UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF SERVICES RENDERED UNIT REMARKS 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT MISCELLANEOUS TARIFFS 1 1.1 MINOR WORKS AT CUSTOMER'S PREMISES Disconnection of low voltage supply. Reconnection of low voltage supply / change blown fuse. Disconnection and reconnection of low voltage supply during the same site visit. Special meter readings. All conducted during office hours. per visit 1.2 Any of the above site visits conducted after hours per visit 1.3 Inspection of installation / 2nd call to fault on consumer's installation. Visit by Vending System Technician. Service not ready for connection per visit 1.4 Visitation fee - To deliver a notice of impending disconnection of supply for non-payment of account each 1.5 MV Switching on Council's equipment - office hours MV Switching on Council's equipment - after hours Weekdays and Saturday Sunday Note: One occasion is a disconnection and the associated reconnection even if two visits are required Replacement of unsafe ready board. Used in conjunction with meter replacement. Cash payment or recovered via PPM. per occasion 1.6 1.6.1 1.6.2 1.7 2013/03/19 01:33 PM per occasion per occasion each 156.14 y 164.91 188.00 156.14 y 219.30 250.00 305.26 y 332.46 379.00 93.86 y 99.12 113.00 1 553.51 y 1 640.35 1 870.00 2 330.70 3 107.02 y y 2 461.40 3 280.70 2 806.00 3 740.00 921.93 y 1 360.53 1 551.00 Moved from "Work related to subsidised supplies. Utility Services - Electricity - Miscellaneous - 60kWh 52.1 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF 1.8 SERVICES RENDERED Supply of prepayment meter passive common base (for replacement purposes) 2 WORK RELATED TO UNAUTHORISED SUPPLIES 2.1 Effective disconnection of an illegally connected supply Effective disconnection / reconnection of tampered supply / unauthorised connection 2.1.1 2.2 2.2.1 2.2.2 2.2.3 2.2.4 2.3 2.3.1 2.3.2 UNIT REMARKS 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT each 57.02 y 60.53 69.00 604.39 y 638.60 728.00 1 444.74 y Delete Delete 4 799.12 3 005.26 3 525.44 y y y 6 155.26 4 388.60 4 996.49 7 017.00 5 003.00 5 696.00 786.84 y 1 094.74 1 248.00 2 218.42 y 2 686.84 3 063.00 2 862.28 y 3 584.21 4 086.00 each Reconnection after effective disconnection Un-metered Supplies each Tampered CT metering installation (does not include meter replacement cost which is quotable) Second tamper offence (single phase) Second tamper offence - (3 phase) Correction of unauthorised relocation of meter each DELETED - Tariff no longer relevant to Revenue Protection Practice Tariff calculated from zero base each each each Tariff calculated from zero base Tariff calculated from zero base Tariff calculated from zero base Conditional reinstatement of disconnected supplies to prevent future tampering / bypassing Bypassed/Tampered meter (single phase) - split meter installed Bypassed/Tampered meter (3 phase) - Mains borne split installed 2013/03/19 01:33 PM each Calculated from zero base. each Calculated from zero base. Utility Services - Electricity - Miscellaneous - 60kWh 52.2 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF 2.3.3 SERVICES RENDERED Faulty pilot cable - Mains borne split meter installed in lieu of repair of cable on consumers property UNIT each REMARKS 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT Calculated from zero base. 3 NEW DOMESTIC SUPPLIES 3.1 60 A single phase: split PPM - where municipal supply cable exists on erf boundary each NOTE: The applicable charge is to be provided only by means of a quotation letter issued by Electricity. 3.2 60 A single phase: split PPM - where municipal supply cable does not exist on the erf boundary each NOTE: The applicable charge is to be provided only by means of a quotation letter issued by Electricity. 1 376.32 y 1 569.30 1 789.00 1 672.81 y 1 741.23 1 985.00 8 505.26 y 8 480.70 9 668.00 Notes: 1. Development contribution may be applicable. 2. Connection Fee covers the cost of 50kWh supplied with New PPM. 3. Installation is subsidised for customers listed in the Indigent Register. 