siemens.com/energy/arrester 3EQ Silicone Surge Arresters For replacing your post insulators Answers for energy. The cost-saving solution for your substation You require fewer post insulators for your installation, thereby saving you both money and space. Diagram of substation prior to 3EQ modification Transformer Voltage Transformer Surge Arrester Support GIS bushing Support Street Reduce the required space even more It‘s no problem to install our 3EQ surge arrester over the transformer! There is no danger to equipment, even in the direct vicinity. Diagram of substation with integrated 3EQ modification Transformer 3EQ as support GIS bushing Voltage Transformer Support Street saved installment space Why is this only possible with the 3EQ surge arrester? The tube design ensures that these arresters are virtually in­destructible. The 3EQ surge arrester is 100 % breakproof ­after a pressure relief operation. No parts will be thrown out and the emerging arc will burn between the directional p ­ ressure relief device. No other design, such as wrapped arresters, direct molded arresters with polymeric housing or porcelain housed arresters, can provide this. Surge Arrester 3EQ3 before test After 80 kA short-circuit-test Do you require high bending moments for the support? The 3EQ surge arrester in tube design can support! 6,000 Nm/MDCL 37,000 inch-lbf (for voltages of 30 kV to 362 kV) 38,000 Nm/MDCL 235,000 inch-lbf (for voltages of 110 kV to 800 kV) 72,000 Nm/MDCL 445,000 inch-lbf (for voltages of 220 kV to 800 kV) 225,000 Nm/MDCL 1,390,000 inch-lbf (for voltages of 550 kV to 1200 kV) Silicone rubber shields FRP rods MO FRP tube Type 3EQ silicone surge arresters in tube design by Siemens: FRP tube for ­ultimate mechanical stability. The silicone rubber is molded directly onto the FRP tube. Type 3EQ silicone surge arresters in tube design by Siemens 3EQ as support Voltage Transformer Street Network with Um = 420 kV Materials such as Foundation, steel structure, post insulators, clamps, rental fees for cranes US$ 1,000 US$ 8,000 Working hours Installation for steel structure and post insu­ lators US$ 1,500 US$ 12,000 Building site Surface area GIS bushing Transformer Network with Um = 123 kW Minimum savings of approximately Clearance between equipment according to technical standards Depends on the costs of land US$ 2,500 US$ 20,000 Published by and copyright © 2014: Siemens AG Energy Sector Freyeslebenstrasse 1 91058 Erlangen, Germany Siemens AG Energy Sector Power Transmission Division High Voltage Products Nonnendammallee 104 13629 Berlin, Germany Please contact us at: Phone: +49 30 386 33 222 Fax: +49 30 386 26 721 E-mail:arrester.energy@siemens.com US contact Siemens Energy, Inc. Power Transmission Division 444 Highway 49 South Richland, MS 39218 Please contact us at: Toll-free:+1 (877) 742-3309 Phone: +1 (601) 932-9800 E-mail:arrester.energy@siemens.com Printed on elementary chlorine-free bleached paper. siemens.com/energy/arrester All rights reserved. Trademarks mentioned in this document are the property of Siemens AG, its affiliates, or their respective owners. Power Transmission Division Order No. E50001-G630-A106-V3-4A00 Printed in Germany Dispo 30002, SIMC-0000-44281 fb 6393 PD WS 08141.0 Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract. siemens.com/energy/arrester