Program Implementation Plan First State Level Steering Committee Meeting – 13th May 10 Digital Equalizer DE Orissa from informing minds to forming minds Decentralized Resource Centre Training Model District Spread SCERT Resource Centre IASE DIET Resource Centre’s School Distribution SCERT SOUTHERN ZONE Ganjam & Gajapati DPIASE, BERHAMPUR Secondary Schools-10 NORTHERN ZONE Sambalpur & Bargarh CENTRAL ZONE Cuttack & Kendrapada DIET, KHALIKOTE RNIASE, CUTTACK DIET, DOLIPUR PMIASE, DIET, SAMBALPUR SAMBALPUR Primary Schools -20 Secondary Schools-32 Primary Schools -10 Secondary Schools-8 Primary Schools -22 Objectives To empower teacher educators, teachers with appropriate knowledge base and technical expertise To develop a state resource group on computer supported learning and instruction Meaningful utilization of educational resources available in the Internet and other sources for teaching-learning purposes Progressive automation of the school administration Mastering the basic applications of IT. Use of Internet and other educational resource materials for developing lesson designs Building the capacity of teachers so that each teacher design innovative lesson plans through effective integration of technology Build up educational resources for their wider diffusion and adoption in government schools for teaching-learning purposes. Overall Picture Schools: 104 Total Number of Teachers: 923 Total Number of Teachers to be Trained: 646 To be Trained at the Resource Centre’s: 452 in the first Year To be trained in the Second Year – 646 as part of refresher training Total Number of Students: 31761 Total Number of Teacher Educators to be Trained: 128 Total Number of Administrators to be Trained: 124 Districts: 6 – Bargarh, Sambalpur, Cuttack, Kendrapda, Ganjam and Gajapati Headcount: 8 Trainers / 1 ZC Monitoring / 3 Senior Monitoring Experts / 2 Junior Monitoring Experts Program Duration – 2 Years Organogram Partnership Model Directorate of TE & SCERT will be the nodal office for all training activities. Board of Secondary Education, Orissa, Directorate of Secondary Education, Orissa, Orissa Primary Education Programme Authority (OPEPA) and American India Foundation Trust (AIFT) will be the main partners. Parent Teacher Association of School (PTA), are other stakeholders in the implementation of the project. School Break-UP Primary Schools Overall Figures District wise-Teachers & Students (Primary Schools) District Cuttack No of Selected Schools Total No of Teachers To be trained by Trained at the trained teachers at Target Teachers (70%) Resource Centre school level Total No of Students 5 30 1069 21 20 1 5 38 963 27 20 7 Sub Total 10 68 2032 48 40 8 Gajapati 10 50 1698 35 40 -5 Ganjam 10 75 4174 52 40 12 Sub Total 20 125 5872 87 80 7 Bargarh 11 70 3052 49 44 5 Sambalpur 11 67 2174 47 44 3 Sub Total 22 137 5226 96 88 8 Total 52 330 13130 231 208 23 Central Zone Kendrapada Southern Zone Northern Zone Secondary Schools Overall Figures District wise-Teachers & Students - Secondary Schools District Cuttack No of Selected Schools Total No of Teachers Total No of Trained at the To be trained by trained teachers Students Target Teachers (70%) Resource Centre at school level 4755 112 52 60 13 161 Kendrapara 19 167 4994 117 76 41 Sub Total 32 328 9749 229 128 101 4 65 2187 45 24 21 6 94 3941 66 36 30 Sub Total 10 159 6128 111 60 51 Baragarh 7 76 1803 53 42 11 Sambalpur 1 14 518 10 6 4 Sub Total 8 90 2321 63 48 15 50 577 18198 403 236 167 Central Zone Gajapati Southern Zone Ganjam Western Zone Total Decision to be taken on the following points Primary school selection and lab to be set up by when? Secondary school computers to be ready by when? Ganjam District Padmanabhava HS / Padmanabhapur? National HS Dura? / CD Writer Training for teacher facilitators for Sec Schools – letter needs to be issued by Dir Secondary Letter to the school heads from