ID 1 1 OPR 52486 2 Task Name PHT work now Duration 151 days? Start Tue 12/14/04 Finish Tue 7/12/05 Resource Names Get STIS IDT & Lindelr's code in smalls 45 days Tue 12/14/04 Mon 2/14/05 R. Diaz-Miller[5%] Add IDL code to update Header 40 days Fri 2/25/05 0 days Fri 3/4/05 24 days Tue 2/1/05 52486 4 n/a Create new PHT files using Lindler's code 5 n/a PCT files for prism and slitless observations 2 days Mon 2/28/05 Tue 3/1/05 J. Davies 6 n/a test 52x2 and slitless prism observations 2 days Mon 2/21/05 Tue 2/22/05 J. Davies[80%] 7 n/a TDS for first order produce correct answers for echelle Fri 2/11/05 C. Proffitt,A. Aloisi 8 Add documentation to OPR for Changes Thu 4/21/05 R. Diaz-Miller[50%] 3 9 n/a 2 R. Diaz-Miller[1%] Fri 3/4/05 R. Diaz-Miller[10%] 6.4 days Thu 2/3/05 100 days? Wed 2/23/05 Deliver new PHT and TDS files (prism/echelle) 0 days Tue 7/12/05 Tue 7/12/05 R. Diaz-Miller[0%] Test secondary wavelenghts 2 days Thu 3/31/05 Fri 4/1/05 J. Davies[50%] Does TDS file covers secondary wavelengths? 10 Fri 3/4/05 Code Bugs Tue 7/12/05 R. Diaz-Miller[10%] 129 days Mon 1/3/05 Fri 7/1/05 1 53062 Uninitialized blaze shift correction flag in CALSTIS7 1 day Tue 2/15/05 Tue 2/15/05 P. Hodge 2 52813 CALSTIS indexing error when reading values from a string 1 day Mon 2/14/05 Mon 2/14/05 P. Hodge 3 52733 Check number of points before doing polynomial fit in calstis6 1 day Tue 1/18/05 Tue 1/18/05 P. Hodge 4 52666 Calstis6 and calstis7 typo in an if statement 1 day Mon 1/3/05 Mon 1/3/05 P. Hodge 5 52766 Remove binning factor from slit tilt correction in calstis7 1 day Mon 1/3/05 Mon 1/3/05 P. Hodge 6 n/a 7 8 9 n/a 10 Put bug fixes in STSDAS 3.3 patch 0 days Mon 2/28/05 Mon 2/28/05 R. N test CALSTIS 2.18 0 days Wed 2/23/05 Wed 2/23/05 R. Diaz-Miller[0%] Build Calistis 2.18 in Pipeline 2 days Mon 4/25/05 Tue 4/26/05 J. Davies Bug fixes in STSDAS 3.3.1 0 days Fri 7/1/05 Fri 7/1/05 R. N patch release notes 3 Future Build 1 52667 Correct for temperature-dependent sensitivity in calstis 2 52667 Test Correct for temperature-dependent sensitivity in Calstis 3 4 n/a Mon 1/3/05 P. Hodge Mon 5/2/05 Tue 5/3/05 J. Davies[50%] Check code that creates these files have the right values 1 day Wed 2/23/05 Wed 2/23/05 R. Diaz-Miller[10%] Deliver TDS files with REFTEMP, TEMPSENS columns 4 days Fri 4/1/05 Wed 4/6/05 R. Diaz-Miller[25%] 2 days Mon 5/2/05 Tue 5/3/05 1 day Mon 2/28/05 Mon 2/28/05 74.33 days Mon 1/3/05 Fri 4/15/05 1 day Mon 1/3/05 Mon 1/3/05 TBA Keyword changes to suport slitless spectroscopy (X1DCORR) CTECORR turned off for subarrays External Project: pipelineProjects050222 Date: Thu 4/7/05 Tue 5/3/05 Mon 1/3/05 ???? 52041 Mon 3/7/05 r[2%],C. Proffitt[2%] 1 day 6 1 Mon 3/7/05 Mon 1/3/05 2 days 5 4 0 days 87 days FIX STIS GC for time-tag assoc. o6nf0203 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 1 M. Swam C. Heller ID 2 OPR Task Name 52808 Add secondary pattern keyword (pattern2) for STIS into DADS databas 3 51357 Extra line breaks in trailer files 4 47831 Changes to ecliptic/gal coordinates 5 51984 Add PA_V3 to Primary Header for MultiDrizzle support 6 n/a 5 1 Close STSDAS OPRs Synphot Related SYN 2 3 51790 4 49587 6 Updates Synphot echelle throughputs Duration 14 days Start Wed 1/19/05 Finish Mon 2/7/05 Resource Names J. Baum[10%] 42 days Thu 2/3/05 Fri 4/1/05 C. Heller[10%] 43.33 days Tue 2/15/05 Fri 4/15/05 J. Baum[3%] 10 days Mon 3/14/05 Fri 3/25/05 M. Swam[5%] 1 day Wed 2/23/05 Wed 2/23/05 P. Barrett 69.94 days Mon 1/3/05 Fri 4/8/05 3.96 days Fri 4/1/05 Fri 4/8/05 0%],J. Davies[50%] Investigate implementation of CENWAVE 1 day Mon 1/3/05 Mon 1/3/05 P. Barrett[50%] "icat" use of missing Kurucz models in Synphot. 