An Example of Performance Based
Logistics
(Fighter Avionics Upgrade)
Dale Waldo
314-705-1865
Last Rev. 5/10/99 by DFW
Requirements
•
•
•
•
Implement F3I
Guaranteed mission capability rate
Support peace and war time scenarios
USAF/Contractor forms partnership for
sustainment over the system life cycle
• Affordable cost to USAF
Implements F3I Requirements
• Performance based specifications
– Form, Fit, Function Interface (F3I)
– ‘How to’ responsibility given to Contractor
• Contractor Depot Maintenance
– Helps mitigate the risk of short lived technologies
– Contractor has configuration control internal to LRU
• Facilitates technology insertion
• Utilizes Trigger Based Item Management (TBIM)
Process
– Provides for trends and targets actions that provide high payoff
– ‘Proactive’ rather than ‘reactive’ management
Ref. PBBE Flexible Sustainment Guide
https://acc.dau.mil/GetAttachment.aspx?id=19314&pname=file&lang=en-US&aid=980 -
Elements of PBL
(Continued)
• Proper O level maintainer training and technical information
– Tech Pubs (plane side repair data) updated during EMD
– CFR/CFI system update; deployment during OT&E
– All technical information evaluated vs “as designed”
– Inclusive Diagnostic System at all levels of assembly
• Automated configuration management required
– For tracking:
Base
Aircraft
LRU
SRU
Critical Component
– Manage parts inventory
– Tracking of bad actor hardware, remove when necessary
PBL Implements F3I Criterion
Availability:
When you need it you will have it!
Base X Flightline
Actual On-Aircraft Mean Repair
Time (MRT)< 45 Minutes
BASE SUPPLY
Shipping
& Receiving
5 Hrs
5
1
Removal
Defective
LRU
3
Install
Good
LRU
2
0 Hrs
- Receives Bad LRU
- Generates DIFM
via CAMS
Spare
4 -- Issues
Picks Up Bad LRU
- Sends Bad LRU to
Shipping
Maint. Tech
Exchanges Bad
LRU for Spare
8 Hrs
AMU Support Section
Shared Responsibility is Key to Success
• Contractor - Provide adequate spares based upon MTBMA
• USAF and Contractor - Minimize Mean Down Time (MDT)
– USAF - 45 Minute MTTR
– Contractor - 5 Hour stores replenishment time (for spares)
– USAF - 8 Hours for local transportation, preparation of
maintenance action and requisition forms,
pack and ship
• Technical Performance Measurands will be implemented to help
manage the program, minimize MDT
Maintenance Concept
Organizational Level Tasks
a DTM is similar
to a thumb drive
Serial Numbers & BIT Matrices
DTM Transfer
• Remove/Replace
Failed LRU
Skill LvL 3
Technician
CFRS/CFI
1) CFRS - Determine
existence of fault.
2) CFI - Determine most
likely cause of fault.
Identify corrective action
to be performed.
• Perform Additional
Troubleshooting Procedure
and Repair System
• Perform System Verification
PMA
Maintainer Always Receives Positive
Action From Technical Data (e.g. Next
Action).
CFR/CFI System
• Proposed Process
CFR / CFI
(Eliminates need for Fault Isolation Tech manual)
Identify Corrective
Action Required
How is this Done?
If “How To” instructions are not required
Is the Fault Corrected?
DTM
PMA
CFRS/CFI
CFR/CFI System
Wiring Diagram on the Fly
Job Guide
Job Guide
Functional Requirements
• Automated Fault Detection
– Provided by on-aircraft system BIT and supplemented with
CFRS
– Accomplished via updates to WIN-95 CFRS
• Automated Fault Isolation capability
– Provides “POSITIVE ACTION” to maintainer
– Electronic automated tool implementation includes Digital
Wire Diagrams
• Currently done with paper manuals today
• Automated data collection
– Enables collection and manipulation of data collected
– Includes maintenance corrective action and parametric
information
Advantages
• CFI data base can readily be updated in 1-2
weeks time frame
– Not Tech Pubs update dependent (months/years
time frame for paper update)
– Maintainer now gets real time data to help isolate
failures
• Portable Maintenance Aid (PMA) compatible
• Deletes paper Fault Isolation/Wiring Diagram
(FI/WD) manuals
* BAD LRU RETURNED
FOR REPAIR
2 DAYS FROM Air Base
REPAIR DEPOT PROCESS
CFRS/CFI
BAD SRU
SRU REPAIR
ASSET MANAGEMENT
•PREPARE TASK
ORDER PACKAGE
•TRACK REPAIR
• OBTAIN SHIPPING
INSTRUCTIONS
• PROCESS GFP DOC.
SHIPPING
& RECEIVING
LRU REPAIR
7 DAYS AVERAGE
•CONFIRM FAILURE
•REPLACE BAD SRU
•LRU TEST
•CONFIRM FIX
•INSPECT
SRU SPARES
SPARE PARTS
2 DAYSTO Air Base
RFI LRU SHIPPED
PER ASSET MANAGEMENT
INSTRUCTIONS
SRU REPAIR
60 DAYS
REPAIRED SRU
Asset Manager
Mountain AFB
Langley AFB
Edwards AFB
(Middleware Merge Engine)
LRU / SRU Field
Configuration Database
Nellis AFB
Eglin AFB
Elmendorf AFB
Property
Management
Database
Lakenheath RAF
Base Supply / Trans.
Databases
Core Automated
Maintenance System
(CAMS)
FRACAS
Database
Airborne
Database
Asset Manager
CFR/CFI/DWDS
Database
SPO
WPAFB
DEPOT
WRALC
Federal Express
Database
Middleware
Merge Engine
Base Supply /
Transportation
Program Office
Asset Management Data Information Screens
Contractor
Asset Manager
Supplier Depot
Field Operations
USAFE
PACAF
Growth
Asset Manager Field Level Metrics
•
•
•
•
•
•
System Readiness or Availability Rate
System MTBMA (less -120 Antenna)
Mean Down Time per Maintenance Action
LRU Demand Rates
System CND Rate
Average Duration from JCN Issue to Part Received by
Commercial Shipper
• Percent JCNs Awaiting Parts - Off Station
• Average Active Maintenance Time for Troubleshooting and
Repair
• Average Repair Turn-Around Time Base Dock to Base Dock
Depot Metrics
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
LRU Repair Rates
Number of broken warranty seals on returns
Number of Units in Pipeline
Average Duration of LRUs in Transit
Average Turn-Around Time by Facility
BCS/RTOK Rates
Depot Test Voids/Total Test Required
Number of Parts Produced by Single Source
Technology Obsolescence Projections
Number of Obsolete Part Types in Field
Percent JCNs Awaiting Parts
Current Value of Repair Inventory
Repair Station Availability Rates & Excess Capacity
Number of Open Engineering Investigations
Number of Outstanding BIT ECRAs and Time Outstanding