Squaw Creek is a tributary of the Salmon River near Clayton, ID. The study reach is a

800 ft length of stream located about 3.0 miles upstream from the confluence with the Salmon

River at the site of an existing Geological Survey (USGS) gaging station, Squaw Creek below

Bruno Creek near Clayton, ID (13297355). The elevation of the reach is about 5,710 ft. The drainage area is 71.6 mi 2 and the geology of the watershed is predominantly sedimentary and mixed volcanics.

In 1994 and 1995, personnel of Case Western Reserve University measured sediment transport and streamflow at this site. Additional information collected at the site included a survey of the stream reach, pebble counts of the substrate surface in 1994, core samples of the surface and subsurface substrate in 2000 and transport distance of painted rocks during high flows in water year 1995. Figure 1 shows a photograph of Squaw Creek looking downstream.

Figure 1. Downstream view of Squaw Creek on May 22, 1995.

Streamflow records for this site are available from the USGS since October 1972.

Estimated average annual streamflow (Q a

) for the stream is 34.3 ft discharge (Q b

) is 181 ft 3

3 /s and the estimated bankfull

/s. Stream discharge in 1994 was very low and the largest mean daily discharge was only 52 ft 3 /s. In 1995 the largest mean daily discharge was 278 ft 3 /s on June 3, well above bankfull discharge.

Channel Profile and Cross-Section

Figure 2 shows the longitudinal profile for the channel bed in the center of the channel, the water surface elevations along each bank at the time of the survey and bankfull flow elevations (floodplains). The study reach is downstream of the bridge. The USGS gaging station is about 30 ft downstream of this bridge The average gradient for the study reach is 0.0100 ft/ft.

Cross-sections of the channel were surveyed at four locations. In 1994, sediment transport and discharge were measured at cross-section 4 at 12 of the 15 sampling dates and the other three just downstream of the bridge near cross-section 1. In 1995, sediment transport and discharge were measured on thirty days. On the first 18 sampling days, measurements were made about 65 ft upstream of cross-section 4. On the remaining 12 sampling days, measurements were made at site about 100 ft downstream of cross-section 4, at a site that was wadeable during higher discharges. The movement of painted rocks during the spring and early summer snowmelt flows

166

164

162

Squaw Creek (USGS)

160 XS1

XS2

158

156

154

Center of channel bed elevation

Water surface elevation left edge

Water surface elevation right edge

Bankfull elevation left side

Bankfull elevation right side

XS3

152

Painted Rock

Transects

0 100 200 300 400 500 600 700

Distance, ft in 1995 were measured at two transects about 75 ft and 125 ft upstream of XS4.

Figure 2. Longitudinal profile of the Squaw Creek study reach.

165

Squaw Creek

Cross-section 4

XS4

800 900

160

Q b

Q a

155

Most discharge and sediment transport measurements in 1994 were made at this cross-section

150

0 10 20 30

Distance, ft

40 50 60

Figure 3. Cross-section of Squaw Creek at a sediment transport measurement site

70

Channel Geometry

Figure 3 shows the cross-section at which most sediment transport measurements were made in water year 1994 (XS4). The station geometry relationships for this cross-section and other measurement sites are shown in Figures 4 and 5. At cross-section 4, for the range of discharges when sediment transport was measured (4.93 to 48.4 ft 3 /s) in 1994, the estimated stream width, estimated average depth and estimated average velocity varied from 17.6 to 24.7

100 10

Squaw Creek (USGS)

10

Width (XS4) y = 13.879x

0.149

R

2

= 0.97

Width

Bridge (XS1) y = 8.486x

0.160

R

2

= 0.96

Average Velocity (XS4) y = 0.161x

0.653

R

2

= 0.998

1

Average Velocity

Bridge (XS1) y = 0.160x

0.649

R

2

= 0.9997

Average Depth

Bridge (XS1) y = 0.754x

0.184

R

2

= 0.97

Average Depth (XS4) y = 0.452x

0.195

R

2

= 0.99

1

Average Depth (XS4)

Width (XS4)

Average Depth - Bridge (XS1)

Width - Bridge (XS1)

Average Velocity (XS4)

Average Velocity - Bridge (XS1)

0.1

1 10 100

0.1

1000

Discharge, ft

3

/s

ft, 0.62 to 0.96 ft, and 0.46 to 2.03 ft/s, respectively. The average reach slope is 0.0100 ft/ft.

Figure 4. Width, average depth, and velocity versus stream discharge at the 1994

measurement cross-sections..

100

Squaw Creek (USGS)

10

Width y = 22.711x

0.126

R 2 = 0.95

Width y = 12.831x

0.168

R

2

= 0.95

10

Average Velocity y = 0.608x

0.329

R

2

= 0.986

Average Velocity y = 0.182x

0.569

R

2

= 0.996

1

1

Average Depth y = 0.428x

0.263

R

2

= 0.97

Average Depth y = 0.074x

0.542

R

2

= 0.99

Average Depth - Site 1

Average Depth - Site 2

Width - Site 1

Width - Site 2

Average Velocity - Site 1

Average Velocity - Site 2

0.1

1 10 100 1000

0.1

Discharge, ft

3

/s

Figure 5. Width, average depth, and velocity versus stream discharge at the 1995

measurement cross-sections.