1 day Mon 3/21/05 Mon 3/21/05 R. Diaz-Miller[1%] Countrate should include cenwave as part of obsmode PHT work future 3 days Mon 2/28/05 216 days Mon 1/3/05 Mon 10/31/05 Wed 3/2/05 ,R. Diaz-Miller[10%] 1 Revise sesnsitivity first order L modes 2 days Mon 1/3/05 Tue 1/4/05 C. Proffitt 2 Revise sensitivity first order M modes 2 days Mon 1/3/05 Tue 1/4/05 C. Proffitt 3 E1/E2 sensiivities 2 days Fri 10/28/05 Mon 10/31/05 C. Proffitt 4 Add Blaze shift correction for secondary echelle wavelenghts 10 days Mon 1/3/05 Fri 1/14/05 A. Aloisi[50%] 5 New secondary curves for secondary wavelengths 1 day Fri 10/28/05 Fri 10/28/05 C. Proffitt 6 Modify Lindler's code to read secondary wav curves correctly 1 day Mon 10/31/05 Mon 10/31/05 C. Proffitt 7 Update G50L/8975 and G750M 20363 throughputs 7 Future Work Image CTE tool 1 day Mon 10/31/05 Mon 10/31/05 260 days? Mon 1/3/05 Fri 12/30/05 3 days Wed 12/28/05 Fri 12/30/05 P. Goudfroo[50%] 1 day Fri 12/30/05 Fri 12/30/05 J. Davies[10%] 1 TBD 2 IDBIAS add BLEW_CLIP to CCD table 3 REFFIL Create new mama darks 20 days Mon 12/5/05 Fri 12/30/05 C. Proffitt[50%] 4 BADPIX Calstis can use aperture select rows in the BPX table 3 days Mon 5/2/05 Wed 5/4/05 P. Hodge 5 BADPIX Create new Bad Pixel table 2 days Thu 5/5/05 Fri 5/6/05 J. Davies 6 ECF 1 day Fri 12/30/05 7 IDBIAS 8 TBD 9 50116 Assess possible installation of ECF-CTE correction task Identify Bias files with hot columns Fri 12/30/05 %],P. Goudfroo[1%] 10 days Fri 12/16/05 Thu 12/29/05 R. Diaz-Miller[1%] 2-D spectral extraction 4 days Tue 12/27/05 Fri 12/30/05 P. Barrett Keyword repair correct DOPPMAG in early E140M TIME-TAG data 1 day? Mon 1/3/05 Mon 1/3/05 S. Parsons 10 Final Spectroscopic PFLATS 3 days Mon 1/3/05 Wed 1/5/05 C. Proffitt 11 LFLAT for first order L modes 3 days Mon 1/3/05 Wed 1/5/05 C. Proffitt 12 G230LB scattering 2 days Thu 12/29/05 Fri 12/30/05 C. Proffitt Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 2 ID 13 OPR Task Name optimal extraction Duration 7 days Start Thu 12/22/05 Finish Fri 12/30/05 Resource Names A. Aloisi J. Maiz 14 FUV F25QTZ L-Flat creation 14 days Tue 12/13/05 Fri 12/30/05 15 FUV-MAMA dark current correlation 15 days Mon 12/12/05 Fri 12/30/05 C. Proffitt 16 CCD side-2 Gain Ratio test 2 days Thu 12/29/05 Fri 12/30/05 L. Dressel Create new gratting aperture correction file 2 days Fri 10/28/05 17 TBA 18 write requirements for new wavecals and flat associations 19 Include wavelength dependent aperture corrections in synphot? 8 On Hold 1 48512 2 49814 9 WCS keyword for STIS time-tag tables (PH) Recreate STIS MAMA additive images (CP) Documentation Mon 10/31/05 0%],C. Proffitt[20%] 3 days Mon 4/11/05 3.33 days Tue 12/27/05 Wed 4/13/05 C. Proffitt 20 days Thu 12/1/05 Wed 12/28/05 5 days Thu 12/1/05 Wed 12/7/05 M. Swam[21%] 2 days Tue 12/27/05 Wed 12/28/05 S. Parsons[1%] 161 days Tue 3/1/05 Tue 10/11/05 Fri 12/30/05 ,R. Diaz-Miller[50%] 1 n/a Write docummentation that has been postponned 0 days Mon 8/1/05 Mon 8/1/05 All 2 n/a Doc. Procedures Delivery Software to SunFire15K 8 days Mon 3/28/05 Wed 4/6/05 R. Diaz-Miller 3 n/a Doc.with location of scripts used in old calibration progs. 