Sustaining the Green Existing Projects Green Energy Cooperative: Concept is to convert waste oil to biofuel. Expanding Production: - Engineering students design - Science and business students provide energy analysis and the business plan. Greenhouse Gas (CO2) (major sources) Electric 4506 tons Steam 3847 tons Natural Gas 690 tons Propane 318 tons Fuel Oil 539 tons Transportation 1057 tons Total 10,948 tons New “zero net energy” showcase building for campus. Design includes: PV, solar thermal, green roof, passive solar, rain gardens and biomass combined heat and power system. The biomass CHP system will provide 63% of the heat and 19% of the electricity needs for the campus. We project it will save 54 TBTU of fossil fuel each year. “You can’t go back and you can’t stand still, If the thunder doesn’t get you, then the lighting will” Site Issues (more at Heiberg) Endurance Wind Turbine Wind Turbine Power P = 0.5 x rho x A x Cp x V3 x Ng x Nb where: P = power in watts (746 watts = 1 hp) rho = air density (1.225 kg/m3 at sea level, less higher) A = rotor swept area, exposed to the wind (m2) Cp = Coefficient of performance (.59 {Betz limit} is the maximum theoretically possible, .35 for a good design) V = wind speed in meters/sec (20 mph = 9 m/s) Ng = generator efficiency (50% for car alternator, 80% or possibly more for a permanent magnet generator or grid-connected induction generator) Nb = gearbox/bearings efficiency (depends, could be as high as 95% if good) New York Wind Resource Explorer Wind Resource Report Geographical Data Heiberg Wind Site Latitude: 42 45'46.8"N Longitude: 76 05'02.4"W Elevation: 1919 Feet Wind Resource Avg. Wind Speed (m/s) 24 m Annual 4.99 30 m Annual 5.29 37 m Annual 5.59 50 m Annual 6.05 Weibull Distribution C = scale K = shape Weibull Parameters c k 5.55 5.89 6.22 6.73 2.206 A 10% increase In wind speed Heiberg wind Site average wind speed Produces a 37% increase In energy output Heiberg Forest Wind Turbine Cost Itemized System Costs: 1) Endurance S-250 wind turbine with controller and 126’ tilt tower $32,500.00 Total installed pre-incentive cost (no sales tax due to tax exempt status) $46,950.00 Less cost of excavation and misc. labor provided by school (-) $ 1,975.00 Less the NYSERDA rebate of $25,732.00 (wind added to curriculum) (-) $25,732.00 The net “turnkey” system cost after the NYSERDA incentive is: $19,243.00 Projected Energy Production: Using the NY Wind Resource Explorer and GPS coordinates obtained on site, this site appears to have an average annual wind speed of 5.5 meters per second (12.3 mph) at 37 meters. Using this wind speed, the Endurance energy production chart shows an annual energy production of 8,100 kwh. A loss factor of 15% is applied, which results in an estimated 6885 kwh. An uncertainty factor of +/– 7% is then applied, resulting in an energy production range between 6403 kwh and 6885. Vertical Axis Wind Turbines, Buyer beware! Vertical Axis Turbines: Urban Green Energy Rated 4 kW Helixwind – Rated 5 kW Heiberg wind site!