Existing Projects
Green Energy Cooperative: Concept
is to convert waste oil to biofuel.
Expanding Production:
- Engineering students design
- Science and business students
provide energy analysis and
the business plan.
Greenhouse Gas (CO2)
(major sources)
Electric
4506 tons
Steam
3847 tons
Natural Gas
690 tons
Propane
318 tons
Fuel Oil
539 tons
Transportation
1057 tons
Total
10,948 tons
New “zero net energy” showcase building for campus. Design includes:
PV, solar thermal, green roof, passive solar, rain gardens and biomass
combined heat and power system. The biomass CHP system will
provide 63% of the heat and 19% of the electricity needs for the
campus. We project it will save 54 TBTU of fossil fuel each year.
“You can’t go back and you can’t stand still,
If the thunder doesn’t get you, then the lighting will”
Site Issues (more at Heiberg)
Endurance Wind Turbine
Wind Turbine Power
P = 0.5 x rho x A x Cp x V3 x Ng x Nb
  where:
P = power in watts (746 watts = 1 hp)
rho = air density (1.225 kg/m3 at sea level, less higher)
A = rotor swept area, exposed to the wind (m2)
Cp = Coefficient of performance (.59 {Betz limit} is the
maximum theoretically possible, .35 for a good design)
V = wind speed in meters/sec (20 mph = 9 m/s)
Ng = generator efficiency (50% for car alternator, 80%
or possibly more for a permanent magnet generator or
grid-connected induction generator)
Nb = gearbox/bearings efficiency (depends, could be as
high as 95% if good)
New York Wind Resource Explorer
Wind Resource Report
Geographical Data
Heiberg Wind Site
Latitude: 42 45'46.8"N Longitude: 76 05'02.4"W
Elevation: 1919 Feet
Wind Resource Avg. Wind Speed
(m/s)
24 m Annual
4.99
30 m Annual
5.29
37 m Annual
5.59
50 m Annual
6.05
Weibull Distribution
C = scale
K = shape
Weibull Parameters
c
k
5.55
5.89
6.22
6.73
2.206
A 10% increase
In wind speed
Heiberg wind
Site average
wind speed
Produces a
37% increase
In energy output
Heiberg Forest Wind Turbine Cost
Itemized System Costs:
1) Endurance S-250 wind turbine with controller and 126’ tilt tower
$32,500.00
Total installed pre-incentive cost (no sales tax due to tax exempt status)
$46,950.00
Less cost of excavation and misc. labor provided by school
(-) $ 1,975.00
Less the NYSERDA rebate of $25,732.00 (wind added to curriculum)
(-) $25,732.00
The net “turnkey” system cost after the NYSERDA incentive is:
$19,243.00
Projected Energy Production:
Using the NY Wind Resource Explorer and GPS coordinates obtained on
site, this site appears to have an average annual wind speed of 5.5 meters
per second (12.3 mph) at 37 meters. Using this wind speed, the
Endurance energy production chart shows an annual energy production of
8,100 kwh. A loss factor of 15% is applied, which results in an estimated
6885 kwh. An uncertainty factor of +/– 7% is then applied, resulting in an
energy production range between 6403 kwh and 6885.
Vertical Axis Wind Turbines,
Buyer beware!
Vertical Axis Turbines:
Urban Green Energy
Rated 4 kW
Helixwind – Rated 5 kW
Heiberg wind site!