Streamlining Product Development at Applied Materials With Siemens PLM and Microsoft External Use Author’s Information Herman Harwell, Senior Member in Design For Excellence (DFx) Group of Applied Materials Global Operations Manufacturing Engineering Organization (GOME) 200mm – 300mm Wafer Semiconductor Processing Systems 2 External Use Applied Materials Overview Applied Materials is the global leader in Nanomanufacturing Technology™ solutions with a broad portfolio of innovative equipment, service and software products for the fabrication of semiconductor chips, flat panels, solar photovoltaic cells, flexible electronics and energy efficient glass. Results for Third Quarter of Fiscal 2007 Net Sales: $2.56 billion Net Income: $474 million EPS: New $0.34 Orders: $2.28 billion Flat Panel Display Processing Systems 200mm – 300mm Wafer Inspection Systems 3 External Use Product Development Roadmap People Driven Framework Research and Plan Concept Design/ Develop Validate/ Source Market/ Promote Produce/ Sell Support/ Retire Idea management Project and portfolio management Management Regulatory compliance Configuration management Sales and marketing Customer needs Product marketing and publishing Requirements management Design data creation R&D and Engineering Visualization and digital mockup Product structure record Engineering change management Sourcing Direct material sourcing Manufacturing process management Mfg Aftermarket support Customer Service EOL 4 External Use New Product Development Challenges Common Issues In New Product Development – – – – – – – – – – Design Issue capture mostly done with Excel spreadsheets Issue closure difficult to track at all project levels (many ad hoc) No consistent process for design issue identification in WIP Design project management varies by business group & size Lotus Notes databases most often utilized tool for design task tracking (EWR/PRIME/HSR/SPS) Lack of consistent approach with PLC phase task deliverables Few people proficient in use of all the new tools TcE/TcVis/NX E-mail most often used tool to notify team members of project issues or changes Supplier collaboration is needed earlier in design process Cross-Functional team members aren’t involved early enough to identify design changes needed 5 External Use PLC Product Development Roadmap • • • • • • SMR Detail Product Design BOM (Preliminary) Preliminary OMS/SOE Preliminary Tool/Fixture Critical Parts List PLC Task Assignments Digital Mockup - DMU 1 PRS 2 • • • • • • PDSS Product Planning Process PPP Controlled (2nd Beta) Build • Strategy Verification • Cost Goals Achieved • MIT Goals Achieved • BOM (EVAL Status) • Material Status @ EVAL • Critical Parts FAI’d • OMS/SOE Released @ EVAL • Tool/Fixture Implementation • Engineering Issue List Addressed • Train the “Trainer” Completed • Field NC Input Engineering (Alpha) Build Strategy Trial BOM (Draft) OMS/SOE Draft Tool/Fixture Trial Initial Engineering Issue List Virtual Build - VB 3 Alpha Stage 4 Beta Stage 5 Product Development Process PDP Gamma Stage 6 Vol Mfg Volume Manufacturing VM 7 Mature Product 8 Mature Products Use Case Roadmap for TcCommunity supporting PLC Deliverables & Tasks Pre-Build Requirements • Strategies • Manufacturing • Test • Sourcing • • • • Managed (1st Beta) Build OMS/SOE Verification Train the “Trainer” Started Engineering Issues Verification Digital Validation - DV TcCommunity-Based Activities: External Use • • • • • • Validation (Gamma) Build Strategy Validation BOM(97% Accurate) Tooling/Fixture Validation Engineering Issues Closed Work Center Train Plan Complete Field NC Goals Met 6 Collaboration Objectives Utilize Teamcenter Community in Design Reviews Conduct DMU activities on WIP design data in TcEngineering regardless of geographic location (PLC deliverables in Phase 4) Capture design issues and disposition them before design freeze and procurement of physical materials Provide extended design team with non-CAD tools to enable design reviews using most current TcEngineering data Utilize Teamcenter Community in global design environment Engage a product development team during PLC Phase 4 to conduct DMU tasks using TcCommunity, TcEngineering & TcVisualization tools Have the team execute the Visualization process workflow and it’s discrete tasks utilizing the capabilities of TcC, TcE & TcVis Evaluate TcCommunity performance when combined with TcE & TcVis against existing processes with only TcE and TcVis tools. 