and to address life safety, seismic, and accessibility issues. Project Description Reorganization and renewal is required to accommodate changes and growth in demand including expanded student learning centre and improved study spaces with power and wireless internet services. Material storage areas will be consolidated into more efficient storage and retrieval systems to free up space. Spaces to support student study and learning will be created including tutorial rooms, private and group work areas. Basic infrastructure and code improvements are also needed including seismic upgrades, washroom improvements, additional electrical and data services and accessibility improvements. Project Objectives To address deferred maintenance backlog, code and life safety systems deficiencies and improve accessibility. To modernize the functionality of library facilities to suit current practices and to support the student academic experience. Demand for Library services has changed with less space needed for storage of hard copy materials and more space needed to provide support for learning. 4.0 Options Considered The most cost effective and practical option is to re-use the existing building. Locating off campus would be impractical given the need for students and faculty to access other resources available only on campus. The cost of acquiring and renovating an off-site building would far exceed the cost of renewing the existing Library Building. No other location exists in buildings on campus for this function. 31 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 5.0 Project Outcomes The project will resolve significant deferred maintenance requirements and provide an improved environment to support teaching for undergraduate and graduate academic programs. The renewed facilities will provide support for enhanced research activities. The building will contribute to sustainability by re-using an existing building, improving energy efficiency and reducing greenhouse gases. Infrastructure Improvements: o The project is expected to reduce the FCI to below 0.1 and will resolve all life-safety and building code deficiencies. Cost Effectiveness: o The project will result in a building that will meet LEED Gold standard. Energy consumption will be reduced through modern and more efficient building systems. Re-use of the existing structure will be more cost effective than demolition and rebuilding. Strategic Alignment: o The improved Library Building supports the Ministry Service Plan objective of building on current strengths to enhance the quality of our post-secondary education. o The project aligns with the institutional priorities of providing a dynamic integration of innovative education, cutting-edge research and equipping SFU students with the knowledge, skills, and experiences that prepares them for life in an ever-changing and challenging world. Quality Education: o The Library provides essential services to support leaning activities including access to literature, study space and learning support. 6.0 7.0 Project Cost/Funding $60,000,000 This project is funded by AVED. There is little expected cost impact on operating or program costs as there is no expansion of program delivery anticipated. Key Risks Disruption of instructional activity if work not completed on time. Budget management 32 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 8.0 Project Schedule SFU Burnaby – Renewal - Library & Student Learning Commons 2015/16 2016/17 2017/18 2018/19 2019/20 SCHEDULE Planning Design Construction Occupancy Mar. 2020 CASH FLOW $60,000,000 33 | P a g e $500,000 $1,000,000 $26,000,000 $32,500,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY RENEWAL – SHRUM SCIENCE - PHYSICS 1.0 2.0 3.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 2 3 OF 6 Current Situation The Physics Wing of the Shrum Science Centre was constructed in 1970. It is 10,305 square meters in size. This building is in poor condition with a Facilities Condition Index assessment of 1.00 and a VFA estimate of $54.0M in deferred maintenance and capital renewal needs. The building is comprised primarily of undergraduate laboratories, and research labs and classrooms that no longer comply with modern academic facility design standards. It also has significant deficiencies with respect to current seismic and building code requirements. The intent of the project is to retain and renew the existing building. Approximately 450FTE undergraduate and 50FTE graduate students study in the Physics department. Project Description The project includes renewal of all major building systems and infrastructure elements. Laboratory areas will be redesigned following the model of the Chemistry renewal project that was completed in 2011. The renovation standard will be modern, modular and flexible to allow for easy adaptation to changing research and