GENEVA, SWITZERLAND 17 GENEVA, – 20 FEBRUARY SWITZERLAND 2015 17 – 20 FEBRUARY 2015 World Meteorological Organization Working together in weather, climate and water WMO Status of Regional WIGOS Implementation Plans and Challenges of the WIGOS Implementation in Regions and Member Countries Agenda Item 8.3 José Arimatéa de Sousa Brito Representing RA-III INTER-COMMISSION COORDINATION GROUP ON WIGOS (ICG-WIGOS-4) GENEVA, SWITZERLAND, 17-20 FEBRUARY 2015 SUMMARY OF THE PRESENTATION 1. INTRODUCTION (Doc. 8.3) 2. OPPORTUNITIES AND CHALLENGES 3. PROJECT WIGOS-SAS 4. SOME CONSIDERATIONS (Doc. 8.3) WIGOS-SAS OPPORTUNITIES GOS WHOS GFCS ? WIGOS Sub Regional Components FRAMEWORK FOR IMPLEMENTATION: WIGOS-SAS • Governance • Collaboration Mechanisms • Technical Activities WIGOS-SAS CHALLENGES Existing capabilities will adhere to the WIGOS Framework WIGOS-SAS PROJECT (Southern South America) Countries involved (NMHS and Water/Energy Agencies) ARGENTINA Plata Basin BOLIVIA BRASIL PARAGUAY URUGUAY CIC and WMO MoU revisited Project duration: 2015-2016 Sustainable operations: 2017 OBJECTIVES AND SCOPE OF THE PROJECT Integration of Hydrometeorological Observation Surface PLATA BASIN 3.100.000 km2 Sub basins: Paraguay 1.092.188 km2 Paraná 1.509.564 km2 Uruguay 365.000 km2 Río de la Plata 130.000 km2 Population More than 100 Mi. OBJECTIVES AND SCOPE OF THE PROJECT Specific products from combined observations Fuente: INA EXAMPLE OF BASIN MONITORING A number of partners already involved Númer o de estacio nes Intervalo de tiempo Telemetría propia 60 15 minutos INMET Brasil 77 Hora Telemetría presas de Brasil 26 Hora DNM / Policía Salto Artigas 50 Día Prefectura/Gen darmería Argentina 18 Día SMN Argentina 4 Diaria ANA Brasil 10 Hora Yacyretá 4 Hora Bolsa de Cereales de Entre Ríos 116 Hora CONTRIBUTION FROM PARTNERS Argentina CONTRIBUTION FROM PARTNERS Cont.) CUENCA DEL PLATA (Bolivia) TIPO DE EST. METEOROLOGICAS CONVENCIONALES METEROLOGICAS CON TRANSMISION GSMGPRS/ SATELITAL HIDROLOGICAS CONVENCIONALES HIDROLOGICAS CON TRANMISION TOTAL No DE ESTACIONES 115 22 / 5 15 8/2 167 Brazil (INMET and ANA) CONTRIBUTION FROM PARTNERS Cont.) Paraguay CONTRIBUTION FROM PARTNERS Cont.) Uruguay EXAMPLE OF TYPICAL WIGOS ACTIVITY Common requirements: new stations beyond a single border Case study: Ibicuí Basin Need to increase data density COMBINATION OF EXISTING RESOURCES Current Radar Network Planned Radar Network (2016) COMBINATION OF EXISTING RESOURCES (Cont.) Climat network Parámetros de calidad de la red GCOS en la AR-III Regio n No. CR CC Quality (T) Quality (R) RAIII 94 94% 88% 91% 91% COMBINATION OF EXISTING RESOURCES (Cont.) RA-III Contribution to GFCS CRC-SAS WIGOS-SAS PROJECT GOVERNANCE President of RA-III Project Board Argentina Bolivia Brazil Paraguay Uruguay PRs of participating Members Chair of WG-ITD Project Team Experts from participating Members and CIC PROJECT MAIN ACTIVITIES WIGOS Implementation Framework Project implementation and evaluation – The development of detailed integration plans for the existing networks Conclusion of collaboration mechanisms involving other participating organizations such as WMO and CIC (There is a MoU between both) Adjustment of the existing networks, optimizing distribution, expanding the radar network and inclusion of AMDAR data Improve overall operation and maintenance Introduction of common quality control processes and standardization of methods of observations Full use of regional WIS facilities, including GISC-Brasilia and DCPC-Buenos Aires Create a mechanism to keep WIR updated (WIGOS Metadata) Exchange best practices of observations through workshops and on the job training Create and maintain a Project Web page WIGOS-SAS PROJECT PHASES Phase 1: Establish a Task Team to prepare a draft Project Implementation Plan Phase 2: Preparation of the Draft Project Implementation Plan (PIP) Phase 3: Meeting of the Board to review and approve PIP Phase 4: Engagement of CIC and other partners for the execution of the Project Phase 5: Project becomes operational PROJECT STATUS Phase 1: Establish a Task Team to prepare a draft Project Implementation Plan • Two meetings after TECO/RECO and AR-III Sessions • Discussions with D/OBS and WIGOS PO (This week) • Definition of Project Scope and Team PROJECT MOTIVATION • • • • • • General consensus about the feasibility of the Project Project originated from a common regional need Partners already working together in sub components Enthusiasm on its execution by partners A real WIGOS spirit (different communities, data sets) STARTUP effort needed SOME CONSIDERATIONS (Doc. 8.3) • CHALLENGES OF RA III WIGOS IMPLEMENTATION • IMPROVING THE COLLABORATION VIA TC AND RA MECHANISMS • CONCLUSIONS World Meteorological Organization Working together in weather, climate and water WMO Thank you!