2409.15-2003-3 Page 1 of 3 FOREST SERVICE HANDBOOK MARK TWAIN NF (REGION 9) ROLLA, MO FSH 2409.15 – TIMBER SALE ADMINISTRATION HANDBOOK CHAPTER - ZERO CODE Supplement No.: R9 Mark Twain 2409.15-2003-3 Effective Date: February 20, 2003 Duration: This supplement is effective until superseded or removed. Approved: RONNIE RAUM Forest Supervisor Date Approved: 02/20/2003 Posting Instructions: Supplements are numbered consecutively by Handbook number and calendar year. Post by document; remove the entire document and replace it with this supplement. Retain this transmittal as the first page(s) of this document. The last supplement to this Handbook was R9 Mark Twain 2409.15-2003-2. New Document R9 Mark Twain 2409.15-2003-3 2 Pages Superseded Document(s) (Supplement Number and Effective Date) R9 Mark Twain 2409.15-2003-2 January 16, 2003 2 Pages Digest: In order by code, summarize the main additions, revisions, or removal of direction incorporated in this supplement. 04.2 – Updates list of Timber Sale Contract Administration Team members. R9 MARK TWAIN SUPPLEMENT EFFECTIVE DATE: 02/20/2003 DURATION: Effective until superseded or removed 2409.15-2003-3 Page 2 of 3 FSH 2409.15 – TIMBER SALE ADMINISTRATION HANDBOOK CHAPTER - ZERO CODE 04.2 - TIMBER SALE ADMINISTRATION TEAM 1. Individuals authorized to serve as Contracting Officer (CO) and to carry out the duties of the CO on Timber Sale Contracts are: David Shore Joe Walker Forest-wide Forest-wide (in Shore’s absence) 2. Individuals authorized to serve as Forest Service Representatives (FSR) and to carry out the duties of the FSR on Timber Sale Contracts are: Name Level of Certification Date of Certification John B. Fraenzl Robert W. Glock Martin J. Saxton Qualified Qualified Qualified TBD TBD TBD 3. Individuals authorized to serve as Timber Sale Administrators (TSA) and to carry out the duties of the TSA on Timber Sale Contracts are: District Name Title Level of Certification Date of Certification Ava/Cassville Willow Springs William (Bill) Miles For. Tech Qualified 11/01 Doniphan/Eleven Point William (Bill) Konen For. Tech Trainee TBD Potosi/ Fredericktown Chris Hopfinger Ted T. Leimer For. Tech For. Tech Trainee Qualified TBD 08/94 Houston/Rolla Cedar Creek Eugene McGregor For. Tech Qualified 07/91 Poplar Bluff Lonnie Thurston For. Tech Trainee TBD Salem Doyle Sanders David Sullivan For. Tech For Tech Qualified Trainee 08/94 TBD R9 MARK TWAIN SUPPLEMENT EFFECTIVE DATE: 02/20/2003 DURATION: Effective until superseded or removed 2409.15-2003-3 Page 3 of 3 FSH 2409.15 – TIMBER SALE ADMINISTRATION HANDBOOK CHAPTER - ZERO CODE 4. Individuals authorized to serve as Engineering Representative (ER) to make final acceptance inspections on specified roads are: Jerry Wilson Dave Easter Mike Pomeroy Ann Valade Diane Crouch Salem Supervisor’s Office Poplar Bluff Willow Springs Supervisor’s Office 5. The Engineering Representative shall be responsible for scheduling final acceptance inspections. Engineering Representatives are not authorized to perform final acceptance inspections on their own assigned projects without prior approval from the Forest Engineer. Individuals authorized to serve as Construction Inspectors on specified roads are: Dave Easter Jerry Wilson Mike Pomeroy Diane Crouch Amy Sullivan Ann Valade Richard Penna Supervisor’s Office Salem Poplar Bluff Supervisor’s Office Salem Willow Springs Ava