academic needs. Undergraduate teaching labs will be consolidated to provide flexibility in class size and to allow sharing of support spaces. Research labs will also be consolidated into larger labs allowing flexibility for expansion and contraction of space assignments as research project needs change over time. Improvements will be made to general circulation and emergency exit routes. All areas will be upgraded to current code guidelines and will provide appropriate life safety systems. The renewal work will take place in the majority of the building. The lecture theatres at the north end of the building that comprise approximately 30% of the space will have minimal improvements to finishes only. Project Objectives To continue with the phased renewal of the Shrum Science Complex begun with the Chemistry renewal project completed in 2011. The project will support SFU’s strategic vision of innovative education and cutting edge research by improving learning conditions for students and improving research delivery areas. 34 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 4.0 5.0 Renewal will address the deferred maintenance backlog and mitigate the ongoing cost of short term maintenance repairs and continued risk of systems failures and their impact on the education and research activities in the Biology building. The science programs train students for careers in the natural and applied sciences where job growth in BC is expected to grow by 1.6% by 2020 and where an estimated 60,000 new or replacement workers will be needed according to the BC Labour Market Outlook 2010-2020. Options Considered The nature of science teaching and research requires hands on experience in a laboratory setting. Alternative means of teaching and research without lab experience is not practical. Specialized lab facilities are not generally available in the marketplace and those that might be typically are not designed to meet the building code requirements for assembly use as required for university teaching functions. Locations distant from the Burnaby campus are also not practical. Project Outcomes The project will resolve significant deferred maintenance requirements and provide an improved environment to support teaching for undergraduate and graduate academic programs. The renewed facilities will provide support for enhanced research activities. The building will contribute to sustainability by re-using an existing building, improving energy efficiency and reducing greenhouse gases. Infrastructure Improvements: o The project is expected to reduce the FCI to below 0.2 and will resolve all life-safety and building code deficiencies. Space utilization will be improved by developing larger open teaching labs and research labs that will allow greater sharing of centralized support spaces and greater flexibility in accommodating various class sizes and expansion/contraction of research projects. Cost Effectiveness: o The project will result in a building that will meet LEED Gold standard. Energy consumption will be reduced through modern and more efficient building systems. Strategic Alignment: o The improved Physics building supports the Ministry Service Plan objective of building on current strengths to enhance the quality of our postsecondary education. o The project aligns with the institutional priorities of providing a dynamic integration of innovative education, cutting-edge research and equipping SFU students with the knowledge, skills, and experiences that prepares them for life in an ever-changing and challenging world. 35 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 6.0 7.0 8.0 Project Cost/Funding $50 million This project is to be funded by AVED. There is little expected cost impact on operating or program costs as there is no expansion of program delivery anticipated. Key Risks Construction logistics of renewing a wing of a larger occupied facility mega structure Relocation of occupants for duration of project Design limitations of existing structure on requirements of modern university laboratory building Budget management Schedule management Project Schedule SFU Burnaby – Renewal Physics 2016/17 2017/18 2018/19 2019/20 2020/21 SCHEDULE Planning Design Construction Occupancy Mar. 2021 CASH FLOW $50,000,000 36 | P a g e $1,000,000 $6,000,000 $15,000,000 $28,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY RENEWAL CONVOCATION MALL 1.0 2.0 3.0 4.