Planning Commission October 6, 2015 155 EDMOND PLANNING COMMISSION MEETING Tuesday, October 6, 2015 5:30 P.M. The Edmond Planning Commission Meeting was called to order by Chairperson Barry K. Moore at 5:30 p.m., October 6, 2015, in the City Council Chambers at 20 South Littler. Other members present were Bill Moyer and Kenneth Wohl. Member Rob Rainey arrived shortly after the meeting began. Present for the City were Robert L. Schiermeyer, City Planner; Kristi McCone, City Planner; Steve Manek, City Engineer; and Steve Murdock, City Attorney. The first item on the agenda was the approval of the September 8, 2015 minutes. No action was taken on the minutes. The next item on the agenda was Case #SP15-00015 Public Hearing and Consideration of Site Plan approval for more parking at the Covell Corner Station, located at Covell Road and Air Depot Boulevard. (Joe Javadzadeh - Covell Corner Station) Planning Department - This request involves 7,500 square foot of paving or more for a parking lot expansion which requires the site plan. There is no building with this request. 1. Existing zoning – “D-1” Special Use Permit, for the convenience store itself the subject parking lot has been zoned “D-1” but not used. 2. Setbacks – N/A 3. Height of building – N/A 4. Parking – 28 parking spaces are being added, north of the convenience store with a new drive onto Air Depot Boulevard. The parking spaces are additional to what is already on the site and it is probably created by the need from Colby’s Restaurant. There is a 30 foot setback from the parking lot to the nearest lot line to the north in Hampden Hollow. 5. Lot size – 2.009 acres 6. Lighting Plan – No changes 7. Signage – No changes, existing sign on the front of the building. 8. General architectural appearance – N/A 9. Sensitive borders – Parking is a use permitted in a sensitive border and some existing trees are being retained on the north. Planning Commission October 6, 2015 10. Mechanical equipment – N/A 11. Fencing/screening – No new fencing 156 Engineering Department 12. Driveways, access management and paving – A driveway variance was approved by the City Council for this parking lot. The drive will be brought to standard. The whole area of the parking has been a graveled area for some time, primarily used by the utility operators. 13. Water and wastewater plans – N/A 14. Drainage detention and grading – Drainage plans have been submitted and reviewed. Building and Fire Code Services Applicable Building Code, Fire Code No buildings. Landscaping/Urban Forestry 15. Lot area = 21,700sf % required = 10 Landscape area required: 2,170 Frontage area required: 1,085 Total PU required: 174 PU within frontage required: 87 Evergreen PU required: 69 16. SP Landscape area: 10,550 SP Frontage area: 5,000 SP Total PU: 431 SP PU within frontage: 283 SP Evergreen PU: 227 Solid Waste Department – The access to the dumpster is not from the new parking lot level it is from the existing level of where the convenience store is located. Edmond Electric Department – The paving indicated west of the existing communications boxes will be constructed over an underground electric service. If the service needs to be rerouted or lowered to maintain NESC code compliance, it will be done at full cost to the developer. Randel Shadid represented the applicant. No one spoke in opposition. Motion by Rainey, seconded by Wohl, to approve this request. Chairman Moore left the room during the discussion and vote. Motion carried by a vote of 3-0 as follows: Planning Commission October 6, 2015 157 AYES: Rainey, Wohl and Moyer. NAYS: None The next item on the agenda was Case #Z15-00032 Public Hearing and Consideration of Edmond Plan Amendment from Restricted Retail Commercial Planned Unit Development to Medium Density Multi-Family, located on the north side of East 2nd Street, east of Vista Lane. (Mike Henderson – Legend V, Tract II) The following general planning considerations represent some of the factors evaluated in reviewing justifications for Plan Map Amendments. 1. Infrastructure: City water and sewer lines are adjacent to the site and will be extended to meet the Fire Department requirements. The most significant infrastructure improvement to address is the protection of the flood plain immediately north of the property and the resolution of detention out of the flood plain. The developer is aware of this condition. 2. Traffic – Second Street is four lane in front of this property. The access management driveway separation standards will be met. When Legacy V was built the developer installed the north side of the traffic signal at his cost and that will be the principal access to this complex. 3. Existing zoning pattern: North – “C-2” and ‘D-2” Commercial (significant flood plain) South – “E-1” General Commercial East – “D-2” West – Multi-family PUD 4. Land Use: North – Undeveloped and flood plain area South – Undeveloped East – Undeveloped and flood plain area, other than the City pump station West – Multi-family, Phase I, Legend V, 200 units existing 5. Density: 12 units per acre maximum by “C-2 Zoning, 141 units possible. 6. Land ownership pattern: North – Large ownership with only practical access from Coltrane South – Several different owners for the “E-1” parcel East – Large ownership with access from Coltrane West – The Legend V Apartment owner 7. Physical features: Significant flood plain and grade change. It is possible to prepare the property for a building site, recognizing the existing physical conditions. Planning Commission October 6, 2015 158 8. Special conditions: None other than the flood plain. Any trails will have to be in the flood plain at this location and would have to coordinate with drainage standards. 9. Location of Schools and School Land: The nearest school is Will Rogers Elementary, west of Bryant. 10. Compatibility to Edmond Plan: As a project coordinated with the existing apartments this is not a significant change to the Edmond Plan. 11. Site Plan Review: Plats and site plans are required. Due to the creek there could be some setback exceptions. Protection of the creek is a premier standard. Attorney Randel Shadid represented the applicant. He indicated that there had never been a commercial offer on the property. The terrain would require it to be filled and leveled, with a retaining wall to meet the ADA building pad requirements. The requirements can be meet with a better design with apartments. “C-2” Density is being requested rather the “C-3”, approximately 141 units would be possible. Hilde Johnson spoke in opposition. Indicating that Spring Creek Village shopping center had a similar problem on the topography but was able to build. She indicated that apartments are not needed but more retail is. She stated that there had been 45 accidents at Vista Lane and Second Street. She indicates that there will be an increase in noise and more drainage in the creek where flooding has already occurred. The creek is also full of debris during heavy rains. She feels that no approval should be provided until there is a completed drainage study. Karen Johnson McCrea also spoke in opposition. She indicated that the farm is important to her family and the proposed use would change the land along the creek. Marie McCrea also spoke in opposition indicating that she had numerous memories of the creek area and the family farm, as the granddaughter of Hilde Johnson. Ed Moore with the ENA objected to the multi-family. Motion by Wohl, seconded by Moyer, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Wohl, Moyer, Rainey and Chairperson Moore NAYS: None The next item on the agenda was Case #Z15-00033 Public Hearing and Consideration of Rezoning from “D-1” Restricted Retail Commercial Planned Unit Development to “C-2” Medium Density Multi-Family Residential District, located on the north side of East 2nd Street, east of Vista Lane. (Mike Henderson – Legend V, Tract II) Attorney Randel Shadid is representing Mike Henderson the current owner, in requesting a tract of land north of 2nd Street east of the Legend V apartments be rezoned to Medium Density Multi-family. Mr. Gary Brooks built Phase I of Legacy V and would like to proceed with another phase built on 11.78 acres. This might allow 141 units built on the property depending on the drainage detention and flood plain study that would need to be done for a site plan and plat. Sewer and water are available to the site. A pedestrian trail has been discussed along the creek adjacent Planning Commission October 6, 2015 159 to the property shown on the Trails Master Plan. The access to the property would be the traffic signal at Vista Lane and 2nd Street. An additional drive may be needed to the east that would benefit fire and service access. There is a large flood plain to the north of the subject parcel. There are adequate land use buffers around this 11 acre parcel. Staff recommends approval. Motion by Wohl, seconded by Moyer, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Wohl, Moyer, Rainey and Chairperson Moore NAYS: None The next item on the agenda was Case #Z15-00030 Public Hearing and Consideration of Edmond Plan Amendment from General Commercial Planned Unit Development to Single Family Dwelling, located south of East 2nd Street, east of Vista Lane. (John Coleman - The Falls) The following general planning considerations represent some of the factors evaluated in reviewing justifications for Plan Map Amendments. 