ID OPR Task Name Duration

advertisement
ID
1
1
OPR
52486
2
Task Name
PHT work now
Duration
151 days?
Start
Tue 12/14/04
Finish
Tue 7/12/05
Resource Names
Get STIS IDT & Lindelr's code in smalls
45 days
Tue 12/14/04
Mon 2/14/05
R. Diaz-Miller[5%]
Add IDL code to update Header
40 days
Fri 2/25/05
0 days
Fri 3/4/05
24 days
Tue 2/1/05
52486
4
n/a
Create new PHT files using Lindler's code
5
n/a
PCT files for prism and slitless observations
2 days
Mon 2/28/05
Tue 3/1/05
J. Davies
6
n/a
test 52x2 and slitless prism observations
2 days
Mon 2/21/05
Tue 2/22/05
J. Davies[80%]
7
n/a
TDS for first order produce correct answers for echelle
Fri 2/11/05
C. Proffitt,A. Aloisi
8
Add documentation to OPR for Changes
Thu 4/21/05 R. Diaz-Miller[50%]
3
9
n/a
2
R. Diaz-Miller[1%]
Fri 3/4/05 R. Diaz-Miller[10%]
6.4 days
Thu 2/3/05
100 days?
Wed 2/23/05
Deliver new PHT and TDS files (prism/echelle)
0 days
Tue 7/12/05
Tue 7/12/05
R. Diaz-Miller[0%]
Test secondary wavelenghts
2 days
Thu 3/31/05
Fri 4/1/05
J. Davies[50%]
Does TDS file covers secondary wavelengths?
10
Fri 3/4/05
Code Bugs
Tue 7/12/05 R. Diaz-Miller[10%]
129 days
Mon 1/3/05
Fri 7/1/05
1
53062
Uninitialized blaze shift correction flag in CALSTIS7
1 day
Tue 2/15/05
Tue 2/15/05
P. Hodge
2
52813
CALSTIS indexing error when reading values from a string
1 day
Mon 2/14/05
Mon 2/14/05
P. Hodge
3
52733
Check number of points before doing polynomial fit in calstis6
1 day
Tue 1/18/05
Tue 1/18/05
P. Hodge
4
52666
Calstis6 and calstis7 typo in an if statement
1 day
Mon 1/3/05
Mon 1/3/05
P. Hodge
5
52766
Remove binning factor from slit tilt correction in calstis7
1 day
Mon 1/3/05
Mon 1/3/05
P. Hodge
6
n/a
7
8
9
n/a
10
Put bug fixes in STSDAS 3.3 patch
0 days
Mon 2/28/05
Mon 2/28/05
R. N
test CALSTIS 2.18
0 days
Wed 2/23/05
Wed 2/23/05
R. Diaz-Miller[0%]
Build Calistis 2.18 in Pipeline
2 days
Mon 4/25/05
Tue 4/26/05
J. Davies
Bug fixes in STSDAS 3.3.1
0 days
Fri 7/1/05
Fri 7/1/05
R. N
patch release notes
3
Future Build
1
52667
Correct for temperature-dependent sensitivity in calstis
2
52667
Test Correct for temperature-dependent sensitivity in Calstis
3
4
n/a
Mon 1/3/05
P. Hodge
Mon 5/2/05
Tue 5/3/05
J. Davies[50%]
Check code that creates these files have the right values
1 day
Wed 2/23/05
Wed 2/23/05 R. Diaz-Miller[10%]
Deliver TDS files with REFTEMP, TEMPSENS columns
4 days
Fri 4/1/05
Wed 4/6/05 R. Diaz-Miller[25%]
2 days
Mon 5/2/05
Tue 5/3/05
1 day
Mon 2/28/05
Mon 2/28/05
74.33 days
Mon 1/3/05
Fri 4/15/05
1 day
Mon 1/3/05
Mon 1/3/05
TBA
Keyword changes to suport slitless spectroscopy (X1DCORR)
CTECORR turned off for subarrays
External
Project: pipelineProjects050222
Date: Thu 4/7/05
Tue 5/3/05
Mon 1/3/05
????