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 2 4 OF 6 Current Situation Convocation Mall was built in 1965 as part of the initial phase of building the SFU Burnaby campus. It is the primary celebration space for major University events and official gatherings such as convocation. Convocation Mall is a large outdoor mall built as the ‘roof’ of a large multistorey parkade. It is covered by a large glass panel roof that sits atop concrete columns and a wood and steel frame. Concrete walkways run along both sides of the mall. The Mall is old and requires significant upgrading. The roof structure does not have adequate load capacity for the snow load experienced on Burnaby Mountain. The glass panels are old and are coming loose from their frames more frequently. The columns and steel frame do not meet current seismic code requirements. The envelope above the parkade is failing and the tile finish needs to be replaced. The concrete walkways are spalling and exposing the rebar reinforcement. Project Description The project includes a complete re-build of the mall. The parkade roof membrane will be repaired and a new tile surface installed. The supporting roof structure will be reinforced. The glass roof will be completely replaced. The adjoining structures and concrete walkways will be repaired. Project Objectives The project will reduce the deferred maintenance backlog. It will eliminate the risk of falling glass panels or failure of the roof structure in a snow or seismic event. It will improve the student experience be restoring the quality of the primary gathering place on the SFU Burnaby campus. It will help SFU to engage the community by providing an improved gathering space for various community events. Options Considered Convocation Mall is part of the iconic architecture of the SFU Burnaby campus and serves a vital functional purpose for the life of the campus. Restoration or re-building are the only options. Evaluation of the best option will be completed during the planning stage of the project. 37 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 5.0 6.0 7.0 8.0 Project Outcomes Infrastructure Improvements: o The project will eliminate the deferred maintenance issues with the Mall. This asset is not included in the VFA database o there is no FCI measurement. Strategic Alignment: o The Mall is a vital component in supporting the activities of campus life at SFU Burnaby. It provides a place where numerous student functions are held each year. All convocations in the entire history of SFU have taken place in Convocation Mall. It provides a place where SFU is able to engage with the community for various public events that take place in the Mall and the facilities that align along the mall such as the University Theatre and Library. Project Cost/Funding $30 million This project is expected to be funded by AVED and private donations. Key Risks Technical and logistical challenge of removing and replacing the roof over an active campus space Budget management Schedule management Project Schedule SFU Burnaby – Renewal Convocation Mall 2017/18 2018/19 2019/20 2020/21 SCHEDULE Planning Design Construction Occupancy Mar 2021 CASH FLOW $30,000,000 38 | P a g e $3,000,000 $17,000,000 $10,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY RENEWAL – MULTI-PURPOSE COMPLEX – PHASE 3 1.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 2 5 OF 6 Current Situation The Multi-Purpose Complex was constructed in 1978 with an addition in the 1983. It is 12,000 square meters in size. The building is comprised primarily of classrooms, laboratories, a gymnasium and offices. This building is in poor condition with a Facilities Condition Index (FCI) assessment of 0.73 and a VFA estimate of $38.5M in deferred maintenance and capital renewal needs. It has significant deficiencies with respect to the condition of mechanical systems. Seismic assessments show the north and south blocks constituting the MultiPurpose Complex to be at 25% and 19% respectively of current code. The intent of the project is to retain and renew the existing building. Approximately 1,700FTE undergraduate and 1,000FTE graduate students study in the Faculty of Education. Systems envelope failure has led to significant moisture damage and mould growth. In 2015, SFU elected to spend $20M of local capital to address building envelope and moisture control problems. Through its 2015/16 Routine Capital “Major Maintenance and Rehabilitation” fund, AVED contributed $1.125 M toward MULTI-PURPOSE COMPLEX envelope renewal. The current upgrade project will address subsurface moisture penetration, above-grade envelope replacement, and replacement of hot water lines that are prone to failure. The current project does not address upgrades to seismic, fire alarm, sprinklering, plumbing, HVAC or electrical systems. 2.0 Project Description The project includes renewal of major building systems and infrastructure elements that are not included in the current envelope rehabilitation project. Training areas will be redesigned to align to modern teaching approaches using flexible active learning classroom concepts. Improvements will be made to general circulation and emergency exit routes. All areas will be upgraded to current code guidelines and will provide appropriate life safety systems including the addition of fire sprinklers. The main electrical and mechanical systems will also be upgraded to improve indoor air quality and energy efficiency. All interior finishes, hardware and lighting will be replaced. 