1. Infrastructure: City water is available along Vista Lane and Martina Drive on the southeast corner of the property. Sanitary sewer is not adjacent. Sewer lines will have to be extended into Tuscan Villas Addition or since there has already been some grading of the property it could turn out that the sewer connection will be from the Second Street area. The developer should evaluate sewer possibilities as soon as possible. Detention will be required for this property. In the past the detention for this 9 acres was an area wide detention for the entire commercial location. This may not be possible depending on when the commercial property develops. 2. Traffic: There is a traffic signal at Vista Lane and 2nd Street. This residential parcel may not directly connect to the commercial to the north. Nine acres of single family should generate approximately 40 homes. 3. Existing zoning pattern: North – “E-1” General Commercial and Single family (which was once zoned commercial) South – “A” Single Family East – “E-1” General Commercial West – “E-1” General Commercial but developed as Oxford Oaks multi-family 4. Land Use: North – Undeveloped South – Developed Single Family East – Undeveloped West – Developed as apartments Planning Commission October 6, 2015 160 5. Density: Theoretical 7 units per acre. With drainage and streets the density is usually from 3 ½ to 4 units per acres. The project would not be a PUD. 6. Land ownership pattern: North – 25 acres undeveloped South – Urban size lots East – 15 ownerships West – Single owner apartment property. 7. Physical features: Gently rolling terrain. 8. Special conditions: N/A 9. Location of Schools and School Land: Will Roger’s Elementary 10. Compatibility to Edmond Plan: This parcel helps solve a transition area and therefore is a good land use and is compatible. Multi-family was not seen as a good use, it was to high impact, not compatible with adjacent density. Commercial uses might be possible but the service lane would likely be nearest to the Tuscan Villa homes. 11. Site Plan Review: A Site Plan is not required but preliminary and final plats are required. Attorney Randel Shadid representing the applicant. No one spoke in opposition. Motion by Wohl, seconded by Rainey, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Wohl, Rainey, Moyer and Chairperson Moore NAYS: None The next item on the agenda was Case #Z15-00031 Public Hearing and Consideration of Rezoning from “E-1” General Commercial Planned Unit Development to “A” Single Family Dwelling District, located south of East 2nd Street, east of Vista Lane. (John Coleman - The Falls) Attorney Randel Shadid is representing John Coleman in requesting that 9.5 acres, a quarter of a mile south of 2nd Street, on the east side of Vista Lane be considered for single family dwelling. The property is currently zoned “E-1” PUD but is undeveloped. A previous owner had planned “The Falls Apartments” on the property that were sometimes referred to as condos. This project never received a special use permit which would have been required in the “E-1” Zoning category. While it is always a concern to reduce the amount of commercial inventory this parcel is critical to the successful development of the “E-1” to the north. This tract will become a buffer land use between the commercial and the established, Tuscan Villas Addition to the south. This parcel does extend east to Wade Martin, which is a private street and is not close Planning Commission October 6, 2015 161 to a public street standard and may never be used as a public street. The current owners of Wade Martin would have to improve the street to a public street standard and ask for it to be accepted and dedicated. There is access to this piece of property on Vista Lane with a possible connection to Martina Drive. The connections would be decided at the plat stage. There was another multi-family project planned for some of this property that was a concern of the Tuscan Villa property owners. That project was for student housing. This rezoning benefits the Tuscan Villas Homeowners. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda was Case #SP15-00022 Public Hearing and Consideration of Site Plan approval for Mon Abri Commercial, Tract 2, located south of Covell Road and east of Broadway. (R.W. Development–Kyle MelsonMon Abri) Planning Department 1. Existing zoning – PUD Office Usage along north Broadway, south of Covell Road. This building is in front of the Mon Abri Senior Housing on the north side of the main entry drive. 2. Setbacks – 10 feet from the front property line along Broadway, this acceptable because it is a Planned Unit Development. Side yard setback on the south is 10 feet. Side yard setback on the north is 70 feet. The setback on the east is 65 feet. 3. Height of building – 39 feet 4. Parking – 11,940 square feet of building. 57 parking spaces provided, bicycle parking will be required and inspected by Jan Fees. The project is not over parked. 5. Lot size – 40,317 square feet 6. Lighting Plan – The light poles can be no more than 20 feet tall including the base. The light poles cannot be placed in the right-of-way along Broadway. 7. Signage – A sign has already been placed in the median near this building. Wall signs may be requested following the standard sizes allowed. 8. General architectural appearance – The building will be brick veneer with a composition shingle roof. The roof will be a 12/12 pitch. The architecture Planning Commission October 6, 2015 162 matches the Mon Abri architecture. Other materials on the building include wood shutters, standing seam metal on the dormer windows. 9. Sensitive borders – N/A 10. Mechanical equipment – The air conditioning units are located on the ground in front of the building along Broadway. The 5 foot by 10 foot brick screen wall will be required for all of the a/c condensers. There are at least four locations. Some of the screen walls will increase 6 foot by 16 foot. 11. Fencing/screening – Fencing has already been in place for the Mon Abri residential Engineering Department 12. Driveways, access management and paving – There are no driveways on Broadway. The common access for Mon Abri residential will also be the access to the office. Parking will be on the east side of the building. 13. Water and wastewater plans – Water and wastewater lines have been installed with the plats. 14. Drainage detention and grading – Drainage and detention is being improved on an addition level bases. Building and Fire Code Services Applicable Building Code, Fire Code Fire sprinkler system may be needed for the 11,940 square foot building. That issue is still being evaluated by fire prevention. Landscaping/Urban Forestry 15. Lot area = 40,317sf % required = 10 Landscape area required: 4031.7 Frontage area required: 2,016 Total PU required: 323 PU within frontage required: 161 Evergreen PU required: 129 16. SP Landscape area: 7,400 SP Frontage area: 3,200 SP Total PU: 579 SP PU within frontage: 205 SP Evergreen PU: 303 Solid Waste Department – Dumpster access will be from the residential portion of Mon Abri. Planning Commission October 6, 2015 163 Edmond Electric Department – Edmond Electric will serve. Attorney Randel Shadid represented the applicant. No one spoke in opposition. Motion by Moyer, seconded by Rainey, to approve this request. Motion carried by a vote of 4-0 as follows AYES: Moyer, Rainey, Wohl and Chairperson Moore NAYS: None The next item on the agenda was Case #SP15-00020 Public Hearing and Consideration of Site Plan Approval for three commercial buildings, known as Chapel Ridge Commercial II, located on the north side of Fretz Avenue, south of the Coffee Creek Apartments. (Sonny Lavi - Chapel Ridge Commercial II) Planning Department 1. Existing zoning – “E-3” Restricted Light Industrial 2. Setbacks – Front setback is 25 feet on Fretz Avenue, side yard setbacks are 23 feet, rear yard setback is 44 feet 3. Height of building – 20 feet 4. Parking – There are three buildings planned and the square footage is follows: Building 1 is 9,900 square feet, Building 2 is 9,900 and Building 3 is 7,803 square feet. There are 46 parking spaces. The usage is office warehouse. There is basically 1 parking space for every 600 square feet of square footage in the building. No parking on Fretz Avenue is acceptable. High impact uses will not work at this location, such as a physical therapy clinic. Bike rack and pad have been provided and will be inspected by Jan Fees. 5. Lot size – 114, 462 square feet 6. Lighting Plan – There will be wall packs on the building but not parking lot light poles. If they do decide to add light poles they cannot be any taller than 24 feet including the base. The owner is Sonny Lavi who also built the project immediately east, which has recently been completed. This project will match that site for general construction standards. 7. Signage – One ground sign, six feet tall, 42 square feet will be permitted, plus wall signs. 8. General architectural appearance – The building will be brick veneer on all four sides. Like the buildings to the east, although they are a metal engineered construction. The roof is an 8/12 pitched roof. Planning Commission October 6, 2015 164 9. Sensitive borders – N/A 10. Mechanical equipment – Is located on the ground based on the minimal slope on the building roof. 11. Fencing/screening – No fencing is required. Engineering Department 12. Driveways, access management and paving – One driveway is planned on Fretz Avenue, meeting all the access standards. 