7 External Use Applied’s New Product Development Tools PLM System – All Tools are Integrated via TeamCenter TcVisualization Direct Integration TcCommunity TcEngineering UG - NX VisMockup VisViewPro Web Portal - Web Portal 3D Clearance Analysis (Static & Dynamic) Animation/Motion Authoring 3D Model Filters & Groups VisVSA Analysis (PMI Verify – Tolerance Simulations & Stack Up) VisJack – Classic Jack Analysis (Serviceability – Ergo – Safety – Access Evaluation & Viewing) Path Planning Authoring (Component & Assembly Extraction – Installation Analysis) JT 3D Model/Structure Viewing Alt Hierarchy Authoring (Mfg Build Sequence – Reports) 3D Model Section Viewing 3D Model Measurement 3D Model Markup (JT models w/TcE Identification) VisPublish Authoring (OMS - Assembly Documents) Visual Issue Authoring (Linked to TcE Models) 2D Drawing Overlay & Compare 2D Drawing Redlining & Markup Design Issues Management. (Closed Loop Corrective Action) PLC Tasks Management (External Linked Spreadsheet) Tools For Internal Multi-Site TcE Dynamic Design Collaboration Tools For External Supplier Static TcE Design Collaboration (i-Series Embedded Viewer) PLC Deliverables Library (Linked PLC Documentation) Conferencing Server Options (AppShare Or VisConference) Design Data Management (WIP & Release Designs) 3D Solid Models Revisions 2D Drawings Revisions Manufacturing Documents Library Commercial Part Library Product Structure BoMs (Product Core & Options Config) Multi-Site Design Data Sources Release Data Management Part Number Issuance Workflow Part Status Workflows Document Status Workflows 3D Model Authoring (NX parts & assemblies) Model As Master Authoring (GD&T – PMI data content) JT 3D Model Creation (Attributes - PMI data content) 2D Drawing Authoring (NX dwg - .cgm) Assembly Structure Authoring (Multiple Product Configurations) Large Model Management (Load Options & View Options) CAD Data Import & Export 8 External Use New Product Development Process Deliverables Governance By The Applied Materials PLC Phase Gated Development Model Identified Use Cases** For TcCommunity Applications – Phase 3: Product Definition (Program Charter) 3 Deliverables [4 Tasks with 6** Sub-Tasks] – Phase 4: Alpha Development 9 Deliverables [18 Tasks with 56** Sub-Tasks] – Phase 5: Beta Development 7 Deliverables [19 Tasks with 59** Sub-Tasks] 9 External Use Applied Materials Visualization Process: DMU DMU Coordination (Facilitator) - New Product Mfg Engineer - Program Management - Design Engineering DMU Closed Loop Corrective Action (DMU Issues Team) - Resolution Owner - Issue Owner (Reviewers) - DMU Coordinator (Facilitator) Digital Mockup Teamcenter DMU Issues Review & Disposition (DMU Issues Team & Reviewers) - New Product & Manufacturing, Design, Industrial, Service, Safety & Packaging Engineers - Materials & Sourcing Management - Suppliers & Vendors** - Community - Engineering -Visualization - MS Excel - MS Word DMU Evaluation Tasks (Reviewers) - New Product & Manufacturing, Industrial, Service, Safety, & Packaging Engineers - Materials & Sourcing Management - Suppliers & Vendors** DMU Issues Reporting (Facilitator) -New Product & Manufacturing, Design, Industrial, Service, Safety, & Packaging Engineers - Materials & Sourcing Management - Suppliers & Vendors** ** Future Implementation Cross-Functional Collaboration External Use 10 TcCommunity Deployment Configuration 8 1 7 4 2 3 5 6 AMAT Community Home Login Page External Use 11 TcCommunity Deployment