the respective authorities informing them about their inclusion as part of the DE Program Zonal Level Sensitization Workshop for HMs Overall Figures Statistics DE Orissa SI No District Name of the school Number of teachers Total no of teachers in the school 1 2 3 4 5 6 Cuttack Kendrapara Ganjam Gajapati Sambalpur Bargarh Enrolled in DE Number of students trained in the program Trained in DE for 1 year 13 Schools (Secondary) 161 4755 05 Schools (Upper Primary) 30 19 Schools (Secondary) 167 05 Schools (Upper Primary) 38 06 Schools (Secondary) 94 3941 10 Schools (Upper Primary) 75 4174 04 Schools (Secondary) 65 2187 10 Schools (Upper Primary) 50 01 School (Secondary) 14 518 11 Schools (Upper Primary) 67 2174 07 Schools (Secondary) 76 1803 11Schools (Upper Primary) 102 Schools 70 907 1069 4994 963 1698 3052 31328 for 2 years for 3 years Training Details Snapshot View Training Details-Resource Centre wise Sl. No. Training Centre No. of Secondary Schools 1 RNIASE,CTC 32 2 DIET,Dolipur 3 IASE,Sambalpur 4 DIET, Sambalpur 5 IASE,Berhampur 6 DIET,Khalikot No. of Upper Primary Schools 10 08 22 10 20 Total nos. of teachers Total nos. of target No. of teachers teachers (70%) for to be trained at Secondary Schools the Resource and Primary Centre/Enrolled Schools/Enrolled RC - Breakup (HM)+ (No. of Teachers) No of teachers to be trained by trained teacher as per a cascade model of training for Secondary Schools/Enrolled 328 229 128 (1+3)=4 101 68 48 40 (1+3)=4 08 90 63 48 (1+5)=6 15 137 96 88 (1+3)=4 08 159 111 60 (1+5)=6 51 125 87 80 (1+3)=4 07 907 634 444 190 SCERT Training Calendar for Teacher Educators (3 IASEs, 3 DIETs, 10 Master Trainers SCERT) – Phase I 1st Batch June (1-4) June (7-11) June (21-25) June (28-30) & July(1) 2nd Batch July(5-8) July(19-23) July(26-29) Aug(2-5) Refresher Session Batch Date 1st Batch OCT (20-21) 2nd Batch OCT (26-27) Batch No. Faculties from 3 IASEs Faculties from 3 DIETS (Khalikot, Dolipur, Sambalpur ) Master Trainers from SCERT Total No. of Participants 1st 15 6 5 26 2nd 15 6 5 26 52 Batch Break-up Training Calendar for Teacher Educators (9 CTEs & 10 DIETs) – Phase II 1st Batch Aug(9-12) Aug(16-20) Aug(23-27) Sept(6-9) 2nd Batch Sept(13-16) Sept(20-24) Sept(27-30) & Nov(1) Nov(8-11) 3rd Batch Nov(22-25) Nov(29-30) & Dec(1-3) Dec(6-10) Dec(13-16) 4th Batch Dec(20-23) Dec(27-31) Jan(3-7) Jan(10-13) 5th Batch Jan(17-20) Feb (1-5) Feb (7-11) Feb (14-17) Feb (21-24) Mar(1-5) Mar(7-11) Mar(14-17) th 6 Batch Refresher Session Batch Date 1st Batch Oct (11-12) 2nd Batch Nov (18-19) 3rd Batch Jan (24-25) 4th Batch Jan (28-29) 5th Batch Mar (22-23) 6th Batch Mar (25-26) Batch No. Faculties from 9 CTEs (each 4) Faculties from rest 10 DIETS (each 4) Total No. of Participants 1st 6 8 14 2nd 6 8 14 3rd 6 6 12 4th 6 6 12 5th 6 6 12 6th 6 6 12 Total 36 40 76 Batch Break-up Special Training Calendar for CIs, DIs and DPCs Batch 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Batch Jun-18 Sept.-03 Dec-04 - 2nd Batch Jun-26 Sept.-18 Dec-18 - 3rd Batch July-02 Sept.-25 Dec-24 - July-09 Oct-01 Jan-08 July-17 Oct-08 Jan-15 July-24 Oct-29 Jan-21 Aug-06 Nov-06 Feb-12 Aug-21 Nov-20 Feb-18 Aug-28 Nov-27 Feb-26 4th Batch 5th Batch 6th Batch 7th Batch 8th Batch 9th Batch - Batch No. CI DI DPC Total No. of Participants 1st 2 9 4 15 2nd 2 9 4 15 3rd 2 9 4 15 4th 3 8 3 14 5th 2 8 3 13 6th 2 8 3 13 7th 2 8 3 13 8th 2 8 3 13 9th 2 8 3 13 Total 19 75 30 124 Batch Break-up Module Breakup – Administrators Pedagogy Time Technology Time Peep into DE 45 Mins Introduction to Computer 30 Mins. Brain Based Learning 1 Hr. 00 Mins. Self Esteem 45 mins. Ms Word 1 Hr. 00 Mins Critical Thinking 2 Hrs. 00 Mins Ms Excel 1 Hr. 00 Mins Creative Thinking 2 Hrs. 00 Mins. Ms Power Point 1 Hr. 00 Mins Multiple Intelligence 2 Hrs. 00 Mins. Internet 1 Hr. 00 Mins. Collaborative Learning 1 Hr. 30 Mins Integrating Technology 1 Hr. 00 Mins. Project Based Learning 2 