13. Water and wastewater plans – Water and wastewater are available and being connected for service. 14. Drainage detention and grading – Drainage detention plans have been submitted in the past. This project is platted as the Fretz Business Park and the grading and drainage for each lot is verified with each new site plan. Building and Fire Code Services Applicable Building Code, Fire Code Walls within 10' of the property line are subject to rating requirements, in accordance with section 602 of the IBC Walls within 20' of the property line are subject to opening limitations An accessible route to each tenant space must be provided from parking area A sloped or ramped access to tenant spaces must be provided from handicap spaces Fire Prevention Comments: The two larger buildings will have to be fire sprinkled. The third building at the back of the property does not require a sprinkler system. A fire hydrant is located along Fretz Avenue. The turning movement for the fire vehicles has been verified to comply. Landscaping/Urban Forestry Landscaping for this project was evaluated for the entire property as a whole. 763 of the required plant units are from new plant material, as are 268 of the evergreen plant units. The rest of the required landscaping will be met through tree preservation. 15. Lot area = 114,462 sf % required = 10 Planning Commission October 6, 2015 Landscape area required: 11,446 Frontage area required: 5,723 Total PU required: 916 PU within frontage required: 458 Evergreen PU required: 366 165 SP Landscape area: 41,500 SP Frontage area: 5,723 SP Total PU: 924 SP PU within frontage: 492 SP Evergreen PU: 384 16. Solid Waste Department – There is a dumpster location on site and there is adequate space to maneuver the vehicle into and out of the property. 17. Edmond Electric Department – Edmond Electric will serve. Shaun McGraw with Red Plains represented the applicant. Mr. McGraw said he understood the parking for the office warehouse would not accommodate uses such as a physical therapist or a dance studio. Motion by Rainey, seconded by Moyer, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Moyer, Wohl and Chairperson Moore NAYS: None The next item on the agenda was Case #DD15-00013 Consideration for Deed Certification for 28 lots in a private street addition, north of Covell Road right-ofway, east of Westminster Road. (Martin Teuscher - Pravada) Martin Teuscher has decided to request a deed certification for 28 single family lots, east of Westminster Road and north of the unopened portion of Covell Road. The property is zoned “R-1” Rural Estate and none of the lots are less than 2.07 acres, meeting the minimum lot size required. State Statutes provide if the development is more than a quarter of a mile from public water and sewer lines that the owner is not required to plat the property, following the details of the subdivision code. Streets in the addition will be private and a gate is planned on Pravada Drive. The developer will still have to meet Title 23 Drainage Standards and has submitted plans documenting that compliance. Mr. Teuscher is also granting the right-of-way along Westminster Road meeting the Master Transportation Plan requirements. The drive approach will also meet City of Edmond standards on Westminster Road. Edmond Electric will serve the addition and utility easements have been provided for that utility. The streets will be named for 911 addressing. A plat was submitted in the past but Mr. Teuscher is withdrawing that from consideration. It is not a minimum requirement based on the State Statute exception to require a plat. Mr. Teuscher owns 114 acres at this location but is only lot splitting 60 acres at this time for the subject 28 lots. Martin Teuscher was in attendance. Kevin Cody, the property owner to the south objected to this request. He described the following items as not in order: The gas company has not been made aware of the development that will impact their gas equipment. He indicated that he needed to see the drainage plans and was concerned Planning Commission October 6, 2015 166 about his water well, in terms of water quality and supply. He felt that there was not enough water for 28 new wells. He indicated that he had not received notice. Staff indicated that with a lot split request, rather than with preliminary plats there is no requirement for notices. Mr. Teuscher commented that no condition has occurred that would indicate that there is no water available. He stated that he met the ODEQ requirement for a lot size for a well and there are new wells being drilled all the time. He noted that with the 28 lots, there is no impact to the gas equipment and that they will use his new roads to access the property, if they want to. He indicated that drainage plans have already been approved, meeting Title 23 requirements. Chairman Moore suggested that Mr. Teuscher continue to give Kevin Cody notice on the progress of the development. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda was Case #DD15-00012 Consideration of Request for a Deed Certification for two lots, located west of Air Depot, north of Indian Hill Road. (Hargrove/Holmes) Martha Gray with Oklahoma City Abstract and Title is representing the applicants in the sale of land generally at 829 Air Depot Boulevard, south of Danforth Road, east of I-35. The property is zoned “R-1” Rural Estate. The Dave’s family who owns the northwest corner of Indian Hill Road and Air Depot Road is not part of this division. The Dave’s family have just over two acres of land. The Hargrove’s own two acres west of the Dave’s and would like to purchase two more acres, west of the Mitchell property that fronts on Air Depot Boulevard. The Hargrove’s will have 5 acres and the Mitchell’s will retain just over two acres with this land division. There is no water and sewer near this property all homes will use water wells and septic tanks or aerobic systems. Each lot will have access to a public street, either Air Depot Boulevard or Indian Hill Road. This location is not within a flood plain. There is an easement provided from Indian Hill Road, north to Tract B, to be purchased by the Hargrove family. Tract B could be sold individually at some time in the future with a driveway leading to Indian Hill Road. The zoning is in place for that possibility. Mrs. Hargrove was in attendance. No one spoke in opposition. Motion by Moyer, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Moyer, Wohl, Rainey and Chairperson Moore NAYS: None The next item on the agenda was Case #Z15-00021 Public Hearing and Consideration of Edmond Plan Amendment for The Prairie at Post, PUD from General Agricultural to Residential Planned Unit Development, located on the west Planning Commission October 6, 2015 167 side of Post Road, north of East 2nd Street, north of Sugar Hill Addition. (TLM Development, LLC-The Prairie at Post) The following general planning considerations represent some of the factors evaluated in reviewing justifications for Plan Map Amendments. Bryan Coon is representing the owner in proposing a single family residential addition that proposes 18 lots where each lot would have at least 60,000 square feet but considering the open space in the entire development, the average lot size would be at least 90,000 square feet. The total open space area include the detention and flood plain areas. The developer is planning a community garden as part of the design of the addition. There are no utilities within a half a mile of this property, so all services would be private. The common areas would be owned and maintained by the 18 lot owners. This area falls outside the Arcadia Lake District. The Edmond Plan would suggest two acre lots in this area based on the utility availability. The Chitwood Farms Addition which is located east of Post Road and east of Arcadia Lake is one of the more unique additions, in that 93 acres has been set aside as Edmond Land Conservancy (ELC) property and that property is used to allow 40,000 square foot lots with private waste water systems. Chitwood Farms Addition does have City water. The two acre lot standard would have also applied to Chitwood Farms Addition because of the proximity to Arcadia Lake. Two acre lots are the minimum recommended lot size, a half a mile north of Second Street and a half a mile east of Post Road to maintain a low density character compatible with Arcadia Lake. The connection to City water at Chitwood Farms Addition was important because the addition was close to the water treatment plant, located immediately west of Post Road. The connection to City water was a partial factor for the lot size, it was the ELC land area that helped set the compatibility character near Arcadia Lake. The Beupre Addition has developed with two acre lots immediately north of Chitwood Farms Addition. The developer wanted to reduce the lot size to 60,000 square feet, (1.3 acre lots) but was denied because that would have been a precedent to change the rural character desired around Arcadia Lake. 1. Infrastructure: The 37.5 acres is not adjacent to City water or sewer and no utilities are planned at this time. The water line along East Second Street and Post Road, a half a mile south of this location is a transmission line and is not suitable for connection for a water distribution line. Sugar Hill Addition to the south but did not connected because of this issue. The Highland Arbors Addition near Air Depot Boulevard did connect but required a series of additional valves to address connecting to the transmission line supplying the two water towers on I-35. This was done at substantial cost. This area is not able to be sewered for any planned system. 