10/01/10 University of Houston (003652) Assessment of Deferred Maintenance and Demolition Needs (MP2) Summary Report for Fiscal Years 2011-2015 as reported in FY 2011 Project Name Type Valenti AHU Replacement, Zoning Deferred Improvements Maintenance Engineeriing Roof Replacement Deferred Maintenance School of Music Structural Issues Deferred Maintenance Annual Classroom Renovations Deferred (Minimum) Maintenance Fire/Life Safety Projects Deferred Maintenance SR1 Chilled Water Systems Deferred Maintenance SR1 Interior Life Safety Issues Deferred Maintenance Law Center Water and Erosion Deferred Issues Maintenance General Facility Architectural Deferred Repairs and Renewal Maintenance General Facility HVAC Repairs and Deferred Renewal Maintenance General Facility Plumbing and Deferred Electrical Repairs and Renewal Maintenance General Facility Legislative and Deferred Mandated Repairs and Renewal Maintenance General Facility Safety Repairs Deferred and Renewal Maintenance Central Plant Expansion Deferred Maintenance Cameron Air Handler Replacement Deferred Maintenance CWRC Structural Issues Deferred Maintenance OB Critical System Issues Food Deferred Service Maintenance Hilton Flood Gate Repairs Deferred Maintenance Hilton Structural T-Stem Deferred Structural Repair Maintenance Building Building Number Name 0506 COMMUNICATIONS Condition Arch HVAC P&E Safety L&M Other Total Cost 0 Non-Critical $0 $264,000 $0 $0 $0 $0 $264,000 0 Non-Critical $550,000 $0 $0 $0 $0 $0 $550,000 0000 0 Non-Critical $1,700,000 $0 $0 $0 $0 $0 $1,700,000 0000 0 Non-Critical $0 $0 $0 $0 $0 $2,500,000 $2,500,000 0000 0 Non-Critical $0 $0 $0 $1,250,000 $0 $0 $1,250,000 0 Non-Critical $0 $0 $6,629,103 $0 $0 $0 $6,629,103 0 Non-Critical $0 $0 $0 $4,943,877 $0 $0 $4,943,877 0 Non-Critical $5,800,000 $0 $0 $0 $0 $0 $5,800,000 0000 0 Non-Critical $3,750,000 $0 $0 $0 $0 $0 $3,750,000 0000 0 Non-Critical $0 $2,500,000 $0 $0 $0 $0 $2,500,000 0000 0 Non-Critical $0 $0 $2,000,000 $0 $0 $0 $2,000,000 0000 0 Non-Critical $0 $0 $0 $0 $1,500,000 $0 $1,500,000 0000 0 Non-Critical $0 $0 $0 $1,250,000 $0 $0 $1,250,000 0 Non-Critical $0 $0 $0 $0 $0 $21,242,876 $21,242,876 0 Non-Critical $0 $150,000 $0 $0 $0 0581 CULLEN COLL OF ENGR, NORTH WIN 0550 SCIENCE AND RESEARCH 0550 SCIENCE AND RESEARCH 0540 LAW LIBRARY Remodeling (Cost less than 25% of Replacement) Remodeling (Cost less than 25% of Replacement) Pri Critical? Remodeling (Cost less than 25% of Replacement) Remodeling (Cost less than 25% of Replacement) Remodeling (Cost between 25-50% of Replacement) 0515 POWER PLANT 0586 ISABEL C. CAMERON 0522 CAMPUS RECREATION 0 Non-Critical $1,500,000 $0 $0 $0 $0 $0 $1,500,000 &WELLNESS CT E. E. OBERHOLTZER Remodeling (Cost between 0 Non-Critical $0 $0 $120,000 $0 $0 $0 $120,000 RESIDENCE HA 25-50% of Replacement) C. HILTON COLL HOTEL & Remodeling (Cost less than 0 Non-Critical $0 $0 $0 $0 $0 $74,000 $74,000 REST MG 25% of Replacement) C. HILTON COLL HOTEL & Remodeling (Cost less than 0 Non-Critical $134,000 $0 $0 $0 $0 $0 $134,000 REST MG 25% of Replacement) Totals (19 Projects) $13,434,000 $2,914,000 $8,749,103 $7,443,877 $1,500,000 $23,816,876 $57,857,856 0559 0590 0590 Remodeling (Cost less than 25% of Replacement) Remodeling (Cost less than 25% of Replacement) Satisfactory $0 $150,000 Totals by Project Type Deferred Maintenance Criticial Type Critical Critical-Auxiliary Non-Critical Totals Number of Projects 0 0 19 19 Demolition Total Cost $0 $0 $57,857,856 $57,857,856 Number of Projects 0 0 0 0 Totals Total Cost $0 $0 $0 $0 Number of Projects 0 0 19 19 Total Cost $0 $0 $57,857,856 $57,857,856 Deferred Maintenance 5 Year Plan Fiscal Year 2011 2012 2013 2014 2015 Number of Projects 18 13 10 8 7 Totals $15,435,003 $21,672,796 $10,009,747 $7,790,310 $2,950,000