Hrs. 00 Mins Total 12 Hrs. 00 mins Basics of Ms-Windows Total Session Time 30 Mins. 6 Hrs. 00 Mins 18 Hrs. 00 Mins. Day Wise Break Up Days Pedagogy Time Technology Time Total Time Slot 1 Peep into DE, Brain Based Learning, Self Esteem, Critical Thinking (Session 1 &2) 4 Hrs. Introduction to Computer, Ms-Windows, Ms Paint, Ms Word 2 Hrs. 6 Hrs. 2 Critical Thinking (Session 3), Creative Thinking, Multiple Intelligence (1,2&3) 4 Hrs. Ms Excel , Ms Power Point 2 Hrs. 6 Hrs. 3 Multiple Intelligence (Session 4), Collaborative Learning, Project Based Learning 4Hrs. Integrating Technology, Internet 2 Hrs. 6 Hrs. 12 Hrs. 6 Hrs. 18 Hrs. SCERT Quarter Wise Training Details SCERT Training Breakup (Teacher Educators) Q-1 (Apr.-Jun.) Faculties from 3 IASEs (15) + Faculties from 3 DIETs (Khalikot, Dolipur, Sambalpur ) (6) + Master Trainers from SCERT (5) = 26 Q-2 (Jul.-Sep.) Q-3 (Oct.-Dec.) Q-4 (Jan.-Mar.) Faculties from 3 IASEs (15) + Faculties from 3 DIETs (Khalikot, Dolipur, Sambalpur ) (6) + Master Trainers from SCERT (5) +Faculties from 9 CTEs (12) + Faculties from 10 DIETs (16) = 54 Faculties from 9 CTEs (6) + Faculties from 10 DIETs (6) + (Refresher Session for ) Faculties from 3 IASEs (30) + Faculties from 3 DIETs (Khalikot, Dolipur, Sambalpur ) (12) + Master Trainers from SCERT (10)+ (Refresher Session for ) Faculties from 9 CTEs (12) + Faculties from 10 DIETs (16) = 92 Faculties from 9 CTEs (18) + Faculties from 10 DIETs (18) + (Refresher Session for ) Faculties from 9 CTEs (24) + Faculties from 10 DIETs (24) = 84 SCERT Special Training Breakup (Adminstrators) Q-1 (Apr.-Jun.) Q-2 (Jul.-Sep.) Q-3 (Oct.-Dec.) Q-4 (Jan.-Mar.) CIs (4) + DIs (18) + DPCs (8) = 30 CIs (21) + DIs (84) + DPCs (34) = 139 CIs (19) + DIs (75) + DPCs (30) = 124 CIs (13) + DIs (48) + DPCs (18) = 79 Decision to be taken on the following points SCERT lab to be ready by when? Other labs to be ready by when (3 IASEs/3 DIETs)? What are the minimum requirements for setting up the lab – furnishing, Chairs and tables, air conditioning etc. Source of funds for the above Centre launch / Program launch? Training to start from June TA/DA of trainees to be met from their own institutions as decided and included in the MoU Resource Centre Common Training Calendar 1st Batch 2nd Batch 3rd Batch 4th Batch 5th Batch 6th Batch July(5-8) July(12-15) July(19-22) July(26-29) Aug(2-5) Aug(9-12) Aug(16-20) Aug(23-27) Aug(30-31) & Sept(1-3) Sept(6-10) Sept(13-17) Sept(20-24) Sept(27-30) & Oct(1) Nov(2-6) Nov(8-12) Nov(15-19) Nov(22-26) Nov(29-30) & Dec(1-3) Dec(6-9) Dec(13-16) Dec(20-23) Dec(27-30) Jan(3-6) Jan(10-13) Feb (16-17) Feb (23-24) Refresher Session Jan (17-18) Jan (27-28) Feb (2-3) Feb (9-10) Module Break up First Phase Time Total Time Slot 2 Hrs. 6 Hrs. MS Paint 2 Hrs. 6 Hrs. 3 Hrs. 45 Mins. MS Word ( Session 1) 2 Hrs. 15 Mins. 6 Hrs. Critical thinking (Session 1&2) 4 Hrs. 15 Mins. MS Word ( Session 2) 1 Hr. 45 Mins. 6 Hrs. Total 16 Hrs 8 Hrs 24 Hrs. Days Pedagogy Time 1st Day Peep into DE , Setting the Stage (2 Sessions) 2nd Day Setting the Stage ( Brain Based Learning ) 4 Hrs. 3rd Day Setting the Stage ( Self Esteem ) 4th Day Technology 2 Hrs. 15 Mins. + 1 Hr. Introduction to 45 Mins. Computer, MS Window Second Phase Days Pedagogy 1st Day Time Technology Review-cum-Refresher Session of First Phase 2nd Day Critical thinking (Session 2&3) 3 Hrs. 35 Mins 3rd Day Creative thinking (Session 1 &2 ) 4 Hrs. 4th Day Creative thinking (Session 2 & 3 ), 2 Hrs. 30 Mins. + 1 Hr. MS Excel (Session 1 & 2) Multiple Int. 30 Mins. (Session 1) 5th Day Time Multiple Intelligence (Session 1 & 2) 4 Hrs. 25 mins. Total 16 Hrs 6 Hrs. MS Word (Session 3) + 1 Hr. 45 Mins. Activity + 40 Mins. MS Excel (Session 1) MS Excel (Session 2) Total Time Slot 6 Hrs. 2 Hrs. 6 Hrs. 2 Hrs. 6 Hrs. 1 Hr. 35 Mins. 6 Hrs. 8 Hrs 30 Hrs. Third Phase Days Pedagogy 1st Day 2nd Day Time Technology Time Review-cum-Refresher Session