52041
Mon 3/7/05 r[2%],C. Proffitt[2%]
1 day
6
1
Mon 3/7/05
Mon 1/3/05
2 days
5
4
0 days
87 days
FIX STIS GC for time-tag assoc. o6nf0203
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 1
M. Swam
C. Heller
ID
2
OPR
Task Name
52808
Add secondary pattern keyword (pattern2) for STIS into DADS databas
3
51357
Extra line breaks in trailer files
4
47831
Changes to ecliptic/gal coordinates
5
51984
Add PA_V3 to Primary Header for MultiDrizzle support
6
n/a
5
1
Close STSDAS OPRs
Synphot Related
SYN
2
3
51790
4
49587
6
Updates Synphot echelle throughputs
Duration
14 days
Start
Wed 1/19/05
Finish
Mon 2/7/05
Resource Names
J. Baum[10%]
42 days
Thu 2/3/05
Fri 4/1/05
C. Heller[10%]
43.33 days
Tue 2/15/05
Fri 4/15/05
J. Baum[3%]
10 days
Mon 3/14/05
Fri 3/25/05
M. Swam[5%]
1 day
Wed 2/23/05
Wed 2/23/05
P. Barrett
69.94 days
Mon 1/3/05
Fri 4/8/05
3.96 days
Fri 4/1/05
Fri 4/8/05 0%],J. Davies[50%]
Investigate implementation of CENWAVE
1 day
Mon 1/3/05
Mon 1/3/05
P. Barrett[50%]
"icat" use of missing Kurucz models in Synphot.
1 day
Mon 3/21/05
Mon 3/21/05
R. Diaz-Miller[1%]
Countrate should include cenwave as part of obsmode
PHT work future
3 days
Mon 2/28/05
216 days
Mon 1/3/05
Mon 10/31/05
Wed 3/2/05 ,R. Diaz-Miller[10%]
1
Revise sesnsitivity first order L modes
2 days
Mon 1/3/05
Tue 1/4/05
C. Proffitt
2
Revise sensitivity first order M modes
2 days
Mon 1/3/05
Tue 1/4/05
C. Proffitt
3
E1/E2 sensiivities
2 days
Fri 10/28/05
Mon 10/31/05
C. Proffitt
4
Add Blaze shift correction for secondary echelle wavelenghts
10 days
Mon 1/3/05
Fri 1/14/05
A. Aloisi[50%]
5
New secondary curves for secondary wavelengths
1 day
Fri 10/28/05
Fri 10/28/05
C. Proffitt
6
Modify Lindler's code to read secondary wav curves correctly
1 day
Mon 10/31/05
Mon 10/31/05
C. Proffitt
7
Update G50L/8975 and G750M 20363 throughputs
7
Future Work
Image CTE tool
1 day
Mon 10/31/05
Mon 10/31/05
260 days?
Mon 1/3/05
Fri 12/30/05
3 days
Wed 12/28/05
Fri 12/30/05
P. Goudfroo[50%]
1 day
Fri 12/30/05
Fri 12/30/05
J. Davies[10%]
1
TBD
2
IDBIAS
add BLEW_CLIP to CCD table
3
REFFIL
Create new mama darks
20 days
Mon 12/5/05
Fri 12/30/05
C. Proffitt[50%]
4
BADPIX
Calstis can use aperture select rows in the BPX table
3 days
Mon 5/2/05
Wed 5/4/05
P. Hodge
5
BADPIX
Create new Bad Pixel table
2 days
Thu 5/5/05
Fri 5/6/05
J. Davies
6
ECF
1 day
Fri 12/30/05
7
IDBIAS
8
TBD
9
50116
Assess possible installation of ECF-CTE correction task
Identify Bias files with hot columns
Fri 12/30/05 %],P. Goudfroo[1%]
10 days
Fri 12/16/05
Thu 12/29/05
R. Diaz-Miller[1%]
2-D spectral extraction
4 days
Tue 12/27/05
Fri 12/30/05
P. Barrett
Keyword repair correct DOPPMAG in early E140M TIME-TAG data
1 day?