2. Traffic: Post Road is the only access to this property. The current driveway is near the flood plain. The engineer will need to continue his study regarding the flood plain study. This would still allow for the protection of the flood plain Planning Commission October 6, 2015 168 meeting all Edmond requirements. The platting of the project will identify that technical assessment. The property to the east has now been purchased by the City of Edmond and is partially developed as the Edmond 66 Softball Complex. 3. Existing zoning pattern: North – “G-A” Agricultural South – “R-3” PUD East – “G-A” Agricultural West – “G-A” Agricultural 4. Land Use: North – Flood Plain South – Sugar Hill Addition East – City of Edmond/Edmond 66 Softball Complex West – Undeveloped 5. Density: 37.5 acres, 18 single family units. Minimum lot size 60,000 square feet but including open space of 90,000 square foot lots. 6. Land ownership pattern: North – Single large ownership South – Individual lots, two acre lots East – City of Edmond West – Single large ownership 7. Physical features: Existing ponds are on the property, flood plain is immediately to the north. 8. Special conditions: Protection of the flood plain is partially for the entry street. 9. Location of Schools and School Land: N/A 10. Compatibility to Edmond Plan: This location falls outside of the Arcadia Lake Planning area but the lots are still projected as two acre lots, because there is no water or sewer lines. Many of the streets are requested to be private and constructed to a private street standard in this area. The character of the area is for two acre lots rather than smaller lots. The Edmond Plan IV does not include or project only agricultural uses on any parcels east of I-35 or anywhere in the city. 11. Site Plan Review: Preliminary and Final Plat will be required. Brian Coon was in attendance for the applicant. Jim Palm spoke in opposition as a resident of Sugar Hill Addition to the south. He felt that the lot size should not be decreased for any reason, beyond the two acres required in Sugar Hill Addition. The flood plain and common area was not sufficient to make up the difference of 60,000 Planning Commission October 6, 2015 169 square foot lots proposed and the 90,000 square foot lots required by the Edmond Plan. He felt like the rules were changing from when he bought his property. Ed Moore, ENA also request that the two acre lots be the minimum. Mr. Coon did indicate that chickens were one of the original goals for the common garden planned but they would be willing l to live without the chickens, if not allowed. Attorney Todd McKinnis also represents the property owner and indicated that the project was comparable to many projects in Edmond. The density is not changing and the cost per square footage of the home is not relevant. This project preserves the open space and protects the flood plain. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda was Case #Z15-00022 Public Hearing and Consideration of Rezoning for The Prairie at Post PUD from “G-A” General Agricultural to Residential Planned Unit Development, located on the west side of Post Road, north of East 2nd Street, north of Sugar Hill Addition. (TLM Development, LLC-The Prairie at Post) Bryan Coon is representing the owner to provide for a new residential PUD on a total of 37.5 acres for 18 single family lots. The Master Plan provides for the smallest lot to be 60,716.70 square feet. This does include to the center line of the road which will be private. The road will be built to City Standards even though it will be private. The road extending west of Post Road is still being evaluated as to the flood plain. The existing driveway has not been adversely affected but with a new road, that drainage issue will be checked. Tract 2 is a common area that will be used for shared gardens and open space. The applicant would like to add that chickens can be raised on each lot. There is a total of 8.7 acres that is common area, 28.76 acres is residential. The Sugar Hill Addition is located to the south, which is in the Arcadia Lake area and the lots are a minimum two acres. Sugar Hill Addition is zoned as an “R-3” PUD. There are no utilities in the general vicinity that could serve this property. Each lot will be served with a private water well, septic tank or aerobic system. There is a large flood plain north of the property. A lake may be incorporated into the detention plan and that is appropriate for the common areas. At least one of the ponds will be on one of the lots and will be used as an aesthetic feature. That pond cannot be used for detention based on the Title 23 requirements. The lots will exceed the ODEQ Standards for water well and septic tank or aerobic systems on each lot. The streets will be private in this addition and will be built to City Standards, which will require inspections and inspection fees. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None Planning Commission October 6, 2015 170 The next item on the agenda was Case #Z15-00026 Public Hearing and Consideration of Edmond Plan Amendment from Suburban Mixed Use (General Agricultural) to Single Family Residential Planned Unit Development, located on the southeast corner of Coltrane Road and Coffee Creek Road. (IHRE Land Co., LLC–Stone Hill at Iron Horse Ranch) The following general planning considerations represent some of the factors evaluated in reviewing justifications for Plan Map Amendments. 1. Infrastructure: City water lines are available along Coltrane Road and will be extended for service. A sanitary sewer line is located to the south and will be extended for service. 2. Traffic: Coltrane Road and Coffee Creek Road are both arterials and require at least a 70 foot of right-of-way. Coltrane Road is designated as a major bicycle route to be developed sometime in the future. The east side of Coltrane Road may allow for the best right-of-way for a bicycle facility. The PUD Master Plan calls for a landscape buffer immediately adjacent to the right-of-way and then a private alley right-of-way. If the plan amendment is approved this will be a location that would not work for a 50 foot right-of-way or 20 foot utility easement, based on the right-of-way needed 3. Existing zoning pattern: North – Edmond School District property Northwest – D-O” Suburban Office South – Flood Plain East – “GA” General Agricultural West – “A” Single Family 4. Land Use: North – Undeveloped school land South – Undeveloped, flood plain and Fairfax Golf Course East – Undeveloped West – Steeple Chase Addition 5. Density: 3.5 units per acre, 233 lots on 98 acres 6. Land ownership pattern: North – Edmond School District South – Fairfax Addition East – Large tract owner West – Acreage lots fronting on Coltrane Road 7. Physical features: Heavily treed. 8. Special conditions: None Planning Commission October 6, 2015 171 9. Location of Schools and School Land: Centennial Elementary School is a 1/8 mile north of Coffee Creek Road. 10. Compatibility to Edmond Plan: Not compatible with the Edmond Plan. Amendment required 11. Site Plan Review: Preliminary and Final Plat if zoning is approved. Brian Coon was in attendance for the applicant. No one appeared in opposition. The Staff commented that even without a solid definition of Suburban Mixed Use, that if 98 acres is removed from the plan that there would be a substantial change. This would suggest that the Edmond Plan only show high intensity uses projected to the half section line east of the request. The Commission was made aware of a new application for office usage west of Sooner Road generally in accordance with the plan. The primary justification for the change would be that there has not been a developer for a commercial or mixed use project come forward and that the development pattern along Coltrane Road is better suited to residential at this time, rather than higher intensity commercial uses including office. Mr. Coon indicated that the first phase of this project would be on the immediate corner, south of Centennial School, east of Steeple Chase and north of the Fairfax Golf Course. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda Case #Z15-00027 Public Hearing and Consideration of Rezoning from “G-A” General Agricultural to Single Family Residential Planned Unit Development, located on the southeast corner of Coltrane Road and Coffee Creek Road. (IHRE Land Co., LLC– Stone Hill at Iron Horse Ranch) This project conflicts with the Edmond Plan. The Staff’s opinion of the options would be as follows: 1. Amend the Edmond Plan, removing 98 acres proposed for Suburban Mixed Use to Single Family. This would affectively move the Suburban Mixed Use boundary east to the flood plain along the east side of this addition. This is what the applicant is requesting. 