Telecommunication Regulator of Cambodia (TRC) Prepared by Mr. IM VUTHA Director of Regulation & Dispute Unit Telecommunication Regulator of Cambodia TRC – 2015 Confidential 1 What is the Telecommunication Cable Network? 2 Any Means of Telecommunication Cabling Work 3 Current Situation of telecommunication Aerial Cable in Phnom Penh and the Reason Why it is still in Existence 4 Risks occurred from Aerial Cabling work 5 Solution and Advantage- Disadvantage 6 Measure, Experience, Recommendation, Plan, Conclusion and Discussion 2 TRC – 2015 Confidential Telecommunication Outside Plant Network : The part of Network that is physically located outside telecom company’s buildings or telecom operator’s buildings. This includes cables, supporting structures, certain equipment items such as load coil. Microwave towers, antennas, and cable-system repeaters are not considered on Outside plant. (page 549, NEWTON’S TELECOM DICTIONARY, OCT. 1998). 3 TRC – 2015 Confidential Cabling work is the installation, connection or maintenance (repair) of any wire, cable, optical fiber cable, tube or conduit that are connected, or intended to be connected, to a telecommunications network on the customer side of the network boundary. (page 120, NEWTON’S TELECOM DICTIONARY, OCT. 1998). 4 TRC – 2015 Confidential Overview of infrastructure Cabling system of Telecom Industry TRC – 2015 Confidential The Current Aspect / Situation in Phnom Penh City TRC – 2015 Confidential Locations where TRC’s Team Work do On-Site Inspection during May 2015 Kro Moun Sor And Preah Ang Duong Russian Avenues, Federation Sisovat Blvd. Blvld and Street 271 TRC – 2015 Confidential Norodom and Mao Tse Tong Blvds. Preah Neruh and Kampuchea Krom Blvds Oknha Klaing Moeurng Street and Preah Sihanuk Blvd Very messy like spider webs Out of orders and standards Why it become like those ? Come up from operators : • Do not care during the installation; • Do not follow up in accordance of technical standard; • During the maintenance or repairing their own cables, do not taken out the damaged cables; • Do not compliance with Environment Impact Standard; TRC – 2015 Confidential Come up from institutions of Poles Rental : • Inho Have right to rent the poles for Telecom Operators to hang; • Event those institutions are set up the standard and specifications for hanging on electrical poles or telephone poles for operators, but do not follow up and enforce to operation violation; • To allow all operators to hang their cables across the main road, Boulevard, and any road in city Why does Aerial Cable come to existence ? Several major factors are arising the aerial cable in the telecommunications sector today in Cambodia as below : a). b). c). d). e). f). Inadequate OSP infrastructure in place when new carriers are coming. A shift in business and commercial telephones to VOIP (Voice Over Internet Protocol) services, that is telephone via the Internet; Intense competition between ISPs Exponentially increases in Internet usage for communications of all types; Quick installation Lower cost than underground system TRC – 2015 Confidential What are risks which coming from the Current cable aspect/ situation ? Fire affects to Electricity Currents Messy in Phnom Penh and Cities RISK Traffic Obstacle and Road Accident TRC – 2015 Confidential Loose Quality because of Lightning, Wet and cut off by any means Why do we need to reform and strengthen this cable ? Need space for Public Constructions such as Sky Bridge or Skyway Etc. To ensure beauty and secure safety of people in Phnom Penh, Cities and Provinces within the whole country. To enforce the use of public infrastructure. To protect existing cable systems from being damaged as shown in previous presentations. Using underground cable means for outside plant network can provide quality, beauty, no environmental impact and improve the quality of network. TRC – 2015 Confidential Use Underground Tube Systems Choice 1 : Change to Underground Cable means Direct Buried to underground Solution Choice 2 : Change to Underground Cable means only at the main areas which crossing Blvds, Roads and Avenues and relocate Cable Aerials along the streets. TRC – 2015 Confidential Use the existing or new Underground tube Systems Use the totally insulated support to hang Cable Aerials along the streets. Direct Buried to underground TRC – 2015 Confidential ១២ Solution (Choice 1) TRC – 2015 Confidential Underground Cable Means (Choice 1) The act of burying in underground tube or direct burry are either expensive even if the operators are responsible by their own or rental from CFOCN/TC/Camintel Meet difficulties if we request permission to do cabling work and it is affect to mind set of people, environmental impact (Traffic, Beauty and Safety) during operation. TRC – 2015 Confidential Bury in Underground Tube System and relocate those cables which are crossing along the streets (Choice 2) Spend less if we relocate the cable laying across Blvds and Main Roads to underground system and modify the Cable Aerials System which are laying along the streets. It is applicable and not affect to people’s mindset and Social environment at the time of operation. TRC – 2015 Confidential TRC – 2015 Confidential N: 11°34'21.23“ & E: 104°55'24.30” Conner of Kramuon Sar Avenue and Norodom Blvd TRC – 2015 Confidential N: 11°34'13.24” & E: 104°55'27.66” Conner of Street 130 and Norodom Blvd TRC – 2015 Confidential Operators who complied with the Instruction Notification by MPTC, TRC and EDC to all Telecommunication Cable Operators Measuring and Instruction from Phnom Penh Municipality TRC – 2015 