description of contract package Project : (Project Name) (Project Location) Subject : CP-(No. ) : (Package Name) I. GENERAL The CONTRACTOR shall undertake the (______________Package Name_____ _________________________) for the proposed (Project Name). This shall be in accordance with the Bid Documents and subject to all conditions and requirement of the plans, specifications and other related Bid and Contract Documents. The CONTRACTOR’S Bid shall allow for the following: I.1 The (Project Name) (_______________________________) shall include all labor, materials, tools equipment, and service required to construct and install all items necessary for the proper execution and completion of said items of work, as shown on the drawings, as specified herein, and or as required by job conditions to provide and complete the construction. I.2 All works of this section shall comply with the requirements of the contract, including general and special conditions, along with the drawings and all other contract documents. I.3 All applicable provisions of the different divisions and sections of the technical specifications for each item shall apply for all items in this summary. I.4 Labor, materials, equipment, tools, supervision and services deemed necessary to complete the (Project Name) (_______________________________) as per industry practice, but NOT specifically shown and mentioned in the plans, details, specifications or in the other bid and contract documents, shall be supplied by the CONTRACTOR without extra cost to the OWNER. Such materials, equipment and tools shall be of the highest quality available and such labor, supervision and services shall be of the highest quality of workmanship possible. I.5 All materials to be furnished shall be new, tested, labeled or approved by the Underwriter’s Laboratories or equivalent standards acceptable to the OWNER, Architects and Engineers. I.6 All coordination works with the OWNER’s authorized representative/s and the Construction Manager and with all the other Trade Contractors and Suppliers, which are necessary for the expeditious and satisfactory implementation, completion and acceptance of the CONTRACTOR’S Scope of work stipulated in the Contract Agreement with the OWNER and in all the other Bid and Contract documents, shall be done by the CONTRACTOR. I.7 The CONTRACTOR shall secure from all private and government agencies and submit to the OWNER at its own expense all necessary bonds, clearances, permits, and insurances required to commence, implement and complete the Project on schedule. I.8 The CONTRACTOR shall prepare and submit to the Construction Project Manager all the necessary schedules, on a weekly and monthly basis, for the Project, such as Schedule of Manpower and Equipment Resources, Schedule of Projected Accomplishments on a periodic and cumulative basis, and Monthly Cash Flow Projections. description of package design coordinates, inc. construction project managers Page 1 of 3 suite 202, itc building 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance II. I.9 The CONTRACTOR shall formalize the Contract Agreement with the OWNER based on the specimen for here in, and all the other related Bid and Contract Documents. I.10 The CONTRACTOR shall prepare and submit on time on the required schedules, documents, material samples, product data, cost and time proposals for changes and other submittals. The CONTRACTOR allows the OWNER and/or its authorized representatives to penalize the CONTRACTOR for unreasonable delays in the submission of such items, information or documents. I.11 The CONTRACTOR shall inspect and ascertain the quantity and quality of all materials prior to delivery at site. Any defects, damages and/or deficiencies on the materials prior to acceptance shall be borne, replaced and/or completed by the CONTRACTOR. I.12 The CONTRACTOR shall perform all necessary testing required by the Consultant. I.13 The CONTRACTOR shall install all Owner Supplied Materials such as rebars, cement etc. The CONTRACTOR shall do all the necessary works to finish the WORK. I.14 Furnishing the Owner Operation Maintenance Manuals and Warranty Certificates. SPECIFIC Works included in this package consist: the furnishing at the CONTRACTOR’S expense all labour, materials, tools, plant and other facilities/services needed to complete and render ready for use the Contract package in accordance with the Drawings, specifications, governing codes and regulations, and other related Contract Documents. The CONTRACTOR shall include, but not limited to, the following: (Sample format only) – to be revised as per actual scope II.1 General Construction Works (Civil /Structural /Architectural /Mechanical /Electrical /Plumbing /Fire Protection/Supply and Installation of Busduct) for the eleven levels calll center as shown on drawings and as mentioned in the specifications. II.2 All structural Works and Civil works such as, concrete frames, slabs, walls, lintels, curbs, machine bases, ramps, and all other concrete structural and non-structural elements, including necessary formworks, shoring and waterproofing, expansion and construction joints, etc., Owner to supply all concrete and reinforcements. II.3 Supply and installation of all concrete hollow blocks to external and internal walls including plastering, mortar, stiffeners, reinforcing bars, joints, connections, thickenings, etc. II.4 Architectural works like floor finishes, wall finishes, ceiling finishes, internal and external finishes, doors, signages, built-in furniture etc. as instructed by the OWNER. II.6 Supply & installation of Mechanical Works for Airconditioning, Ventilation and Kitchen Exhaust System, Chilled & Condenser Water System and Water Treatment for cooling towers (Supply of major equipment like water chillers, cooling towers, pumps, ahu & fcu, and fans & blowers shall be owner supplied). II.7 General Electrical Works like supply and installation of Incoming Mains, Power and Lighting System, Wiring Devices, Lighting fixtures, Grounding System, BMS etc. II.8 Supply and installation of Plumbing Works Storm Drainage System, Sanitary Sewer System, Water Supply System including booster & sump pumps, and make-up water line for cooling towers description of package design coordinates, inc. construction project managers Page 2 of 3 suite 202, itc building 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance II.9 Supply and installation of Fire Protection System for Wet & Dry Stand Pipe System, including fire & jockey pumps. II.10 OWNER’S option to supply and deliver materials. The contractor is required to submit guaranteed maximum quantity. II.11 Providing samples, coordinating with our trades, marking and setting out, labeling, providing sufficient materials for the mock-ups, operation and maintenance manuals, spares, testing and commissioning, training and warranties. II.12 Delivering all the materials and any necessary labour to the jobsite or to another place within Metro Manila as designated by the OWNER. II.13 Unloading and distributing materials and equipment around the site will be undertaken by the CONTRACTOR. II.14 Providing as-built and shop drawings. II.15 Any other works required to complete the WORK. Prepared by : DESIGN COORDINATES, INC. Construction Project Managers description of package design coordinates, inc. construction project managers Page 3 of 3 suite 202, itc building 337 sen.gil puyat ave., makati city 1209 phone: +63 2 8961981-84 fax: +63 2 8999276 email: info@dci.com.ph website: www.dci.com.ph pioneer people performance