of Second Phase Multiple Intelligence (Session 3 & 4) 4 Hrs. 15 Mins Total Time Slot 6 Hrs. MS Excel (Session 2&3) 1 Hrs 45 Mins 6 Hrs. 3rd Day Multiple Intelligence (Session 4) + 1 Hrs. 15 Mins + 2 Hrs. Collaborative Learning 45 Mins. (Session 1) MS-Power Point [ 2 sessions] 2 Hrs. 6 Hrs. 4th Day Collaborative Learning 2 Hrs. 45 Mins. + 1 Hrs. (Session 3) + PBL 15 Mins. (Session 1 &2) MS-Power Point [ 2 sessions] 2 Hrs. 6 Hrs. 5th Day Project Based Learning(Session 3 -7) 3 Hrs. 45 Mins. Integrating technology (Session 1,2&3) 2 Hrs. 15 Mins. 6 Hrs. Total 16 Hrs 8 Hrs 30 Hrs. Fourth Phase Days Pedagogy 1st Day Time Technology Time Review-cum-Refresher Session of Third Phase 2nd Day Project Based Learning (Session-8 & 9) 4 Hrs. 3rd Day Project Based Learning (Session-10 & 11) 3 Hrs. 50 Mins. 4th Day Total Integrating technology (Session 4-5) 6 Hrs. 2 Hrs. 6 Hrs. Integrating technology 2 Hrs. 10 Mins. (Session 6-7) 6 Hrs. Integrating technology 2 Hrs. 30 Mins. (Session 8-10) , Internet + 3 Hrs. 30 (Session 1,2&3) Mins. 6 Hrs. 10 Hrs. 10 Mins. 7 Hrs. 50 Mins. Total Session Time Total Time Slot 108 Hrs / 18 Days 24 Hrs. Two Day Refresher Session Days Topic Time 1st Day Demonstration on Lesson Design using Techno-Pedagogy by each participant 6 Hrs. 2nd Day Hands-on-activity / Effective Integration of Techno-Pedagogy in Teaching Learning Practice 6 Hrs. 12 Hrs. Training – Snapshot View IASE District Cuttack No. of teachers to No. of be trained by the No. of teachers No. of selected Total no. of teachers trained teachers at trained at the Name of IASE schools teachers enrolled school level as per a Resource Centre (70%) cascade model of training 13 161 112 52 60 Kendrapara 19 167 117 76 41 Sub Total 32 328 229 128 101 Central Zone Manuals to be covered in Q2 Manuals to be covered in Q3 Manuals to be covered in Q4 [1st Batch] Manual-2 (TechnologyVol.2), Manual-4 (PBL). [1st Batch] Covered third reviewManual-1 (Setting the cum-refresher session. Stage), Manual-2 (Technology-Vol.1, [2nd,3rd & 4th Batch] [5th & 6th Batch] Vol.2(Ms-PPT) ) , Manual-2 Manual-2 Manual-3 (Pedagogy), (Technology-Vol.1, (TechnologyCovered first,second Vol.2) , Manual-3 Vol.2) review-cum-refresher (Pedagogy), Manual-4 (PBL). session. Manual-4 (PBL) Covered third Covered second and RNIASE, Cuttack review-cum[2nd - 6th Batch] third review-cumrefresher session. Manual-1 (Setting the refresher session. Stage), Manual-2 [1st - 6th Batch] (Technology-Vol.1 [5th & 6th Batch] review-cum(Ms-Excel (Session 1Manual-2 refresher session. 2) ) ), (TechnologyManual-3 (Pedagogy Vol.2- Ms-Excel, PPT, upto MI(Session(1-2) ) Integrating Tech. 1,2 Covered first review&3), Manual-3 cum-refresher session. (Pedagogy), Manual-4 (PBL Session 1-7). Covered second review-cum-refresher session. District Gajapati No. of selected Total no. of schools teachers 4 65 No. of No. of teachers teachers trained at the enrolled Resource (70%) Centre 45 24 No. of teachers to be trained by the trained teachers at Name of IASE school level as per a cascade model of training 21 South Zone DPIASE, Berhampur Ganjam 6 94 66 36 30 Sub Total 10 159 111 60 51 Manuals to be covered in Q2 Manuals to be covered in Q3 Manuals to be covered in Q4 [1st Batch] Manual-2 (TechnologyVol.2), Manual-4 (PBL). [1st Batch] Covered third reviewManual-1 (Setting the cum-refresher session. Stage), Manual-2 (Technology-Vol.1, [2nd,3rd & 4th Batch] [5th & 6th Batch] Vol.2(Ms-PPT) ) , Manual-2 (TechnologyManual-2 Manual-3 (Pedagogy), Vol.1, (TechnologyCovered first,second Vol.2) , Manual-3 Vol.2) review-cum-refresher (Pedagogy), Manual-4 (PBL). session. Manual-4 (PBL) Covered third Covered second and review-cum[2nd - 6th Batch] third review-cumrefresher session. Manual-1 (Setting the refresher session. Stage), Manual-2 [1st - 6th Batch] (Technology-Vol.1 [5th & 6th Batch] review-cum(Ms-Excel (Session 1-2) Manual-2 (Technologyrefresher