39 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS The seismic performance will be upgraded to a minimum of 75% of current code, addressing major life safety issues. A phased renovation is contemplated, utilizing swing space in Discovery 1. 3.0 Project Objectives The project will support SFU’s strategic vision of innovative education and cutting edge research by improving learning conditions for students and improving research delivery areas. Renewal will address the deferred maintenance backlog and mitigate the ongoing cost of short term maintenance repairs and continued risk of systems failures and their impact on the education and research activities in the MultiPurpose Complex. Design changes will improve the functionality of teaching facilities to promote contemporary learning practices and to support the student academic experience. Systems improvements will improve the energy efficiency of the building. 4.0 Options Considered The most cost effective and practical option is to re-use the existing building. Locating off campus would be impractical given the need for students and faculty to access other resources available only on campus. The cost of acquiring and renovating an off-site building would far exceed the cost of renewing the existing Multi-Purpose Complex. Full replacement of the Multi-Purpose Complex is estimated to cost $70M. 5.0 Project Outcomes The project will resolve significant deferred maintenance requirements and provide an improved environment to support teaching for undergraduate and graduate academic programs. The renewed facilities will provide support for enhanced research activities. The building will contribute to sustainability by re-using an existing building, improving energy efficiency and reducing greenhouse gases. Creation of flexible and responsive teaching and working environments including: o o o Spaces that are able to support new technologies Flexible and open space for teaching, learning and working Increased access to natural light Infrastructure Improvements: o The project is expected to reduce the FCI to below 0.1 and will resolve all life-safety and building code deficiencies. Cost Effectiveness: o The project will result in a building that will meet LEED Gold standard. Energy consumption will be reduced through modern and more efficient building 40 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 6.0 7.0 8.0 systems. Re-use of the existing structure will be more cost effective than demolition and rebuilding. Strategic Alignment: o The improved Multi-Purpose Complex supports the Ministry Service Plan objective of building on current strengths to enhance the quality of our post-secondary education. o The project aligns with the institutional priorities of o providing a dynamic integration of innovative education, cutting-edge research and equipping SFU students with the knowledge, skills, and experiences that prepares them for life in an ever-changing and challenging world. Project Cost/Funding $12,000,000 This project is to be funded by AVED. There is little expected cost impact on operating or program costs as there is no expansion of program delivery anticipated. Key Risks Disruption of instructional activity if work not completed on time. Budget management Project Schedule SFU Burnaby – Renewal MultiPurpose Complex – Phase 3 2015/16 2016/17 2017/18 2018/19 2019/20 SCHEDULE Planning Design Construction Occupancy Sept. 2020 CASH FLOW $12,000,000 41 | P a g e $2,000,000 $5,000,000 $5,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY WHOLE ASSET REPLACEMENT AND RENEWAL – DATA CENTRE – NEW 1.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 2 6OF 6 Current Situation SFU currently operates a central data centre in the basement of the Strand Hall Administration building. The data centre is the primary location of computers that support SFU’s administrative and research computing systems. The demand for computing capacity is no longer able to be accommodated in the existing data centre due to insufficient space, inadequate and unreliable power, an HVAC system long past its useful life, inadequate cooling capacity to meet current demands and aging technology utilized in racks and servers. This building was designed before computers were in common use. It will neither be easy to retrofit nor cost effective, to provide a change of use and repurpose this facility to suit the needs of academic computing, long term. While this facility (with upgrades and modifications to the existing HVAC and power) can likely be used as part of a longer term need to provide ‘secure’ research strategy, it is not appropriate to meet the long