4. The Tariff is independent of metering technology to be utilised (applied as per metering policy). All other installations: per quotation supplied by Electricity Services (meter type to be determined according to meter policy) standardised costs for Domestic Supplies of up to 100A 3 phase 2013/03/19 01:33 PM Utility Services - Electricity - Miscellaneous - 60kWh 52.3 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF 4 SERVICES RENDERED ELECTRICITY DEVELOPMENT CONTRIBUTION UNIT REMARKS 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT DC for domestic customers is calculated on the group-diversified maximum demand of the property rather than its authorised capacity i.e network design after diversity maximum demand (ADMD) according to NRS 034 multiplied by the number of dwellings or living units. In the case of a sectional title residential development or block of flats where the units are metered individually by the City from a common meter room, DC is calculated on the sum of the group-diversified maximum demands of all the units, irrespective of the size of the bulk supply. The same applies for a block of flats or other sectional title residential development where units are not individually metered by the City, provided the sum of the group-diversified maximum demands of all the units does not exceed 100 A 3 phase, in which case the customer is deemed a commercial customer and DC is based on the authorised capacity of the bulk supply. For commercial/industrial consumers DC is calculated on the Authorised Capacity for new connections and on the increase in Authorised Capacity for supply upgrades. 4.1 Electricity Development Contribution (DC) for new developments: 2013/03/19 01:33 PM Utility Services - Electricity - Miscellaneous - 60kWh 52.4 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF SERVICES RENDERED UNIT REMARKS 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT Network Segment: High Voltage / Medium Voltage Medium Voltage Medium Voltage / Low Voltage Low Voltage R/kVA R/kVA R/kVA R/kVA 586.84 1 080.70 1 666.67 2 056.14 y y y y 619.30 1 141.23 1 759.65 2 171.05 706.00 1 301.00 2 006.00 2 475.00 4.2.1 4.2.2 4.2.3 Electricity Development Contribution (DC) for upgrades: Network Segment: High Voltage / Medium Voltage Medium Voltage Medium Voltage / Low Voltage R/kVA R/kVA R/kVA 586.84 1 080.70 y y 619.30 1 141.23 706.00 1 301.00 y R618.42 + (R1141.23 x Factor) R618.42 + (R1141.23 x Factor) + VAT 4.2.4 Low Voltage R/kVA y R1029.82 + (R1141.23 x Factor) R1029.82 + (R1141.23 x Factor) + VAT 4.1.1 4.1.2 4.1.3 4.1.4 4.2 5 5.1 WORK RELATING TO SUBSIDISED SUPPLIES (Cash payment or recovered via PPM System) 40 A single phase connection (split PPM and, if applicable, readyboard) 2013/03/19 01:33 PM Factor = 0 for supplies ≤ 105kVA Factor = 0,5 for 105kVA < supply ≤ 800kVA Factor = 1 for supplies > 800kVA R585.97 + (R1080.70 x Factor) Factor = 0 for supplies ≤ 105kVA Factor = 0,5 for 105kVA < supply ≤ 800kVA Factor = 1 for supplies > 800kVA R975.44 + (R1080.70 x Factor) NOTE: Installation is free of charge for customers listed in the Indigent Register. Utility Services - Electricity - Miscellaneous - 60kWh 52.5 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF SERVICES RENDERED UNIT REMARKS 5.1.1 Group low cost housing developments, Low cost housing infill connections, Informal Settlements and Backyard Dwellings each Applicants in low cost housing developments approved for servicing who meet the criteria set out in the tariff policy would qualify for the subsidised connection fee. Applicants in informal settlements approved for servicing who meet the criteria set out in the tariff policy would qualify for the subsidised connection fee. In addition to these criteria, backyard dwellings will also qualify for a subsidised connection but only in areas where the electricity infrastructure has been upgraded specifically to accommodate backyard dwellings. 5.2 Relocation of ready board / PPM combination board. each 6 6.1 RETROFITTING OF ENERGY METERS. Suitable accommodation for PPM to be provided by contractor on property boundary. Necessary cable work to be carried out by client's contractor. (Cash payment or recovered via PPM system) Retrofitting of existing credit meter with 60A single phase split PPM each Fee covers cost of 50 kWh supplied with new meter. NOTE: The applicable charge is to be provided only by means of a quotation letter issued by Electricity (Customer Support Services) 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT 221.93 y 555.26 633.00 550.00 y 580.70 662.00 1 326.32 y 1 568.42 1 788.00 All other retrofits: per quotation supplied by Electricity (Distribution Systems Development). Standardised costs are used for meters up to 100A 3 phase. 2013/03/19 01:33 PM Utility Services - Electricity - Miscellaneous - 60kWh 52.6 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF SERVICES RENDERED 7.1 7.1.1 METERING Tariff investigation - based on existing consumption data and requiring a site visit 7.1.2 Tariff or load profile investigation - requiring equipment and personnel 7.1.3 Upgrade of Commercial and Industrial metering to incorporate AMR technology (not for an increase in supply capacity or tariff change). 