0 days Mon 8/1/05 Mon 8/1/05 All 4 SYN TIR for synphot deliveries 8 days Tue 3/1/05 5 n/a Thu 3/10/05 R. Diaz-Miller[50%] Update FRINGEFLAT ISR (info PRESPEC) 2 days Mon 8/1/05 Tue 8/2/05 C. Proffitt 6 MAMA Dark monitor 7 days Mon 10/3/05 Tue 10/11/05 C. Proffitt 7 L&M modes sensitivities 7 days Mon 10/3/05 Tue 10/11/05 C. Proffitt 8 E mode sensiivities 7 days Mon 10/3/05 Tue 10/11/05 A. Aloisi 9 Synphot for TDS implementation 6 days Mon 3/7/05 Mon 3/14/05 R. Diaz-Miller 10 Absolute imaging calibration 8 days Thu 3/3/05 Mon 3/14/05 C. Proffitt Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 3 ID 1 System 1 repository 200 n/a n/a n/a Started repository. Waiting for all changes to make 2 repository 100 n/a n/a n/a 3 repository 100 n/a n/a n/a Changes to the sensitivity curves to normalize for T 4 Reffiles 100 n/a n/a n/a Changes to Prism 5 reffiles 300 n/a n/a n/a Change to reference files. Ready. Testing now. 6 STIS 100 7 STSDAS 100 n/a n/a n/a Test done. Needs only reffiles. Code in place. 8 Priority 100 OPUS STSDAS CALSTIS 9 reffiles 100 reffiles 500 2 12/26 1/9 1/16 1/23 February 1/30 2/6 2/13 2/20 R. Diaz-Mille C. Proffitt,A. Aloi Ale has to give us the range n/a n/a n/a Doublecheck secondary wavelenghts outputs 500 1 STSDAS 100 16.0 3.3patch 2.18? Does not affect pipeline. Solaris 9.... 2 STSDAS 100 16.0 3.3 patch 2.18? Does not affect pipeline. Linux. 3 STSDAS 100 15.5 3.3patch 2.17b Needs to be installed in STSDAS. In OPUS 15.5. S 4 STSDAS 100 5 STSDAS 100 15.5 3.3patch 6 Patch 100 n/a 3.3patch 7 Does not affect the pipelin. Linux. 2.17a will go in patch. Should not change from 2.17b OPUS 500 15.7 3.3.1 STSDAS 300 16.0 3.4 500 3 500 2/ 2.18 THe information should go in the release notices put them in Calstis release notes page STSDAS 100 16.0 3.4 2.18 Needs Testing... 2 STIS 100 16.0 3.4 2.18 Testing 500 P. Hodge Set to zero CCD entries if sensitivity decreaces with 4 IDL 500 n/a n/a 5 OPUS 500 16.0? n/a 6 STIS 500 4 P. Hodge 2.18 Shouldn't produce any changes with old version 1 3 P. Hodge P. Hodge Run Fitsverify only 9 10 P. Hodge P. Hodge 2.18 Ready 500 8 1 January 1/2 J. 500 10 Notes R. Need to be delivered after test. CCD slopes should n/a Change Rules tables.Final Calibration? Was it done? 500 OPUS 100 Project: pipelineProjects050222 Date: Thu 4/7/05 16.0 n/a n/a C. Heller Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 4 ID 2 System Priority 190 OPUS STSDAS ? n/a CALSTIS na/ on the works Notes 12/26 3 OPUS 210 16.? n/a n/a On the works 4 OPUS 188 ? n/a n/a Should give our input... 5 OPUS 500 ? n/a n/a Add to primary Header for STIS obs 6 STSDAS 500 n/a n/a n/a Robert J. is doing it. See Active OPR list; table To C n/a n/a n/a Not started. Update synphot files 500 n/a n/a n/a Follow up implementation and assignment 100 n/a ? 