term academic computing needs for two key reasons: o Prior to any major service and infrastructure renovations, the computing facility would need to be shut down and relocated to do the required upgrades. The increased cost, risk of failure and/or interruption of service to the community, make this option unfeasible. o Retrofitting this Strand Hall building is not ideal. Compromises would need to be made; the costs would be higher than a new build. The floor to floor height is not appropriate, the exiting floor plate for server racks would be decreased to accommodate a new substation and new HVAC units, water pipes and drains above increase the risk of failure. As well, being in the basement intensifies the risk of flooding. In 2009, SFU retained ownership of a leased building previously used by the BC Transmission Corporation which was initially thought to be ideal for use as a data centre. In 2012 the due diligence Condition Assessment Reports prepared for this facility identified major life safety issues. Exiting requirements and seismic upgrades would be required by the change of use as well as the subsequent Building Permit Application process. In 2013 a site for a new data centre was identified. This site is in the SFU Discovery zone. Preliminary site investigations indicate that SFU can build a purpose-built data centre which would better meet the data centre’s current and future needs, for less cost than other options. 42 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS IN 2014 Compute Canada (CC) announced its intention to consolidate its advanced research computing (ARC) facilities into four regional data centres throughout Canada. In 2015 SFU was given conditional approval to host one of these data centres in our existing data centre in the Water Tower Building (WTB). To meet CC’s requirements, SFU has agreed to complete the planned WTB upgrade and further upgrade its cooling capacity by April 1, 2016. The tight schedule to meet CC’s requirements and lack of local funding to build a new data centre necessitated extending the life and upgrading the cooling capacity of the WTB. The effort and expense to temporarily upgrade the WTB does not preclude the need for a new purpose-built data centre. 2.0 Project Description: This new facility will accommodate the rapid pace of administrative and academic data use that has surpassed the spatial, power and cooling potential of the existing location. This centre will house key computing support staff, machine rooms for research, operations and data storage. Infrastructure upgrades will include an in ground duct bank for both power and data, extending from the main SFU substation to the new data centre. The gross area of the facility is projected to be 1,000 GASM (11,000sq.ft.) dependent in part, on the providing growth for research. 3.0 Project Objectives The purpose of the project is to provide a stable and reliable computer facility to house and protect the University’s administrative and academic information systems, over the long term. Risk of catastrophic failure and loss of years of research data makes this project a university priority. The new facility will be an “insecure” facility, with capacity to be converted to a “secure” facility. The existing Strand Hall and water tower spaces will be retrofitted to support other administrative and “secure” needs. 4.0 5.0 Options Considered The existing Strand Hall location was assessed, but discounted for reasons covered under current situation. Off-site campus options were considered, but considered inappropriate particularly for many research systems where local access and security are required. The former BC Transmission building was considered but discounted for reasons covered under Current Situation. Project Outcomes Strategic Alignment: o Reliable and effective data systems are essential to support SFU’s university academic and research activities. 43 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 2 – WHOLE ASSET REPLACEMENT & RENEWAL PROJECTS 6.0 7.0 8.0 Project Cost/Funding $15,000,000. This project is expected to be funded by AVED Key Risks Bringing infrastructure to the site Budget management Schedule management Project Schedule SFU Burnaby – Data Centre NEW 2016/17 2017/18 2018/19 2019/20 2020/21 SCHEDULE Planning Design Construction Occupancy Dec. 2021 CASH FLOW $15,000,000 44 | P a g e $ $1,000,000 $6,000,000 $8,000,000 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 3 STUDENT HOUSING PROJECTS SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 3 – STUDENT HOUSING PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY STUDENT RESIDENCE EXPANSION – PHASE 1 1.