MONTHLY PROGRESS REPORT-MAY-2014 LOCATION MAP SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 1 MONTHLY PROGRESS REPORT-MAY-2014 EXECUTIVE SUMMARY Project- Information The Government of India has entrusted to the National Highways Authority of India (NHAI), under Ministry of Shipping, Road Transport and Highway (MOSRT&H) now known as (MORT&H) for the development of highways under National Highways Development Projects (NHDP). The projects contemplate enhancing the traffic capacity and safety on a few of the selected heavily trafficked high density stretches/ corridors of National Highways for efficient transshipment of goods as well as passenger traffic. General The Concession was awarded by NHAI to Soma – Isolux Consortium through LOA dated 29.04.2010. SPV named Soma Isolux Varanasi Aurangabad Tollway Private Limited was incorporated for signing the Concession Agreement and to carry out the project work. Concession Agreement for the project was signed on 30th July, 2010 All Directors Liable to retire by rotation with a right of nomination. India Isolux Corsan Concessions S.A. 00.26% Isolux Corsan Concessions India Private Limited 49.74% Soma Enterprises Limited 26.00% Soma Tollways Private Limited 24.00% Country % of equity Project Title/ Scope of Work Type of Concession Project Length Concession Period Concessionaire EPC Contractor EPC Contractor Client Consultant Safety Consultant Operational Date O&M Construction Period Modification in the shareholding is done after approval of NHAI. In any case the Group shareholding (Isolux and Soma) will remain in 50-50 basis. Up gradation of the actual Highway (four laning) and construction of the additional 2 lanes and service roads as per the details of the CA. Construction Period: 30 Months Operation of the 2 existing toll plazas and the new one to be built from the Appointed Date. Maintenance of the Project Highway as per the standards included in the CA from the Appointed Date. Corridor Control, Medical Assistance, accidents assistance etc. in the Project Highway as per the standards included in the CA. Toll 192.4 km 30 years CA signature: 30th July 2010 Concession period Start (Appointed Date: 12th September, 2011) Concession period Final : 12th September,2041 Soma Isolux Varanasi Aurangabad Tollway Pvt. Ltd. Soma Enterprise Ltd-Package-A - Ch: 786+000-871+000 Isolux Corsan India (P) Ltd -Package-B- Ch: 871+000-978+400 National Highway Authority of India (NHAI) ICT (P) Ltd in JV with Rodic Consultants (P) Ltd appointed as Independent Consultant on 29th April 2011 as per Clause 29.1 of Concession Agreement. M/S RITES Ltd appointed as Safety Consultant on 26th April 2011 as per Clause 18.1.2 of concession agreement. 12th September, 2011 To be done by the concessionaire directly. Construction starts from Appointed date: 12th Sept’2011 Construction completion date: 10th March’2014 Construction completion period: 910 days SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 2 MONTHLY PROGRESS REPORT-MAY-2014 PROJECT BRIEF Project :: Six Laning of Varanasi-Aurangabad Section of NH-2 From Km 786.000 to Km 978.400 (Length 192.400 Km) in the state of Uttar Pradesh and Bihar on Design,Build,Finance,Operate and Transfer (“DBFOT”) Toll basis under NHDP Phase-V Authority :: National Highways Authority of India (NHAI) Concessionaire :: Soma Isolux Varanasi Aurangabad Tollway (P) Ltd Independent Engineer :: ICT (P) Ltd in JV with Rodic Consultants (P) Ltd EPC Contractor :: Soma Enterprise Ltd-Package-A Ch:786+000-871+000 Isolux Corsan –Package-B-Ch: 871+000 -978+400 Design Consultant :: Package A-HBS Consulting Engineers Package B-Halcrow Consulting India Safety Consultant :: M/S RITES Ltd Project Cost :: Rs. 3379.45 Cr Concession Agreement :: 30th July 2010 Appointment Date :: 12th Sept,11 Concession Period :: 30 Years Schedule Project :: 9th March,2014 :: Rs. 169.84 Cr Completion Performance Security (As per Schedule-F) Details of Escrow A/C :: The Escrow Account has been opened by the Concessionaire jointly with the Authority. The Inflow & Outflow of the fund is maintained through this account. The Account is opened in Punjab National Bank, Banjara Hill, Hydrabad branch. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 3 MONTHLY PROGRESS REPORT-MAY-2014 SCOPE OF THE PROJECT Contract Length :: SERVICE ROAD :: 192.40 Km [ start-786+000 to 978+400 End ] 291.408 Km [L.H.S + R.H.S ] As per Concession Agreement Major Bridge :: 14 Nos (Excluding Bride at Ganga & Sone River) Minor Bridge :: 24 Nos ROB :: 3 Nos VUP :: 42 Nos PUP :: 77 Nos SLAB/BOX/PIPE :: 244 Nos FLY OVERS :: 7 Nos BUS BAYS/ TRUCK LAY BYE :: 60 nos TOLL PLAZA :: 3 Nos SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 4 MONTHLY PROGRESS REPORT-MAY-2014 1.0 STATUS OF UNCONSTRUCTIBLE LAND WITH THE POSITION OF HINDRANCES Soma LHS 26.903 RHS 22.858 Service Road LHS RHS 31.383 21.348 Total Scope 85.000 85.000 73.250 73.150 170.000 146.400 316.400 % Un Constructible Length 31.65% 26.89% 42.84% 29.18% 29.27% 36.02% 32.39% Isolux 48.510 37.690 60.750 32.472 86.200 93.222 179.422 Total Scope 107.400 107.400 71.440 72.960 214.800 144.400 359.200 % Un Constructible Length 45.17% 35.09% 85.04% 44.51% 40.13% 64.56% 49.95% Soma - Isolux 75.413 60.548 92.133 53.820 135.961 145.953 281.914 Total Scope 192.400 192.400 144.690 146.110 384.800 290.800 675.600 % Un Constructible Length 39.20% 31.47% 63.68% 36.84% 35.33% 50.19% 41.73% Description MCW MCW 49.761 Combined SR 52.731 Total 102.492 Note: Even though tree cutting work is still in progress in Chandauli district. The updated status is mentioned above, if we take some area of chandauli as in land available. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 5 MONTHLY PROGRESS REPORT-MAY-2014 2.0 STATUS OF LAND ACQUISITION S.No Description Uttar Pradesh Bihar Total Varanasi Chandauli Kaimur Rohtas Aurangabad Chainages Project Length (786-806) 20 Km (806-843) 37 Km (843-890) 47 Km (890-934) 44 Km (934-978.4) 44.4 Km 3A Published in Gazette of India 23.08.10 08.10.10 12.04.10 07.12.09 05.04.10 3A Published in Local Newspaper 19.09.10 23.11.10 27.05.10 20.01.10 12.05.10 15 39 40 26 26 146 17.782 28.484 41.935 37.386 60.108 185.696 3D Published in Gazette of India 25.07.11 22.09.11 08.04.11 23.09.10 08.12.10 3D Published in Local Newspaper 12.09.11 03.11.11 04.05.11 26.11.10 02.02.11 13 38 34 26 26 137 Area acquired as per 3D (ha) 15.321 23.827 33.635 31.071 57.116 160.970 5 Declaration of Award 12/13 23/38 34/34 24/26 12/26 105/137 6 Compensation Distribution 6/13 16/38 33/34 19/26 7/26 81/137 7 Possession taken from Competent Authority. 5/13 12/38 24/34 17/26 6/26 64/137 1 2 3 No. of Village in 3A Area acquired as per 3A (ha) 4 No. of Village in 3D Note: Above mentioned details may vary due to routine Land Acquisition site works continue. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 6 192.4 Km MONTHLY PROGRESS REPORT-MAY-2014 3.0 STATUS OF HINDRANCES AT SITES S.No. Hindrance type Package-A 1. Tree Cutting In UP Section- The activity of Tree Cutting is on schedule in all the 5 districts. The Tree cutting work started in Chandauli district in Forest Area and till now 1396 nos trees (i) have been cut down.(Tree cutting figures are corrected in Chanduali district as our EPCSoma informed us that they have taken less than 300 mm girth ,trees which were fallen due to rain but falling beyond COI.) In Bihar Section-393 No of trees are missing in the previous approved list of tree cutting, which are to be included in revised approval list for tree cutting on priority. No of Forest trees – 320 (Within in COI and ROW) No of Private trees- 73 (Within COI behind ROW) Approval for additional trees which were earlier not identified and NHAI verified only 125 trees in EPC-Soma Scope in respect of 393 nos trees vide their letter no: 12364 (ii) dated 1st Apr-13. And balance 268 nos of trees are still yet to get clearance for cutting at site. The Balance tree in Kaimur district of Approved List is 38 nos is presently not possible due to various reasons mentioned in our letter no: 3506 dated 22nd Feb-13. SPV proposed a joint verification at site with SPV, I.E, NHAI & EPC. This matter is pending on Part of NHAI. 2. Utility Shifting The work of shifting of utilities like electrical lines, water pipe lines and hand pumps is getting hampered at many locations due to non-acquisition of required land. However as per the instructions of client, at the locations of Entry & Exits Ramps, Trucks Lay byes, and Junction and at the locations of encumbrances within ROW, the utility shifting is being continued without leaving gaps at the above locations which requires reshifting after land acquisition. For which extra payment is required. Further, shifting of electrical lines, water pipe line & Misc utilities are also affected due to non-clearance of Forest Land. STATUS OF APPROVAL OF DETAIL DESIGN OF ROB at Km: 809+050 & ROB at 3. Km: 788+650 a) ROB (i) We are in receipt of NHAI letter in which Railway raised demand note for ROB at Km: 788 ` 89.46 Lacs and for ROB at Km: 809 ` 25.47 Lacs. (ii) Rests of Parallel activities are in progress at both ROB’s. 4. Remarks Unavailability of COI -UP Section -836+200 to 838+400-B.H.S, 842+400 to 843+000-RHS -Bihar Section-863+400 to 871+000-LHS and 846+200 to 860+000-LHS) The work progress in above section is affected due to non-availability of COI. 5. (i) (ii) (iii) Any Other Hinderance The Production & transportation of aggregate from Dala Crusher is stopped by the local authority since 28.02.12 due to landslide of rocks in a local stone quarry which is deeply affecting the progress of highway & structure works at site. Piling work at Major Bridge km 843+318-L.H.S During site visit, it was confirmed by PD, NHAI that there is no land on RHS as the existing Cantilever of bridge is already floating in private land. Therefore, fresh land acquisition is to be done. -The land matter at Km 793+200 to 793+600 is not restored. During the visit of Authority, the land owner agreed to commence the work on said land, but there is court interference on the land and the work is stand still till date. