Process Name: Building Development Plan Process Flow Parent Process Name: : Building Inspectors Process Responsible Person: Hester Hutchinson Date : 2006-04-17 Updated: August 2007 Page 1 BI : Building Inspector Approved Building Plan record to BI Module via Submission Module Admin Support Admin Support A) Supplies Copy of Approved Building Plan to BI B) Diary item discussed with BI and amended if required C) Plan copy filed in BI Cabinet Log In to system activating daily diary Print Diary for day or period required Log and organise inspection slips received Amend and organise diary items as required Log and diarise SMS No Access Inspections Admin Support Building Inspector leave office with documents (files) and PDA for daily inspections Admin Support Retrieve BI file for: Daily diary schedule Inspection slips received Synchronize PDA A B I Module Admin Support Building Inspector A On Site Inspection PDA Log: A) Work in Progress Inspections - See B B) Commencements - See B C) Completions – See E D) Unauthorised, Notices, Complaints – See F Return to office to Synch PDA Receive files and PDA from Bi and sort Files into: Work in Progress Completions Printing New Work No Access SMS Admin Support Admin Support Check diary updates Print certificates Activate SMS:No Access Inspections Synchronize PDA B B I Module Reason to be supplied Diary item to automate and amended if required Admin Support B WORK COMMENCED YES C Admin Support NO Check inspection for: Work Commenced date populated (Date reflects in Submission Module) Amend diary date if required C Work in Progress inspections to be logged After 3rd and every consecutive Progress Inspection the system automates the Ready for Valuation prompt Ready for Valuation YES Ready for Valuation Date automates in system Update diary and progress inspection B I Module NO E B I Module YES Owner pays fee. PX updates extension Which flags in BI Module WORK COMMENCED YES YES Admin Support NO Check for: Progress Inspection diary item update Amend diary date if required WORK COMMENCED After 11 Months NO Warning SMS to owner : Plans about to Lapse Ext of Validity Requested After 13 months NO Warning: SMS to owner: Plan Lapsed D B I Module System Task Key Trigger Decision Manual Task Responsible Bus Business Event Output Input Documents Database Connector Interface Process Terminator Flow Arrow Unit Handover Process Name: Building Development Plan Process Flow nt Process Name: : Building Inspectors Process Responsible Person: Hester Hutchinson Date : 2006-04-17 Updated: August 2007 Page 2 Admin Support Building Inspector to do on site inspection to verify unauthorised building work D WORK COMMENCED YES Update Extension of Validity in Submission Module activating same date in BI Module C Submission Module NO Admin Support Update Tracker: Plans Lapse Date Activating date in Submission Module Print Lapse Letter Post letter and plan to owner END BI Module BI : PDA E WORK COMPLETED YES Admin Support Completes Completion Box in PDA: Ready for Valuations Work Completed Can Occupancy Certificate be issued Is land use legal Has building been occupied Admin Support Ensure that Completion date has been populated Ensure that Ready for Valuation date (if not complied with earlier) has been validated / populated Ensure that Diary date de-activates BI Module PRINT CERTIFICATE YES Print Certificate in Back end system for Building Inspector to verify and sign BI Module BI Module NO EITHER OR BI to serve NOTICE If in contravention of the NBR and Building Standards Act 103 of 1977 C COMPLIED YES BI to sign Certificate A/B NO Admin Support FINAL NOTICE TO BE SERVED Capture HAND OVER DATE Flag of Record Number and details BI Module System Task Key Trigger Decision Manual Task END Legal Module END Compliance in Legal Module Business Event Output Input Documents Database Connector Interface Process Flow Arrow Unit Handover Process Name: Building Development Plan Process Flow Parent Process Name: : Building Inspectors Process Responsible Person: Hester Hutchinson Date : 2006-04-17 Updated: August 2007 Page 3 Search LIS & LUM:GIS Database for Erf number & owner information and Zoning & Zoning Scheme Building Inspector Receives: Written/ telephone Complaint Or by routine inspection F Admin Support Create New Record Search for Erf details Select as Type of Application: Contravention Capture date and description of complaint that was received Building Inspector: Performs a site inspection to verify the complaint Synchronize PDA Completes Yes /No tick box indicating if Notice is to be served. Yes: Creates Notice Number YES Notice generated G BI Module BI Module / PDA NO Admin Support Income Module On requirements met BI signs off item as Complied With Consults with Building Inspector and attaches the correspondence to the new application BI / Admin Clerk Notice flags via LIS Captures outcome of inspection as well as date complied Admin Support Check and arrange diary date follow up Inspection Send sms for no access if required G Letter (when required) to complainant (Letter to print via system) END Admin Support BI does follow up inspection INCOME MODULE COMPLIED NO YES Complied with Date captured END BI Module /PDA H Key: Trigger Decision Manual Task System Task Business Event Input/ Output Documents Database Connector Interface Process Terminator Flow Arrow Responsible Bus. Unit/ Handover Process Name: Building Development Plan Process Flow Parent Process Name: : Building Inspectors Process BI TO CONTACT OWNER VIA: SMS : NO ACCESS E-MAIL CARD IN POST BOX Responsible Person: Hester Hutchinson Date : 2006-04-17 Updated: August 2007 REFER TO CITY POLICE NO Response Page 4 YES NO BI/Admin Clerk BI/ADMIN SUPPORT Building Inspector: to Serve Notice H NOTICE SERVED XXX Diary Item Captures date of Contravention Notice BI Carries out Inspection / Desktop Enquiry Captures Outcome of Inspection Enters Hand Over Date in System COMPLIED BI Module I BI Module (Legal Module) Process office takes over Option 1 (Legal Module) BI/ADMIN SUPPORT Building Inspector completes docket folder with supporting document (affidavits/statements) I BI Performs site inspection to verify status Verify information in Tracker Update/organise diary if required Legal Module Option 2 Letter to complainant BI Module Record no and details flag Create Ref/Case No (Legal Module) BI/ADMIN SUPPORT END Capture Date and outcome of Site Inspection Diarise item for follow up xxx BI Module / PDA Key: Trigger Decision Manual Task System Task Business Event Input/Output Documents Database Connector Interface Process Terminator Flow Arrow Responsible Bus. Unit/ Handover