2. Ask the applicant to modify his request to remove some of the Single Family that is proposed, leaving the possibility for at least office usage on some of the land. The Staff understands that Suburban Mixed Use is not defined and from the uses listed in the Edmond Plan description, office is the most compatible with existing conditions. Planning Commission October 6, 2015 172 3. Disapprove any amendment to the Edmond Plan, changing the Suburban Mixed Use current projection. Bryan Coon who is representing the property owner in requesting 98 acres “A” Single Family PUD Zoning, east of the Steeple Chase Neighborhood, southeast of the original Iron Horse Ranch and south of the Centennial School property which extends to Coffee Creek Road. Mr. Coon provides for the following in his letter for an Edmond Plan Amendment “on the advice of the City of Edmond Planning Department, we have applied to rezone this property to A Single Family Residential PUD and we need the zoning and Edmond Plan IV regulations to match. The word advice might be a little strong. The Staff explained to Mr. Coon that this project as proposed does not match the Edmond Plan but if he did not want to develop a mixture of uses following the Suburban Mixed Use Projection description, he would have to amend the plan and I explained the process to proceed with that request. The Planning Commission is aware that there is no Suburban Mixed Use Zoning District but as described it should include a variety of uses that could not be approved in a Single Use Zoning District. The purpose of projecting Suburban Mixed Use was to attempt to set aside future areas for higher use or a range of uses, more than Single Family Dwelling or even Single Family PUD. Edmond is not over zoned commercially and when projected uses were considered in 2006 for the Edmond Plan, locations were chosen to accomplish this, using sites felt to be in least conflict with the Single Family areas. The Suburban Mixed Use does not require retail uses and it does not require Multi-Family Uses. The City Council has addressed two developments that have required changes to the Urban Mixed Use projection and that includes Covell Valley and Hedgerow Addition. These locations were at Air Depot Boulevard, and Danforth Road, and Covell Road east of Air Depot Boulevard. In both developments some commercial was retained, 37 acres on the northwest corner of Air Depot Boulevard and Danforth Road with the Hedgerow Addition. 13 acres of Retail Zoning was approved south of Covell Road and north of Covell Valley Addition. The issue with this request following the Edmond Plan Projection is that the developer of the Stone Hill at Iron Horse feels that the market conditions at this time are best suited for single family and not higher intensity uses. The mixture of lot sizes with the 6,600 square foot lots on the southeast corner is not what the plan is suggesting by mixed use. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda was Case #PR15-00025 Public Hearing and Consideration of Preliminary Plat approval for Preston Place, located on the Planning Commission October 6, 2015 173 west side of Boulevard and approximately one-half mile south of 33rd Street. (Preston Place - DCD Holdings, LLC) Engineer Earnest Isch is requesting plat approval for three commercial lots north of Stonebridge Boulevard, west of South Boulevard this property is part of the Stonebridge PUD. The three commercial lots are as follows: Lot 1 - 38,134.6 square feet, Lot 2 - 20,401 square feet, Lot 3 - 57,609.8 square feet. The lots are connected to Boulevard and Stonebridge Boulevard with a common driveway easement. Each lot will be developed with City water and sewer. A new water line is being constructed along the common driveway. A proposed sewer line is being extended from the south for service. The project is zoned as a PUD. The front setback planned is 25 feet from the property line, 50 feet would be the normal setback. There is a green belt area to the west, shown as Tract C. The right-of-way along Boulevard is 50 feet from the center line. The Master Transportation Plan requires at least 70 feet. A variance will be requested of the City Council to retain the 50 foot of right-of-way with a 20 utility easement (50/20). The project contains 3 acres. Keith Beatty was in attendance for the applicant. No one spoke in opposition. Motion by Moyer, seconded by Rainey, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Moyer, Rainey Wohl and Chairperson Moore NAYS: None The next item on the agenda was Case #PR15-00026 Public Hearing and Consideration of a revised preliminary plat for Hidden Creek, located north of Danforth Road, one-half mile east of Air Depot Boulevard. (Larry Tombs-Hidden Creek) Larry Tombs is requesting approval of a revised preliminary plat of Hidden Creek. The project is located west of Hidden Lake Section 2, north of Danforth Road. The property is zoned “A” Single Family Dwelling. The plat contains 21.8 acres and 59 single family lots. The lots are generally 80’ x 130’ (10,300 square feet or larger). The streets will be public. All the lots will be served with City water and sewer. Edmond Electric will serve the addition. The developer will provide for a 50 foot of right-of-way with a 20 foot utility easement along Danforth Road. Water will be extended offsite to Air Depot and will be extended to the far east property line. There is also a 10 foot easement on the east side of the property between Hidden Lake and the New Hidden Creek Addition. That easement will be in a 30 foot green belt between the two additions. There is at least 50 foot of setback between the two additions. The addition will include some common area for detention and median improvements. The sanitary sewer is also being extended offsite to the northeast from the Covell Valley Addition. Larry Tombs represented the application. He indicated that he was working on a project west of the subject plat that would involve a Mixed Use development with Planning Commission October 6, 2015 174 Single family office and retail. He described that the pipelines extending through the quarter section east of Air Depot were not suitable for single family development. He also indicated he was extending the utilities offsite to open the area up for development as suggested by the Edmond Plan. Commissioner Moyer complimented Mr. Tombs on his development proposal and the work that he had already accomplished to establish the project. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda was Case #ES15-00003 Public Hearing and Consideration of request to close the south six feet of a 20 foot wide utility easement on the north side of Lot 5, Block 22 of the Oak Tree Addition, Blocks 21-22. (William C. Palmer) Mr. Palmer would like to build a swimming pool in his backyard. His plans indicate that he needs to move some of the pool 6 feet into the 20 foot easement along the north side of his lot. This property is at 5617 Oak Tree Road. Mr. Palmer has already investigated utility line locations and is making arrangements with the gas company to accommodate their equipment close to the pool. No other utilities represent a conflict with this closing. Subject to the private utility company’s acceptance of the pool location, the south 6 feet of the 20 foot easement could be closed. Mr. Palmer was in attendance. No one spoke in opposition. Motion by Moyer, seconded by Rainey, to approve this request with the approval of ONG clearance. Motion carried by a vote of 4-0 as follows: AYES: Moyer, Rainey, Wohl and Chairperson Moore NAYS: None The next item on the agenda was Case #Z15-00028 Public Hearing and Consideration of Edmond Plan Amendment from Single Family usage to High Density Multi-Family usage, on the east side of Fretz Avenue, approximately a quarter of a mile south of Danforth Road. (Perth, LLC) The following general planning considerations represent some of the factors evaluated in reviewing justifications for Plan Map Amendments. 1. Infrastructure: City water is along the east side of Fretz Avenue, immediately adjacent to the property. Sanitary sewer lines are located on the west side of Fretz Avenue and will have to be accessed under Fretz Avenue and extended to the property. The existing house was built in 1949 and is planned to be demolished for the multi-family structure. Planning Commission October 6, 2015 175 2. Traffic: Fretz Avenue is a major collector street and one of the few such streets in Edmond, connecting Danforth Road to 33rd Street at least indirectly. There are no street improvements required except for the adequate drive approach and ADA sidewalks. If right-of-way is needed for these improvements this should be a requirement. 3. Existing zoning pattern: North – Single family South – “C-2” Multi-family (Edmond Plan Amendment 2005) East – Uni-City Mobile Home Park West – Meadow Lakes Addition 4. Land Use: North – Single family home South – Group home East – Mobile home West – Single family home 5. Density: 16 units per acre, 6 units if there is an appropriate site plan. 6. Land ownership pattern: North – Urban lot South – Urban lot size East – Mobile Home lot West – Urban lot 7. Physical features: Home on the property. 8. Special conditions: None 9. Location of Schools and School Land: Ida Freeman Elementary south of Meadow lakes, Edmond North High School is one half-mile north. 10. Compatibility to Edmond Plan: Very compatible with the plan as it has been amended. 11. Site Plan Review: Duplexes none and multi-family yes. Mr. Perth was in attendance. No one spoke in opposition. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None Planning Commission October 6, 2015 176 The next item on the agenda was Case # Z15-00029 Public Hearing and Consideration of Rezoning from “’A” Single Family to “C-3” High Density Residential & Commercial Services District on the east side of Fretz Avenue, approximately a quarter of a mile south of Danforth. (Perth, LLC) Eddie Panko representing Perth, LLC is requesting that a .46 acre tract (124 feet x 165 feet) be rezoned to multi-family. Seven units might be possible but are unlikely due to the drainage detention, parking and landscaping requirements. This location is just north of a multi-family parcel used for a group home and there is a mobile home park to the east of this site, which is multi-family density. There are other multi-family parcels to the north on Fretz Avenue. There is one other house, immediately north of the subject property. Meadow Lakes Addition is located to the west. Sanitary sewer lines are located on the west side of Fretz Avenue. City water is located immediately adjacent on Fretz Avenue. Fretz Avenue is a major collector street and is near a City Link Bus route. A site plan will be required for multi-family construction, if the developer planned for two duplexes, a site plan may not be required. This location seems suited for re-development for multi-family type units and there has already been multiple locations approved for apartment density. The existing house is planned to be removed. Mr. Perth was in attendance. No one spoke in opposition. Motion by Rainey, seconded by Moyer, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Moyer, Wohl and Chairperson Moore NAYS: None The next item on the agenda was: Case #SP13-00034 Public Hearing and Consideration of Site Plan extension for a McDonald’s restaurant, located on the south side of Covell Road and west of I-35. (McDonald’s) This site plan has been approved a little over 18 months ago and an extension is requested for the approval of the same plan originally approved. There are no amendments. Planning Commission previously considered this item on January 7, 2014 and approved it by a vote of 5-0. City Council considered this item on February 10, 2014 and approved the plan by a vote of 4-1. (Continued from Jan 27, 2015) Planning Department comments: 1. Existing zoning – “E-1” General Commercial PUD (PUD up to date as to the 5 year time limit for PUD’s) 2. Setbacks – The front setback is 57 feet from the property line, the east setback is 50 feet, the west setback is 74 feet and the rear yard setback is 68 feet. Planning Commission October 6, 2015 177 3. Height of buildings – 28 feet 4. Parking – 40 spaces are shown on the plans. There is seating for 87 persons. 5. Lot size – 37,728 square feet. The building is 4,365 square feet, the square footage listed is the gross building area. 6. Lighting Plan – A photometric lighting plan has been submitted, none of the light poles can exceed 24 feet in height, including the base. The light poles are 21 feet tall with the support posts being 3 feet tall. 7. Signage – Based on the I-35 Corridor standards, one ground sign is acceptable per ownership. 25 feet tall, 60 square feet including a pole cover matching the materials on the building (brick and stone) equal to 30% of the sign frame or sign size width. The pole cover will be brick matching the building exterior. Landscaping is required at the base of the sign equal to the square footage of the sign and could be counted toward the landscaping but is a separate requirement. Landscaping includes plant materials, not just grass. Directional signs or other accessory signs cannot include logos or names. All of the other wall signs planned meet code. 8. General architectural appearance – Combination of stone, brick veneer on all four sides of the building. Flat roof with mechanical equipment located on the roof, screened by the parapet wall. Some metal fascia at the parapet wall and/or wall sign location. 9. Sensitive borders – Not applicable, the land adjacent is zoned commercial or undeveloped/unplatted. The land to the west is undeveloped/unplatted and zoned single family but projected for commercial. 10. Mechanical equipment –The mechanical equipment will be located on the roof and will be screened by the parapet wall. There has been a detailed description given to the developer about low profile equipment, location on the roof, etc. to accomplish the screening standard. 11. Fencing/screening – The dumpster is located on the southwest corner of the property and will be screened with brick matching the building. Engineering Department comments: 12. Driveways, access management and paving– The Cross Timbers Park Southwest plat is being completed providing for the street for the commercial lots in this addition. Access will be provided off the new commercial street, Market Street and there will not be any curb cuts on Covell for the McDonald’s restaurant. Planning Commission October 6, 2015 178 13. Water and wastewater plans – Water and sewer lines were installed with the addition and will be connected for service. 14. Drainage detention and grading – The final plat is under construction for Cross Timbers Park Southwest applying to the subject property. The Cross Timbers Northwest is under construction on the north side of Covell Road. The detention location for the McDonald’s site is located on the north side of Covell in a detention area that will serve more than just one building site. Other than the street right-of-ways, runoff does not cross another property owner. Building and Fire Code Services comments: 15. Applicable Building Code, Fire Code and ADA – Fire Sprinkler- The building is required to be fire sprinkled. Fire Hydrant & Location – Approved Fire Department Access- Approved Fire Flow – Approved Gates – None shown or approved 16. Urban Forestry comments: McDonald’s received a variance which was reviewed by the City Council on February 10, 2015. The original plan did not provide the 10 foot wide improved landscape area along the east property line adjacent to Market Street. McDonald’s is proposing to install and maintain landscape in one of the median islands within Market Street. Medians within public right of way are dedicated to the City, unless such areas are platted to identify a specific owner. Waste Management comments: 17. Refuse facilities – The location for the solid waste enclosure will be okay as long as it meets Edmond Enclosure Specifications. Edmond Electric comments: 18. Electric – The developer representatives have been notified of required changes to the electric distribution. The primary cable route will need to be incorporated into the overall distribution for the Cross Timbers Park Southwest development and will utilize easements provided via the Plat. Planning Commission October 6, 2015 179 The location of the transformer will need to be repositioned in the southerly direction to obtain a minimum clearance of ten feet to the building due to type of construction. Adequate space is available to meet clearance requirements. Shawn McGraw with Red Plains Engineering represented the applicant. No one spoke in opposition. Motion by Rainey, seconded by Moyer, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Moyer, Wohl and Chairperson Moore NAYS: None The next item on the agenda was: Case #Z15-00023 Public Hearing and Consideration of Edmond Plan Amendment from Single Family Dwelling District to Commercial Planned Unit Development PUD located west of the Edmond School District property and north on Danforth Road. (Sid & Jabal Inc.–Victory Car Wash.) The following general planning considerations represent some of the factors evaluated in reviewing justifications for Plan Map Amendments. 1. Infrastructure: Water is available on Danforth Road along this property. Sewer is available to the east and to the west. The land is relatively flat, the owner should investigate sewer line depths. 2. Traffic: Danforth is a busy arterial street, there are a number of traffic generators in the area. The right-of-way requirement along Danforth Road is no less than 70 feet and may be more to meet the requirements of the Master Transportation Plan. The School District has a driveway just to the east of the property and the strip center has a driveway to the far west side of their property. There is a drive that accesses some of this property on the west side, immediately east of the property line for the strip shopping center. That driveway will need to be eliminated or improved as the only drive to the subject property meeting the best driveway separation standards. The subject should not have two drives and other than that standard it might be a little too early to pin down the driveway location for the subject parcel. 3. Existing zoning pattern: North – “A” Single family South – PUD Commercial “E-1” level East – “D-1” Restricted Commercial West – “D-1” Restricted Commercial 4. Land Use: North – School District storage building Planning Commission October 6, 2015 180 South – Hibdon Tire Center East – School District Administrative Office West – Strip Shopping Center 5. Density: N/A 6. Land ownership pattern: North – School District, 5 acres South – Retail lots, ½ acre of less East – School District, 7 acre plus West – Strip Shopping Center, 10 acres, Kop Kang the owner of the shopping center owns land to the north of the shopping center. 