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 7 MONTHLY PROGRESS REPORT-MAY-2014 (iv) - The Land for proposed ROW as per approved Design/Drawing is yet to be acquired by the Authority for the development of the project. - Additional Land for Entry-Exit Ram, Bus Bay and Truck Lay Bye etc is yet to be acquired. - The constructions of VUP/PUP/Flyovers are also being affected due to nonconstruction of service road for the want of land to divert traffic. - Construction of Box Culvert at Km 789+462 LHS is affected/obstructed by existing compound wall of residential building to accommodate full width of box culvert and also, full length widening of Box Culvert at km. 793.046 RHS could not be done due to unavailability of land. - From Km. 807+400 to 807+800-LHS, to take up work on service road in full width, it is required to shift existing electrical lines but there is no land available to shift the same. Construction of U/P at Km. 807+470 and junction is not possible without construction of service road. - In Between, Km: 836+000-838+500-B/S and Km: 842+350-843+000. Land for even widening of Main carriageway also is not available. In the above chainage2 Nos Minor Bridges at Km: 836+002 & 837+777, 1 Nos VUP at Km 838+450, 2 Nos PUP at Km 837+145 & 842+995, 3 Nos Box Culvert and 4 Nos Pipe culverts are being affected for want of Land Acquisition. - At Km: 843+002, land acquisition for construction of PUP on LHS is yet to be done. - From Km 865+500 to 867+940, as per CA, 8 m wide PQC of service road is to be constructed on each side in addition to outer drain. Land required accommodating service road and drain is yet to be done. Moreover, there is an existing water pipe line adjacent to service road running parallel to the alignment. Before taking up construction of service road work in the above chainage, shifting of pipe line is to be done first then only existing pipe line can be taken out to take up construction of service road. This pipe line also requires some extra width of land which is to be acquired yet. - The progress of Work from Km 789.500 to Km 790.000 RHS, from Km 790.500 to Km 790.800 RHS, Km 794.500 to Km 794.950 (RHS), Km 797.690 to Km 797.740 RHS & Km 798.850 LHS, Km 799.090 to Km 799.730 RHS is affected due to existence of permanent Structure /Unavailability of PROW. - At Sasaram (Bihar), the mining is restricted by the state government and they are not allowing us to run our crusher plant even after regular follow up with the concerned authority for getting clearance at the earliest, however, it is getting delayed due to non-support of state govt for clearing Applicable Permits. - Highway works from Km 793.200 to Km 793.700 (RHS) is stopped by the locals due to non acquisition of land. Please refer our letter no. 4051 Dated 7 May 2013 addressed to NHAI along with self-explanatory EPC’s letter 854 Dated 28 April 2013 which states about land matter yet not resolved from Km 793+200 to Km 793+700. Other hindrances details are weekly submitted to NHAI/I.E. via Letters. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 8 MONTHLY PROGRESS REPORT-MAY-2014 Package-B 1 UTILITY RELOCATION 1.1). Disputed Trees Felling within the ROW: There are total 635 nos (Revised) of balance trees which are to be cut. (a) Trees which are not cut due to local problems- 180 Nos (b) Trees which are within TOE but outside existing ROW -290 Nos, valuation of trees required. (c) Trees within existing ROW which are now marked & sent for approval of cutting to respective but still approval for cutting is not received -165 Nos 1.2) SPV requested to Authority for revision of rates of tree cutting on account of increase in labour wages from 2011 to Nov-2013. 1.3) Electrical Utilities: Revised estimate of shifting of electrical utilities has not been resolved yet.NHAI vide their letter no: 12659 dated 7 May-13 recommended to RO-Patna to approve CP & OH. Payment made also lack the profit and overhead charges affecting Cash Flow. (a) (1.4) Over head line crossing: (a) Overhead line crossing at chainages: 918+330,908+250,908+700,909+370,909+420, & 909+470 relocation are not started due to land availability problem. (b) High Tension Wire Pylon: - The Approval for shifting of High Tension Electric Wire Pylon at Ch: 891+410-L/S in Kaimur district and at Ch: 938+840-R/S-in Aurangabad district given by NHAI .The Estimate approved by NHAI vide letter no 11201 dated 15.10.12 has to be revised as the estimate prepared without considering the required length between two HT Pylon. Another letter sent to NHAI vide letter no 3387 dated 06.02.13 & 3547 dated 26th Feb-13 to review the proposed estimate and to approved estimate of another 5 HT Pylon. c) Water pipe line shifting: (i) Water pipe line shifting from 955+450 to 958+040 not started on account of land acquisition problem. (ii) 901+550 to 903+430-RHS, 902+250 to 902+850-LHS cannot be started due to land constrain. (iii) Water Pipe at Ch: 894+350 to 898+450-L.H.S was started but the work stopped on account on Land Constrain. (iv) Pipe Line Network crossing at Ch: 921+100,932+000 and 933+400 are required to be relocated. 2 (a) SHIFTING OF RELIGIOUS STRUCTURES (i) Religious Structure in EPC-Isolux: There are 57 religious structures in EPC-Isolux. The Estimate of 33 Nos of Religious structures which have been approved vide letter no. 11015/5/PD Varanasi/ 6 lane/ 2012-13/11418 Dated 27 Nov. 2012 from km 873+700 to km 907+930 and remaining estimates for 24 structures was approved by NHAI vide their letter no: 40801 dated: 26th June-13. (iii) Religious structure in EPC-Soma: There are 58 religious structures in EPCSoma.NHAI had returned estimate for shifting of 30 nos religious structures and asked to resubmit the estimate as per SOR .The revised estimate is submitted to I.E. & NHAI vide our letter no: 5030 dated: 11th Nov-13 for their final approval. I.E. has asked SPV vide letter no: 2661 dated 4th Jan-14 to resubmit the estimate according to their observations and it has been submitted vide SPV letter no: 5508 dated 25th Feb-2014 for Bihar portion and I.E. has also verified and forwarded to NHAI for approval vide letter no: 2769 dated 25th Feb-2014 after that again Revised cost estimate has been submitted to I.E. & NHAI vide letter no: 5640 and 5642 dated 31st Mar-14. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 9 MONTHLY PROGRESS REPORT-MAY-2014 3 (a) 4. a) 5. 6. Local People Dissents due to non-payment of Compensation of Land (i) Stoppage of Highway work due to protest by local inhabitants at following locations -915+900 to 916+570-RHS -916+050 to 916+550-LHS - 921+000 to 921+340-LHS -926+300 to 926+800-RHS -927+410 to 928+850-BHS -953+440 to 953+870-LHS - 977+730 to 978+000-RHS (iii) Hindrance for Construction of ROB at Km 941+097 has not been removed till date in order to commence the pilling works as also mentioned vide Letter No - SI-PO/NH-2/201213/ 2851 dated 20 Oct-12. The details above hindrances were submitted to Senior Divisional Engineer, ECR, Mughal Sarai by NHAI vide 11253 Dated 25 Oct-2012. NHAI has informed SPV that Railway department has submitted the estimate of 2.25 Cr for shifting of Fly over cabin, OHE mast and othe ancillary work for ROB at Km 941+097. Stoppage of Highway work in newly acquired land due to protest by several local inhabitant at following locations -871+000 to 871+532-LHS -871+180-LHS -871+960 to 872+250-LHS -876+900 to 877+100-LHS -877+100 to 877+250-LHS -880+900 to 881+200-LHS Villagers & Farmers obstruction Possession of Land of villages named Barhauli, Amiratha & Jahanabad in Kaimur District due to non-payment of Pvt structures and Pvt trees. Please refer our letter no: 4403 dated 28th June-13 & 4418 dated 1st July-13. NHAI and I.E. is requested to overlook the matter. Without payment of pvt structure and pvt trees, villagers won’t allow us to construction the road. In Same case in EPC-Soma; Villagers of Chajjupur,Amiriti,Khadsara,Rohuan,Sarangpur,karanpura,Awahariya,Shahpur,kanauli , Shivsagar, Tikari, Bilhadi & Bamhaur not allowing our EPC-Soma for construction work until their payment of Pvt structures and Pvt trees will paid off. Stoppage of Crusher operations at Chaparwar by due to Local CPI (Maoist) are now very often. It disturbed our crusher operations work and there is panic stricken situation experienced by our crusher staff. Ban of Mining by Bihar state Govt. - The State Govt of Bihar has stopped issuing new Mining Lease license and renewal of old license from 4th Feb-2010 - Permission for proposed Crusher at Madanpur was not obtained due to which company is forced to demobilize the commissioned crusher resulting in financial and Time loss. Claims on account of mobilization and demobilization of Crusher and the stocked Boulder of about 2 lacs Tons at Madanpur shall be submitted in due course. Note: (i) Other hindrances details are weekly submitted to NHAI/I.E. via Letters. (ii)Concessionaire has submitted the weekly program vide letter no: 5099 dated 27 th Nov-13 to start the work in Kaimur district where villagers not allowing us to do work invited NHAI team to present on said dates to support our EPC to start the work but NHAI with Local administration were not present on 29th Nov-13 on first day of the scheduled Planned. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 10 MONTHLY PROGRESS REPORT-MAY-2014 4.0 STATUS OF UTILITIES SHIFTING EPC-SOMA ENTERPRISE LTD-PACKAGE-A KM: 786+000 TO 871+000 Electrical Utility from Km 786.000 to Km 871+000: S. No. Particulars LHS RHS Total Shifted as on date Balance to be shifted i) Electric Poles 638 418 1056 612 444 ii.) Telephone Pole 67 47 114 - 114 iii.) Transformers 53 19 72 - 72 iv.) High Mast Light - 1 1 - 1 v.) Light Pole - 3 3 - 3 vi) H.T Pole - 2 2 - 2 vii) Cable Chamber 1 - 1 - 1 viiI) Cable Pillar 2 - 2 - 2 761 490 1251 612 639 Total Shifted as on date Balance to be shifted xiii) Total Electrical Crossings from Km 786.000 to Km 871.000: S. No. Particulars i.) HT Line Crossing(11 KV-35 KV) 15 3 12 ii.) LT Line Crossing(415 volts) 101 3 98 iii.) Cable Wire Crossing (Underground) 3 - 3 iv.) Telephone Line Crossing 5 - 5 124 6 118 vi) Total SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 11 MONTHLY PROGRESS REPORT-MAY-2014 Miscellaneous Utility Details from Km 786.000 to Km 871.000 S. No. Particulars LHS RHS Total Shifted as on date Balance to be shifted i) Hand Pump 86 76 162 30 132 ii.) Tube Well 1 - 1 - 1 iii.) Bore Well 8 6 14 - 14 iv.) Well 23 15 38 - 38 v) Pond 1 - 1 - 1 vi.) BSNL Chamber 12 - 12 - 12 vii.) Chamber or pipe chamber 2 - 2 - 2 viii.) Septic Tank - 1 1 - 1 ix.) Water Tank - 2 2 - 2 133 100 233 30 203 Total Particulars Total Shifted as on date Balance to be shifted 300mm dia A.C. Pipe 780 455 325 200mm dia D.I. Pipe 2773.5 - 2773.5 250mm dia D.I. Pipe K-7 20 - 20 150 mm dia C.I. Pipe 200 - 200 125mm dia D.I. Pipe k-7 785 - 785 100mm dia C.I. Pipe 150 - 150 110mm dia P.V.C. Pipe 350 - 350 90mm dia P.V.C. pipe 6kg/cm2 150 - 150 80mm dia P.V.C. pipe 6kg/cm2 45 - 45 Total 5253.5 455 4798.5 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 12 MONTHLY PROGRESS REPORT-MAY-2014 EPC-ISOLUX CORSAN-PACKAGE-B Electrical Utility from Km 871+000 to 978+400: S. No. Particulars LHS RHS Total Shifted as on date Balance to be shifted i) Electric Poles 603 295 898 433 465 ii.) Telephone Pole 27 3 30 - 30 iii.) Transformers 34 20 54 4 50 iv.) High Mast Light - - - - - v.) Light Pole - 1 1 - 1 vi) Mobile Tower 4 - 4 - 4 vii) Cable Chamber - - - - - viiI) Cable Pillar - - - - - 668 319 987 437 550 xiii) Total Electrical Crossings from Km 871+000 to 978+400: S. No. Particulars Total Shifted as on date Balance to be shifted i.) HT Line Crossing-(132 KV) 12 - 12 ii.) HT Line Crossing-(11 KV-33 KV) 80 14 66 iii.) LT Line Crossing-(240-440 V) 64 21 43 iv.) Cable Wire Crossing (Underground) 1 1 - v.) Telephone Line Crossing - - - 156 36 121 Total SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 13 MONTHLY PROGRESS REPORT-MAY-2014 Miscellaneous Utility Details from Km 871+000 to 978+400 S. No. Particulars Total Shifted B.H.S Balance to be shifted 160 0 160 0 0 0 Unit LHS RHS Total 62 98 Shifted L.H.S Shifted R.H.S i) Hand Pump Nos ii.) Tube Well Nos iii.) Bore Well Nos 17 23 40 0 40 iv.) Boring Nos 6 6 12 0 12 v.) Well Nos 0 0 0 vi) Pipe Line Rmt 0 0 0 vii) Pond Nos 0 0 0 viii.) BSNL Chamber Nos 0 0 0 ix.) Chamber Nos 0 0 0 x.) Septic Tank Nos 0 0 0 xi.) Water Pipe Line Rmt 7290 3880 11170 2455 8715 xii.) Water Pipe Line Crossing Nos 3 3 3 0 3 xiii.) Water Tank Nos 23 27 50 0 50 1770 685 Note: - Exact chainage of Water pipe line in Kudra is not available so 2 Km of water Pipe Line is assumed in RHS. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 14 MONTHLY PROGRESS REPORT-MAY-2014 Continue….. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 15 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 16 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 17 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 18 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 19 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 20 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 21 MONTHLY PROGRESS REPORT-MAY-2014 Water Pipe Line Locations and its Shifting details SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 22 MONTHLY PROGRESS REPORT-MAY-2014 STATUS OF TREE CUTTING FOR BOTH PACKAGE-A & B SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 23 MONTHLY PROGRESS REPORT-MAY-2014 5.0 STATUS OF APPLICABLE PERMITS EPC-SOMA ENTERPRISE LTD-PACKAGE-A SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 24 MONTHLY PROGRESS REPORT-MAY-2014 EPC-ISOLUX CORSAN INDIA-PACKAGE-B SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 25 MONTHLY PROGRESS REPORT-MAY-2014 6.0 STATUS OF GEOTECHNICAL & HYDROLOGICAL INVESTIGATION EPC-SOMA ENTERPRISE LTD-PACKAGE-A Geotechnical & Hydrological Investigation Status: i) SBC Test of all structures are in progress Status- (a) 95 Nos SBC test Conducted at site (788+817,795+176,791+380,791+930,792+841,793+046,793+806,789+462,794+080,794+800,797+160 ,798+010,798+410,799+811,800+596,805+088,805+961,809+156,806+190,806+752,809+847,810+027, 811+092,812+467,812+930,813+256,813+358,814+031,814+583,815+380,816+241,824+856,825+414, 825+907,828+514,828+819,830+277,831+002,833+034,836+387,836+905,839+378,839+719,840+315, 840+719,841+589,842+580,844+722,844+749,844+776,844+906,845+811,846+887,847+102,849+014, 851+371,855+066,856+305,857+554,857+854,858+175,858+368,859+055,860+216,861+493,862+118, 866+329,868+862,869+765) ii) Confirmatory Bore test completed at following location. Status- (a) 14 Nos CBT conducted at Ch: 788+650,794+351,804+800,809+847,810+027, 815+200,817+300,843+125,844+595,854+310,853+809,854+049,854+727,870+627. EPC-ISOLUX CORSAN INDIA-PACKAGE-B Geotechnical & Hydrological Investigation Status: [For Structures] Status: (a) 129 Nos SBC test result submitted. (871+390,874+059,874+519,875+257,875+623,876+841,877+622,877+769,878+870,880+328, 880+866,881+931,895+766,898+665,905+227,905+520,910+646,924+078,939+972,943+760,945+625, 945+723,951+413,951+560,951+701,953+620,968+201,971+08) ,(73 nos) submitted vide our letter 3332 dt: 25th Jan-2013 and (28 nos) submitted vide our letter no 3538 dated: 26th Feb-2013. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 26 MONTHLY PROGRESS REPORT-MAY-2014 7.0 STATUS OF DESIGN & DRAWINGS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 27 MONTHLY PROGRESS REPORT-MAY-2014 8.0 STATUS OF MOBILISATION OF PLANTS, EQUIPMENTS & MACHINARY, MANPOWER EPC-SOMA ENTERPRISE LTD-PACKAGE-A Description of Plant & Machinery Dozer- 90 HP Excavator (.9 cum.) Rock Breaker (Attachment) Diesel tanker Tractor Water Tanker (10 KL) Tipper (10 Tyre) Tipper (6 Tyre) Motor Grader (120 HP) Soil Compactor Weigh bridge 100T Weigh bridge 60T Crusher (150 TPH,GSB) Crusher (320 TPH)UP Section Crusher (200 TPH) Crusher (200 TPH)Bihar Section Mobile Crane-12 Ton Mobile Crane-32 Ton Mobile Crane-100Ton Loader Bobcat WMM Plant (200 TPH) Hydra crane Trailer WMM Paver Mini Roller-2Ton Air Compressor Milling Machine- 170 Ton per hrs Broomer Bitumen Sprayer Unit No No No No No No No No No No No No No No No No No No No No No No No No No No No No No No Available At site 5 9 1 3 4 24 79 10 7 8 4 3 2 1 1 1 3 1 5 3 4 2 1 1 3 1 2 3 HM Plant (320 TPH) (UP Section) No 1 HM Plant (160 TPH) (UP Section) No 1 HM Plant (200 TPH) (Bihar) No - Bituminous Paver PTR Tandem Roller Light Source DLC Paver PQC Paver No No No No No No 2 3 4 1 3 Remarks 1 nos is 120 TPH & 1 nos is 160 TPH At Dala Near Chunar,Damagpur At Sasaram Ch: 804, 821+440, & Ch: 871 12 Ton 35 Ton Ram Nagar Camp, Foundation work completed Chandauli Camp, Operational Shifted from Mohania camp to Ram Nagar Camp. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 28 MONTHLY PROGRESS REPORT-MAY-2014 Continue…….. Description of Plant & Machinery Kerb Laying Machine Batching Plant (56 cum.) (UP & Bihar Section) Batching Plant (150 cum.)(Bihar) Chilling Plant 314 Tons Silo Feeding System Water Tanks (30 KL) Poly Carbonate Tanks (10 KL) JCB Transit Mixer Concrete Pump Pile Rig Boom Placer Bar Cutting Machine Bar Bending Machine 6 Tyre Platform Vehicle-16 Ton CTB Plant-240 TPH Unit Available At site No - No No No No No No No No No No No No No No No Remarks 3 1 2 16 2 5 6 3 10 1 Truck Mounted To establish at Ram Nagar. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 29 MONTHLY PROGRESS REPORT-MAY-2014 EPC-ISOLUX CORSAN INDIA-PACKAGE-B Description Dozer JCB Rock Breaker Excavator Backhoe Loader Loader Motor Grader Vib. Compactor Kerb Casting Machine Air Compressor Mechanical Broomer Bitumen Browser Sensor Paver - 9 M WMM /DBM Paver Texturing Curing Machine Tandam Roller (12 T) Pneumatic Tyre Roller (28 Ton) Water Tanker Water Tanker Tipper 20 Ton Trailer Diesel Bowser Transit Mixer 6 cum Concrete Pump Concrete Pump with Boom Placer Piling Rig (Hydraulic) Truck Mounted Rig Hydra Crane Crane 30 Ton Crawler Crane Truck Crane Bar Bending machine Bar shearing Machine Wagon Drill Tractor Drill PQC Cutter Light Mast Weigh Bridge Capacity Available At site 2.6 M 0.6 CUM - 0.9 CUM 140 HP 10 MT 300 CFM 4 KL 9M 12 Ton 28 Ton 10 KL 5.5 KL 20 MT 40 MT 9 KL 6 CUM 30 CUM/PH 70 CUM/PH 30 TON 6 KW 100 T 1 10 7 22 11 14 4 2 1 2 1 1 4 1 16 3 53 4 2 10 1 - Remarks M/S-MK M/S USCPL (Sub contractor) 1 nos M/S USCPL (Sub contractor) 1 nos-M/S MK Vertical Pump 3 3 1 1 3 3 3 7 9 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 30 MONTHLY PROGRESS REPORT-MAY-2014 Continue……… Description Capacity Available At site Remarks 1 Nos M/S-USCPL 1 Nos M/S-KIPL (1 Nos M/S-ICI-C&C-at Sasaram Camp) 1 Nos M/S-USCPL- Sub contractor (Sasaram Bypass) 1 Nos M/S-C&C- on hired basis ICI-C&C-at Kudra Camp 1 nos Kudra camp (M/S-ICI-C&C) 1 Nos Sasaram (M/S-ICI-C&C) 1 nos Aurangabad (M/S- M/S-ICI-C&C ) 1 nos Kudra camp -(M/S-ICI-C&C) 1 nos Aurangabad-(M/S-ICI-C&C) Sasaram WMM Plant - 200 TPH 200 TPH 3 Batching Plant 20 cum 20 CUM 1 Batching Plant 30 cum 30 CUM 1 Batching Plant 60 Cum 60 CUM 3 Batching Plant 120 Cum 120 CUM 2 Hot Mix Plant 200 TPH DG - all types 160 TPH 1 22 Crusher Plant- (Cheperwar) 300 TPH 1 1 Nos Existing operational. Crusher Plant- (Cheperwar) 250 TPH 1 1 Nos shifted from Madanpur to cheparwar. Sand Screening Plant 1 Operational at Kudra DLC Paver 1 PQC Paver 1 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 31 MONTHLY PROGRESS REPORT-MAY-2014 STATUS OF MANPOWER ORGANIZATION CHART EPC-SOMA ENTERPRISE LTD-PACKAGE-A SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 32 MONTHLY PROGRESS REPORT-MAY-2014 STATUS OF MANPOWER ORGANIZATION CHART EPC-ISOLUX CORSAN INDIA-PACKAGE-B SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 33 MONTHLY PROGRESS REPORT-MAY-2014 EPC-SOMA-PACKAGE-A MANPOWER LIST SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 34 MONTHLY PROGRESS REPORT-MAY-2014 EPC-ISOLUX CORSAN-PACKAGE-B MANPOWER LIST Continue…… SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 35 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 36 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 37 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 38 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 39 MONTHLY PROGRESS REPORT-MAY-2014 9.0 STATUS OF QUALITY WORKS 9.1-QUALITY ASSURANCE PLAN AND WORK METHODOLOGY (i) The Construction methodology for structures/Road works submitted by Concessionaire Vide letter no: SI-PO/NH-2/11-12/298 dated: 2nd Sept, 11 for EPC-Soma Enterprise LtdPackage-A and vide letter no: SI-PO/NH-2/11-12/268 dated: 25th Aug, 11 by EPC-Isolux Corsan India Remarks: Both EPC are using common standard formats regarding QAP. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 40 MONTHLY PROGRESS REPORT-MAY-2014 9.2-STATUS OF SOURCE APPROVAL-EPC-SOMA ENTERPRISE LTD-PACKAGE-A SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 41 MONTHLY PROGRESS REPORT-MAY-2014 Continue……. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 42 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 43 MONTHLY PROGRESS REPORT-MAY-2014 STATUS OF SOURCE APPROVAL-EPC-ISOLUX CORSAN INDIA-PACKAGE-B SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 44 MONTHLY PROGRESS REPORT-MAY-2014 9.3-STATUS OF QUALITY CONTROL TEST-EPC-SOMA ENTERPRISE LTDPACKAGE-A Continue………. