The Simple Early Mining Life
Tailings – Brisbane 28/02/06
2
Before TSFs – Sand Dumps
Tailings – Brisbane 28/02/06
3
The Simple Life – Cocopan Haulage
Tailings – Brisbane 28/02/06
4
Before Tailings Pumping Systems
Tailings – Brisbane 28/02/06
5
Early TSF Construction
Tailings – Brisbane 28/02/06
6
TAILINGS STORAGE FACILITIES
 Named a TSF
 Includes:
Storage walls and footprint
Slurry pipelines
Return water dam
Return water system
 But they do not always “store” the
tailings
Tailings – Brisbane 28/02/06
7
Kalgoorlie before Kaltails
Wind and Water Erosion
Tailings – Brisbane 28/02/06
8
TSFs
 Largest dams ever built – seen from
space
 Unlike water dams, have to last “for
ever”
 Normally built progressively over a long
period – up to 50 years
 Often built with non-engineering
materials
 Should be considered as a living entity
Tailings – Brisbane 28/02/06
9
20 Years On using Tailings!
Upstream raised gold TSF
Tailings – Brisbane 28/02/06
10
Mining Realities
 Mining a continuous operation
 TSF at the back end of the operation
 Generally “out of sight and out of mind”
 A cash consumer, not a cash contributor
 A source of “constipation” when they go
wrong
 Do it right the first time!!!
Tailings – Brisbane 28/02/06
11
TSF Failures
 At least 2 TSF failures reported
annually
 Many more not reported
 Failure includes:
Wall failure
Wall breach
Overtopping
Release of contaminated liquor
Contaminated seepage
Tailings – Brisbane 28/02/06
12
Unreported Wall Failure
Out of Sight
Tailings – Brisbane 28/02/06
13
Unreported TSF Failure
No Injuries
Tailings – Brisbane 28/02/06
14
Unreported Contaminated Flow
“Contained”
Tailings – Brisbane 28/02/06
15
In-River Tailings Disposal
In river
Tailings – Brisbane 28/02/06
16
Result of Failures?
 Poor public perception
Omai
Baie Mare
Marcopper
Los Frailes
 Leads to a lack of trust
Tailings – Brisbane 28/02/06
17
Failures
 No TSF failures are unexpected
 All failures can be predicted with
hindsight
 Failures due to one or more of:
Poor design
Poor construction management
Poor operation
Changing management during
operation
Lack of rigorous and regular
inspection
Tailings – Brisbane 28/02/06
18
OUR DUTY AS DESIGNERS
 Carry out a rigorous design
 Provide the owner with clear
operating guidelines
 Stand-up for our role
 Record, assess and advise
Tailings – Brisbane 28/02/06
19
Appropriate Tailings Disposal
 Design must:
Meet project requirements
Satisfy legislative standards
Follow current engineering
knowledge
Look to better environmental
expectations
Tailings – Brisbane 28/02/06
20
Transportation
 Low solids content slurry
 High solids slurry
 Paste
 Cake
 Dry
Tailings – Brisbane 28/02/06
21
Ash - 12% Solids
Tailings – Brisbane 28/02/06
22
Diamonds - 45% Solids
Tailings – Brisbane 28/02/06
23
Gold - 70% Solids
Tailings – Brisbane 28/02/06
24
Tailings Placement
 Pumping
Low solids content
High solids content
 Conveying
 Trucking or railing
Tailings – Brisbane 28/02/06
25
Conventional
2 Stage Pumping for Codisposal
Tailings – Brisbane 28/02/06
26
Paste
1 MW Diaphragm Positive
Displacement Pump - Flyash
Tailings – Brisbane 28/02/06
27
Conveying
Dry
Flyash
Flyash
Dewatered
Tailings
Tailings – Brisbane 28/02/06
28
Trucking
Flyash
Tailings – Brisbane 28/02/06
29
Why Change?
 The drier the tailings the lower:
Water losses
Chemical losses
Risks of environmental contamination
Rehabilitation costs
 Increased risk of:
Dust
Erosion
Tailings – Brisbane 28/02/06
30
Dust & Erosion
Dust
Erosion
Tailings – Brisbane 28/02/06
31
Understand the Tailings
 Seepage
 Water quality
 Dust
 Radiation
 Instability
 Geomorphological processes
Tailings – Brisbane 28/02/06
32
Seepage in a Dry Environment
HDPE Liner to reduce Seepage
Tailings – Brisbane 28/02/06
33
Radiation
Subaqueous to reduce Radiation
Tailings – Brisbane 28/02/06
34
Accidents do Happen!!
The Human Element
Tailings – Brisbane 28/02/06
35
Mine Expansion
 Two mining realities:
The full tonnage is achieved well
ahead of schedule
More ore is found
 SO:
Plan for full tonnage earlier
Consider expansion
• Do not limit expansion through
design
• Consider the next TSF site
Tailings – Brisbane 28/02/06
36
Conclusion
 Endeavour to place tailings back
in mine
Legislated in California
 Plan for tailings retreatment
 Provide comprehensive
Operational Management
Documentation
Tailings – Brisbane 28/02/06
37
Coal Tailings In Final Void
Tailings – Brisbane 28/02/06
38
Paste Backfilling Underground
Paste Backfill
Tailings – Brisbane 28/02/06
39
In-Pit Codisposal - Gold
Tailings
Tailings – Brisbane 28/02/06
Waste
40
The End
My thanks to:
Fraser Alexander for old photos
Mining clients for use of project photos
Various authors quoted without reference
My colleagues who keep me on my toes!!??
Tailings – Brisbane 28/02/06
41
Download