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 3 1 OF 2 Current Situation There are 7 residence buildings and 9 townhouses providing 1767 beds in the SFU Burnaby student housing precinct. Louis Riel House, built in 1969, has deteriorated to the point that it is not economically viable to repair, and so it will be demolished this fall reducing the residence housing capacity by 210 units. SFU has undertaken an extensive market demand and master planning exercise to assess the economic viability of expansion. 2.0 Project Description The master plan envisions the expansion of current facilities of 1767 beds to 3,250 bed. This project represents the first phase which will be expansion of 350 beds in a new building on the site of the current Louis Riel House which will be demolished as described above. The units will be for first year undergraduate students. 3.0 Project Objectives It will improve the student experience by improving the quality of the living environment on the Student Residence precinct at the Burnaby campus. It will improve accessibility to the University by providing housing options in an area where housing for students is in short supply and very expensive. The additional beds are an essential part of SFU’s strategy to attract international students in support of the provincial initiative to expand international student enrollment. 4.0 Options Considered Various housing configurations were considered in the Housing Master Plan 2015. This location was chosen since site services are already in place and site preparation costs are minimal. 5.0 Project Outcomes Student Recruitment and Retention: o A high quality residential experience has been linked to higher academic outcomes. o The plan will support students’ educational achievements by providing affordable housing that is in close proximity to the campus. Strategic Alignment: o The expansion will accommodate international students. 45 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 3 – STUDENT HOUSING PROJECTS 6.0 7.0 8.0 Project Cost/Funding The plan will support B.C.’s skills for Jobs Blueprint and the Aboriginal PostSecondary Education and Training Policy Framework and Action Plan. $37.5 million. This project is expected to be funded by AVED and private donations. Key Risks Budget management Schedule management Project Schedule SFU Burnaby – Student Residence Expansion – Phase 1 2015/16 2016/17 2017/18 2018/19 SCHEDULE Planning Design Construction Occupancy Aug 2018 CASH FLOW $37,500,000 46 | P a g e $3,500,000 $23,000,000 $11,000,000 2019/20 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 3 – STUDENT HOUSING PROJECTS INSTITUTION CAMPUS/CITY SFU B UR NA BY STUDENT RESIDENCE EXPANSION – PHASE 2 1.0 2.0 3.0 4.0 5.0 PROJECT TITLE PROJECT CATEGORY PROJECT PRIORITY 3 2 OF 2 Current Situation There are 7 residence buildings and 9 townhouses providing 1767 beds in the SFU Burnaby student housing precinct. Louis Riel House, built in 1969, has deteriorated to the point that it is not economically viable to repair, and so it will be demolished this fall reducing the residence housing capacity by 210 units. SFU has undertaken an extensive market demand and master planning exercise to assess the economic viability of expansion. Project Description The master plan envisions the expansion of current facilities of 1767 beds to 3,250 beds, representing a growth from 6% of SFU students in housing to approximately 18%. This project represents the first phase which will be expansion of 350 beds in a new building on the site of the current Madge Hogarth site which will be demolished. The units will be for first year undergraduate students. Project Objectives It will improve the student experience by improving the quality of the living environment on the Student Residence precinct at the Burnaby campus. It will improve accessibility to the University by providing housing options in an area where housing for students is in short supply and very expensive. The additional beds are an essential part of SFU’s strategy to attract international students in support of the provincial initiative to expand international student enrollment. Options Considered Various housing configurations were considered in the Housing Master Plan 2015. This location was chosen since site services are already in place and site preparation costs are minimal. Project Outcomes Student Recruitment and Retention: o A high quality residential experience has been linked to higher academic outcomes. o The plan will support students’ educational achievements by providing affordable housing that is in close proximity to the campus. 