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 45 MONTHLY PROGRESS REPORT-MAY-2014 Continue……… SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 46 MONTHLY PROGRESS REPORT-MAY-2014 Continue………… SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 47 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 48 ORT- MONTHLY PROGRESS REPORT-MAY-2014 WEATHER RERORT-EPC-SOMA ENTERPRISE LTD-PACKAGE-A Ram Nagar-Lab Report Temperature (Celsius) Min Max Date Average Rainfall (mm) Mohania-Lab Report Temperature (Celsius) Min Max Average Rainfall (mm) 26-Apr-14 24.4 34.6 - 26.2 37.3 - 27-Apr-14 29.1 37.3 - 26.3 37.4 - 28-Apr-14 29.1 37.9 - 26.5 37.4 - 29-Apr-14 29.1 37.9 - 27.0 37.2 - 30-Apr-14 29.0 37.8 - 26.9 39.7 - 01-May-14 29.1 39.6 - 26.7 39.6 - 02-May-14 28.4 37.6 - 26.8 39.7 - 03-May-14 28.3 39.5 - 28.3 36.1 - 04-May-14 29.1 37.3 - 27.4 37.6 - 05-May-14 24.9 34.5 - 27.2 37.4 - 06-May-14 24.7 36.5 - 27.1 37.6 - 07-May-14 24.6 36.9 - 29.1 37.0 - 08-May-14 27.2 39.1 - 29.1 37.3 - 09-May-14 26.9 38.4 - 29.1 37.9 - 10-May-14 24.9 35.9 - 29.1 37.9 - 11-May-14 24.1 36.0 - 29.0 37.8 12-May-14 24.6 37.3 - 29.1 39.6 - 13-May-14 24.7 37.8 - 28.4 37.6 - 14-May-14 24.9 38.1 - 28.3 39.5 - 15-May-14 26.0 35.8 - 28.7 35.7 - 16-May-14 27.1 37.1 - 28.7 36.8 - 17-May-14 27.1 38.6 - 28.7 37.9 - 18-May-14 27.7 37.0 - 28.7 39.0 - 19-May-14 27.5 38.1 - 28.7 39.0 - 20-May-14 26.8 37.4 - 28.7 39.0 - 21-May-14 28.7 39.0 - 28.7 39.0 - 22-May-14 28.7 39.0 - 29.0 38.0 - 23-May-14 28.7 39.0 - 29.0 39.4 - 24-May-14 27.7 37.6 - 29.0 39.4 - 25-May-14 27.4 37.6 - 28.4 39.4 - SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 49 MONTHLY PROGRESS REPORT-MAY-2014 STATUS OF QUALITY CONTROL TEST-EPC-ISOLUX CORSAN INDIAPACKAGE-B Continue….. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 50 MONTHLY PROGRESS REPORT-MAY-2014 Continue…….. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 51 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 52 MONTHLY PROGRESS REPORT-MAY-2014 Continue….. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 53 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 54 MONTHLY PROGRESS REPORT-MAY-2014 WEATHER RERORT-EPC-ISOLUX CORSAN INDIA-PACKAGE-B Kudra-Lab Report Date Temperature (Celsius) Min Max Average Rainfall (mm) Sasaram- Lab Report Temperature (Celsius) Min Max Average Rainfall (mm) Aurangabad- Lab Report Temperature (Celsius) Min Max Average Rainfall (mm) 26-Apr-14 25.4 41.9 - 25.8 46.8 - 24.7 42.6 - 27-Apr-14 25.3 43.3 - 25.2 44.9 - 24.7 42.9 - 28-Apr-14 22.3 42.6 - 23.5 46 - 23.6 42.8 - 29-Apr-14 24.1 41.0 - 23 46.2 - 23.8 42.9 - 30-Apr-14 24.1 43.0 - 25.5 48.1 - 24.5 43.4 - 01-May-14 27.4 45.1 - 28.4 47.4 - 24.9 43.8 - 02-May-14 26.1 39.7 - 27.8 42.5 - 25.3 43.2 - 03-May-14 26.6 40.3 - 27 44.2 - 25.0 43.1 - 04-May-14 24.3 42.3 - 25.2 46 - 25.1 43.6 - 05-May-14 25.2 39.6 - 25.6 42.5 - 25.4 43.9 - 06-May-14 25.6 40.4 - 27.2 45.2 - 25.2 43.7 - 07-May-14 26.3 41.1 - 26.8 43.8 - 24.9 43.7 - 08-May-14 28.9 41.4 - 27.2 44.6 - 23.8 42.5 - 09-May-14 30.8 41.4 - 28.9 43.6 - 23.7 39.6 - 10-May-14 28.2 42.3 - 28.8 44.2 - 23.8 39.8 - 11-May-14 28.4 43.5 - 29.3 45.4 - 23.8 39.9 - 12-May-14 27.3 44.9 - 28 46 - 26.6 40.6 - 13-May-14 25.2 41.8 - 25.2 46.6 - 24.4 42.1 2.0 MM 14-May-14 26.8 41.3 - 27 44.2 - 24.1 42.3 - 15-May-14 26.9 41.4 - 27.5 42.4 - 25.9 42.6 - 16-May-14 27.0 41.5 - 27.5 43.6 - 26.9 43.0 - 17-May-14 27.1 41.6 - 28.6 46.6 - 26.9 43.6 - 18-May-14 27.0 41.6 - 27.8 45.4 - 26.9 44.4 - 19-May-14 27.1 42.1 - 28 45.2 - 26.9 44.5 - 20-May-14 27.8 42.1 - 29.2 45.3 - 27.4 44.6 - 21-May-14 27.4 42.8 - 28 46.6 - 26.3 43.9 - 22-May-14 25.4 42.0 - 27.5 47.1 - 26.2 44.1 - 23-May-14 29.6 44.1 - 30.3 49.6 - 26.3 45.4 - 24-May-14 29.3 25.9 43.8 - 31.2 49.8 - 26.4 45.6 - 43.2 1.6 25.8 47.4 35.7 26.5 45.8 - 25-May-14 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 55 MONTHLY PROGRESS REPORT-MAY-2014 9.4-(I) STATUS OF SITE CAMPS EPC-SOMA ENTERPRISE LTD-PACKAGE-A SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 56 MONTHLY PROGRESS REPORT-MAY-2014 9.4-(II)-STATUS OF SITE CAMPS EPC-ISOLUX CORSAN INDIA-PACKAGE-B SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 57 MONTHLY PROGRESS REPORT-MAY-2014 10.0 STATUS OF MILESTONES Note: (i) The 1st Milestone scheduled on 23rd May, 2012 has successfully achieved and communicated to NHAI & ICT. (ii) Extension of Time for 365 days for all Milestones requested to NHAI. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 58 MONTHLY PROGRESS REPORT-MAY-2014 11.0 STATUS OF PHYSICAL PROGRESS- PACKAGE-A & B Total Length EPC’A’ Achieved EPC ‘B’ Achieved Description ( Km ) Main Carriage Way LHS 186.58 C& G 186.58 Emb 186.58 SG 186.58 GSB 100.16 WMM 101.82 DBM 101.82 BC 86.43 DLC 86.43 PQC Total Achieved Package- Total Length Till date Pkg-A Total Length Till date Pkg-A A&B 82.11 82.11 82.11 82.11 73.21 74.87 74.87 8.9 8.9 27.83 14.54 10.26 7.25 0.00 1.90 0.00 1.42 0.00 104.47 104.47 104.47 104.47 26.95 26.95 26.95 77.53 77.53 49.37 40.11 36.56 36.17 1.89 1.24 0.00 26.43 23.69 77.20 54.65 46.82 43.42 1.89 3.14 0.00 27.85 23.69 82.11 82.11 82.11 82.11 73.21 74.87 74.87 8.9 8.9 30.09 15.97 13.19 9.72 0.00 0.00 0.00 1.72 0.00 104.47 104.47 104.47 104.47 26.95 26.95 26.95 77.53 77.53 59.92 46.16 44.18 40.91 2.32 0.55 0.00 29.28 28.19 90.01 62.13 57.37 50.63 2.32 0.55 0.00 31.00 28.19 72.23 72.23 72.23 72.23 64.38 64.38 7.85 7.85 22.85 4.64 4.17 4.06 0.00 0.00 1.36 0.00 73.79 73.79 73.79 73.79 66.09 66.09 7.7 7.7 16.51 5.85 2.59 1.71 0.00 0.00 0.00 0.00 39.36 10.49 6.76 5.77 0.00 0.00 1.36 0.00 72.23 72.23 72.23 72.23 64.38 64.38 7.85 7.85 32.77 17.65 11.92 8.69 1.92 0.81 1.55 0.00 73.79 73.79 73.79 73.79 66.09 66.09 7.7 7.7 39.96 22.20 14.97 10.28 0.00 0.00 0.00 0.00 72.73 39.85 26.89 18.97 1.92 0.81 1.55 0.00 Main Carriage Way RHS C& G 186.58 Emb 186.58 186.58 SG GSB 186.58 WMM 100.16 DBM 101.82 BC 101.82 DLC 86.43 PQC 86.43 Service Roads LHS 146.02 C& G 146.02 Emb 146.02 SG 146.02 GSB/DL 130.47 WMM 130.47 DBM 15.55 DLC 15.55 PQC Service Roads RHS 146.02 C& G 146.02 Emb 146.02 SG 146.02 DL/GSB 130.47 WMM 130.47 DBM 15.55 DLC 15.55 PQC SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 59 MONTHLY PROGRESS REPORT-MAY-2014 12.0 STATUS OF PHYSICAL STRUCTURE PROGRESSPACKAGE-A & B Package - A – Soma Structures progress Total (As per Site) Completed In Progress Yet to be started Major Bridge 5 0 3 2 Minor Bridge 10 0 9 1 VUP 23 0 2 21 PUP 43 0 2 41 Flyover 2 0 1 1 2 182 0 22 2 109 0 51 Type of Structure ROB Slab / Box / Pipe Culvert Package – B – Isolux Structures progress Total (As per Site) Completed In Progress Yet to be started Major Bridge 7 0 6 1 Minor Bridge 15 0 11 4 VUP 19 0 0 19 PUP 38 0 1 37 Flyover 5 0 0 5 ROB 1 0 0 1 199 30 136 33 Type of Structure Slab / Box / Pipe Culvert Note: (i) Structures where excavation started are also considered in work in progress. (iii) Structure details are mentioned at Page no: 128 Annexure-2 & 3 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 60 106.005 100.505 97.505 83.075 74.675 192 150 121 99 500.00 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD be submitted afterward. Page 61 158.673 158.673 May-14 158.667 Apr-14 Mar-14 158.048 157.758 157.616 157.386 156.806 156.046 155.206 154.741 152.961 150.461 140.279 1,494 1,494 1,483 1,446 1,405 1,362 1,306 1,248 1,225 1,199 1,171 1,093 1,023 1750.00 Feb-14 Jan-14 Dec-13 Nov-13 Oct-13 Sep-13 Aug-13 Jul-13 Jun-13 May-13 Apr-13 953 Cummulative Achieved 137.436 Cummulative Planned Mar-13 247 Mar-12 113.675 314 Apr-12 116.175 385 May-12 117.675 469 Jun-12 119.030 484 Jul-12 119.030 494 Aug-12 119.030 505 Sep-12 120.513 564 Oct-12 121.539 647 Nov-12 122.120 725 Dec-12 126.130 810 Jan-13 132.580 886 Feb-13 135.000 Feb-12 Jan-12 Dec-11 0.00 Nov-11 250.00 TURNOVER (RS. CRORES) 750.00 86 1000.00 79 1250.00 0.000 1500.00 Oct-11 Sep-11 MONTHLY PROGRESS REPORT-MAY-2014 13.0 STATUS OF FINANCIAL PROGRESS-S-CURVE EPC-SOMA ENTERPRISE LTD-PACKAGE-A S-Curve:-Soma Financial Progress 2000.00 N O T E : The S-Curve planned figures will be updated after approval of EOT & as per approved EOT date, revised construction program will 1500.00 1250.00 1000.00 750.00 500.00 250.00 0.00 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD be submitted afterward. Page 62 289.412 304.680 May-14 281.382 Apr-14 Mar-14 270.932 256.722 246.337 224.640 214.460 209.300 203.760 201.220 195.454 185.954 176.139 1,494 1,477 1,433 1,376 1,309 1,238 1,176 1,148 1,123 1,099 1,036 972 904 1750.00 Feb-14 Jan-14 Dec-13 Nov-13 Oct-13 Sep-13 Aug-13 Jul-13 Jun-13 May-13 Apr-13 161.878 Cummulative Planned Cummulative Achieved Mar-13 75 Sep-11 TURNOVER (RS. CRORES) 0.000 Oct-11 85 74.675 Nov-11 84.905 97 Dec-11 95.705 114 Jan-12 134 96.955 Feb-12 197 98.455 271 Mar-12 99.845 324 Apr-12 101.345 385 May-12 104.345 442 Jun-12 109.894 463 Jul-12 111.394 496 Aug-12 111.958 526 Sep-12 115.418 577 Oct-12 118.878 640 Nov-12 123.188 706 Dec-12 133.758 773 Jan-13 141.382 840 Feb-13 150.915 MONTHLY PROGRESS REPORT-MAY-2014 STATUS OF FINANCIAL PROGRESS-S-CURVE EPC-ISOLUX CORSAN INDIA-PACKAGE-B S-Curve:-Isolux Financial Progress 2000.00 N O T E : The S-Curve planned figures will be updated after approval of EOT & as per approved EOT date, revised construction program will MONTHLY PROGRESS REPORT-MAY-2014 14.0 CORRESPONDENCE DETAIL LETTER INCOMING FROM INDEPENDENT ENGINEER/NHAI Continue……. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 63 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 64 MONTHLY PROGRESS REPORT-MAY-2014 LETTER OUTGOING TO INDEPENDENT ENGINEER/NHAI Continue….. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 65 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 66 MONTHLY PROGRESS REPORT-MAY-2014 C-1-SAFETY ARRANGEMENTS AT SITE EPC-SOMA ENTERPRISE LTD-PACKAGE-A Safety arrangement at 804.870 LHS Safety Arrangement @ Ch. 857+050 @ Median RHS Median Closure @ ch. 866+340 Safety Arrangement @ Ch. 845+630 RHS Safety Arrangement @ Ch. 859+280 @ Median RHS Safety Arrangement @ Ch. 868+050 @ Median LHS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 67 MONTHLY PROGRESS REPORT-MAY-2014 SAFETY ARRANGEMENTS PHOTOGRAPHSISOLUX CORSAN INDIA-PACKAGE-B Toolbox talks conducted at live road near drain work Provided NJB Use of PPE at PQC site at Night shift Provided Bollards with fuzzy at site Barricading at DLC site Concreting of girder at 871.600 LHS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 68 MONTHLY PROGRESS REPORT-MAY-2014 Barricading with helps bollards & fuzzy Right use of PPE at Girder site Barricading after PQC Laying completing TBT Training at Girder casting site Provided Bollards at site TBT Training General Guideline during welding & cutting (Kudra camp on Fabrication Yard SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 69 MONTHLY PROGRESS REPORT-MAY-2014 D-1-OPERATION & MAINTENANCE OF HIGHWAY ACCIDENT REPORT Continue……. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 70 MONTHLY PROGRESS REPORT-MAY-2014 Continue……. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 71 MONTHLY PROGRESS REPORT-MAY-2014 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 72 MONTHLY PROGRESS REPORT-MAY-2014 CORRIDOR CONTROL REPORT SITE SAFETY AND ROAD MONITORING BY ROUTINE PATROLLING TRAFFIC MANAGEMENT at Ch: 823+350 RHS TRAFFIC MANAGEMENT at Ch: 819+530 LHS 04+570 RHS LHS Removal of accident vehicle off from the highway at Ch: 822+050 RHS Removal of accident vehicle off from the highway at Ch: 807+610 RHS . Removing debris/Waste materials from the highway at Ch: 793+800 RHS Removing debris/Waste materials from the highway at Ch: 795+820 RHS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 73 MONTHLY PROGRESS REPORT-MAY-2014 Continue…. Providing Ambulance service at Ch: 826+820 RHS Removal of dead animal from the highway at Ch: 807+780 LHS Removal of accident vehicle off from the highway at Ch: 887+960 RHS Providing Ambulance service at Ch: 801+220 LHS Removal of dead animal from the highway at Ch: 802+550 RHS Providing Medical aid to injured person in accident at Ch: 951+500 LHS LHS . SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 74 MONTHLY PROGRESS REPORT-MAY-2014 E-1-MAINTAINENCE OF HIGHWAY MAINTAINENCE WORK DONE DURING THE MONTH Location From 793.800 788.102 788.410 788.610 788.815 To 793.950 788.410 788.610 788.815 789.270 Mohansarai 788+050 857.625 858.040 856.980 858.380 859.195 850.865 853.855 857.625 857.000 859.195 847.860 848.910 850.960 853.850 846.500 847.860 845.822 845.800 847.170 847.340 853.850 854.680 854.650 863.990 862.990 853.750 857.770 858.130 857.550 858.990 859.600 851.540 854.400 857.800 857.595 859.600 848.845 849.140 851.540 854.400 846.950 848.640 846.500 847.070 847.295 847.830 854.670 854.020 854.940 856.000 846.250 845.800 855.000 844.180 844.410 845.830 Description Patch work by DBM Laying Patch work by DBM Laying Patch work by DBM Laying Patch work by DBM Laying Patch work by DBM Laying Maintenance of Mohansarai Service Road with 9 trip GSB Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Micro Surfacing work Pothole filling Work Pothole filling Work Pothole filling Work Pothole filling Work Pothole filling Work Pothole filling Work Pothole filling Work Pothole filling Work Pothole filling Work 846.950 846.500 855.100 Micro Surfacing work Micro Surfacing work Shifting of Metal crash Barrier Shifting of Metal crash Barrier Shifting of Metal crash Barrier Shifting of Metal crash Barrier Side Remarks RHS RHS RHS RHS RHS BHS RHS RHS LHS LHS LHS RHS RHS RHS LHS LHS LHS LHS RHS RHS RHS LHS RHS LHS LHS LHS LHS LHS LHS RHS RHS LHS Lane-1 Lane-1 Lane-1 Lane-2 Lane-1 Lane-1 Lane-1 Lane-2 Lane-2 Lane-2 Lane-1 Lane-1 Lane-2 Lane-2 Lane-1 Lane-2 Lane-1 Lane-1 Lane-1 Lane-1 LHS LHS LHS LHS RHS RHS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 75 MONTHLY PROGRESS REPORT-MAY-2014 Shifting of Metal crash Barrier 854.915 844.910 844.910 848.640 855.000 845.535 845.535 849.870 855.100 Micro Surfacing work Micro Surfacing work Micro Surfacing work 846.950 849.140 850.110 855.000 845.990 846.950 850.110 847.670 849.870 850.815 855.108 846.250 847.690 850.815 905+260 - MCW repair by Ezee Patch LHS(MCW) 911+100 - MCW repair by Ezee Patch RHS(MCW) 879+425 879+450 MBCB Repair LHS(MCW) 879+420 879+425 MBCB Repair RHS(MCW) 907+000 923+050 929+650 938+630 937+350 937+150 937+600 937+290 Sasaram T/P 923+060 938+320 937+450 937+350 937+690 937+620 Lane-1 Lane-2 Lane-2 Shifting of Metal crash Barrier LHS LHS LHS RHS Micro Surfacing work Micro Surfacing work Micro Surfacing work RHS LHS LHS Lane-2 Lane-1 Lane-1 Shifting of Metal crash Barrier RHS Shoulder Micro Surfacing work Micro Surfacing work Micro Surfacing work RHS RHS LHS Lane-2 Lane-1 Lane-2 Toll Plaza Repairing- VNS & ABAD Side Booth Nos. 1, 2, 3 & 4 Slippage Area Removal by JCB Slippage Area Removal by JCB Patch work by WMM Work Excavation & MCW removal Excavation & MCW removal Excavation & MCW removal WMM Dumping & Laying RHS(MCW) RHS(MCW) RHS(MCW) RHS(MCW) RHS RHS RHS RHS Note: (i) Routine Maintenance are continue throughout the Project Like- Drain cleaning,Watering,Median Plant trimming, garbage cleaning at structure,foothpath areas etc. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 76 MONTHLY PROGRESS REPORT-MAY-2014 PHOTOGRAPHS-ROUTINE HIGHWAY MAINTAINENCE Ch. 788.102 to ch. 788.410 RHS DBM laying Metal crash Barrier work at ch-855.000 to 855.105 RHS Shoulder Micro Surfacing work from ch-846.950 to 847.690 RHS MCW Lane-1 Ch. 793.800 to ch. 793.950 RHS DBM lay ing Micro Surfacing work from ch-850.110 to 850.815 LHS MCW Lane-2 Micro Surfacing work from ch-845.990 to 846.250 RHS MCW Lane-2 Continue…… SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 77 MONTHLY PROGRESS REPORT-MAY-2014 Micro Surfacing from ch-850.110 to 850.815 LHS MCW L-1 Micro Surfacing from ch-849.140 to 849.870 LHS MCW L-1 Micro Surfacing from ch-846.950 to 847.670 RHS MCW L-2 Ch. 844.910 to ch. 849.870 Microsurfacing LHS(MCW) CH. 855.000 to Ch. 855.100 MCB repair & installation NJ Crash Barrier Shifting at Ch. 866.365 BHS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 78 MONTHLY PROGRESS REPORT-MAY-2014 Ch. 846.250 to ch. 846.950 MCW Microsurfacing Ch. 846.250 to ch. 846.950 MCW Microsurfacing Unauthorized Median opening closed at ch848.585 Unauthorized Median opening closed at ch- 843.950 Pothole filling at ch-854.650 to 854.670 LHS MCW Pothole filling at ch-863.990 RHS MCW SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 79 MONTHLY PROGRESS REPORT-MAY-2014 Pothole filling at ch-853.850 LHS MCW Micro Surfacing work from ch-850.960 to 854.400 RHS MCW L-2 Micro Surfacing work from ch-847.860 to 849.140 LHS MCW L-1 Micro Surfacing work from ch-845.822 to 846.500 RHS MCW L-1 Micro Surfacing work from ch-859.195 to 859.600 LHS MCW L-1 Excavation & MCW removal 937+350 937+450 RHS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 80 MONTHLY PROGRESS REPORT-MAY-2014 SITE WORK PROGRESS EPC-SOMA ENTERPRISE LTD-PACKAGE-A Pile of minor bridge @ P1 /P2 at ch854.049 RHS ACW Pile of Major Bridge test pile at ch-854.310 RHS ACW Coordinate checking of pile @ Major bridge at ch-843.303 LHS ACW Pile of Major Bridge test pile at ch854.310 RHS ACW Coordinate checking of pile @ Major bridge at ch-843.303 LHS ACW Coordinate checking of pile @ Major bridge at ch-843.303 LHS ACW SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 81 MONTHLY PROGRESS REPORT-MAY-2014 SITE WORK PROGRESS EPC-ISOLUX CORSAN INDIA-PACKAGE-B GSB Layer Preparation before WMM 913+300-913+540 RHS DBM Laying RHS 937+245 937+620 Checking Shuttering, Reinforcement and conc. M-25 for raft 956+590 956+610 LHS for Drain work WMM 1st Layer preparation 919+020919+100 LHS Checking Shuttering, Reinforcement and conc. M-25 for wall 944+200 944+220 RHS Concreting for girder at 871.600 LHS SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 82 MONTHLY PROGRESS REPORT-MAY-2014 E-3-(I) STATUS OF ENVIRONMENTAL COMPLIANCE EPC-SOMA ENTERPRISE LTD-PACKAGE-A- SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 83 MONTHLY PROGRESS REPORT-MAY-2014 E-3-(II) EPC-ISOLUX CORSAN INDIA-PACKAGE-B SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 84 MONTHLY PROGRESS REPORT-MAY-2014 E-4-COMPLIANCE OF PROVISIONS OF CONCESSION AGREEMENT FOR EFFECTIVE PROJECT MANAGEMENT OF DBFOT PROJECT DURING CONSTRUCTION PERIOD SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 85 MONTHLY PROGRESS REPORT-MAY-2014 DURING OPERATION PERIOD SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 86 MONTHLY PROGRESS REPORT-MAY-2014 F-EVENTS OF FORCE MAJEURE EPC-SOMA ENTERPRISE LTD-PACKAGE-A (i) Ban on Mining & Crushing at Dala Crusher.The Event informed vide our letter to NHAI-SI-PO-NH-2/2011-201/1398 dated 17th Mar-12. (ii) Relief on Account of Force Majeure Event-Adverse Weather condition/Floods on NH-2-Package-A. The event informed vide our letter no- SI-Po/NH2/20112012/475 dated: 8th Oct-2011. EPC-ISOLUX CORSAN INDIA-PACKAGE-B (i) An incident happened on 30th Dec, 2011 near stone mines at Chaparwar quarry (Proposed crusher location) in the state of Jharkand.An Armed Group of 40-50 Nexulist peoples threatened the Isolux Corsan staff at Chaparwar quarry location and burnt one JCB Machine. The Incident is explained in detailed manner given by our letter noSI-PO-NH-2/2011-2012/914 dated: 9th Jan, 2012 is attached with Newspaper copy. This incident comes under “FORCE MAJEURE” Article 34.3-Indirect Political Event in Concession Agreement “ an act of war (wheather declared or undeclared ),invasion, armed conflict or act of foreign enemy,blockade,embargo,riot,insurrection,terrorist or military action, civil commotion or politically motivated sabotage”. (ii) Stoppage of work due to bandh called by the Extremist group in some parts of Jharkhand and Bihar States-(Km: 843+000-978+400.This event informed vide our letter no- SI-PO-NH-2/2011-2012/1466 dated 28th Mar-12. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 87 MONTHLY PROGRESS REPORT-MAY-2014 G- OPERATION REPORTS S.No 1.0 1.1 1.2 1.2.1 1.2.2 1.2.3 1.2.4 1.2.5 1.2.6 1.2.7 1.2.8 1.2.9 1.3 1.3.1 1.3.2 1.3.3 1.3.4 1.3.5 1.3.6 1.3.7 1.3.8 1.3.9 1.4 1.4.1 1.4.2 1.4.3 1.4.4 1.4.5 1.4.6 1.4.7 1.4.8 1.4.9 2.0 2.1 2.2 2.3 3.0 3.1 3.2 3.3 3.4 3.5 3.6 Content Traffic & Revenue Report Traffice Figures Dafi Toll Plaza Monthly User fee collection & Deposit Report Detail of Monthly Vehicle passing Details of Toll Collection & Deposit Single Entry-Monthly Fee Statement Return Entry Special Privilege-Return Journey-Monthly Fee Statement Special Privilege-Multiple Journey-Monthly Fee Statement Reusage of Return Entry Ticket Usage of Monthly Pass-Monthly Fee Statement Mohania Toll Plaza Monthly User fee collection & Deposit Report Detail of Monthly Vehicle passing Detail of Toll Collection & Deposit Single Entry-Monthly Fee Statement Return Entry-Monthly Fee Statement Special Privilage-Return Journey Special Privilage-Multiple Journey Reusage of Return Entry Ticket Usage of Monthly Pass-Monthly Fee Statement Sasaram Toll Plaza Monthly User fee collection & Deposit Report Detail of Monthly Vehicle Passing Detail of Toll Collection & Deposit Single Entry-Monthly Fee Statement Return Entry-Monthly Fee Statement Reusage of Return Ticket Special Privilage-Single Journey Special Privilage-Multiple Journey Usage of Monthly Pass Toll Collection Deposit Dafi Deposit Mohania Deposit Sasaram Deposit Corridor Control Report Incident and Accident Summary Monthly Information Dead Animal Report Ambulance Report Incident Management Data Road User Complain detail SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 88 MONTHLY PROGRESS REPORT-MAY-2014 1. 1.1 Traffic and Revenue Report Traffic Figures The following traffic figures are provided per plaza for the month. The legend below indicated the class table used in the report. Class of Vehicle Description Class 1 Car/Jeep/Van Class 2 LCV (Light Commercial Vehicle) / Mini Bus Class 3 Truck/Bus Class 4 MAV (Multi Axle Vehicle) Heavy Earth Moving Equipment Class 5 OSV (Over sized Vehicle) SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 89 MONTHLY PROGRESS REPORT-MAY-14 MONTHLY USER FEE COLLECTION AND DEPOSIT REPORT Detail of Monthly Vehicle passing OF THE DHAFFI PLAZA AT KM. 800+000 FOR DURING THE MONTH, THE DISTANCE FROM KM 786+000 TO KM 841. 