Mon 1/3/05
Mon 1/3/05
S. Parsons
10
Final Spectroscopic PFLATS
3 days
Mon 1/3/05
Wed 1/5/05
C. Proffitt
11
LFLAT for first order L modes
3 days
Mon 1/3/05
Wed 1/5/05
C. Proffitt
12
G230LB scattering
2 days
Thu 12/29/05
Fri 12/30/05
C. Proffitt
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 2
ID
13
OPR
Task Name
optimal extraction
Duration
7 days
Start
Thu 12/22/05
Finish
Fri 12/30/05
Resource Names
A. Aloisi
J. Maiz
14
FUV F25QTZ L-Flat creation
14 days
Tue 12/13/05
Fri 12/30/05
15
FUV-MAMA dark current correlation
15 days
Mon 12/12/05
Fri 12/30/05
C. Proffitt
16
CCD side-2 Gain Ratio test
2 days
Thu 12/29/05
Fri 12/30/05
L. Dressel
Create new gratting aperture correction file
2 days
Fri 10/28/05
17
TBA
18
write requirements for new wavecals and flat associations
19
Include wavelength dependent aperture corrections in synphot?
8
On Hold
1
48512
2
49814
9
WCS keyword for STIS time-tag tables (PH)
Recreate STIS MAMA additive images (CP)
Documentation
Mon 10/31/05 0%],C. Proffitt[20%]
3 days
Mon 4/11/05
3.33 days
Tue 12/27/05
Wed 4/13/05
C. Proffitt
20 days
Thu 12/1/05
Wed 12/28/05
5 days
Thu 12/1/05
Wed 12/7/05
M. Swam[21%]
2 days
Tue 12/27/05
Wed 12/28/05
S. Parsons[1%]
161 days
Tue 3/1/05
Tue 10/11/05
Fri 12/30/05 ,R. Diaz-Miller[50%]
1
n/a
Write docummentation that has been postponned
0 days
Mon 8/1/05
Mon 8/1/05
All
2
n/a
Doc. Procedures Delivery Software to SunFire15K
8 days
Mon 3/28/05
Wed 4/6/05
R. Diaz-Miller
3
n/a
Doc.with location of scripts used in old calibration progs.
0 days
Mon 8/1/05
Mon 8/1/05
All
4
SYN
TIR for synphot deliveries
8 days
Tue 3/1/05
5
n/a
Thu 3/10/05 R. Diaz-Miller[50%]
Update FRINGEFLAT ISR (info PRESPEC)
2 days
Mon 8/1/05
Tue 8/2/05
C. Proffitt
6
MAMA Dark monitor
7 days
Mon 10/3/05
Tue 10/11/05
C. Proffitt
7
L&M modes sensitivities
7 days
Mon 10/3/05
Tue 10/11/05
C. Proffitt
8
E mode sensiivities
7 days
Mon 10/3/05
Tue 10/11/05
A. Aloisi
9
Synphot for TDS implementation
6 days
Mon 3/7/05
Mon 3/14/05
R. Diaz-Miller
10
Absolute imaging calibration
8 days
Thu 3/3/05
Mon 3/14/05
C. Proffitt
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 3
ID
1
System
1
repository
200
n/a
n/a
n/a Started repository. Waiting for all changes to make
2
repository
100
n/a
n/a
n/a
3
repository
100
n/a
n/a
n/a Changes to the sensitivity curves to normalize for T
4
Reffiles
100
n/a
n/a
n/a Changes to Prism
5
reffiles
300
n/a
n/a
n/a Change to reference files. Ready. Testing now.