7. Physical features: The land is flat and has been used for a pasture. 8. Special conditions: None 9. Location of Schools and School Land: North High School, ½ mile east. 10. Compatibility to Edmond Plan: In accordance with the plan. 11. Site Plan Review: Site plan and special use permit is required if the PUD zoning is approved. If the car wash is not submitted the land could still be developed as light retail with the site plan. Motion by Wohl, seconded by Moyer, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Wohl, Moyer, Rainey and Chairperson Moore NAYS: None The next item on the agenda was: Case #Z15-00024 Public Hearing and Consideration of Rezoning from “A” Single Family to Commercial PUD located west of the Edmond School District property and north on Danforth. (Sid & Jabal Inc.–Victory Car Wash) Sid & Jabal Inc. would like the application to follow a procedure used with the Child Care Center recently approved as a PUD on Coltrane Road and North of Covell Road. That application was presented as a PUD describing the details of the Day Care Center but without the special use permit plans required. The Day Care on Coltrane Road will have to request a special use permit. This applicant would like to follow that procedure to ask if “D-1” level Commercial Use is appropriate on the two plus acre parcel, knowing that the primary use of the property will be for a car wash that requires a special use permit. The property is projected for the “D-1” Restricted Commercial on the Edmond Plan. There is a strip shopping center to the west and the school property is to the east, which was originally a shopping center and both are zoned “D1” Restricted Commercial. Hibdon Tire is located across the street to the south and it is at PUD allowing uses at an “E-1” General Commercial level. Planning Commission October 6, 2015 181 If the Planning Commission is not in favor of a car wash this request will need to be denied. The Staff will recommend the approval of a Special Use Permit due to the character of the area. The PUD will not be sufficient to allow a car wash because there is no site plan or special use permit application, if the Planning Commission wants to see an application prior to making a decision, then the matter will need to be continued and the applicant will need to complete the drainage plans, landscaping plans and all the other plans required for a full site plan. A draft copy of the site plan is available but not an official submittal. The applicant was hoping to save the cost of those plans, if the use is felt to be inappropriate. The Staff would suggest that while there are many “D-1” Restricted Commercial zoned areas not suitable for a special use permit this is probably not one of them. This location is strictly commercial. The School District has purchased the land to the north. There is a large commercial tract to the south, east of the Service Blake Soccer Fields. There are no single family homes adjacent to this property. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda was: Case #SP15-00019 Public Hearing and Consideration of Site Plan approval for additional buildings for Extra Space Storage at 820 South Kelly Avenue. (Extra Space Storage, LLC) Planning Department 1. Existing zoning – “E-1” General Commercial, over time outdoor storage has occurred at this location, which would require “E-2” Open Display zoning. The property contains 7.1 areas and with these additions the project will be completed and the outdoor storage will be corrected. 2. Setbacks – These buildings are set well off of Kelly Avenue. The neighborhood to the north is Terrace Addition and the single family to the northeast is Apple Village Addition and a mobile home park to the east. The buildings nearest to the homes or sensitive border boundary were built years ago (1996, prior to the Sensitive Border Standards). The one half of the 10th Street right-of-way was closed by ordinance #2578. The setback for the 11,997 square foot building built in the southeast corner does happen to meet the sensitive border standard of 70 feet, since it is lined up with the original buildings. There happens to be a utility easement on the east side of the property and that is why there is open space. The land to the south is zoned commercial and does not require sensitive border setback but the setback is 40 feet from the south. Building A setback is 13 foot from the north property line this meets the side yard setback and aligns up with the previously constructed buildings. Planning Commission October 6, 2015 182 3. Height of building – One building is indoor self-storage and office and is being considered for three story construction but the owner may decide on two story. The building will be 45 feet in height, if three story. There is no height limit on “E-1”. 4. Parking – The two story building is 12,000 square feet per plan but could be 36,000 square feet if three story. Most of the building is climate controlled self storage. There are 8 parking spaces near the building. 8 spaces were provided for one of the earlier buildings and there are parking spaces on the east side of the property for customer convenience. There will be no more outdoor storage for boats, motor homes, camper or outdoor materials, with the construction of the two 11, 993 square foot building in the southeast part of the property. 5. Lot size – 309,289 square feet, 7.1 acres 6. Lighting Plan – There will be no light poles for the additional construction. There will be wall packs on the building. The property will be fenced with a security fence. There is already a site proof fence on some of the north and east. 7. Signage – No new ground signs. The Extra Space Storage owns the access drive to Kelly Avenue. There will be a new wall sign. 8. General architectural appearance – The exterior of the main building, Building B is EIFS. Building A contains 9,975 square feet. Building B could be two or three stories and may contain up to 36,000 square feet. (12,000 square feet per floor). Building C and Building D located on the east side of the property, east of the detention area will contain 11,993 square feet in each building. Those buildings do contain a large number of outside doors with a textured metal panel framed around the doors. The east, west and north elevations also involve a textured metal panel, with additional wall surface treatment. The total square footage includes 69,961 square feet 9. Sensitive borders – Part of the property to the north is a single family house. A sight proof fence will be required along that portion of the property not already fenced. The property immediately southeast is the Apple Village Mobile Home Park, the property to immediate south is the Pines Business Park. 10. Mechanical equipment – Mechanical equipment will be screened if put on the roof of the main building. 11. Fencing/screening – The developer will install fencing next to the single family homes on the north, where there is not a fence. Planning Commission October 6, 2015 183 Engineering Department 12. Driveways, access management and paving – There will be no new driveways. Access management standards have been meet. 13. Water and wastewater plans – Water and sewer lines are adjacent for connection. New water lines and fire hydrants are being constructed for the buildings. 14. Drainage detention and grading – Drainage and detention plans have been submitted and reviewed. Common area B is a detention area. Building and Fire Code Services Applicable Building Code, Fire Code The three story building will be fire sprinkled and the other buildings will have adequate fire hydrants and water lines. Landscaping/Urban Forestry Landscaping for this project was evaluated for the entire property as a whole. 763 of the required plant units are from new plant material, as are 268 of the evergreen plant units. The rest of the required landscaping will be met through tree preservation. 15. Lot area = 309,289 sf % required = 10 Landscape area required: 30928.9 Frontage area required: 0 Total PU required: 2474 PU within frontage required: 0 Evergreen PU required: 990 16. SP Landscape area: 80,000 SP Frontage area: 0 SP Total PU: 2,474 SP PU within frontage: 0 SP Evergreen PU: 990 Solid Waste Department – A new enclosure will be needed for the three story building. 