1.2.1 PART - I Sl. No. 1 2 3 4 5 6 Type of Vehicles Car/Jeep/Van LCV Truck Bus MAV OSV Total Amount of Fee collected through Tickets For the Current Month Cumulative from 12/09/11 Fee Collected through Passes For the Current Month Cumulative from 12/09/11 Total Amount Collected For the Current Month Cumulative from 12/09/11 3416925 75271525 131595 3656700 3548520 78928225 1620900 44424210 8700 1111920 1629600 45536130 5570260 162201015 0 567220 5570260 162768235 1028415 33877255 0 422960 1028415 34300215 50984490 1445291760 0 2404835 50984490 1447696595 7700 294240 0 0 7700 294240 62628690 1761360005 140295 8163635 62768985 1769523640 Total Amount Deposited Remarks Difference For the Current Month month 62766120 Cumulative from 12/09/11 1769408768 PART - II Sl. No. 1 Name of the Bank & Branch For the Current Month Cumulative from 12/09/2011 Punjab National Bank, Branch-Bhikharipur,Varanasi 62766120 1769408768 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 90 Remarks MONTHLY PROGRESS REPORT-MAY-14 Dhaffi Plaza No. of Average Monthly Passage All Types of Single Entry All types of Return Journey All types of Return Passage Usage of Monthly Passes Exempted Records Violation records N.T Vehicle (tractor/3 wheeler) Grand Total (A) Car/Jeep/Van LCV Truck Bus MAV OSV Total 3081 699 1140 229 6067 1 11218 Car/Jeep/Van LCV Truck % of Grand Nos. Total (A) Bus % of Grand Nos. Total (A) MAV OSV % of Grand Nos. Total (A) Total % of Grand Nos. Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) 31739 33.23 14342 66.14 17887 50.62 2143 30.14 161200 85.71 22 100.00 227333 57.84 20891 21.87 3091 14.26 8577 24.27 2394 33.67 14793 7.87 0 0.00 49746 12.66 19395 20.30 2852 13.15 8180 23.15 2250 31.65 11330 6.02 0 0.00 44007 11.20 12448 13.03 606 2.79 80 0.23 0 0.00 0 0.00 0 0.00 13134 3.34 10997 11.51 792 3.65 607 1.72 323 4.54 754 0.40 0 0.00 13473 3.43 50 0.05 0 0.00 2 0.01 0 0.00 7 0.00 0 0.00 59 0.02 0 0.00 0 0.00 0 0.00 0 0.00 0 0 0 0.00 45308 11.53 95520 100 21683 100 35333 100.00 7110 100.00 188084 100.00 22 100.00 393060 100.00 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 91 MONTHLY PROGRESS REPORT-MAY-14 1.2.3 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 92 MONTHLY PROGRESS REPORTMAY-14 1.2.4 SINGLE ENTRY MONTHLY FEE STATEMENT-DHAFFI PLAZA Project Highway: NH-2 Type of Vehicle (1) A Car B LCV C Bus D Truck E Multi-axle Truck F Oversized Vehicle G Total For corresponding Month of Previous Year Fee No. of Collected Vehicles (in Rs.) (2) (3) (1) A Car B LCV C Bus D Truck E Multi-axle Truck F Oversized Vehicle G Total For the Month Reported on No. of Vehicle s (4) Fee Collected (in Rs.) (5) Fee per Vehicle (in Rs.) (6) (7) Fee Collected (in Rs.) (8) No. of Vehicles 34265 1713250 26061 1433355 55 31739 1745645 15349 1227920 15055 1279675 85 14342 1219070 3080 523600 2420 435600 180 2143 385740 19462 3308540 18445 3320100 180 17887 3219660 149411 40340970 167506 47739210 285 161200 45942000 27 8910 42 14700 350 22 7700 221594 47123190 229529 54222640 227333 52519815 1.2.5 Project Highway: NH-2 Type of Vehicle For Preceding Year RETURN ENTRY MONTHLY FEE STATEMENT-DHAFFI PLAZA For corressponding Month of Previous Year For Preceeding Year For the Month Reported on Fee Fee Fee Fee No. of No. of per No. of Collected Collected Collected Vehicles Vehicles Vehicle Vehicles (in Rs.) (in Rs.) (in Rs.) (in Rs.) (2) (3) (4) (5) (6) (7) (8) 20161 1512075 19289 1543120 80 20891 1671280 3487 435875 2832 368160 130 3081 400530 2754 716040 1918 527450 275 2229 612975 9123 2371980 8549 2350975 275 8492 2335300 10650 4313250 5502280 430 0 0 0 0 520 46175 9349220 45384 10291985 12796 9519 4093170 0 0 44212 9113255 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 93 MONTHLY PROGRESS REPORTMAY-14 1.2.6 SPECIAL PREVILEDGE - RETURN JOURNEY MONTHLY FEE STATEMENT-DHAFFI PLAZA Project Highway: Varanasi Aurangabad For corressponding Month of Previous Year For Preceeding Month For the Month Reported on (2) (3) (4) (5) Fee per Vehicl e (in Rs.) (6) (7) (8) A Car B LCV C Bus D Truck n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 283 48110 122 21960.00 180.00 165 29700.00 83 14110 133 180.00 85 15300.00 E Multi-axle Truck 5405 918850 6199 180.00 5274 949320.00 F Oversized Vehicle G Total n/a n/a n/a 23940.00 1115820.0 0 n/a n/a n/a n/a 5771 981070 6454 1161720 5524 994320 Type of Vehicle (1) No. of Vehicles Fee Collected (in Rs.) No. of Vehicle s Fee Collecte d (in Rs.) No. of Vehicle s Fee Collected (in Rs.) 1.2.7 SPECIAL PREVILEDGE - MULTIPLE JOURNEY MONTHLY FEE STATEMENT-DHAFFI PLAZA Project Highway: Varanasi - Aurangabad Type of Vehicle (1) A Car B LCV C Bus D Truck E Multi-axle Truck F Oversized Vehicle G Total For corressponding For Preceeding Month of Previous Month Year Fee Fee No. of No. of Collected Collected Vehicles Vehicles (in Rs.) (in Rs.) (2) (3) (4) (5) For the Month Reported on Fee per Vehicle (in Rs.) (6) (7) Fee Collected (in Rs.) (8) 0 0.00 10 1300.00 No. of Vehicles 0 0 0 0 3 375 4 520 0 0 0 0 0 0.00 0 0 0 0 0 0.00 0 0 0 0 0 0.00 0 0 0 0 0 0.00 3 375 4 520 10 1300.00 130.00 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 94 MONTHLY PROGRESS REPORTMAY-14 1.2.8 REUSAGE OF RETURN ENTRY TICKET MONTHLY FEE STATEMENT-DHAFFI PLAZA Project Highway: NH-2 DHAFFI TOLL PLAZA Type of Vehicle (1) A Car B LCV C Bus D Truck E Multi-axle Truck F Oversized Vehicle G Total For corressponding For Preceeding Month of Previous For the Month Reported on Year Year Fee Fee Fee No. of No. of Fee per Vehicle No. of Collected Collected Collected Vehicles Vehicles (in Rs.) Vehicles (in Rs.) (in Rs.) (in Rs.) (2) (3) (4) (5) (6) (7) (8) 18596 0 17915 0 0 19395 0 3236 0 2604 0 0 2852 0 3002 0 1937 0 0 2250 0 8773 0 8259 0 0 8180 0 12664 0 14875 0 0 11330 0 0 0 0 0 0 0 0 46271 0 45590 0 44007 0 1.2.9 USAGE OF MONTHLY PASS MONTHLY FEE STATEMENT-DHAFFI PLAZA Project Highway: NH-2 Type of Vehicle (1) A Car B LCV C Bus D Truck E Multi-axle Truck F Oversized Vehicle G Total For corressponding Month of Previous Year Fee No. of Collected (in Vehicles Rs.) (2) (3) For Preceeding Year For the Month Reported on (4) Fee Collecte d (in Rs.) (5) Fee per Vehicle (in Rs.) (6) No. of Vehicles (7) Fee Collected (in Rs.) (8) No. of Vehicles 13147 132205 13323 259845 225 & 1795 12448 131595 785 38360 1050 31900 2900 606 8700 0 5740 0 0 2900 & 6075 0 0 380 45920 92 0 2900 & 6075 83 0 687 162000 40 0 6075 & 9525 0 0 0 0 0 0 11595 0 0 14999 384225 14505 291745 13137 140295 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 95 MONTHLY PROGRESS REPORT-MAY-14 1.3.0 MONTHLY USER FEE COLLECTION AND DEPOSIT REPORT OF THE MOHANIA PLAZA 1.3.1 PART - I Sl. No. Type of Vehicles Amount of Fee collected through Tickets For the Current Month Cumulative from 01/04/11 Fee Collected through Passes For the Current Month Cumulative from 01/04/11 Total Amount Collected For the Current Month Cumulative from 01/04/11 1 Car/Jeep/Van 2760410 64682650 49580 1,310,255 2809990 2 LCV 1083105 28734640 11225 242,150 1094330 3 Truck 1803770 58543200 0 196,555 1803770 58739755 4 Bus 265860 11685330 0 265860 11699270 5 MAV 36748800 1026495540 0 6 OSV 7020 239160 0 0 7020 239160 42668965 1190380520 60805 1890115 42729770 1,192,270,635 Total 13940 127,215 36748800 Total Amount Deposited For the Current Month Cumulative from 01/04/11 Remarks Differenc e month 65,992,905 28,976,790 42729465 1,192,270,635 42729465 1,192,270,635 1,026,622,755 PART - II Sl. No. 1 Name of the Bank & Branch For the Current Month Punjab National Bank, Branch-Akorhi, Mohania. (Bihar) 42729465 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Cumulative from 01/04/2011 1,192,270,635 Page 96 Remarks MONTHLY PROGRESS REPORT-MAY-14 1.3.2 Detail of Monthly Vehicle passing Mohania Plaza No. of Average Monthly Passage Car/Jeep/Van LCV Truck Bus MAV OSV Total 3563 779 443 68 5599 1 10452 Car/Jeep/Van LCV Truck Bus MAV OSV Total Nos. % of Grand Total (A) Nos. % of Grand Total (A) 85.61 26 100.00 204491 63.11 12986 7.48 0 0.00 40688 12.56 20.31 11709 6.75 0 0.00 43306 13.37 0 0.00 0 0.00 0 0.00 5495 1.70 4.15 8 0.38 276 0.16 0 0.00 12757 3.94 25 0.18 1 0.05 6 0.00 0 0.00 104 0.03 0.00 0 0.00 0 0.00 0 0 0 0.00 17183 5.30 100 13726 100.00 2112 100.00 173572 100.00 26 100.00 324024 100.00 Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) 27.69 11777 48.77 12290 89.54 1224 57.95 148595 23650 21.41 3176 13.15 426 3.10 450 21.31 All types of Return Passage 22526 20.40 8257 34.20 385 2.80 429 Usage of Monthly Passes 5201 4.71 264 1.09 30 0.22 Exempted Records 11234 10.17 669 2.77 570 69 0.06 3 0.01 N.T Vehicle (tractor/3 wheeler) 17183 15.56 0 Grand Total (A) 110442 100 24146 Nos. % of Grand Total (A) All Types of Single Entry 30579 All types of Return Journey Violation records SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 97 MONTHLY PROGRESS REPORT-MAY-14 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 98 MONTHLY PROGRESS REPORTMAY-14 1.3.4 SINGLE ENTRY MONTHLY FEE STATEMENT-MOHANIA PLAZA Project Highway: Soma Isolux Varanasi Aurangabad Mohania Toll Plaza For corressponding Month of Previous Year Fee No. of Collected Vehicles (in Rs.) (2) (3) Type of Vehicle For Preceeding Month For the Month Reported on (4) Fee Collected (in Rs.) (5) Fee per Vehicle (in Rs.) (6) (7) Fee Collected (in Rs.) (8) A Car 23511 940440 40 30579 1223160 B LCV 11862 771030 65 11773 765245 C Bus 1473 206220 140 1224 171360 D Truck 11517 1612380 140 12256 1715840 E Multi-axle Truck 142203 31284660 220 147130 32368600 F Oversized Vehicle 33 8910 270 26 7020 183967 31761805 202988 36251225 (1) G Total No. of Vehicles No. of Vehicles 1.3.5 RETURN ENTRY MONTHLY FEE STATEMENT-MOHANIA PLAZA Project Highway: Soma Isolux Varanasi Aurangabad Mohania Toll Plaza Type of Vehicle For corressponding Month of Previous Year Fee No. of Collected Vehicles (in Rs.) (2) (3) For Preceeding Month For the Month Reported on (4) Fee Collected (in Rs.) (5) Fee per Vehicle (in Rs.) (6) (7) Fee Collected (in Rs.) (8) A Car 18916 1229540 65 23650 1537250 B LCV 1863 186300 100 1984 198400 C Bus 360 75600 210 450 94500 D Truck 368 77280 210 392 82320 E Multi-axle Truck 11688 3857040 330 12067 3982110 F Oversized Vehicle 0 0 405 0 0 33747 5081530 38543 5894580 (1) G Total No. of Vehicles No. of Vehicles SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 99 MONTHLY PROGRESS REPORTMAY-14 1.3.6 SPECIAL PRIVELEGE SINGLE ENTRY MONTHLY FEE STATEMENT-MOHANIA PLAZA