7.1.4 Provision of monthly load profile meter data requiring a site visit Testing of PPM on site (in situ) Testing of credit or PPM meter (Lab test with calibration report) Testing & calibration of low voltage circuit breakers Verification and re-certification of CTs making use of a portable test set Verification of VT's by removing and replacing VT's and test in lab Testing of solid state transformer operated meters making use of a portable test set. Excludes testing of CTs or VTs Replacement of broken / removed meter seals 7.1.5 7.1.6 7.1.7 7.1.8 7.1.9 7.1.10 7.1.11 UNIT 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT per investigation 530.70 y 560.53 639.00 2 245.61 y 2 371.05 2 703.00 5 587.72 y 5 900.88 6 727.00 530.70 530.70 y y 560.53 560.53 639.00 639.00 741.23 y 782.46 892.00 425.44 y 449.12 512.00 855.26 y 903.51 1 030.00 Quotable y Quotable Quotable 855.26 y 903.51 1 030.00 530.70 y 560.53 639.00 658.77 y 695.61 793.00 21.05 y 21.93 25.00 per investigation per installation per investigation each each each per set per device each 7.1.12 Replacement of lost / damaged prepayment meter key pad [Customer Interface Unit] each 7.1.13 Replacement of magnetic card for PPM system each 2013/03/19 01:33 PM REMARKS Utility Services - Electricity - Miscellaneous - 60kWh 52.7 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF 7.1.14 7.1.15 7.1.16 7.1.17 7.2 7.2.1 SERVICES RENDERED Replacement of lost or damaged batteries for radio frequency split meter customer interface unit Provision for meter output pulses (installing an interface pulse unit only) Provision of load profile reading from AMI system (if available) Provision of remote meter reading (Read only function) QUALITY OF SUPPLY Quality of Supply - requiring equipment and personnel (may be refunded if quality of supply is outside NRS 048 limits) 8 HIRE OF METER BOXES / FREE STANDING KIOSKS AT PUBLIC VENUES 8.1 8.2 8.3 Where meter box and supply already exist Refundable Deposit on padlock and keys Administration fee for inspection of meter box after use 8.4 8.5 8.6 9 Free standing kiosk directly adjacent to supply point Connection and disconnection of kiosk Energy fee (Applicable to meter boxes and free standing kiosks) UNIT REMARKS NEW TARIFF CALCULATED FROM ZERO BASE 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT 87.72 y 92.98 106.00 1 754.39 y 1 852.63 2 112.00 150.00 y Free Free 150.00 y 158.77 181.00 2 247.37 y 2 372.81 2 705.00 Free 485.00 y n Free 512.00 Free As for Special Meter Reading y As for Special Meter Reading As for Special Meter Reading 114.91 314.91 y y 121.05 332.46 138.00 379.00 Small Power User 2 y Small Power User 2 Small Power User 2 each per month Legacy only, no new agreements. per investigation Per connection each per day per connection c/kWh HIRE OF MV SWITCHGEAR AND TRANSFORMERS 2013/03/19 01:33 PM Utility Services - Electricity - Miscellaneous - 60kWh 52.8 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) SERVICES RENDERED REF UNIT 9.1 9.1.1 Equipment for Breakdowns Hire Charge per month 9.1.2 Refundable Deposit against damages per letting 9.2 9.2.1 Equipment for network extension Hire Charge per month 9.2.2 Refundable Deposit against damages per letting 9.3 Charge for mobile generators: (Fuel charged separately) 9.3.1 9.3.2 9.3.3 500 kVA 315 kVA 200 kVA 10 10.1 LOAD CONTROL EQUIPMENT Refusal to accept connection 10.2 Penalty for illegal disconnection of load control equipment 2013/03/19 01:33 PM REMARKS 2012/13 excl. VAT R 3% of replacement value 100% of replacement value VAT Yes/No y n 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT 3% of replacement value 100% of replacement value 3% of replacement value 100% of replacement value 5% of replacement value 100% of replacement value 5% of replacement value 100% of replacement value n 5% of replacement value 100% of replacement value 3 824.56 3 131.58 2 596.49 y y y 4 038.60 3 307.02 2 742.11 4 604.00 3 770.00 3 126.00 121.93 y 128.95 147.00 730.70 y 771.93 880.00 y Only where mobile generators are available and required due to breakdowns. per 9 hours per 9 hours per 9 hours per month or part thereof per disconnection Utility Services - Electricity - Miscellaneous - 60kWh 52.9 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF SERVICES RENDERED UNIT REMARKS 11 REFUNDABLE DEPOSITS FOR SUPPLY OF ELECTRICITY 11.1 Domestic Tariff (For single dwelling unit per dwelling unit Increase takes account of non-payment risk and including up to 1 granny flat only) electricity tariff increases All other Bulk Domestic, Small and Large Power per kVA supply agreements (Per supply agreement) 11.2 11.2.1 0 to 130 kVA Per agreement 130 to 230 kVA Per agreement 11.2.3 230 to 330 kVA Per agreement 11.2.4 330 to 500 kVA Per agreement 11.3 Large, Very Large & Time of Use supply agreements 500 kVA and above 12 UNMETERED CONSUMPTIVE TARIFFS 12.1 5 A single phase 2013/03/19 01:33 PM VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT Notes: 1. Deposit not applicable to supplies provided via PPM's. 2. Deposits are non-vatable. 