Configuration 1 2 3 4 5 AMAT Community Home Login Page (cont.) External Use 12 TcCommunity Deployment Configuration 1 6 3 7 2 4 8 5 PLC Program’s Design Review Workspace (Home Tab) External Use 13 TcCommunity Deployment Configuration 1 6 2 4 5 3 PLC Program’s Design Review Workspace (My Workspace Tab) External Use 14 Applied DMU 2D Drawing Review Example 2D DRAWING VISUAL ISSUE 2D DRAWING & MARKUP ARE STORED IN TCE: VISUAL ISSUES ARE CREATED AND STORED IN TCCOMMUNITY DATABASE MARKUP CONTENT CONSISTS OF 3-ELEMENTS: OBSERVATION [O]; RECOMMENDATION [R]; FEEDBACK [F] 2D MARKUPS ARE POSITIONED OUTSIDE THE DRAWING: ALL MARKUPS ARE MERGED & POSITIONED OUTSIDE THE DRAWING BORDER TO ALLOW READABILITY 2D Drawing Issues Tracking Prior To Product MRP Release External Use 15 Closed Loop Corrective Action Process End Start PLC Deliverable From Task Assignment (Reviewer) Task Assignment Scope From Facilitator Using Review Module (Reviewer) T1 Email Notification Approval Status (Res Owner) (VI Owner) (Facilitator) Reviewer Finds Problem; Creates Visual Issue Active (VI Owner) Lotus Notes Team Conference For Review Date Visual Issue Dispositioned (Facilitator) Dispositioned Visual Issue Status Changed Resolved [VI Owner] T2 Visual Issue Form With Audit History & Routing Slip Dispositions 4 Disposition Of Visual Issue Complete Approved (Facilitator) Visual Issue Resolution Verified & Status Changed Closed [VI Owner] Visual Issue Actions Complete & Content Frozen Locked [Facilitator] 3 Resolution Of Visual Issue Verified Approved (VI Owner) Reason for Issue Visual Issue Resolution Owner Identified [Observation] [Assigned To] Proposed solution Resolution Determined [Recommendation] [Feedback] Assign To A Team Conference Resolution Due Date Assigned [Review Date] [Due Date] Product Design Issues Tracking Prior To MRP Release External Use Create Routing Slip Link To Visual Issue (1- Res Owner) (2- VI Owner) (3-Facilitator) 1 Visual Issue Resolution Implemented CAD a/o TcE [Res Owner] Visual Issue Resolution Completed Approved [Res Owner] 2 16 Closed Loop Corrective Action Process ROUTING SLIP APPROVAL: STATUS OF EACH REVIEWER IN THE ORDER OF REVIEW LINK TO VISUAL ISSUE CONTENT CLCA HISTORY FOR ROUTING SLIP: CLCA HISTORY STORED IN VISUAL ISSUE VISUAL ISSUE PROVIDES EVIDENCE OF ALL ACTIONS: FROM DISCOVERY OF ISSUE, THROUGH RESOLUTION OR FINAL DISPOSITION, TO VERIFICATION AND CLOSING OF ISSUE. Product Design Issues Tracking Prior To MRP Release External Use 17 New Product Development Integration TcCommunity Return On Investment 60 TcCommunity's Application Advantages In Each Virtual Design Review Category 50 TcC-Based TcVis-Based CAD-Based % of Total; Cumulative All Categories = 100% 40 30 20 10 0 Administration Data Management PLC Tasks Issue Management Review Effort Resource Burden In Each DMU Method Evaluated TcC Resource Usage Efficiencies – Lowest Administration Burden Design Review Sites & Workspaces DMU Roles Established Within TcC Managed Review Tasks Assignments Managed Review Scope & Agendas TcC Event Links in Lotus Notes eMail – Lowest Data Management Burden DMU Data Linked To TcE, Not Copied DMU BOM Synced To TcE Eng_BOM All TcE Sites Accessible Within TcC – Lowest PLC Deliverables Burden PLC Deliverables Doc Libraries in TcC TcE Item Issues Linked To PLC Docs – Lowest Issues Management Burden Visual Issue Data Capture & Tracking Visual Issues Link To TcE Design Data Issue Routing Via Lotus Notes email Issue Reporting, Rollups & Dashboards – Highest Reviewer Time Availability 83% Increase Over Vis-Based Reviews 175% Increase Over CAD-Based Basis: Equal Resource Allocation / Method / Assembly Reviewed (Avg.) 18 External Use Future Direction Applied Materials Roadmap – Deploy Teamcenter Engineering 2007 during FY 2008 – Deploy Microsoft Office SharePoint Server (MOSS) during FY 2009 – Deploy Teamcenter Community 2007 on MOSS during FY2009 19 External Use Thank You, Herman Harwell Applied Materials 20 External Use 21 External Use