Project Highway: Soma Isolux Varanasi Aurangabad Mohania Toll Plaza For corressponding Month of Previous Year Type of Vehicle For Preceeding Month For the Month Reported on No. of Vehicles Fee Collected (in Rs.) No. of Vehicles Fee Collected (in Rs.) Fee per Vehicle (in Rs.) No. of Vehicles Fee Collected (in Rs.) (2) (3) (4) (5) (6) (7) (8) G Oversized Vehicle 0 0 3 0 36 1391 0 0.00 0.00 195.00 0.00 2340.00 194740.00 0.00 40.00 65.00 65.00 65.00 65.00 140.00 0.00 0 0 4 0 34 1465 0 0.00 0.00 260.00 0.00 2210.00 205100.00 0.00 H Total 1430 197275 0 1503 207570 (1) A Car B LCV C Mini Bus D Bus E Truck F Multi-axle Truck 1.3.7 SPECIAL PREVILEDGE - MULTIPLE JOURNEY MONTHLY FEE STATEMENT-MOHANIA PLAZA Project Highway: Soma Isolux Varanasi Aurangabad Mohania Toll Plaza For corressponding Month of Previous Year Type of Vehicle For Preceeding Month For the Month Reported on No. of Vehicles Fee Collected (in Rs.) No. of Vehicles Fee Collected (in Rs.) Fee per Vehicle (in Rs.) No. of Vehicles Fee Collected (in Rs.) (2) (3) (4) (5) (6) (7) (8) A Car 0 0.00 65.00 0 0.00 B LCV 0 0.00 100.00 0 0.00 770 0.00 100.00 1192 119200.00 D Bus 0 0.00 100.00 0 0.00 E Truck 31 0.00 100.00 34 3400.00 F Multi-axle Truck 853 0.00 210.00 919 192990.00 H Oversized Vehicle 0 0.00 0.00 0 0.00 1654 0 2145 315590 (1) C Mini Bus H Total SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 100 MONTHLY PROGRESS REPORTMAY-14 1.3.8 REUSAGE OF RETURN ENTRY TICKET MONTHLY FEE STATEMENT-MOHANIA PLAZA Soma Isolux Varanasi Aurangabad Project Highway: Mohania Toll Plaza Type of Vehicle For corressponding Month of Previous Year Fee No. of Collected Vehicles (in Rs.) (1) A Car B LCV C Mini Bus D Bus E Truck F Multi-axle Truck G Oversized Vehicle (2) (3) H Total For Preceeding Year No. of Vehicles For the Month Reported on Fee Collected (in Rs.) Fee per Vehicle (in Rs.) (5) 0 0 0 0 0 0 0 (6) 40/65 65/100 65/100 140/210 140/210 220/330 270/405 (4) 17873 624 4769 348 392 11504 0 35510 No. of Vehicles Fee Collected (in Rs.) (7) 22526 573 7684 429 385 11709 0 43306 (8) 0 0 0 0 0 0 0 0 1.3.9 Project Highway: USAGE OF MONTHLY PASS MONTHLY FEE STATEMENT-MOHANIA PLAZA Soma Isolux Varanasi Aurangabad Mohania Toll Plaza For corressponding Month of Previous Year Type of Vehicle (1) A Car (Local Pass) A Car (Monthly Pass) B LCV C Bus D Truck E Multi-axle Truck F Oversized Vehicle G Total For Preceeding Month For the Month Reported on No. of Vehicle s Fee Collecte d (in Rs.) (4) (5) Fee per Vehicl e (in Rs.) (6) 0 203 45675 0 0 4 0 0 0 0 0 0 No. of Vehicle s Fee Collecte d (in Rs.) (7) (8) 225 208 46800 5560 1390 2 2780 4 8980 2245 5 11225 0 0 0 4705 0 0 0 0 1 4705 4705 0 0 0 0 0 0 0 7380 0 0 0 0 0 0 0 8985 0 0 0 0 0 212 64920 215 60805 No. of Vehicle s Fee Collecte d (in Rs.) (2) (3) 0 0 0 Fee per Vehicle (in Rs.) SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 101 MONTHLY PROGRESS REPORT-MAY-14 1.4.0 MONTHLY USER FEE COLLECTION AND DEPOSIT REPORT OF THE SASARAM PLAZA AT KM. 907+100, THE DISTANCE FROM KM 883+600 TO KM 978+400 1.4.1 PART - I Amount of Fee collected through Tickets Sl. No. Type of Vehicles 1 Car/Jeep/Van LCV/MINI BUS Truck Bus MAV OSV Total 2 3 5 5 6 For the Current Month Cumulative from 12/09/11 Fee Collected through Passes For the Current Month Cumulative from 12/09/11 Total Amount Collected For the Current Month Cumulative from 12/09/11 103697390 333450 7336520 4950545 111033910 49395545 0 248450 1886625 49643995 3757435 124060725 0 0 3757435 124060725 631215 24340380 0 0 631215 24340380 79054100 2143644170 0 0 79054100 2143644170 18000 515580 0 0 18000 515580 89964470 2445653790 333450 7584970 90297920 2453238760 4617095 1886625 Total Amount Deposited For the Current Month 90296752 Remarks Difference Cumulative from 12/09/11 2453150455 PART - II Sl. No. 1 Name of the Bank & Branch For the Current Month Cumulative from 12/09/2011 PUNJAB NATIONAL BANK SASARAM 90296752 2453150455 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 102 Remarks MONTHLY PROGRESS REPORT-MAY-14 1.4.2 Detail of Monthly Vehicle passing SASARAM TOLL PLAZA No. of Average Monthly Passes All Types of Single Entry All types of Return Journey All types of Return Passage Usage of Monthly Passes Exempted Records Violation records N.T Vehicle (tractor/3 wheeler) Grand Total (A) Car/Jeep/Van LCV Truck Bus MAV OSV Total 2947 570 462 80 5645 1 9705 Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) Nos. % of Grand Total (A) 20083 21.98 7815 44.25 10747 74.99 1242 50.22 129194 73.83 30 96.77 169111 56.21 19950 21.84 3175 17.98 1199 8.37 560 22.64 21595 12.34 0 0.00 46479 15.45 20475 22.41 5867 33.22 1686 11.76 653 26.41 21513 12.29 0 0.00 50194 16.68 20531 22.47 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 20531 6.82 10255 11.23 802 4.54 699 4.88 18 0.73 2691 1.54 1 3.23 14466 4.81 57 0.06 2 0.01 1 0.01 0 0.00 2 0.00 0 0.00 62 0.02 4 0.00 0 0.00 0 0.00 0 0.00 0 0 0 0.00 4 0.00 91355 99.99562148 17661 100 14332 100.00 2473 100.00 174995 100.00 31 100.00 300847 100.00 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 103 MONTHLY PROGRESS REPORT-MAY-14 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 104 MONTHLY PROGRESS REPORTMAY-14 1.4.4 SINGLE ENTRY MONTHLY FEE STATEMENT-SASARAM PLAZA Project Highway: Type of Vehicle (1) NH-2 For corressponding For Preceeding Month of Previous Year Year Fee Fee No. of No. of Collected Collected Vehicles Vehicles (in Rs.) (in Rs.) (2) (3) (4) (5) A Car B LCV/MINI BUS D Bus E Truck G Multi-axle Truck I Oversized Vehicle J Total For the Month Reported on Fee per Vehicle (in Rs.) (6) No. of Vehicles Fee Collected (in Rs.) (7) (8) 95 20083 1907885 150 7815 1172250 315 1229 387135 315 10518 3313170 495 126974 62852130 600 30 18000 166649 69650570 1.4.5 RETURN ENTRY MONTHLY FEE STATEMENT-SASARAM PLAZA Project Highway: Type of Vehicle (1) A Car B LCV/MINI BUS D Bus E Truck G Multi-axle Truck I Oversized Vehicle J Total NH-2 For corressponding For Preceeding Month of Previous Year Year Fee Fee No. of No. of Collected Collected Vehicles Vehicles (in Rs.) (in Rs.) (2) (3) (4) (5) For the Month Reported on Fee per Vehicle (in Rs.) (6) No. of Vehicles Fee Collected (in Rs.) (7) (8) 140 18088 2532320 225 1839 413775 470 474 222780 470 572 268840 740 19826 14671240 900 0 0 40799 18108955 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 105 MONTHLY PROGRESS REPORTMAY-14 1.4.6 REUSAGE OF RETURN TICKET MONTHLY FEE STATEMENT-SASARAM PLAZA Project Highway: NH-2 For corressponding Month of Previous Year Type of Vehicle (1) A Car B LCV/MINIBUS C Bus D Truck E Multi-axle Truck F Oversized Vehicle GTotal For Preceeding Year No. of Vehicles Fee Collected (in Rs.) No. of Vehicles (2) (3) (4) Fee Collecte d (in Rs.) (5) n/a n/a n/a n/a For the Month Reported on Fee per Vehicle (in Rs.) No. of Vehicles Fee Collected (in Rs.) (6) (7) (8) n/a 20475 0 5867 0 653 0 1686 0 21513 0 0 0 50194 0 1.4.7 SPECIAL PREVILEDGE - SINGLE JOURNEY MONTHLY FEE STATEMENT-SASARAM PLAZA Project Highway: NH-2 For corressponding Month of Previous Year Type of Vehicle Fee No. of Collected Vehicles (in Rs.) For Preceeding Month (2) (3) No. Fee of Collected Vehi (in Rs.) cles (4) (5) n/a n/a n/a For the Month Reported on Fee per Vehicle (in Rs.) No. of Vehicle s Fee Collected (in Rs.) (6) (7) (8) 0 0 0 B LCV 150 0 0 C Bus/Mini bus 150 13 1950 D Truck E Multi-axle Truck F Oversized Vehicle 150 229 34350 315 2220 699300 0 0 0 2462 735600 (1) A Car G Total 0 n/a 0 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 106 MONTHLY PROGRESS REPORTMAY-14 Project Highway: Type of Vehicle (1) 1.4.8 SPECIAL PREVILEDGE - MULTIPLE JOURNEY MONTHLY FEE STATEMENT-SASARAM PLAZA NH-2 For corressponding For Preceeding Month of Previous For the Month Reported on Month Year Fee Fee Fee per No. of No. of No. of Fee Collected Collected Collected Vehicle Vehicles Vehicles Vehicles (in Rs.) (in Rs.) (in Rs.) (in Rs.) (2) (3) (4) (5) (6) (7) (8) A Car 95 1862 176890 B LCV 225 1336 300600 C Bus/MINI BUS 225 86 19350 D Truck 225 627 141075 E Multi-axle Truck 470 1769 831430 F Oversized Vehicle 0 0 0 5680 1469345 n/a n/a 0 G Total 0 0 0 1.4.9 USAGE OF MONTHLY PASS MONTHLY FEE STATEMENT-SASARAM PLAZA Project Highway: NH-2 Type of Vehicle For corressponding Month of Previous Year No. Fee of Collecte Vehic d (in les Rs.) (2) (3) For Preceeding Year Fee Collecte d (in Rs.) (5) Fee per Vehicle (in Rs.) No. of Vehicle s Fee Collected (in Rs.) (6) (7) (8) A Car 0 1483 333450 B LCV/MINIBUS 0 0 0 C Bus 0 0 0 D Truck 0 0 0 E Multi-axle Truck 0 0 0 F Oversized Vehicle 0 0 1483 0 (1) G Total No. of Vehicle s For the Month Reported on (4) SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD 333450 Page 107 MONTHLY PROGRESS REPORTMAY-14 2. DEPOSIT DATE DHAFFI PLAZA SHIFT - 1 SHIFT - 2 1-May-14 844820 524815 747815 29700 2147150 2-May-14 766440 541660 781635 16650 2106385 3-May-14 798320 526985 751985 9225 2086515 4-May-14 739955 525910 769130 8995 2043990 5-May-14 658040 600535 703475 7200 1969250 6-May-14 771265 467860 722955 4050 1966130 7-May-14 767505 521605 761390 5620 2056120 8-May-14 668215 485725 761720 1800 1917460 9-May-14 709600 549600 760610 2700 2022510 10-May-14 633215 501950 701200 3825 1840190 11-May-14 599835 508825 709885 4270 1822815 12-May-14 451430 339095 456125 450 1247100 13-May-14 636460 578515 733155 1800 1949930 14-May-14 733680 531860 683915 3370 1952825 15-May-14 745380 535175 753895 9850 2044300 16-May-14 790890 544620 769935 0 2105445 17-May-14 749720 569295 741360 900 2061275 18-May-14 773395 542385 728665 900 2045345 19-May-14 732405 614710 741875 4495 2093485 20-May-14 721195 543720 732340 450 1997705 21-May-14 764405 533970 739565 225 2038165 22-May-14 744875 630125 769460 225 2144685 23-May-14 800380 615800 729815 675 2146670 24-May-14 820700 576595 809015 1125 2207435 25-May-14 856740 535160 830820 0 2222720 26-May-14 733020 581680 792295 1575 2108570 27-May-14 786925 541960 713390 225 2042500 28-May-14 745285 501725 675510 1125 1923645 29-May-14 868290 536650 765505 0 2170445 30-May-14 772790 560090 791190 7400 2131470 31-May-14 731185 577895 833340 11470 2153890 22916360 16746495 22962970 140295 62766120 2.1 TOTAL SHIFT - 3 POS TOTAL SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 108 MONTHLY PROGRESS REPORTMAY-14 2. DEPOSIT 2.2 MOHANIA PLAZA DATE 1-May-14 2-May-14 3-May-14 4-May-14 5-May-14 6-May-14 7-May-14 8-May-14 9-May-14 10-May-14 11-May-14 12-May-14 13-May-14 14-May-14 15-May-14 16-May-14 17-May-14 18-May-14 19-May-14 20-May-14 21-May-14 22-May-14 23-May-14 24-May-14 25-May-14 26-May-14 27-May-14 28-May-14 29-May-14 30-May-14 31-May-14 TOTAL SHIFT - 1 SHIFT - 2 SHIFT - 3 POS 428790 385425 387240 371785 393470 389545 408170 414025 443570 