An Example of Performance Based Logistics (Fighter Avionics Upgrade) Dale Waldo 314-705-1865 Last Rev. 5/10/99 by DFW Requirements • • • • Implement F3I Guaranteed mission capability rate Support peace and war time scenarios USAF/Contractor forms partnership for sustainment over the system life cycle • Affordable cost to USAF Implements F3I Requirements • Performance based specifications – Form, Fit, Function Interface (F3I) – ‘How to’ responsibility given to Contractor • Contractor Depot Maintenance – Helps mitigate the risk of short lived technologies – Contractor has configuration control internal to LRU • Facilitates technology insertion • Utilizes Trigger Based Item Management (TBIM) Process – Provides for trends and targets actions that provide high payoff – ‘Proactive’ rather than ‘reactive’ management Ref. PBBE Flexible Sustainment Guide https://acc.dau.mil/GetAttachment.aspx?id=19314&pname=file&lang=en-US&aid=980 - Elements of PBL (Continued) • Proper O level maintainer training and technical information – Tech Pubs (plane side repair data) updated during EMD – CFR/CFI system update; deployment during OT&E – All technical information evaluated vs “as designed” – Inclusive Diagnostic System at all levels of assembly • Automated configuration management required – For tracking: Base Aircraft LRU SRU Critical Component – Manage parts inventory – Tracking of bad actor hardware, remove when necessary PBL Implements F3I Criterion Availability: When you need it you will have it! Base X Flightline Actual On-Aircraft Mean Repair Time (MRT)< 45 Minutes BASE SUPPLY Shipping & Receiving 5 Hrs 5 1 Removal Defective LRU 3 Install Good LRU 2 0 Hrs - Receives Bad LRU - Generates DIFM via CAMS Spare 4 -- Issues Picks Up Bad LRU - Sends Bad LRU to Shipping Maint. Tech Exchanges Bad LRU for Spare 8 Hrs AMU Support Section Shared Responsibility is Key to Success • Contractor - Provide adequate spares based upon MTBMA • USAF and Contractor - Minimize Mean Down Time (MDT) – USAF - 45 Minute MTTR – Contractor - 5 Hour stores replenishment time (for spares) – USAF - 8 Hours for local transportation, preparation of maintenance action and requisition forms, pack and ship • Technical Performance Measurands will be implemented to help manage the program, minimize MDT Maintenance Concept Organizational Level Tasks a DTM is similar to a thumb drive Serial Numbers & BIT Matrices DTM Transfer • Remove/Replace Failed LRU Skill LvL 3 Technician CFRS/CFI 1) CFRS - Determine existence of fault. 2) CFI - Determine most likely cause of fault. Identify corrective action to be performed. • Perform Additional Troubleshooting Procedure and Repair System • Perform System Verification PMA Maintainer Always Receives Positive Action From Technical Data (e.g. Next Action). CFR/CFI System • Proposed Process CFR / CFI (Eliminates need for Fault Isolation Tech manual) Identify Corrective Action Required How is this Done? If “How To” instructions are not required Is the Fault Corrected? DTM PMA CFRS/CFI CFR/CFI System Wiring Diagram on the Fly Job Guide Job Guide Functional Requirements • Automated Fault Detection – Provided by on-aircraft system BIT and supplemented with CFRS – Accomplished via updates to WIN-95 CFRS • Automated Fault Isolation capability – Provides “POSITIVE ACTION” to maintainer – Electronic automated tool implementation includes Digital Wire Diagrams • Currently done with paper manuals today • Automated data collection – Enables collection and manipulation of data collected – Includes maintenance corrective action and parametric information Advantages • CFI data base can readily be updated in 1-2 weeks time frame – Not Tech Pubs update dependent (months/years time frame for paper update) – Maintainer now gets real time data to help isolate failures • Portable Maintenance Aid (PMA) compatible • Deletes paper Fault Isolation/Wiring Diagram (FI/WD) manuals * BAD LRU RETURNED FOR REPAIR 2 DAYS FROM Air Base REPAIR DEPOT PROCESS CFRS/CFI BAD SRU SRU REPAIR ASSET MANAGEMENT •PREPARE TASK ORDER PACKAGE •TRACK REPAIR • OBTAIN SHIPPING INSTRUCTIONS • PROCESS GFP DOC. SHIPPING & RECEIVING LRU REPAIR 7 DAYS AVERAGE •CONFIRM FAILURE •REPLACE BAD SRU •LRU TEST •CONFIRM FIX •INSPECT SRU SPARES SPARE PARTS 2 DAYSTO Air Base RFI LRU SHIPPED PER ASSET MANAGEMENT INSTRUCTIONS SRU REPAIR 60 DAYS REPAIRED SRU Asset Manager Mountain AFB Langley AFB Edwards AFB (Middleware Merge Engine) LRU / SRU Field Configuration Database Nellis AFB Eglin AFB Elmendorf AFB Property Management Database Lakenheath RAF Base Supply / Trans. Databases Core Automated Maintenance System (CAMS) FRACAS Database Airborne Database Asset Manager CFR/CFI/DWDS Database SPO WPAFB DEPOT WRALC Federal Express Database Middleware Merge Engine Base Supply / Transportation Program Office Asset Management Data Information Screens Contractor Asset Manager Supplier Depot Field Operations USAFE PACAF Growth Asset Manager Field Level Metrics • • • • • • System Readiness or Availability Rate System MTBMA (less -120 Antenna) Mean Down Time per Maintenance Action LRU Demand Rates System CND Rate Average Duration from JCN Issue to Part Received by Commercial Shipper • Percent JCNs Awaiting Parts - Off Station • Average Active Maintenance Time for Troubleshooting and Repair • Average Repair Turn-Around Time Base Dock to Base Dock Depot Metrics • • • • • • • • • • • • • • • LRU Repair Rates Number of broken warranty seals on returns Number of Units in Pipeline Average Duration of LRUs in Transit Average Turn-Around Time by Facility BCS/RTOK Rates Depot Test Voids/Total Test Required Number of Parts Produced by Single Source Technology Obsolescence Projections Number of Obsolete Part Types in Field Percent JCNs Awaiting Parts Current Value of Repair Inventory Repair Station Availability Rates & Excess Capacity Number of Open Engineering Investigations Number of Outstanding BIT ECRAs and Time Outstanding Questions?