6
STIS
100
7
STSDAS
100
n/a
n/a
n/a Test done. Needs only reffiles. Code in place.
8
Priority
100
OPUS
STSDAS
CALSTIS
9
reffiles
100
reffiles
500
2
12/26
1/9
1/16
1/23
February
1/30
2/6
2/13
2/20
R. Diaz-Mille
C. Proffitt,A. Aloi
Ale has to give us the range
n/a
n/a
n/a Doublecheck secondary wavelenghts outputs
500
1
STSDAS
100
16.0 3.3patch
2.18? Does not affect pipeline. Solaris 9....
2
STSDAS
100
16.0 3.3 patch
2.18? Does not affect pipeline. Linux.
3
STSDAS
100
15.5 3.3patch
2.17b Needs to be installed in STSDAS. In OPUS 15.5. S
4
STSDAS
100
5
STSDAS
100
15.5 3.3patch
6
Patch
100
n/a 3.3patch
7
Does not affect the pipelin. Linux.
2.17a will go in patch. Should not change from 2.17b
OPUS
500
15.7
3.3.1
STSDAS
300
16.0
3.4
500
3
500
2/
2.18 THe information should go in the release notices
put them in Calstis release notes page
STSDAS
100
16.0
3.4
2.18 Needs Testing...
2
STIS
100
16.0
3.4
2.18 Testing
500
P. Hodge
Set to zero CCD entries if sensitivity decreaces with
4
IDL
500
n/a
n/a
5
OPUS
500
16.0?
n/a
6
STIS
500
4
P. Hodge
2.18 Shouldn't produce any changes with old version
1
3
P. Hodge
P. Hodge
Run Fitsverify only
9
10
P. Hodge
P. Hodge
2.18 Ready
500
8
1
January
1/2
J.
500
10
Notes
R.
Need to be delivered after test. CCD slopes should
n/a Change Rules tables.Final Calibration?
Was it done?
500
OPUS
100
Project: pipelineProjects050222
Date: Thu 4/7/05
16.0
n/a
n/a
C. Heller
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 4
ID
2
System
Priority
190
OPUS STSDAS
?
n/a
CALSTIS
na/ on the works
Notes
12/26
3
OPUS
210
16.?
n/a
n/a On the works
4
OPUS
188
?
n/a
n/a Should give our input...
5
OPUS
500
?
n/a
n/a Add to primary Header for STIS obs
6
STSDAS
500
n/a
n/a
n/a Robert J. is doing it. See Active OPR list; table To C
n/a
n/a
n/a Not started. Update synphot files
500
n/a
n/a
n/a Follow up implementation and assignment
100
n/a
?
5
1
January
1/2
1/9
1/23
SYNPHOT
300
500
3
SYNPHOT
4
STSDAS
6
Is there a component per each wavelength?
P. Barrett[50%]
n/a Don't know if done. Have to test.
500
1
reffiles
500
n/a
n/a
n/a
C. Proffitt
2
reffiles
500
n/a
n/a
n/a Has Ralph updated those? If not, Can he do the wo
C. Proffitt
3
reffiles
500
n/a
n/a
n/a
4
reffiles
500
n/a
n/a
n/a Analysis first then reference files
5
500
n/a
n/a
n/a
6
500
n/a
n/a
n/a Charles will check if the code interpolates and if it d
500
n/a
n/a
n/a
reffiles
7
A. Aloisi[50%]
500
1
STSDAS
500
n/a
TBD
2
Reffiles
400
n/a
n/a
n/a Pipeline using a different clipping but reffiles have n
3
Reffiles
500
n/a
n/a
n/a Do the best we can with the data there
4
STSDAS
300
TBD
TBD
5
Reffiles
300
n/a
na/
6
STSDAS
300
?
?