Confidential Basic Recommendations Minimize or stop laying new aerial cables, especially crossing over the roads and Blvds in Cities, Provinces and Phnom Penh. Should offers two solutions for the network of underground telecom- munication cables infrastructure which is crossing road: in urban areas operators are required to share (conduits, manhole or handhole & cables riser pipe), while other areas operators can work together on the basis of economic relations. All operators should coordinate with EDC and other relevant units to create the plan of arrangement and to compact the bundles aerial cable along the road in metropolitan area. Appoint a single operator/company to coordinate, implement and build the conduit system crossing the street. Specifically in urban areas which are required to be shared. Shall purchase cable with print in label name of company permanent on cable shield. TRC – 2015 Confidential Basic Recommendations Management of aerial cable is done by sorting bundle of compact, indicating type sign (cable tag) and maintaining the minimum span. Select proper cable types and accessories suitable with installation method and environment conditions. Promote efficiency in the preventive maintenance one’s own OSP network. Modify each span cable along the street by deploying the totally insulated support for all aerial cables together. Suitable poles will be used depending on the particular size and weight of cable. The aerial cables must be placed high enough to preserve safety in metropolitan areas TRC – 2015 Confidential Basic Recommendations Telco operators, ISPs and cable TV companies should adopt standards, new technologies, modern techniques for OSP network to intensify coordination and cooperation to ensure successful implementation to preserve the urban landscape for cleaner, safer and fresher atmosphere aimed at gradually moving to "Civilizations – Modernization”. Encourage Telco operators /ISPs to share the existing underground facilities infrastructure – if not, there won’t be enough space available for new construction. When constructing the network of underground telecommunication cables which are crossing main streets, we shall offer solutions to promote joint construction of the conduit system (infrastructure). Operators must ensure that all construction of new conduit system should be done in way that is available for future use (space for expansion). TRC – 2015 Confidential Inter-Ministry Committee Establishment Phnom Penh Capital Hall Ministry of Interior PPWSA EDC MPWT MPTP (Chairman) Ministry of Informati on TC TRC TRC – 2015 Confidential MLMUPC To control framework and technical standard for all kinds of telecom cable/other related Cable laying To adopt the master plan framework and technical standard relating with all kinds of telecom cable/other related Cable laying To enforce and issue the Decision, relating with All Kinds of Cable laying management to ensure the public beauty, safety and security. To penalty which person, who are violated the rules and decisions, which are issued by Government. Inter-Ministerial Technical Team Establish ment under inter-ministerial Committee Phnom Penh Capital Hall PPWSA Ministry of Interior EDC To draft the necessary regulatory frameworks for inter-ministry committee to endorsement as : MPWT MPTP (Chairman) TC PPDT TRC MLMUP C TRC – 2015 Confidential Ministry of Information Master Plan, Policy and Regulatory frameworks related with the all kinds of cable laying / installation. Technical Standard for the all kinds of cable laying / installation. The procedures for enforcement to which cable owner, which is violated the Master Plan, Policy, and regulatory framework in force. Schedule and work plan for implementation. As secretariat of Inter-ministry committee and direct executer in presenting the inter-ministry committee in accordance to Master Plan, Policy and Regulatory Frameworks, which are endorsed by Committee. Proposal Framework (August 2015 – 2016) Project Area Phase 1 Phase 2 Phase 3 Phase 4 Along Russian Federal Blvd (From PP International Airport to Preah Norodom Blvd.) Along Preah Norodom Blvd. (From Wat Phon to Preah Monivong Bridge) Along Preah Monivong Blvd. (From Preah Monivong Bradge to Chroy Chang Va Bridge) Along Mao Tse Tong Blvd. (From Preah Norodom Blvd. to TV Tower Toul Kork) TRC – 2015 Confidential Scope of Project Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Proposal Framework (August 2015 – 2016) Project Area Phase 5 Phase 6 Phase 7 Phase 8 Along Preah Sihanouk Blvd. (From Sky Bridge Stoeung Mean Chey to Independent Menoment) Along Street 271 (From 7 makara Sky Bridge to Monivong Sky Bridge) Along Kampuchea Krom Blvd. (From 7 Makara Sky Bride to Phsa Thmei) Along other Blvd. and Streets in whole Phnom Penh Capital TRC – 2015 Confidential Scope of Project Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Relocate every crossing road cables to Underground. Use totally Insulated support with all existing aerial telecom Cables (along the road). Promote the use of common infrastructure Support all development of infrastructure to the high efficiency, quality and reasonable price which is match with Economical and Environmental protection acts and meets people’s need and ensure beauty of Cities Provinces and Capital City as good as the given name “the Kingdom of Wonder” (Clean City and Good Services!!!!!!!) Remind all operators about the risks and accidents which cause to the lost of Beauty, Social impact occurred resulting from Aerial Cabling work with no standard and Environmental impact TRC – 2015 Confidential ២០ TRC – 2015 Confidential