3. Deposit may be increased to reflect 3 months consumption if record of payment is poor. 11.2.2 11.3.1 2012/13 excl. VAT R Per kVA per agreement Increase takes account of non-payment risk and electricity tariff increases Increase takes account of non-payment risk and electricity tariff increases Increase takes account of non-payment risk and electricity tariff increases Increase takes account of non-payment risk and electricity tariff increases Increase takes account of non-payment risk and electricity tariff increases 735.00 n 800.00 2 165.00 n 2 350.00 8 925.00 n 9 630.00 16 510.00 n 17 800.00 23 670.00 n 25 550.00 250.00 n 370.00 808.77 y 557.89 For radio relay stations,VMS boards, security and speed trap cameras, etc. Calculated using the Small Power User 1 Tariff - energy charge only - assuming a 60% load factor R/month (500 kWh) Utility Services - Electricity - Miscellaneous - 60kWh 636.00 52.10 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) SERVICES RENDERED UNIT 12.2 12.3 12.4 12.5 12.6 12.7 12.8.1 10 A single phase 20 A single phase 30 A single phase 20 A 3 phase 30 A 3 phase Closed circuit TV camera - up to 104 Watt ILLUMINATED TELEPHONE KIOSKS and BUS SHELTERS - up to 60 Watt - client to install connection cable to nearest street light pole R/month R/month R/month R/month R/month R/month each (1000 kWh) (2000 kWh) (3000 kWh) (6000 kWh) (9000 kWh) Charge for energy consumption (75 kW.h) Connection Fee 12.8.2 ILLUMINATED TELEPHONE KIOSKS and BUS SHELTERS - up to 60 Watt - client to install connection cable to nearest street light pole R/month Charge for energy consumption (22 kW.h) 12.9.1 ILLUMINATED SIGN-BOARD - up to 240 Watt client to install connection cable to nearest street light pole ILLUMINATED SIGN-BOARD - up to 240 Watt client to install connection cable to nearest street light pole each REF 12.9.2 13 MISCELLANEOUS 13.1 13.2 Electricity supply regulations (By-law) Document search fee 14 14.1 IDENTIFICATION & PROTECTION OF UNDERGROUND SERVICES Above ground cable location 2013/03/19 01:33 PM R/month REMARKS 2012/13 VAT excl. VAT Yes/No R 1 034.21 y 2 068.42 y 3 102.63 y 624.56 y 9 306.14 y 121.93 y 2013/14 Recalculated excl. VAT 1 114.91 2 230.70 3 345.61 6 691.23 10 036.84 83.33 2013/14 R incl. VAT 1 271.00 2 543.00 3 814.00 7 628.00 11 442.00 95.00 537.72 y 564.91 644.00 36.84 y 24.56 28.00 537.72 y 564.91 644.00 137.72 y 94.74 108.00 Free y Free Free 60.53 y 64.04 73.00 758.77 y 800.88 913.00 Connection Fee Charge for energy consumption (85 kW.h) each Available on City web per installation/ order/invoice per visit Utility Services - Electricity - Miscellaneous - 60kWh 52.11 UTILITY SERVICES - ELECTRICITY SERVICES (SUNDRY TARIFFS) REF SERVICES RENDERED 14.2 Refundable Security deposits to be paid by contractors prior to undertaking work near HV or MV cable. Deposit may be waived at the discretion of the Service Provider. 14.2.1 14.2.2 14.2.3 14.2.4 14.2.5 14.2.6 14.2.7 Fluid filled cable (132 kV 3 core) Fluid filled cable (132 kV single core) Fluid filled cable (66 kV 3 core) Fluid filled cable (66 kV single core) XLPE cable Gas filled (33 and 66 kV) Solid Cable (33 kV 3 core) 14.3 Test holes 15 15.1 GREEN ENERGY CERTIFICATES Note: Applies only where the consumer has specifically requested to purchase Green Energy Certificates UNIT REMARKS per test hole 2012/13 excl. VAT R VAT Yes/No 2013/14 Recalculated excl. VAT 2013/14 R incl. VAT 1 264 800.00 843 200.00 906 440.00 685 100.00 263 500.00 748 340.00 205 530.00 n n n n n n n 1 335 630.00 890 420.00 957 200.00 723 470.00 278 256.00 790 250.00 217 040.00 758.77 y 800.88 913.00 25.00 y 25.00 28.50 c/kWh NOTE 1: The abovementioned services are not available at all Depots and provision thereof will be at the sole discretion of the Director : Electricity Services. NOTE 2: Work not appearing in the schedule will be undertaken on acceptance of a quotation supplied by Electricity Services and at the discretion of the Director: Electricity Services 2013/03/19 01:33 PM Utility Services - Electricity - Miscellaneous - 60kWh 52.12