382955 389560 386845 353990 393435 403045 426740 423565 418355 425340 387025 415700 418870 422475 431245 462480 438800 393740 357890 436950 416970 368720 470890 446400 477075 471770 493280 472190 494300 409935 492610 425880 450335 401405 461100 438380 485130 497400 488740 480195 484265 420325 469080 513010 513895 496285 535200 532455 506055 463385 473460 487275 468450 511060 480525 459020 474050 468355 453980 492410 532390 486880 476695 478390 405890 475340 472845 492590 469055 491605 499880 495470 484205 476190 515705 524980 578535 512660 516785 452745 528690 499640 575990 589235 10575 9675 5400 2700 3150 3370 900 675 1800 1840 675 675 225 900 4270 225 0 450 225 225 0 1390 4490 0 0 0 225 0 225 675 5845 12576715 14720155 15371790 60805 TOTAL 1421315 1322025 1328735 1320305 1358255 1319085 1395780 1357025 1424860 1287370 1318960 1194815 1290655 1305560 1385035 1393420 1403910 1398880 1405300 1291780 1360970 1448975 1465840 1506065 1510340 1488040 1352765 1349965 1410275 1480910 1432250 42729465 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 109 MONTHLY PROGRESS REPORTMAY-14 2. DEPOSIT 2.1.3 Sasaram Plaza DATE 1-May-14 2-May-14 3-May-14 4-May-14 5-May-14 6-May-14 7-May-14 8-May-14 9-May-14 10-May-14 11-May-14 12-May-14 13-May-14 14-May-14 15-May-14 16-May-14 17-May-14 18-May-14 19-May-14 20-May-14 21-May-14 22-May-14 23-May-14 24-May-14 25-May-14 26-May-14 27-May-14 28-May-14 29-May-14 30-May-14 31-May-14 Total SHIFT - 1 919360 873965 789630 826855 786940 795555 862180 832530 852620 785060 805625 895580 711550 879295 790595 974330 771170 837650 856855 858820 941750 887925 899045 911295 979825 857470 800320 775395 905420 806019 866700 26337329 SHIFT - 2 1075350 960270 1112918 975745 1133220 1043070 1070925 1013820 1076290 978970 1021385 933240 904930 897320 1096055 1035980 1113330 974925 1025940 963630 1069500 1072765 1130250 1203020 1243735 1207685 1133825 1093835 1105885 1174005 1100510 32942328 SHIFT - 3 991805 899600 925620 983795 939340 903920 975240 1002785 962570 906880 920690 885080 914090 929815 993675 922100 1016010 1069235 972370 935385 985375 1116960 1077775 1100500 1054340 998555 954050 1141345 1056040 1100020 1048680 30683645 POS 64575 58275 27900 19125 18000 14400 18225 14625 11700 10575 11700 6075 7200 9000 6075 4725 3600 5400 4050 4500 2700 1350 4050 2475 1350 1350 0 225 0 0 225 333450 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD TOTAL 3051090 2792110 2856068 2805520 2877500 2756945 2926570 2863760 2903180 2681485 2759400 2719975 2537770 2715430 2886400 2937135 2904110 2887210 2859215 2762335 2999325 3079000 3111120 3217290 3279250 3065060 2888195 3010800 3067345 3080044 3016115 90296752 Page 110 MONTHLY PROGRESS REPORTMAY-14 3. CORRIDOR CONTROL REPORT 3.1 Incident & Accident Summary S.No 1 Occurrence Break Down Apr-14 May-14 Variance since Last Month 145 209 64 Comulative Total Jan-13 to May-14 Comulative Total 12 Sep 11 to May14 733 7294 Remarks Mech. Failure Tyre Burst Fuel Finished Others 78 42 24 65 209 2 Accidents 61 77 16 277 1608 Over Speeding Sudden Break Out of Control Others 34 14 17 12 77 (a) During Day 36 43 7 155 892 (b) During Night 25 25 0 112 706 Day Accident Night Accident 48 30 78 Person Injured 83 111 28 419 2723 Person Died 9 11 2 42 345 Pedestrian Crossing Two Wheeler Other Vehicles 19 26 66 111 Dead Animal 65 Banner Removed 16 51 23 -14 7 358 107 2344 Animal Hospitalized 357 Total illegal banners Challan by Police SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD 0 23 0 Page 111 MONTHLY PROGRESS REPORT-MAY-14 3.2. Monthly Information MONTHLY INFORMATION Stretch KM:786+000 to 978.400 B C A Current Month Grand Total(A+B) Total upto preceding Month Help Help Help Help Help Help Provided by Provided Accident Victim Provided by Provided Accident Victim Provided by Provided Accident Victim Ambulance by Ambulance by Ambulance by Patrolling Patrolling Patrolling Vehicle Injured Fatal Vehicle Injured Fatal Vehicle Injured Fatal 1280 2657 2612 334 71 326 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD 111 Page 112 11 1351 2983 2723 345 MONTHLY PROGRESS REPORTMAY-14 3.2.2 Dead Animal Report DEAD ANIMAL REPORT S.No: Date Location Side Time (Hrs) Type And Numbers Dog Cow Others a b c d e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 1-May-14 913+000 LHS 23:02 1 2-May-14 820+950 RHS 12:50 1 3-May-14 837+700 RHS 11:55 1 3-May-14 802+550 RHS 13:10 1 3-May-14 811+210 LHS 15:45 1 4-May-14 890+900 LHS 8:17 1 4-May-14 808+350 LHS 9:38 1 4-May-14 811+190 LHS 9:45 1 5-May-14 862+000 RHS 9:20 1 6-May-14 807+780 LHS 10:25 1 7-May-14 916+120 LHS 11:17 1 8-May-14 876+250 RHS 8:30 1 8-May-14 816+150 Median 10:05 1 9-May-14 953+020 LHS 1:25 1 11-May-14 787+300 RHS 7:50 1 11-May-14 821+910 RHS 13:10 1 11-May-14 823+670 LHS 15:35 1 12-May-14 843+340 RHS 8:05 1 12-May-14 884+970 LHS 8:48 1 13-May-14 880+970 LHS 7:38 1 13-May-14 799+250 LHS 9:00 1 13-May-14 852+100 LHS 9:46 1 13-May-14 823+800 RHS 10:04 1 13-May-14 814+410 RHS 10:15 1 15-May-14 918+430 RHS 11:06 1 16-May-14 820+600 RHS 11:00 1 16-May-14 850+680 LHS 12:50 1 17-May-14 890+160 RHS 0:34 1 17-May-14 808+870 LHS 7:30 1 19-May-14 811+340 LHS 18:00 1 20-May-14 901+900 RHS 16:00 21-May-14 823+600 LHS 11:29 1 21-May-14 798+380 LHS 16:20 1 22-May-14 846+400 RHS 11:00 23-May-14 873+850 RHS 7:10 1 23-May-14 897+280 LHS 8:34 1 23-May-14 825+160 LHS 16:10 24-May-14 823+180 RHS 11:00 f Action Taken g 1 1 1 1 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD h Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Page 113 MONTHLY PROGRESS REPORTMAY-14 Side Time (Hrs) d Type And Numbers Other Dog Cow s e f a S.No: a Date b Location c 39 40 41 42 43 44 45 46 47 48 49 50 51 24-May-14 802+280 RHS 13:25 1 25-May-14 857+820 RHS 7:05 1 27-May-14 799+560 LHS 7:30 1 27-May-14 794+030 RHS 9:05 1 29-May-14 874+380 LHS 9:10 1 29-May-14 806+410 RHS 10:25 1 30-May-14 816+060 RHS 13:00 1 30-May-14 948+250 LHS 0:10 1 30-May-14 967+200 LHS 2:07 1 31-May-14 835+190 RHS 10:45 1 31-May-14 794+110 RHS 7:28 31-May-14 924+490 RHS 9:51 1 31-May-14 890110 LHS 12:02 1 Grand Total 1 47 1 Action Taken b Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed Removed 3 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 114 MONTHLY PROGRESS REPORT-MAY-14 3.4 AMBULANCE REPORT Sl No: a 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Date/Month/Ye Day/Nigh ar t Location (Chainage) Details of Accident Victims Serious Minor Non Fatal Injury Injury Injury e f g h b c d 1-May-14 Thu 836+550 1 1-May-14 Thu 790+050 2-May-14 Fri 822+470 2-May-14 Fri 826+000 3-May-14 Sat 972+560 3-May-14 Sat 908+000 3-May-14 Sat 875+600 3-May-14 Sat 870+000 4-May-14 Sun 895+850 4-May-14 Sun 854+450 5-May-14 Mon 949+560 6-May-14 Tue 951+210 6-May-14 Tue 892+860 6-May-14 Tue 843+710 6-May-14 Tue 948+650 7-May-14 Wed 844+250 7-May-14 Wed 912+800 7-May-14 Wed 835+240 8-May-14 Thu 935+00 8-May-14 Thu 823+150 8-May-14 Thu 823+650 9-May-14 Fri 898+510 RP/Ambulance i j 0 PS Saiyad Raja Amb-2 1 0 PS Rohania Amb-1 1 0 PS Chandauli Amb-2 1 0 PS Chandauli Amb-2 0 PS Muf.A'bad Amb-8 1 0 PS Shivsagar Amb-6 1 0 PS Mohania Amb-4 0 PS Mohania Amb-4 0 PS Chenari Amb-5 2 0 PS Durgawati Amb-3 1 0 PS Barun Amb-8 1 0 PS Barun Amb-8 0 PS Kudra Amb-5 0 PS Durgawati Amb-3 0 PS Barun Amb-7 0 PS Saiyad Raja Amb-3 0 PS Darigaon Amb-6 0 PS Chandauli Amb-2 0 PS Dehringar Amb-7 0 PS Chandauli Amb-2 0 PS Chandauli Amb-2 0 PS Chenari Amb-5 1 3 1 1 3 1 Name of Area Police Station 1 1 1 1 1 1 2 2 5 2 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD 2 Page 115 MONTHLY PROGRESS REPORT-MAY-14 Sl No: a 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Location Date/Month/Year Day/Night (Chainage) b Details of Accident Victims Serious Minor Non Fatal Injury Injury Injury e f g h Name of Area Police Station RP/Ambulance i j 0 PS Shivsagar Amb-5 1 0 PS Durgawati Amb-3 1 0 PS Ramnagar Amb-1 0 PS Durgawati Amb-4 0 PS Barun Amb-7 Amb-8 c d 10-May-14 Sat 897+250 11-May-14 Sun 849+590 11-May-14 Sun 804+20 12-May-14 Mon 859+720 12-May-14 Mon 949+550 13-May-14 Tue 972+000 1 0 PS Muf.A'bad 14-May-14 Wed 818+600 1 0 PS Alinagar Amb-2 15-May-14 Thu 919+400 2 0 PS Chandauli Amb-6 15-May-14 Thu 803+500 1 0 PS Lanka Amb-1 15-May-14 Thu 553+460 0 PS Kudra Amb-4 16-May-14 Fri 901+210 1 0 PS Shivsagar Amb-3 16-May-14 Fri 800+000 1 0 PS Lanka Amb-1 17-May-14 Sat 840+020 1 0 PS Saiyad Raja Amb-3 17-May-14 Sat 968+200 2 0 PS Muf.A'bad Amb-8 18-May-14 Sun 843+510 0 PS Durgawati Amb-3 18-May-14 Sun 847+860 0 PS Saiyad Raja Amb-3 19-May-14 Mon 849+000 Amb-3 20-May-14 Tue 826+820 20-May-14 Tue 951+500 20-May-14 Tue 941+700 21-May-14 Wed 859+380 21-May-14 Wed 944+020 21-May-14 Wed 826+530 22-May-14 Thu 878+710 22-May-14 Thu 896+880 22-May-14 Thu 872+880 23-May-14 Fri 800+400 23-May-14 Fri 851+540 2 1 1 1 1 1 1 1 1 1 0 PS Saiyad Raja 1 0 PS Chandauli Amb-2 5 0 PS Barun Amb-8 1 0 PS Saiyad Raja Amb-7 2 0 PS Durgawati Amb-4 1 0 PS Barun Amb-7 0 PS Chandauli Amb-2 0 PS Kudra Amb-4 0 PS Chenari Amb-6 1 0 PS Mohania Amb-4 1 0 PS Lanka Amb-1 0 PS Durgawati Amb-3 1 1 1 1 1 1 2 1 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 116 MONTHLY PROGRESS REPORT-MAY-14 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 24-May-14 Sat 876+740 24-May-14 Sat 826+050 24-May-14 Sat 898+990 24-May-14 Sat 815+000 24-May-14 Sat 888+900 25-May-14 Sun 868+650 25-May-14 Sun 950+720 26-May-14 Mon 801+220 27-May-14 Tue 794+030 27-May-14 Tue 814+500 27-May-14 Tue 795+720 28-May-14 Wed 887+400 28-May-14 Wed 931+300 28-May-14 Wed 812+210 28-May-14 Wed 842+750 29-May-14 Thu 884+330 29-May-14 Thu 913+500 29-May-14 Thu 957+740 30-May-14 Fri 853+170 30-May-14 Fri 790+480 31-May-14 Sat 805+650 Total 0 PS Mohania Amb-4 0 PS Chandauli Amb-2 0 PS Shivsagar Amb-6 1 0 PS Alinagar Amb-2 1 0 PS Kudra Amb-5 0 PS Mohania Amb-4 0 PS Barun Amb-7 1 0 PS Lanka Amb-1 2 0 PS Rohania Amb-1 0 PS Alinagar Amb-2 0 PS Rohania Amb-1 0 PS Kudra Amb-5 0 PS Dehringar Amb-7 1 0 PS Ramnagar Amb-2 1 0 PS Saiyad Raja Amb-3 0 PS Kudra Amb-4 0 PS Darigaon Amb-6 1 0 PS A'bad Twn Amb-8 3 0 PS Durgawati Amb-3 2 0 PS Rohania Amb-1 1 0 PS Alinagar Amb-1 67 0 1 1 3 1 1 1 3 1 1 1 2 1 1 1 9 40 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 117 MONTHLY PROGRESS REPORT-MAY-14 SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 118 MONTHLY PROGRESS REPORT-MAY-14 NH2-ROAD USER COMPLAIN DETAIL May-14 Complain No Plaza Date Complained by Complaints Daffi No User Complain Mohania No User Complain Sasaram 128 28/05/2014 A.K. Guha & S. Chaudhary From Aurangabad to Sasaram NH-02 road and maintenance work is very bad but carry to any we have paid Rs.95/- as toll tax. SOMA ISOLUX VARANASI AURANGABAD TOLLWAY (P) LTD Page 119 Action taken Road is under maintenance.