2442.1 Page 1 of 2 FOREST SERVICE MANUAL ROGUE RIVER-SISKIYOU NATIONAL FOREST MEDFORD, OREGON FSM 2400 – TIMBER MANAGEMENT CHAPTER 2440 – DESIGNATING, CRUISING, SCALING, AND ACCOUNTABILITY RRS Supplement No.: 2400-2008-1. Effective Date: May 6, 2008 Duration: This supplement is effective until superseded or removed. Approved: SCOTT D. CONROY Forest Supervisor Date Approved: 05/06/2008 Posting Instructions: Supplements are numbered consecutively by title and calendar year. Post by document; remove the entire document and replace it with this supplement. Retain this transmittal as the first page(s) of this document New Document Superseded Document(s) by Issuance Number and Effective Date 2442.1 2 Pages None Digest: This supplement is to be used to obtain the volume of estimated quantities sold when the unit of measure is tons for timber sales. RRS SUPPLEMENT 2400-2008-1 EFFECTIVE DATE: May 6, 2008 DURATION: This supplement is effective until superseded or removed. 2442.1 Page 2 of 2 FSM 2400 – TIMBER MANAGEMENT CHAPTER 40 – DESIGNATING, CRUISING, SCALING, ACCOUNTABILITY 2442 – TIMBER CRUISING 2442.1 – Volume Estimators In preparing timber sales to be sold using estimated quantity of products to be removed with green tons as the unit of measure in A2 of the 2400-6 contract. The following pounds per gross cubic foot will be used. The following pounds per cubic foot data are applicable to green sales only. Species Douglas Fir <15 inches Rogue River/Siskiyou NF Douglas Fir >15 inches White Fir – all diameters Ponderosa Pine <15 inches Ponderosa Pine >15 inches Port-Orford & Incense Cedar Red Alder - all diameters Sitka Spruce - all diameters Example: Timber Sale Contract A2 Tons Calculation: (1) (2) (3) (4) Cruise Gross Weight Pounds Percent Pounds Species Cu Ft Factor Standing Removed Removed 205 2,004 59 118,236 95% 112,324 Pounds per Gross Cubic Foot 59 51 60 65 60 61 57 54 (5) Tons Removed 56.16 (1) Weight Factor = Pounds Per Gross Cubic Foot (from supplement above) (2) Pounds Standing = Gross Cubic Feet x Weight Factor (3) Percent Removed = % Material Hauled out on Trucks (4) Pounds Removed = Pounds Standing x (Percent Removed/100) (5) Tons Removed = Pounds Removed / 2,000 (6) Contract A2 Tons = Tons Removed rounded to the nearest whole Ton (6) Contract A2 Tons 56