5 1 January 1/2 1/9 1/23 SYNPHOT 300 500 3 SYNPHOT 4 STSDAS 6 Is there a component per each wavelength? P. Barrett[50%] n/a Don't know if done. Have to test. 500 1 reffiles 500 n/a n/a n/a C. Proffitt 2 reffiles 500 n/a n/a n/a Has Ralph updated those? If not, Can he do the wo C. Proffitt 3 reffiles 500 n/a n/a n/a 4 reffiles 500 n/a n/a n/a Analysis first then reference files 5 500 n/a n/a n/a 6 500 n/a n/a n/a Charles will check if the code interpolates and if it d 500 n/a n/a n/a reffiles 7 A. Aloisi[50%] 500 1 STSDAS 500 n/a TBD 2 Reffiles 400 n/a n/a n/a Pipeline using a different clipping but reffiles have n 3 Reffiles 500 n/a n/a n/a Do the best we can with the data there 4 STSDAS 300 TBD TBD 5 Reffiles 300 n/a na/ 6 STSDAS 300 ? ? 7 Reffile 400 n/a na/ n/a Check _cols.ps plots 8 STSDAS 500 TBD TBD TBD Decide on what to do TBD Will be done when possible BD Calstis should be able to select rows in the BPX tab na Add rows for different modes ? Ask how much time is acceptable for the calibration 9 Archive 300 n/a n/a n/a Not sure why it has not been done 10 reffiles 500 n/a n/a n/a C. Proffitt 11 Reffiles 500 n/a n/a n/a Linda will check 9611 data C. Proffitt 12 STSDAS 500 ? ? Project: pipelineProjects050222 Date: Thu 4/7/05 S. Parsons ? Contact M. Gregg (snapshot program) for potential Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 5 February 1/30 2/6 2/13 2/20 J. Baum[10%] P. 500 2 7 1/16 ID 13 System Priority STSDAS 500 OPUS STSDAS ? ? 12/26 January 1/2 1/9 1/16 ? reffiles 500 15 STSDAS? 500 ? ? 16 reffiles? 500 n/a n/a 17 STSDAS 500 TBA TBA n/a n/a n/a Not sure if we are doing this. 500 undef n/a n/a Requires rules table and database change and ana 500 undef n/a n/a On undefinite hold 19 n/a Notes 14 18 n/a CALSTIS na/ data anlaysed already ? Charles it is not sure if there is one n/a Test could result in changes to the CCD table TBA 500 reffiles? 8 500 500 1 OPUS 2 OPUS 9 500 1 TIR/ISR 500 n/a n/a n/a Include information of where calibration information 2 TIR 200 n/a n/a n/a Setting up things 3 TIR 500 n/a n/a n/a 4 TIR 300 n/a n/a n/a Research project going on 5 TIR 500 n/a n/a n/a 6 ISR 500 ISR 7 ISR 500 ISR 8 ISR 500 9 ISR 100 10 PASP 500 Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 6 1/23 February 1/30 2/6 2/13 2/20 ID 1 1 March 2/27 3/6 3/13 3/20 3/27 April 4/3 4/10 4/17 4/24 May 5/1 5/8 5/15 5/22 June 5/29 6/5 July 6/12 6/19 6/26 7/3 3/4 4 R. Diaz-Miller[10%] 5 J. Davies 6 avies[80%] 7 isi 8 R. Diaz-Miller[10%] 9 7/12 10 J. Davies[50%] 2 1 2 3 4 5 6 2/28 23 8 J. Davies 9 7/1 3/7 3 1 2 3 7/24 R. Diaz-Miller[50%] 3 10 7/17 r[5%] 2 7 7/10 J. Davies[50%] Diaz-Miller[10%] 4 R. Diaz-Miller[25%] 5 M. Swam 6 4 1 Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 7 Augu 7/31 ID 2 March 2/27 3/6 3/13 3/20 3/27 3 April 4/3 4/17 4/24 May 5/1 5/8 5/15 5/22 June 5/29 6/5 July 6/12 6/19 C. Heller[10%] 4 J. Baum[3%] 5 6 4/10 M. Swam[5%] Barrett 5 1 R. Diaz-Miller[50%],J. Davies[50%] 2 3 4 R. Diaz-Miller[1%] V. Laidler,R. Diaz-Miller[10%] 6 1 2 3 4 5 6 7 7 1 2 3 4 P. Hodge 5 J. Davies 6 7 8 9 10 11 12 Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 8 6/26 7/3 7/10 7/17 7/24 Augu 7/31 ID 13 March 2/27 3/6 3/13 3/20 3/27 April 4/3 4/10 4/17 4/24 May 5/1 5/8 5/15 5/22 June 5/29 6/5 July 6/12 6/19 6/26 7/3 7/10 7/17 7/24 Augu 7/31 14 15 16 17 18 C. Proffitt 19 8 1 2 9 1 8/1 2 R. Diaz-Miller 3 4 8/1 R. Diaz-Miller[50%] 5 C. 6 7 8 9 R. Diaz-Miller 10 C. Proffitt Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 9 t ID 2 8/7 8/14 8/21 September 8/28 9/4 9/11 9/18 9/25 October 10/2 10/9 10/16 10/23 November 10/30 11/6 