session. ) ), Vol.2- Ms-Excel, PPT, Manual-3 (Pedagogy Integrating Tech. 1,2 upto MI(Session(1-2) ) &3), Manual-3 Covered first review(Pedagogy), cum-refresher session. Manual-4 (PBL Session 1-7). Covered second review-cum-refresher session. District Baragarh No. of selected schools 7 No. of teachers to No. of No. of be trained by the teachers Total no. of teachers trained teachers trained at the Name of IASE teachers enrolled at school level as Resource (70%) per a cascade Centre model of training 76 53 42 11 West Zone Sambalpur 1 14 10 6 4 Sub Total 8 90 63 48 15 Manuals to be covered in Q2 Manuals to be covered in Q3 [1st Batch] Manual-2 (TechnologyVol.2), [1st Batch] Manual-4 (PBL). Manual-1 (Setting Covered third the Stage), Manualreview-cum2 (Technologyrefresher session. Vol.1, Vol.2(Ms-PPT) ) , [2nd,3rd & 4th Manual-3 Batch] (Pedagogy), Manual-2 Covered (Technology-Vol.1, first,second review- Vol.2) , Manual-3 cum-refresher (Pedagogy), session. Manual-4 (PBL) Dr. PMIASE, Covered second and Sambalpur [2nd - 6th Batch] third review-cumManual-1 (Setting refresher session. the Stage), Manual2 (Technology-Vol.1 [5th & 6th Batch] (Ms-Excel (Session Manual-2 1-2) ) ), (TechnologyManual-3 Vol.2- Ms-Excel, (Pedagogy upto PPT, Integrating MI(Session(1-2) ) Tech. 1,2 &3), Covered first Manual-3 review-cum(Pedagogy), refresher session. Manual-4 (PBL Session 1-7). Covered second review-cumrefresher session. Manuals to be covered in Q4 [5th & 6th Batch] Manual-2 (TechnologyVol.2) Manual-4 (PBL). Covered third review-cumrefresher session. [1st - 6th Batch] review-cumrefresher session. DIET District Cuttack No. of selected schools 5 Total no. of teachers 30 No. of teachers to be trained by No. of No. of the trained teachers teachers teachers at trained at the Name of DIET enrolled school level as Resource (70%) per a cascade Centre model of training 21 20 1 Central Zone Kendrapara 5 38 27 20 7 Sub Total 10 68 48 40 8 Manuals to be covered in Q2 Manuals to be covered in Q3 [1st Batch] Manual-1 (Setting the Stage), Manual2 (Technology[1st Batch] Vol.1, Manual-2 Vol.2(Ms-PPT) ) , (TechnologyManual-3 Vol.2), (Pedagogy), Manual-4 (PBL). Covered Covered third first,second reviewreview-cumcum-refresher refresher session. session. DIET, Dolipur [2nd - 6th Batch] [2nd,3rd & 4th Batch] Manual-1 (Setting Manual-2 the Stage), Manual(Technology2 (Technology-Vol.1 Vol.2) , Manual-3 (Ms-Excel (Session (Pedagogy), 1-2) ) ), Manual-4 (PBL) Manual-3 Covered second and (Pedagogy upto third review-cumMI(Session(1-2) ) refresher session. Covered first review-cumrefresher session. Manuals to be covered in Q4 [5th & 6th Batch] Manual-2 (TechnologyVol.2), Manual-3 (Pedagogy), Manual-4 (PBL). Covered second and third reviewcum-refresher session. [1st - 6th Batch] review-cumrefresher session. District Gajapati No. of selected schools Total no. of teachers No. of teachers enrolled (70%) No. of teachers No. of to be trained teachers by the trained trained at teachers at the school level as Resource per a cascade Centre model of training 10 50 35 40 -5 Ganjam 10 75 52 40 12 Sub Total 20 125 87 80 7 South Zone Name of DIET Manuals to be covered in Q2 [1st Batch] Manual-1 (Setting the Stage), Manual-2 (TechnologyVol.1, Vol.2(Ms-PPT) ) , Manual-3 (Pedagogy), Covered first,second review-cumDIET, refresher session. Khalikote [2nd - 6th Batch] Manual-1 (Setting the Stage), Manual-2 (TechnologyVol.1 (Ms-Excel (Session 1-2) ) ), Manual-3 (Pedagogy upto MI(Session(1-2) ) Covered first review-cumrefresher session. Manuals to be covered in Q3 Manuals to be covered in Q4 [1st Batch] Manual-2 (Technology[5th & 6th Batch] Vol.2), Manual-2 Manual-4 (PBL). (TechnologyCovered third Vol.2), Manual-3 review-cum(Pedagogy), refresher session. Manual-4 (PBL). Covered second [2nd,3rd & 4th and third Batch] review-cumManual-2 refresher session. (TechnologyVol.2) , Manual-3 [1st - 6th