Introduction
Importance of pre-qualification
The importance of classification
Major categories
Flow chart of pre-qualification process
Features of new pre-qualification procedures
Registration on SEC’s website procedures
How to Register with SEC
Registration Guides
Bidder Portal
INTRODUCTION
 SEC policy:
To create appropriate & fair opportunities for all qualified contactors
that are powered to be partners of our business through the prequalification gate, which help the company to select contractors
with good experience and competence.
 Pre-qualification:
Is a comprehensive process of technical evaluation for the
contractor that carried out by generation business line specialists,
in addition to a financial and commercial evaluation process done
by the contracting sector.
3
The importance of pre-qualification
 For Saudi Electricity Company:
1. Selection of contractors who can complete projects on time
and required quality.
2. Reducing the duration of the projects bidding due to prequalification of contractors.
 For Contractors:
1. Equal opportunities for contractors who applies for
company projects.
2. Giving sufficient time to the contractor to achieve the
technical, financial and commercial requirements of the
company before bidding.
4
The importance of Classification
 Why do we need to classify contractors according to their
specialties ?
Due to the multiplicity of Saudi Electricity Company works in
various fields and the varying capabilities of contractors and their
specialties, it was necessary to develop a classification of the
various generation works for the purpose of:
 Inviting only qualified contractors at tendering stage.
 Avoid assigning the project to non-specialists contractors
or with limited capacity.
5
Major Categories
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
6
Power stations.
Gas turbine Blades & HGP parts.
Transformers (Xfmr).
Generators
Boilers
Gas turbines and its auxiliaries
Steam turbines and its auxiliaries
HVAC systems
Electronic control systems
Water treatment and distillation
Maintenance management & trouble analysis
Mechanical works
Electrical works
Electronic works
Tests, analysis and treatments for substances.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
Civil works
Fire fighting systems
Consultations.
Technical service support.
Manpower
Long term services of operation & maint.
Material Supply
fuel transport
Exhaust System
Training
Energy rental.
Equipment rental
Environment & pollution
Different activities and not categorized
Manufacturing and supply of mechanical
part.
Flow Chart of Pre-qualification Process
OLD PROCESS
CONTRACTOR
Issuing letters for successful
and failed qualification
Contracting Sector
(By Contracting Department SOA)
7
Contracting Commercial Evaluation
Generation Technical Evaluation
(By Contracting Department SOA)
(By Generation Operations Sectors)
Flow Chart of Prequalification Process
CONTRACTOR
START :
Through SEC website
Issuing letters for failed qualification
Issuing letters for successful qualification
Generation Head Office
Generation Technical Evaluation
(By Operational Excellence and Coordination Department)
(By Generation Operations Sectors)
Fail
Technical
Evaluation
Result
Pass
Contracting Commercial Evaluation
(By Contracting Department)
8
NEW PROCESS
Features of new qualification procedures
1. Save more than 10 days wasted in Correspondence.
2. Better communication between technical teams and contractors.
3. Better response to solve issue.
4. Contractor will receive the prequalification letter with improved quality.
5. Total time of prequalification will improved.
9
HOW TO REGISTER WITH SEC
Step 1: Access to the company's site (https://www.se.com.sa), and click “More”
below the “Business” tab as shown below.
10
HOW TO REGISTER WITH SEC
Step 2: Click on “Contractors E-Bidding” logo.
11
HOW TO REGISTER WITH SEC
Step 3: Click on “Contractor Registration” link as shown below.
12
HOW TO REGISTER WITH SEC
Step 4: Follow the steps and complete the required data to get “Vendor No”.
13
Registration Guides
To get all the registration guides and reference number of Generation
Operations Projects, follow the below steps:
2
3
14
1
Registration Guides
Generation Operations
Projects RFX No.
Guides
15
Registration Guides
16
Bidder Portal
After registering, you are now ready to prequalify your company for SEC's
projects. Please visit Bidder Portal to download the Prequalification documents
depending on your field of expertise (the following picture).
1
2
3
17
Bidder Portal
• Note that the (User ID) is the “Vendor No.”
• After login, use the reference number “RFx” for the required categories.
Then, the qualification documents can be downloaded.
18
Thank you
19
Download