Channel Material

A pebble count was made at one cross-section in June 1994 and at three cross-sections in

July 2000. The D

50 and D

90

for the 1994 pebble count were 43 mm and 82 mm, respectively

(Figure 6). The D

50 and D

90

for the 2000 combined pebble counts were 46 mm and 116 mm, respectively, and about 9% of the material was sand size or smaller. In July 2000, three core samples were also collected in the reach. The D

50

and D

90

for the surface and subsurface cores were 83 mm and 151 mm and 29 mm and 124 mm, respectively.

100

Squaw Creek (USGS)

90

80

70

60

50

40

30

20

10

1994 Pebbles Counts

2000 Pebble Counts

2000 Subsurface Cores

2000 Surface Cores

0

0.1

1 10

Particle Size, mm

100 1000

Figure 6. Particle size distribution for surface and subsurface material samples in

Squaw Creek.

Sediment Transport

Sediment transport measurements made in 1994 and 1995 include 92 measurements of bedload transport and 32 measurements of suspended sediment transport. Sediment transport measurements spanned a range of stream discharges from 4.93 ft 3 3 /s

(8.37Q

a

; 1.48Q

b

/s (0.15Q

a

; 0.03Q

b

) to 267 ft

).

Bedload transport ranged from 0.0002 to 27.2 tons/day and suspended transport ranged from 0.12 to 107 tons/day.

Over the range of measured discharges, suspended transport accounts for the majority of the material in transport with approximately an order of magnitude greater suspended transport at the lowest discharges and about four times as much at the highest discharges during which sediment transport was measured (Figure 7).

1000

Squaw Creek (USGS)

100

10

1

Suspended Sediment y = 0.000294x

2.198

R

2

= 0.95

BCF=1.103

0.1

0.01

Total Bedload y = 1.363E-05x

2.516

R

2

= 0.79

BCF=1.846

1994 XS4

1994 Bridge

1995 Site 1

1995 Site 2

1994 XS4 Susp

1995 Site1 Susp

1995 Site2 Susp

0.001

Q a

Q b

0.0001

1 10 100

Discharge, ft

3

/s

Figure 7. Bedload and suspended load transport rate versus discharge.

1000

The bedload transport rates by size class (Figure 8) shows that the larger rates are associated with material in the 0.5 to 2 mm diameter size class. No relationship is shown for particles >32 mm diameter since only five of the samples contained this size class of material.

All discharges transporting material >32 mm exceeded 138 ft 3 /s.

100

Squaw Creek (USGS)

10

1

<0.5 mm y = 1.105E-05x

2.236

R

2

= 0.76

0.5 - 2 mm y = 9.336E-06x

2.432

R

2

= 0.76

0.1

2 - 8 mm y = 2.954E-07x

2.876

R

2

= 0.74

0.01

8 - 32 mm y = 4.023E-07x

2.792

R

2

= 0.42

0.001

Q a

Q b

<0.5 mm

0.5 - 2 mm

2 - 8 mm

8 - 32 mm

>32 mm

0.0001

1 10 100 1000

Discharge, ft

3

/s

Figure 8. Bedload transport rate versus discharge for s elected size classes.

The size of the largest particle in the bedload sample increased with discharge (Figure 9).

The largest particle measured in a bedload sample was 66.5 mm at a discharge of 267 ft 3 /s. At discharges greater than bankfull discharge (181 ft 3 /s) the largest particle typically exceeded 30 mm and often was larger than the median diameter of the surface material. There is a weak tendency for increasing median size of the bedload sample with increasing discharge. The D

50 for most of the bedload samples was in the sand size, 0.5 to 2.0 mm. The largest median diameter of a bedload sample was 10.3 mm. The information on the largest particle in the bedload sample and observations of painted rock movement suggest that discharges near or slightly below the bankfull discharge are capable of moving the median diameter particles on the channel surface.

1000

Squaw Creek (USGS)

100

Largest Painted

Rock Moved

1995

D

50

Surface Material

June 29, 1994 R 2 = 0.73

10

R 2 = 0.25

1

Largest Particle

Median Size

Q a

Q b

0.1

1 10 100 1000

Discharge, ft

3

/sec

Figure 9. M edian size of the bedload sample and the largest particle size versus

stream discharge for Squaw Creek.

Painted Rock Transport

April 25, 1995 (Figure 2). Daily mean discharge on the day of rock placement was 32 ft size of the rocks ranged from 30 to 100 mm diameter (b-axis) which represents the D

28

D

94

A total of forty painted rocks were placed across two transects (twenty per transect) on measured on July 29, 1995.

3 /s. The

up to the

of the surface particle size distribution. The final transport distances of the rocks were

Only eight of the forty rocks were found. Of those found, seven had not moved or only moved 0.2 ft. One rock had moved 1 ft and another rock was found 194 ft downstream of transect 2, but could not be identified as to its original transect or location. The largest daily mean discharge during this period of study of painted rocks was 278 ft 3 /s on June 3, 1995.