17. Edmond Electric Department – • Building A will be served from an existing pedestal located near the southwest corner of the adjacent building to the west. If the electrical load exceeds the capacity of the pedestal, the owner will be required to provide/install a new conduit to Edmond Electric’s specifications to support a new transformer/service. • Building B will be served from an existing transformer located near the northeast corner of the building. Planning Commission October 6, 2015 184 • Buildings C & D should be served from a common service established as part of the required relocation of underground electric. It is recommended the owner build a meter rack and distribute the required electricity from the customer owned distribution panel. Additional transformers will not be provided to serve Buildings C & D. Dr. Garzon asked if the property drained towards her dental office to the west. Jason Emmett, engineer with Cedar Creek Consulting said no, the property will drain towards the existing detention. Steve Manek, City Engineer verified this was correct. Dr. Garzon asked about the height of the building. “E-1” allows for 45 feet and in this case only three stories will be permitted. Motion by Rainey, seconded by Wohl, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Rainey, Wohl, Moyer and Chairperson Moore NAYS: None The next item on the agenda was: Case #SP15-00021 Public Hearing and Consideration of Site Plan approval for two commercial buildings at 401 S. Coltrane. (Coltrane Holdings, LLC) Planning Department 1. Existing zoning – “E-1” General Commercial 2. Setbacks – Based on the Master Transportation Plan at least 70 foot of right-ofway is needed on Coltrane Road and Coltrane Road is also a bike route, designated on the Bike Plan. The setbacks are measured from the property line, if 70 foot of right-of-way is provided the building is setback more than 50 feet from that right-of-way line. The Coltrane right-of-way is considered very important as a major street and bike way. The side yard to the south is 13 feet, the land developed to the south is commercial and this complies, the setback to the west is over 300 feet which fully complies and the setback to the north the 43 feet. The land surrounding this property is commercial there is no sensitive border condition. 3. Height of building – The height of the two story building is 40 feet and meets “E1” District Standards, the second building is one story and is about 20 feet. 4. Parking – There are two buildings planned and the square footage is as follows: Building 1 is 22,887 square feet and is two story, Building 2 is 10,836 and is one story. A total of 33,723 square feet. Eighty nine parking spaces have been provided for the warehouse with limited offices. 5. Lot size – 94,357 square feet Planning Commission October 6, 2015 185 6. Lighting Plan – Light poles are provided and will not exceed the 24 foot height including the base. 7. Signage – One ground sign will be permitted, 6 feet tall and 42 square feet plus wall signs. 8. General architectural appearance – The building is a combination of brick and trim materials. One building is two story and the other is one story but they both have 12/6 pitched roofs. Mechanical equipment will be located on the ground due to the pitched roof construction. 9. Sensitive borders – N/A 10. Mechanical equipment – Mechanical equipment will be located on the ground due to the pitched roof. 11. Fencing/screening – No fencing or screening is required. Engineering Department 12. Driveways, access management and paving – This site only has one drive approach that will meet the Assess Management Standard since the property has 328 feet of frontage. ADA sidewalks will be required. The right-of-way requirement is 70 foot from the center line based on the Master Transportation Plan. 13. Water and wastewater plans – Water and sewer are being extended on to the site for service. 14. Drainage detention and grading – The detention is provided in the northern part of the ownership. Plans have been submitted and reviewed. Building and Fire Code Services Applicable Building Code, Fire Code All buildings on the property will be fire sprinkled. We are looking at a water supply requirement of 2,750 gpm for 2 hours on a 10,000 sq. ft. Type V-B building and 4,000 gpm for 4 hours on a 23,000 sq. ft. Type V-B building. An 8-inch main with a 6-inch fire lead-in will most likely provide adequate water for the sprinkler systems however, we would like to at least see provision for looping the 8inch main for future construction. Planning Commission October 6, 2015 186 After a preliminary review, it is my opinion that the storage building will be an S-1 occupancy, not an S-2 and that it will require sprinkler protection. Landscaping/Urban Forestry 15. Lot area = 94,357 sf % required = 10 Landscape area required: 9435.7 Frontage area required: 4718 Total PU required: 755 PU within frontage required: 377 Evergreen PU required: 302 16. SP Landscape area: 14,079 SP Frontage area: 7,228 SP Total PU: 805 SP PU within frontage: 424 SP Evergreen PU: 559 Solid Waste Department – There is adequate space for a dumpster location pickup. Tenant spaces will not require their own dumpsters. 17. Edmond Electric Department – Edmond Electric will serve. Keith Beatty and Matt Wilson represented the applicant. No one spoke in opposition. Motion by Moyer, seconded by Rainey, to approve this request. Motion carried by a vote of 4-0 as follows: AYES: Moyer, Rainey, Wohl and Chairperson Moore NAYS: None The next item on the agenda was: Case #SP15-00026 Public Hearing and Consideration of Site Plan approval for the Homestead Shopping Center, Phase II, located on the northwest corner of Danforth Road and Santa Fe Avenue. (Danforth Development, LLC-Homestead Shopping Ctr.) Planning Department 1. Existing zoning – “D-1” Restricted Commercial 2. Setbacks – Front setback is 70 feet from the front property line, setback from the north property line is 50, setback from the south property line is 30 feet, and setback from the west is 73 feet from the property line. This is a sensitive border on the west side and the property compiles. 3. Height of building – Height of building is 21 feet and fully compliant. 4. Parking – Building square footage is 11,598 it requires 58 parking spaces. 58 spaces are provided. Bicycle spaces are shown and will be inspected by Jan Fees. Planning Commission October 6, 2015 187 5. Lot size – 57,844 square feet 6. Lighting Plan – There is an existing shopping center at this location and the light poles cannot exceed 20 feet in height including the base. There will be wall packs on the building. The Homestead Addition lies to the west. 7. Signage – One ground sign is proposed, 6 foot tall and 22 square feet per side. Wall signs will also be allowed to Code. 8. General architectural appearance – The building will follow the theme that has been started with mostly glass store fronts with brick and EIFS trim. There are brick and cast stone columns on the front. The back of the building is all EIFS. 9. Sensitive borders – Sensitive border to the west next to Homestead Addition. Light poles on the back of the addition cannot exceed 12 feet in height. A 73 foot setback has been establish, exceeding the 70 foot setback required. The dumpster is 25 feet from the west property line. If there were drive-in windows established on the north and south sides of the property those windows would not be adjacent to single family. The back of the building next to single family does have a fire lane and dumpster and parking but only walk through doors as required by the Building Code. There are no drive through on the back. The land to the north is another vacant commercial lot. 10. Mechanical equipment – Mechanical equipment will be located on the roof and will be screened by parapet walls. 11. Fencing/screening – There is already a site proof fence on the west. Engineering Department 12. Driveways, access management and paving – Driveways are already in place and are interconnected with adjoining uses. 13. Water and wastewater plans – Traffic signal at Homestead Shopping Center north of Danforth on Santa Fe was paid for by the developers. 14. Drainage detention and grading – Drainage detention has been done on an area wide bases and is in order. Building and Fire Code Services Applicable Building Code, Fire Code The building will be fire sprinkled. Site Plan has been reviewed; there is adequate emergency vehicle access. Planning Commission October 6, 2015 188 Landscaping/Urban Forestry 15. Lot area = 57,844 sf % required = 10 Landscape area required: 5,784.4 Frontage area required: 2,892 Total PU required: 463 PU within frontage required: 231 Evergreen PU required: 185 SP Landscape area: 12,000 SP Frontage area: 3,000 SP Total PU: 267 SP PU within frontage: 205 SP Evergreen PU: 80 The landscape buffer located along Santa Fe is only 7 foot wide and will require a variance from City Council. This buffer matches up with the existing development to the south, which also has a 7 foot landscape buffer. This project is currently deficient in total plant units by 196 and deficient in evergreen requirements by 72 plant units. The applicant would like to seek a variance to count existing trees on the west end of the site that are found within a utility easement. These trees would fulfill the total plant unit requirement. I will be going by the site this afternoon to verify whether they would also meet the evergreen requirement. 16. Solid Waste Department – Existing services. 17. Edmond Electric Department – Existing services. Keith Beatty represented the applicant. He indicated that they would continue to work on the landscaping but that the difficulty was fire lanes parking and driveways were already in place, limiting where the landscaping could go now, this limits where the landscaping could be situated using the current rules about the utility easements. Motion by Rainey, seconded by Moyer, to approve this request. Motion carried by a vote of 3-1 as follows: AYES: Rainey, Moyer and Wohl NAYS: Chairperson Moore There was no New Business. Motion by Rainey, seconded by Moyer, to adjourn. Motion carried by a vote of 4 - 0 as follows: AYES: Rainey, Moyer, Wohl and Chairperson Moore NAYS: None Meeting adjourned at 7:50 p.m. Planning Commission October 6, 2015 Barry K. Moore, Chairperson Edmond Planning Commission 189 Robert Schiermeyer, Secretary Edmond Planning Commission