7
Reffile
400
n/a
na/
n/a Check _cols.ps plots
8
STSDAS
500
TBD
TBD
TBD Decide on what to do
TBD Will be done when possible
BD Calstis should be able to select rows in the BPX tab
na Add rows for different modes
? Ask how much time is acceptable for the calibration
9
Archive
300
n/a
n/a
n/a Not sure why it has not been done
10
reffiles
500
n/a
n/a
n/a
C. Proffitt
11
Reffiles
500
n/a
n/a
n/a Linda will check 9611 data
C. Proffitt
12
STSDAS
500
?
?
Project: pipelineProjects050222
Date: Thu 4/7/05
S. Parsons
? Contact M. Gregg (snapshot program) for potential
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 5
February
1/30
2/6
2/13
2/20
J. Baum[10%]
P.
500
2
7
1/16
ID
13
System
Priority
STSDAS
500
OPUS STSDAS
?
?
12/26
January
1/2
1/9
1/16
?
reffiles
500
15
STSDAS?
500
?
?
16
reffiles?
500
n/a
n/a
17
STSDAS
500
TBA
TBA
n/a
n/a
n/a Not sure if we are doing this.
500
undef
n/a
n/a Requires rules table and database change and ana
500
undef
n/a
n/a On undefinite hold
19
n/a
Notes
14
18
n/a
CALSTIS
na/ data anlaysed already
? Charles it is not sure if there is one
n/a Test could result in changes to the CCD table
TBA
500
reffiles?
8
500
500
1
OPUS
2
OPUS
9
500
1
TIR/ISR
500
n/a
n/a
n/a Include information of where calibration information
2
TIR
200
n/a
n/a
n/a Setting up things
3
TIR
500
n/a
n/a
n/a
4
TIR
300
n/a
n/a
n/a Research project going on
5
TIR
500
n/a
n/a
n/a
6
ISR
500
ISR
7
ISR
500
ISR
8
ISR
500
9
ISR
100
10
PASP
500
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 6
1/23
February
1/30
2/6
2/13
2/20
ID
1
1
March
2/27
3/6
3/13
3/20
3/27
April
4/3
4/10
4/17
4/24
May
5/1
5/8
5/15
5/22
June
5/29
6/5
July
6/12
6/19
6/26
7/3
3/4
4
R. Diaz-Miller[10%]
5
J. Davies
6
avies[80%]
7
isi
8
R. Diaz-Miller[10%]
9
7/12
10
J. Davies[50%]
2
1
2
3
4
5
6
2/28
23
8
J. Davies
9
7/1
3/7
3
1
2
3
7/24
R. Diaz-Miller[50%]
3
10
7/17
r[5%]
2
7
7/10
J. Davies[50%]
Diaz-Miller[10%]
4
R. Diaz-Miller[25%]
5
M. Swam
6
4
1
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 7
Augu
7/31
ID
2
March
2/27
3/6
3/13
3/20
3/27
3
April
4/3
4/17
4/24
May
5/1
5/8
5/15
5/22
June
5/29
6/5
July
6/12
6/19
C. Heller[10%]
4
J. Baum[3%]
5
6
4/10
M. Swam[5%]
Barrett
5
1
R. Diaz-Miller[50%],J. Davies[50%]
2
3
4
R. Diaz-Miller[1%]
V. Laidler,R. Diaz-Miller[10%]
6
1
2
3
4
5
6
7
7
1
2
3
4
P. Hodge
5
J. Davies
6
7
8
9
10
11
12
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 8
6/26
7/3
7/10
7/17
7/24
Augu
7/31
ID
13
March
2/27
3/6
3/13
3/20
3/27
April
4/3
4/10
4/17
4/24
May
5/1
5/8
5/15
5/22
June
5/29
6/5
July
6/12
6/19
6/26
7/3
7/10
7/17
7/24
Augu
7/31
14
15
16
17
18
C. Proffitt
19
8
1
2
9
1
8/1
2
R. Diaz-Miller
3
4
8/1
R. Diaz-Miller[50%]
5
C.