11/13 11/20 December 11/27 12/4 12/11 12/18 12/25 January 1/1 1/8 3 4 5 6 5 1 2 3 4 6 1 2 3 C. Proffitt 4 5 C. Proffitt 6 C. Proffitt 7 7 1 P. Goudfroo[50 2 J. Davies[10%] 3 C. Proffitt[50%] 4 5 6 C. Proffitt[1%],P 7 R. Diaz-Miller[1% 8 P. Barrett 9 10 11 12 Project: pipelineProjects050222 Date: Thu 4/7/05 C. Proffitt Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 10 t ID 13 8/7 8/14 8/21 September 8/28 9/4 9/11 9/18 9/25 October 10/2 10/9 10/16 10/23 November 10/30 11/6 11/13 11/20 December 11/27 12/4 12/11 12/18 12/25 January 1/1 1/8 A. Aloisi 14 J. Maiz 15 C. Proffitt 16 L. Dressel 17 J. Davies[40%],C. Proffitt[20%] 18 19 C. Proffitt,R. Dia 8 1 M. Swam[21%] 2 S. Parsons[1%] 9 1 2 3 4 5 roffitt 6 C. Proffitt 7 C. Proffitt 8 A. Aloisi 9 10 Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 11 ID 2 1/15 1/22 February 1/29 2/5 2/12 2/19 March 2/26 3/5 3/12 3/19 3/26 April 4/2 4/9 4/16 4/23 May 4/30 5/7 3 4 5 6 5 1 2 3 4 6 1 2 3 4 5 6 7 7 1 ] 2 3 4 5 6 . Goudfroo[1%] 7 ] 8 9 10 11 12 Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 12 5/14 5/21 June 5/28 6/4 6/11 6/18 ID 13 1/15 1/22 February 1/29 2/5 2/12 2/19 March 2/26 3/5 3/12 3/19 3/26 April 4/2 4/9 4/16 4/23 May 4/30 5/7 14 15 16 17 18 19 z-Miller[50%] 8 1 2 9 1 2 3 4 5 6 7 8 9 10 Project: pipelineProjects050222 Date: Thu 4/7/05 Task Milestone External Tasks Split Summary External Milestone Progress Project Summary Deadline Page 13 5/14 5/21 June 5/28 6/4 6/11 6/18 1 3 4 5 7 8 10 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 2 3 4 Get STIS IDT & Lindelr's code in smalls Started repository. Waiting for all changes to make a build Add documentation to OPR for Changes Changes to the sensitivity curves to normalize for TDS zero point and IDL code to update header of pht file. Create new PHT files using Lindler's code Changes to Prism PCT files for prism and slitless observations Change to reference files. Ready. Testing now. TDS for first order produce correct answers for echelle Test done. Needs only reffiles. Code in place. Does TDS file covers secondary wavelengths? Ale has to give us the range Test secondary wavelenghts Doublecheck secondary wavelenghts outputs Uninitialized blaze shift correction flag in CALSTIS7 Does not affect pipeline. Solaris 9. CALSTIS indexing error when reading values from a string Does not affect pipeline. Linux. Check number of points before doing polynomial fit in calstis6 Needs to be installed in STSDAS. In OPUS 15.5. Shouldn't be a difference with 2.17b Calstis6 and calstis7 typo in an if statement Does not affect the pipelin. Linux. Remove binning factor from slit tilt correction in calstis7 will go in patch. Should not change from 2.17b Put bug fixes in STSDAS 3.3 patch Ready test CALSTIS 2.18 Run Fitsverify only Build Calistis 2.18 in Pipeline Shouldn't produce any changes with old version Bug fixes in STSDAS 3.3.1 THe information should go in the release notices patch release notes put them in Calstis release notes page Correct for temperature-dependent sensitivity in calstis Needs Testing Test Correct for temperature-dependent sensitivity in Calstis Testing Check code that creates these files have the right values Set to zero CCD entries if sensitivity decreaces with temperature Deliver TDS files with REFTEMP, TEMPSENS columns Need to