Name ________________________ Period ______ Evaluation Worksheet 23 PROJECT EVALUATION (Summative Evaluation) Objective of this Worksheet: to gather data and summarize responses Evaluation data that I gathered gave results for Level 1 and Level 2 Evaluation: Level 1: How do students react to specific education events in the instruction? Did they meet the goals and objectives in an acceptable way? Did they like it? From student responses to the questionnaire, the summary of their answers: 1. Learner experiences and attitudes toward delivery system, navigation, screen design: Positive Negative Revision recommendations: 2. Learner experiences with, and attitudes toward, the instructional materials and topics in your project: Positive Negative Revision recommendations: 3. Learner experiences and attitudes toward objectives, lesson flow and options, and how you assess them. Positive Negative Revision recommendations: 1 Level 2: Can students actually do what the instruction tried to teach them to do or learn? How well did the students accomplish the objectives of your instruction? (Worksheet 6) Test results when at least 5 people from the class or school tried it out in the Beta Test: 3. Number of learners in test: _______ 4. Number of learners successfully completing Beta test and completing the objectives: _______ 5. Average length of time of instruction: _________________ 6. Pre- and post-test scores: Learner Number 1 2 3 4 5 6 7 8 9 Pre-test score Post-test score Summary comments on how well students were able to complete the objectives (Worksheet 6) ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ ________________________________________________________________________________________ General project revision recommendations: These are listed in order of priority, to do before I produce the Final Version of the project: 1. ______________________________________________________________________________ 2. ______________________________________________________________________________ 3. ______________________________________________________________________________ 4. ______________________________________________________________________________ 5. ______________________________________________________________________________ Approved by ____________________________ Date ______________ 2