6
7
8
9
R. Diaz-Miller
10
C. Proffitt
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 9
t
ID
2
8/7
8/14
8/21
September
8/28
9/4
9/11
9/18
9/25
October
10/2
10/9
10/16
10/23
November
10/30 11/6
11/13
11/20
December
11/27 12/4 12/11
12/18
12/25
January
1/1
1/8
3
4
5
6
5
1
2
3
4
6
1
2
3
C. Proffitt
4
5
C. Proffitt
6
C. Proffitt
7
7
1
P. Goudfroo[50
2
J. Davies[10%]
3
C. Proffitt[50%]
4
5
6
C. Proffitt[1%],P
7
R. Diaz-Miller[1%
8
P. Barrett
9
10
11
12
Project: pipelineProjects050222
Date: Thu 4/7/05
C. Proffitt
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 10
t
ID
13
8/7
8/14
8/21
September
8/28
9/4
9/11
9/18
9/25
October
10/2
10/9
10/16
10/23
November
10/30 11/6
11/13
11/20
December
11/27 12/4 12/11
12/18
12/25
January
1/1
1/8
A. Aloisi
14
J. Maiz
15
C. Proffitt
16
L. Dressel
17
J. Davies[40%],C. Proffitt[20%]
18
19
C. Proffitt,R. Dia
8
1
M. Swam[21%]
2
S. Parsons[1%]
9
1
2
3
4
5
roffitt
6
C. Proffitt
7
C. Proffitt
8
A. Aloisi
9
10
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 11
ID
2
1/15
1/22
February
1/29
2/5
2/12
2/19
March
2/26
3/5
3/12
3/19
3/26
April
4/2
4/9
4/16
4/23
May
4/30
5/7
3
4
5
6
5
1
2
3
4
6
1
2
3
4
5
6
7
7
1
]
2
3
4
5
6
. Goudfroo[1%]
7
]
8
9
10
11
12
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 12
5/14
5/21
June
5/28
6/4
6/11
6/18
ID
13
1/15
1/22
February
1/29
2/5
2/12
2/19
March
2/26
3/5
3/12
3/19
3/26
April
4/2
4/9
4/16
4/23
May
4/30
5/7
14
15
16
17
18
19
z-Miller[50%]
8
1
2
9
1
2
3
4
5
6
7
8
9
10
Project: pipelineProjects050222
Date: Thu 4/7/05
Task
Milestone
External Tasks
Split
Summary
External Milestone
Progress
Project Summary
Deadline
Page 13
5/14
5/21
June
5/28
6/4
6/11
6/18
1
3
4
5
7
8
10
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
2
3
4
Get STIS IDT & Lindelr's code in smalls
Started repository. Waiting for all changes to make a build
Add documentation to OPR for Changes
Changes to the sensitivity curves to normalize for TDS zero point and IDL code to update header of pht file.
Create new PHT files using Lindler's code
Changes to Prism
PCT files for prism and slitless observations
Change to reference files. Ready. Testing now.
TDS for first order produce correct answers for echelle
Test done. Needs only reffiles. Code in place.
Does TDS file covers secondary wavelengths?
Ale has to give us the range
Test secondary wavelenghts
Doublecheck secondary wavelenghts outputs
Uninitialized blaze shift correction flag in CALSTIS7
Does not affect pipeline. Solaris 9.
CALSTIS indexing error when reading values from a string
Does not affect pipeline. Linux.
Check number of points before doing polynomial fit in calstis6
Needs to be installed in STSDAS. In OPUS 15.5. Shouldn't be a difference with 2.17b
Calstis6 and calstis7 typo in an if statement
Does not affect the pipelin. Linux.