be delivered after test. CCD slopes should be zero for now: if sensitivity decreaces with temperature (CTE decreaces with T) Keyword changes to suport slitless spectroscopy (X1DCORR) Change Rules tables.Final Calibration? CTECORR turned off for subarrays Was it done? Add secondary pattern keyword (pattern2) for STIS into DADS database on the works Extra line breaks in trailer files On the works Changes to ecliptic/gal coordinates Should give our input Page 14 5 6 1 2 3 4 2 4 6 1 2 3 4 5 6 7 8 9 11 12 14 15 16 19 1 2 Add PA_V3 to Primary Header for MultiDrizzle support Add to primary Header for STIS obs Close STSDAS OPRs Robert J. is doing it. See Active OPR list; table To Close Updates Synphot echelle throughputs Not started. Update synphot files Investigate implementation of CENWAVE Is there a component per each wavelength? "icat" use of missing Kurucz models in Synphot. Follow up implementation and assignment Countrate should include cenwave as part of obsmode Don't know if done. Have to test. Revise sensitivity first order M modes Has Ralph updated those? If not, Can he do the work? or, Is easy enough so we can do it? For this we need to back out the TDS from his code. Charles: blaze correction is per wavelength but seems the same for primaray and secondary wavelengths. Might be necessary to check the zero point. Add Blaze shift correction for secondary echelle wavelenghts Analysis first then reference files Modify Lindler's code to read secondary wav curves correctly Charles will check if the code interpolates and if it does then will have to correct this. Image CTE tool Will be done when possible add BLEW_CLIP to CCD table Pipeline using a different clipping but reffiles have not been changed. Create new mama darks Do the best we can with the data there Calstis can use aperture select rows in the BPX table Calstis should be able to select rows in the BPX table depending on the mode used. Create new Bad Pixel table Add rows for different modes Assess possible installation of ECF-CTE correction task Ask how much time is acceptable for the calibration of a dataset in OTFR. Wait until the code has been optimized. Now it takes about 2 hours. Identify Bias files with hot columns Check _cols.ps plots 2-D spectral extraction Decide on what to do Keyword repair correct DOPPMAG in early E140M TIME-TAG data Not sure why it has not been done LFLAT for first order L modes Linda will check 9611 data G230LB scattering Contact M. Gregg (snapshot program) for potential solution FUV F25QTZ L-Flat creation data anlaysed already FUV-MAMA dark current correlation Charles it is not sure if there is one CCD side-2 Gain Ratio test Test could result in changes to the CCD table Include wavelength dependent aperture corrections in synphot? Not sure if we are doing this. WCS keyword for STIS time-tag tables (PH) Requires rules table and database change and analysis. Complicated. If Possible in next build. Recreate STIS MAMA additive images (CP) On undefinite hold Page 15 1 2 4 6 7 Write docummentation that has been postponned Include information of where calibration information has been archived. Doc. Procedures Delivery Software to SunFire15K Setting up things TIR for synphot deliveries Research project going on MAMA Dark monitor ISR L&M modes sensitivities ISR Page 16