Batch] (Pedagogy), review-cumManual-4 (PBL) refresher session. Covered second and third reviewcum-refresher session. District Baragarh No. of selected schools 11 No. of teachers to be No. of trained by the No. of teachers trained Total no. of teachers Manuals to be trained at the teachers at Name of DIET teachers enrolled covered in Q2 Resource school level as (70%) Centre per a cascade model of training 70 49 44 5 West Zone Sambalpur 11 67 47 44 3 Sub Total 22 137 96 88 8 [1st Batch] Manual-1 (Setting the Stage), Manual-2 (TechnologyVol.1, Vol.2(Ms-PPT) ) , Manual-3 (Pedagogy), Covered first,second review-cumDIET, refresher session. Sambalpur [2nd - 6th Batch] Manual-1 (Setting the Stage), Manual-2 (Technology-Vol.1 (Ms-Excel (Session 1-2) ) ), Manual-3 (Pedagogy upto MI(Session(1-2) ) Covered first review-cumrefresher session. Manuals to be covered in Q3 Manuals to be covered in Q4 [1st Batch] Manual-2 [5th & 6th (TechnologyBatch] Vol.2), Manual-2 Manual-4 (PBL). (TechnologyCovered third Vol.2), Manual-3 review-cum(Pedagogy), refresher session. Manual-4 (PBL). Covered second [2nd,3rd & 4th and third Batch] review-cumManual-2 refresher (Technologysession. Vol.2) , Manual-3 (Pedagogy), [1st - 6th Batch] Manual-4 (PBL) review-cumCovered second refresher and third reviewsession. cum-refresher session. Decision to be taken on the following points TA/DA for teacher trainees – 20 days (18 days training plus two days refresher) 444 teachers for the first year – 444*20*Approved TA/DA Fund source for the above Second Year – Refresher / Module Break Up 15 days Module Breakup for Refresher (2nd Year) - 2011-12 TechnoPedagogy Approach Days First Session Time in Hrs. Second Session Time in Hrs. Total Time Slot 1st Day Warmup session by individual or group, Down Memory Lane 3 Questionnary on Computer Fundamental , to create Schema/Hierarchical Structure of their Institution 3 6 Hrs. 2nd Day Activities on Brain Based Learning 3 School Diagram, Shapes of different objects, scientific appratus Recap on Word Processing features 3 6 Hrs. 3rd Day Activities to identify the five steps in building selfesteem in children (in group) 3 Activities on Paragraph Writing, formatting, inserting symbols, pictures Activities on creating documents, cross word puzzle, framing bank receipts, withdrawal forms 3 6 Hrs. Activities to frame questions and to infer the 4th Day importance of fostering questioning spirit/probing in children (in group) 3 Lesson plan design/delineation of concept wheel 3 6 Hrs. Activities on designing questions to cater to various levels of thinking 3 Recap on Spreadsheet features, To be familiar with Automatic Recalculation, Multiple addressing modes, identification of basics of statistics and use of excel in it. 3 6 Hrs. 3 Uses of different types of formula and function,graphs. Data Driven Decissions. Preparation of Routine, Pay Fixation, Data Analysis, Assessment Report 3 6 Hrs. 3 Exercises on Excel, Trend Analysis Recap on PPT Presentation features, to appreciate the advantages of using a Multimedia package to complete certain activities related to their professional work 3 6 Hrs. 5th Day We construct our knowledge house. To appreciate that effective learning takes place when learner constructs his effective knowledge house Activities: A. Stone Pebble Game 6th Day B. Nine dots game C. Geometry through paper folding. Participants will continue to learn how to use origami sites and animations to teach geometry through paper folding. To design various activities to stimulate creative thinking and helps students to express their 7th Day creative thoughts. Using the technique of Brainstorming / mind map and four aspects of Creativity 8th Day Story telling activity, Poster design, 3 Projects on burning Topics, Presentation on student's Progression, 3 6 Hrs. Create Crossword puzzles and 9th Day Brainteasers.Creating pie charts, bar graphs etc in MS excel. 