Presentation on SAS

advertisement
GENEVA, SWITZERLAND
17 GENEVA,
– 20 FEBRUARY
SWITZERLAND
2015
17 – 20 FEBRUARY 2015
World Meteorological Organization
Working together in weather, climate and water
WMO
Status of Regional WIGOS Implementation Plans and Challenges of the WIGOS
Implementation in Regions and Member Countries
Agenda Item 8.3
José Arimatéa de Sousa Brito
Representing RA-III
INTER-COMMISSION COORDINATION GROUP ON WIGOS (ICG-WIGOS-4)
GENEVA, SWITZERLAND, 17-20 FEBRUARY 2015
SUMMARY OF THE PRESENTATION
1. INTRODUCTION (Doc. 8.3)
2. OPPORTUNITIES AND CHALLENGES
3. PROJECT WIGOS-SAS
4. SOME CONSIDERATIONS (Doc. 8.3)
WIGOS-SAS OPPORTUNITIES
GOS WHOS GFCS ?
WIGOS
Sub Regional Components
FRAMEWORK FOR IMPLEMENTATION:
WIGOS-SAS
• Governance
• Collaboration Mechanisms
• Technical Activities
WIGOS-SAS CHALLENGES
Existing capabilities will adhere to the WIGOS Framework
WIGOS-SAS PROJECT (Southern South America)
Countries involved
(NMHS and Water/Energy Agencies)
ARGENTINA
Plata Basin
BOLIVIA
BRASIL
PARAGUAY
URUGUAY
CIC and WMO MoU revisited
Project duration: 2015-2016
Sustainable operations: 2017
OBJECTIVES AND SCOPE OF THE PROJECT
Integration of Hydrometeorological Observation
Surface
PLATA BASIN
3.100.000 km2
Sub basins:
Paraguay
1.092.188 km2
Paraná
1.509.564 km2
Uruguay
365.000 km2
Río de la Plata
130.000 km2
Population
More than 100 Mi.
OBJECTIVES AND SCOPE OF THE PROJECT
Specific products from combined observations
Fuente: INA
EXAMPLE OF BASIN MONITORING
A number of partners already involved
Númer
o de
estacio
nes
Intervalo
de tiempo
Telemetría
propia
60
15
minutos
INMET Brasil
77
Hora
Telemetría
presas de
Brasil
26
Hora
DNM / Policía
Salto Artigas
50
Día
Prefectura/Gen
darmería
Argentina
18
Día
SMN Argentina
4
Diaria
ANA Brasil
10
Hora
Yacyretá
4
Hora
Bolsa de
Cereales de
Entre Ríos
116
Hora
CONTRIBUTION FROM PARTNERS
Argentina
CONTRIBUTION FROM PARTNERS Cont.)
CUENCA DEL PLATA (Bolivia)
TIPO DE EST.
METEOROLOGICAS
CONVENCIONALES
METEROLOGICAS CON
TRANSMISION GSMGPRS/ SATELITAL
HIDROLOGICAS
CONVENCIONALES
HIDROLOGICAS CON
TRANMISION
TOTAL
No DE
ESTACIONES
115
22 / 5
15
8/2
167
Brazil (INMET and ANA)
CONTRIBUTION FROM PARTNERS Cont.)
Paraguay
CONTRIBUTION FROM PARTNERS Cont.)
Uruguay
EXAMPLE OF TYPICAL WIGOS ACTIVITY
Common requirements: new stations beyond a single border
Case study: Ibicuí Basin
Need to increase data density
COMBINATION OF EXISTING RESOURCES
Current Radar Network
Planned Radar Network (2016)
COMBINATION OF EXISTING RESOURCES (Cont.)
Climat network
Parámetros de calidad de la red GCOS en la AR-III
Regio
n
No.
CR
CC
Quality (T)
Quality (R)
RAIII
94
94%
88%
91%
91%
COMBINATION OF EXISTING RESOURCES (Cont.)
RA-III Contribution to GFCS
CRC-SAS
WIGOS-SAS
PROJECT GOVERNANCE
President of RA-III
Project Board
Argentina
Bolivia
Brazil
Paraguay
Uruguay
PRs of participating Members
Chair of WG-ITD
Project Team
Experts from participating
Members and CIC
PROJECT MAIN ACTIVITIES
WIGOS Implementation Framework









Project implementation and evaluation – The development of detailed
integration plans for the existing networks
Conclusion of collaboration mechanisms involving other participating
organizations such as WMO and CIC (There is a MoU between both)
Adjustment of the existing networks, optimizing distribution, expanding the
radar network and inclusion of AMDAR data
Improve overall operation and maintenance
Introduction of common quality control processes and standardization of
methods of observations
Full use of regional WIS facilities, including GISC-Brasilia and DCPC-Buenos
Aires
Create a mechanism to keep WIR updated (WIGOS Metadata)
Exchange best practices of observations through workshops and on the job
training
Create and maintain a Project Web page
WIGOS-SAS PROJECT PHASES
Phase 1:
Establish a Task Team to prepare a draft Project
Implementation Plan
Phase 2:
Preparation of the Draft Project Implementation Plan (PIP)
Phase 3:
Meeting of the Board to review and approve PIP
Phase 4:
Engagement of CIC and other partners for the execution of
the Project
Phase 5:
Project becomes operational
PROJECT STATUS
Phase 1: Establish a Task Team to prepare a draft Project
Implementation Plan
• Two meetings after TECO/RECO and AR-III
Sessions
• Discussions with D/OBS and WIGOS PO (This
week)
• Definition of Project Scope and Team
PROJECT MOTIVATION
•
•
•
•
•
•
General consensus about the feasibility of the Project
Project originated from a common regional need
Partners already working together in sub components
Enthusiasm on its execution by partners
A real WIGOS spirit (different communities, data sets)
STARTUP effort needed
SOME CONSIDERATIONS (Doc. 8.3)
•
CHALLENGES OF RA III WIGOS IMPLEMENTATION
•
IMPROVING THE COLLABORATION VIA TC AND RA MECHANISMS
•
CONCLUSIONS
World Meteorological Organization
Working together in weather, climate and water
WMO
Thank you!
Download