47 | P a g e SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L A N - 2 0 1 6/ 1 7 – 202 0 / 2 1 CATEGORY 3 – STUDENT HOUSING PROJECTS 6.0 7.0 8.0 Strategic Alignment: o The plan will support B.C.’s skills for Jobs Blueprint and the Aboriginal PostSecondary Education and Training Policy Framework and Action Plan. o The expansion will accommodate international students. Project Cost/Funding $38 million This project is expected to be funded by AVED and private donations. Key Risks Budget management Schedule management Project Schedule SFU Burnaby – Student Residence Expansion 2016/17 2017/18 2018/19 2019/20 SCHEDULE Planning Design Construction Occupancy Aug 2019 CASH FLOW $38,000,000 48 | P a g e $3,500,000 $23,000,000 $11,500,000 2020/21 SI MO N FR AS E R U N I VE R SI TY 5 Y E AR C AP I T AL P L AN - 2 0 1 5 / 16 – 2 01 9 / 2 0 APPENDICES 1.0 AVED (Attachment 3) Prioritized list for Proposed Category 1: New Priority Projects, Category 2: Whole Asset Replacement & Renewal Projects, and Category 3: Student Housing Projects 2.0 AVED (Attachment 4) Summary of Major Ongoing/Planned Self-Funded Projects) 5 Y E AR SI MO N FR AS E R U N I VE R SI TY C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 APPENDIX 1 Attachment 3 -- Prioritized List of Proposed Category 1: New Priority Projects, Category 2: Whole Asset Replacement & Renewal Projects and Category 3 Student Housing Projects Priority Ranking Institution Campus Project Description Anticipated Construction Start Date Project Category Anticipated Occupancy Date Total Project Budget Total Cashflow Total Cashflow Forecast Forecast 2015/16 2016/17 Total Cashflow Forecast 2017/18 Total Cashflow Forecast 2018/19 Total Casflow Foreocast 2019/2020 Total Cashflow Forecast 2020/21 Total Cashflow Forecast Outgoing Years 1 Simon Fraser University Surrey Sustainable Energy and Environmental Engineering SE3P 1 Sep-17 Jan-20 $70,000,000 200,000 2,800,000 8,000,000 38,000,000 21,000,000 0 0 2 Simon Fraser University Burnaby Shrum Science - Biology 2 Apr-18 Sep-20 $75,000,000 0 2,000,000 3,500,000 25,000,000 30,000,000 14,500,000 0 3 Burnaby Burnaby Student Residence Expansion - Phase 1 First Peoples' House 3 1 Apr-16 Apr-17 Aug-18 Mar-19 $37,500,000 $15,000,000 0 0 3,500,000 1,000,000 23,000,000 8,000,000 11,000,000 6,000,000 0 4 Simon Fraser University Simon Fraser University 0 0 0 0 5 Simon Fraser University Surrey Health Systems Innovation and Sustainability 1 Apr-18 Mar-20 $90,000,000 0 0 1,000,000 8,000,000 40,000,000 41,000,000 0 6 Simon Fraser University Burnaby Shrum Science - Physics 2 Apr-19 Mar-21 $50,000,000 0 0 1,000,000 6,000,000 15,000,000 28,000,000 7 Simon Fraser University Burnaby Library & Student Learning Commons 2 Apr-18 Mar-20 1,000,000 26,000,000 32,500,000 0 Surrey Business and Creative Technologies 1 Apr-19 Mar-21 0 0 0 500,000 Simon Fraser University $60,000,000 $90,000,000 0 8 0 3,500,000 1,000,000 8,000,000 40,000,000 41,000,000 9 Simon Fraser University Burnaby Student Residence Expansion - Phase 2 3 Apr-17 Aug-19 $38,000,000 0 0 10 Simon Fraser University Burnaby Convocation Mall 2 Apr-19 Mar-21 $30,000,000 0 0 11 Simon Fraser University Burnaby Multi-Purpose Complex - Phase 3 2 Sep-18 Sep-20 $12,000,000 0 12 Simon Fraser University Burnaby Data Centre - New 2 Apr-17 Dec-18 0 13 Simon Fraser University Surrey Innovative Teaching and Other Facilities 1 Apr-20 Mar-22 $15,000,000 $36,000,000 49 | P a g e 0 23,000,000 11,500,000 0 0 3,000,000 17,000,000 10,000,000 0 0 0 0 2,000,000 5,000,000 5,000,000 0 0 0 0 0 1,000,000 6,000,000 8,000,000 0 0 500,000 4,500,000 31,000,000 5 Y E AR APPENDIX 2 SI MO N FR AS E R U N I VE R SI TY C AP I T AL P L AN - 2 0 1 6 / 17 – 2 02 0 / 2 1 Five-Year Capital Plan (2016/17-2020/21) Summary of Major Ongoing/Planned Self-Funded Projects Institution Campus Project Description Anticipated Construction Start Date Anticipated Occupancy Date Total Project Budget Tot al Cashflow Forecast 2016/17 0 2,000,000 4,000,000 0 0 0 0 0 17,000,000 0 0 0 0 $64,500,000.00 2,500,000 20,000,000 22,000,000 20,000,000 0 0 Dec-15 $3,000,000.00 3,000,000 0 0 0 0 0 Sep-16 Sep-18 $10,000,000.00 0 3,500,000 6,500,000 0 0 0 Jun-16 Dec-18 $15,000,000.00 3,000,000 5,000,000 7,000,000 0 0 0 Art Museum Apr-17 Sep-18 $20,000,000.00 0 500,000 9,500,000 10,000,000 0 0 Bio-Mass Central Heating Plant Jun-16 Dec-18 $20,000,000.00 0 6,500,000 7,500,000 6,000,000 0 0 Jun-15 2 Simon Fraser University Burnaby Data Centre Nov-15 3 Simon Fraser University Vancouver Graduate Residence & Innovation Centre for Beedie School of Business Feb-15 4 Simon Fraser University Burnaby SFSS SUB/Stadium Jan-16 5 Simon Fraser University Burnaby Demolition Louis Riel House - Student Residence Oct-15 6 Simon Fraser University Burnaby Lorne Davies Complex Renovation 7 Simon Fraser University Burnaby Athletics and Recreation - Field House 8 Simon Fraser University Burnaby 9 Simon Fraser University Burnaby Apr-16 $6,000,000.00 $17,000,000.00 Dec-18 Tot al Cashflow Forecast Out going Y ears 0 Multi-Purpose Complex Envelope Replacement & Upgrade May-16 Tot al Cashflow Forecast 2019/20 5,000,000 Burnaby 5,000,000 Tot al Cashflow Forecast 2018/19 5,000,000 Simon Fraser University $20,000,000.00 Tot al Cashflow Forecast 2017/18 5,000,000 1 Dec-18 $175,500,000.00 50 | P a g e Tot al Cashflow Forecast 2015/16