3 10 th Day The group will decide a burning topic as per the curriculum and design a lesson plan. Role Play on Lesson Design. Identify different types of Multiple Intelligence are reflected in the lesson design. 3 School Profile/ Village Profile 3 6 Hrs. 11th Day Plan an activity to get insights on three types of behaviour and to nurture shared leadership and positive interdependence within groups and individuals respectively. 3 Project complition and evaluation Recap different aspects of Internet, Browsing techniques , familiarisation with the jargons. 3 6 Hrs. 12 th Day Recap the features of Project Based Learning. Identify the objective and core objective of a topic from curriculum(by each participants) 3 To be familiar with email, Use Word Search Maker to create Crossword puzzles and Brainteasers. Effective use of Wiki Educator 3 6 Hrs. 13th Day Projects on Current Issues Right to Education (RTE), Environmental Pollution, Global Warming 3 Participants will design lesson plan / ELP using web resources & other materials for effective teaching. i.e classroomphysics.com and arvindguptatoys.com Email id Creation, Creating a Blog (Own/School/Office), Creating a Website 3 6 Hrs. 14th Day Projects on Current Issues Population Explosion Women Empowerment Sanitation in India 3 3 6 Hrs. 15th Day Projects on Current Issues Our Culture Technology in cricket AIDS Child labour 4 2 6 Hrs. Total time in hrs. 46 44 90 Lesson Plan design by participants in Group. QUIZSTAR, Create Online Quizzes and Organize Results, HotPOTATO, Making Crossword puzzles RubiStar It is a free tool to help teachers create quality rubrics. Web Worksheet Wizard and Project Poster, Quick and easy online school projects and short reports. 3 Decision to be taken on the following points TA/DA for teacher trainees – 15 days Refresher 634 teachers for the second year – 634*15*Approved TA/DA Fund source for the above Post Training Activities – Output Indicators Trained teacher educators from IASE and DIET’s will administer selected modules as part of the teacher training to be conducted, in their respective IASEs and DIETs. It will be the additional responsibility of the teachers of schools already trained at the Resource centre’s to train students and teachers in their schools. Out of the trained teachers, selected teachers will impart training to students while the others will be training the other teacher in phases. Roles will be reversed every quarter. As part of the cascade model of training the trained teachers will train their remaining colleagues in computer fundamentals with the objective of making effective use of technology for teaching-learning purposes in a phased manner. Teacher facilitators (student trainers) will initiate & facilitate completion of three quality Projects by students per month per school using internet and computers. Teachers will make one quality lesson plan per month on hard spots by browsing the web resources and other e-learning resources available at the school. Each of the trained teacher should transact five classes at least per month using computers. Decision to be taken on the following points How to ensure that the output will be as expected from the Govt. side? Monitoring on the part of CI, DPC, DI, Science Supervisors, Programmer, MIS etc. – Random visits – No. of schools? Training of Programmers and Science Supervisors in DIETs and IASEs? TA/DA? Training of BRC and CRC? TA/DA? Manpower SCERT – 2 IASE/DIET – 6 Monitoring Experts – 2 Junior Monitoring Expert - 2 ZC - 1 Trainer Responsibilities SCERT Trainer IASE / DIET Trainers Reporting Template / Teacher Portfolio Tracker Frequency of reporting – Monthly Monitoring Infrastructure Programmatic District Education Authorities CI: DPC: DI: Roles and Responsibilities Programmer MIS: Template Science Supervisor: Frequency of Reporting - Monthly State level Steering committee DE