Remove binning factor from slit tilt correction in calstis7
will go in patch. Should not change from 2.17b
Put bug fixes in STSDAS 3.3 patch
Ready
test CALSTIS 2.18
Run Fitsverify only
Build Calistis 2.18 in Pipeline
Shouldn't produce any changes with old version
Bug fixes in STSDAS 3.3.1
THe information should go in the release notices
patch release notes
put them in Calstis release notes page
Correct for temperature-dependent sensitivity in calstis
Needs Testing
Test Correct for temperature-dependent sensitivity in Calstis
Testing
Check code that creates these files have the right values
Set to zero CCD entries if sensitivity decreaces with temperature
Deliver TDS files with REFTEMP, TEMPSENS columns
Need to be delivered after test. CCD slopes should be zero for now: if sensitivity decreaces with temperature (CTE decreaces with T)
Keyword changes to suport slitless spectroscopy (X1DCORR)
Change Rules tables.Final Calibration?
CTECORR turned off for subarrays
Was it done?
Add secondary pattern keyword (pattern2) for STIS into DADS database
on the works
Extra line breaks in trailer files
On the works
Changes to ecliptic/gal coordinates
Should give our input
Page 14
5
6
1
2
3
4
2
4
6
1
2
3
4
5
6
7
8
9
11
12
14
15
16
19
1
2
Add PA_V3 to Primary Header for MultiDrizzle support
Add to primary Header for STIS obs
Close STSDAS OPRs
Robert J. is doing it. See Active OPR list; table To Close
Updates Synphot echelle throughputs
Not started. Update synphot files
Investigate implementation of CENWAVE
Is there a component per each wavelength?
"icat" use of missing Kurucz models in Synphot.
Follow up implementation and assignment
Countrate should include cenwave as part of obsmode
Don't know if done. Have to test.
Revise sensitivity first order M modes
Has Ralph updated those? If not, Can he do the work? or, Is easy enough so we can do it? For this we need to back out the TDS from his code. Charles: blaze correction is per wavelength but
seems the same for primaray and secondary wavelengths. Might be necessary to check the zero point.
Add Blaze shift correction for secondary echelle wavelenghts
Analysis first then reference files
Modify Lindler's code to read secondary wav curves correctly
Charles will check if the code interpolates and if it does then will have to correct this.
Image CTE tool
Will be done when possible
add BLEW_CLIP to CCD table
Pipeline using a different clipping but reffiles have not been changed.
Create new mama darks
Do the best we can with the data there
Calstis can use aperture select rows in the BPX table
Calstis should be able to select rows in the BPX table depending on the mode used.
Create new Bad Pixel table
Add rows for different modes
Assess possible installation of ECF-CTE correction task
Ask how much time is acceptable for the calibration of a dataset in OTFR.
Wait until the code has been optimized. Now it takes about 2 hours.
Identify Bias files with hot columns
Check _cols.ps plots
2-D spectral extraction
Decide on what to do
Keyword repair correct DOPPMAG in early E140M TIME-TAG data
Not sure why it has not been done
LFLAT for first order L modes
Linda will check 9611 data
G230LB scattering
Contact M. Gregg (snapshot program) for potential solution
FUV F25QTZ L-Flat creation
data anlaysed already
FUV-MAMA dark current correlation
Charles it is not sure if there is one
CCD side-2 Gain Ratio test
Test could result in changes to the CCD table
Include wavelength dependent aperture corrections in synphot?
Not sure if we are doing this.
WCS keyword for STIS time-tag tables (PH)
Requires rules table and database change and analysis. Complicated.
If Possible in next build.
Recreate STIS MAMA additive images (CP)
On undefinite hold
Page 15
1
2
4
6
7
Write docummentation that has been postponned
Include information of where calibration information has been archived.
Doc. Procedures Delivery Software to SunFire15K
Setting up things
TIR for synphot deliveries
Research project going on
MAMA Dark monitor
ISR
L&M modes sensitivities
ISR
Page 16
Download