Working Group District Level Steering committee State Level SC – Quarterly DE Working Group – Monthly DSCM – Bi-Monthly School Level RG – Monthly School level resource group Details Decision to be taken on the following points Letter for setting up of the DLSC and School Level Resource Group – Director SSA/Secondary/Elementary Letter for setting up a technical committee at the district and state level for project evaluation? Who will be the members? Baseline Administered to 123 teachers of Secondary Schools (52% Teachers) To be administered to 104 teachers of upper Primary Schools 1. 2. 3. 4. Questionnaire on Techno-Pedagogy Last three years data – HSC Pass percentage Last three years Enrollment data Overall pass percentage in Mathematics, Science and English – DE and Non – DE Schools – last three years End line study at the end of two years Decision to be taken on the following points Any other indicators which the Govt. will like to add? Budget Q1 2010-11 Q2 2010-11 APersonnel Q3 2010-11 Q4 2010-11 Total 201011 768,000 768,000 768,000 768,000 3,072,000 B Training 94,000 94,000 94,000 94,000 376,000 C Travel 65,000 65,000 65,000 65,000 260,000 D Program Support 65,000 110,000 110,000 110,000 395,000 E Capital expenses 0 15,000 15,000 15,000 45,000 F Resource Centre for SCERT 300,000 1,292,000 300,000 1,052,000 1,052,000 1,052,000 4,448,000 Cost Sharing Sl. No. 1 i. Heads Infrastructure Resource Centre at SCERT AIFT SCERT OPEPA 10 computers, LAN, One LASER B&W SCERT will provide other necessities printer, Internet connectivity for two for setting up the resource centre years Upper Primary Schools – Lab Set Up and Hardware √ ii. Resource Centre maintenance cost at SCERT iii. Lab set up in six Centres (3 DIETS, 3 Advanced Centres) iv Maintenance of computer in 100 schools √ v. Internet connections (Broadband) in 100 schools √ 2 Training cost: 6 training centre’s – Zonal level √ i. ii TA of Trainees DA √ √ iii. iv. v. vi Educational resources Food for Trainees Training materials Honorarium for subject expert 3. i. ii 4. Personnel Training Personnel 6 trainers Monitoring Personnel 6 monitoring experts Baseline and Endline Assessment i. ii. Baseline Endline Trainer salaries Computer maintenance cost from the second year. Apart from this other costs like office stationery and other incidental costs, will be taken up by the SCERT √ EDUKIT, ILTM MATERIALS √ folder, pen, paper, Books √ √ √ √ √ Targets Q1 and Q2 Activity MoU Signed off Annual Plan in Place Budgets in place School Selection in districts ILTM Training Calender (90 Hours) 15 days centralized training Organogram Portfolio of Teachers Monthly Plan - 20th to 19th Attendance Sheets -20th to 19 Baseline Exercise Trainings Coordinators Teachers Facilitators External Support SCERT Teacher educators Administrators Total Resource centres IASE DIET Total Meetings Steering Committee Working Group Meeting School Monitoring Committee District Review Monthly Review with ILTM team Blog review with team Travel STL District Visits RC District Visits ZC Visits ILTM Core member visits Target Q1 Q2 Dates Q3 15th March 10 Yes 20th April Yes Secondary schools Primary schools 1,292,000 1,052,000 10 4 3 1 3 444 1 1 26 30 56 54 139 193 52 Secondary Schools 20th April 30th June Internal reviews 510 446 956 1 3 3 3 1 3 306 8 3 3 6 NA 3 Events Summer Camp DE Contest award distribution ceremony Scholarships 1 20 Dashboard Number of Teachers in school Number of Teachers enrolled for this year Number of teachers to be trained Number of Students to be given exposure in DE Infrastructure in schools 907 634 634 31328 Q4 Thank You Education Technology Debate/World Bank Summary Blended ICT Model Deep end supporting eco-system From learning context to technology selection rather than the reverse From procurement to output oriented model There are enough examples of success and failures but without proper documentation