www.sbcbend.com INTRODUCTION TO SBC AS OF 14th SEPTEMBER, 2009 SEOUL OFFICE T. 02-2043-7200 F. 02-2043-3500 SBC BEND CO. LTD HAMAN KYEONGNAM, KOREA Tel +82 (0)55 580 9900 Fax +82(0)55 580 9999 SBC BEND HAMAN PLANT & OFFICE www.sbcbend.com 2 INTRODUCTION TO SBC TABLE OF CONTENTS 1 SBC PROFILE 4 2 PRODUCTS 9 3 MANUFACTURING FACILITIES, AND IM & TE 12 4 QUALITY AND QUALIFICATION 20 5 SPECIFICATIONS & MAJOR CUSTOMERS 24 www.sbcbend.com 3 1. SBC PROFILE BRIEF HISTORY Apr. 23, 1996 Established Samkwang Bend at Changwon, Kyungnam Jul. 23, 1997 Registered as Approved Supplier by KEPCO Aug. 02, 1997 Registered as Approved Supplier by Hanjung Nov. 11, 1997 Certified ISO 9001 by KSA Jun. 04, 1998 `~ Dec. 30, 2003 Authorized Manufacturing of KS B1522, KS B1541, KS B1543 Piping Fittings Dec. 29, 1999 Registered as Quality Class “R” Supplier by KEPCO Nov. 20, 2002 ~ Dec. 26, 2007 Authorized Manufacturing of JIS B2311, JIS B2312, JIS B2313 Piping Fittings Aug. 21, 2006 Authorized Manufacturing and Sales of Fittings by DNV www.sbcbend.com 4 1. SBC PROFILE(CONT’D) BRIEF HISTORY Cont’d Sep. 27, 2007 Moved Head Office and Factory to Haman Feb. 19, 2008 Authorized KEPIC MN Certificate Holder Mar. 08, 2008 Authorized PED Mar. 13, 2008 Authorized ASME NPT Stamp Holder Jun. 03, 2008 Changed Company Name To SBC Bend CO., LTD Mar. 11, 2009 Registered as Approved Supplier by Canada(CRN) May. 03, 2009 Registered as Approved Vendor by KNPC , Kuwait. June. 08, 2009 Registered as Approved Vendor by Aramco, Saudi Arabia HAMAN PLANT 2 1137-1 SADORI GUNBUK HAMAN, PLANT AREA 50,000 M PRODUCTION CAPACITY 50,000 T/Year by Total of 200 Employees www.sbcbend.com 5 1. SBC PROFILE OPERATION ORGANIZATION PRESIDENT SALES PRODUCT -ION OVERSEAS PLANNING DOMESTIC QUOTATION SEOUL OFFICE PRODUCT SHIPPING PROCUREMENT R&D MAINTENANCE QUALITY ADMINIST -RATION Q.A H.R Q.C ACCOUNT E.R.P E&S www.sbcbend.com 6 1. SBC PROFILE PROJECT ORGANIZATION PRESIDENT P. M SALES PRODUCTION www.sbcbend.com PROCUREMENT R&D MAINTENANCE QUALITY ADMINIST -RATION 7 1. SBC PROFILE(CONT’D) QUALITY AWARD April 03, 2008 Won Korean System Management Grand Prize www.sbcbend.com 8 2. PRODUCTS Butt-Welding Fittings Unit : inch Materials Products Carbon Steel, Alloy Steel, & Stainless Steel Elbow Tee Reducer Cap www.sbcbend.com Production Range Molded ~ ~ ~ ~ 60 60 48 48 Fabricated ~ ~ ~ ~ 102 102 102 102 Specification KS, JIS, ASTM, JPI, MSS, ANSI, DIN, BS, AWWA, API 9 2. PRODUCTS (CONT’D) Forged Fittings Products Production Range (Unit : Inch) Elbow Tee Reducer/Insert Cap Coupling Boss Union ~4 Outlet ~ 36 Materials Carbon Steel, Alloy Steel, and Stainless Steel www.sbcbend.com Specifications KS, JIS, ASTM, JPI, MSS, ANSI, DIN, BS, AWWA, API 10 2. PRODUCTS(CONT’D) Sources of Raw Materials ITEM CARBON STEEL STAINLESS STEEL ALLOY STEEL MATERIAL SOURCE/ORIGIN SEAMLESS PIPE JFE(NKK), SUMITOMO/JAPAN, BENTELER/GERMANY SAW PIPE SEAH, HYUNDAI/KOREA PLATE POSCO/KOREA, JFE(NKK)/JAPAN, INDUSTEEL/BELGIUM FORGING/BAR MYSCO/KOREA SEAMLESS PIPE JFE(NKK), SUMITOMO,KUZE/JAPAN, INDUSTEEL/BELGIUM EFW PIPE SEAH, LG METALS, SUNGWON/KOREA PLATE POSCO/KOREA, OTOKUMPU/SWEDEN, INDUSTEEL/BELGIUM FORGING/BAR MYSCO SEAMLESS PIPE SUMITOMO, JFE/JAPAN, DALMINE/ITALY, V&M/GERMANY PLATE POSCO/KOREA, JFE/JPN, INDUSTEEL/BELGIUM, OTOKUMPU/SWN FORGING/BAR MYSCO INCONEL ALLEGHENY, INCO ALLOY/USA, SUMITOMO/JAPAN www.sbcbend.com REMARKS 11 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) PRESSES 20,000 Ton Tee Bulging Press, Max. 36” www.sbcbend.com 6,000 Ton Press, Max. 80” 12 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) PRESSES 5,000 Ton Press, Max. 60” www.sbcbend.com 1,200 Ton Press 13 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) PRESSES 400 Ton Stainless Press, Max. 24” www.sbcbend.com 200 Ton Stainless Press, Max. 12” 14 3. MANUFACTURING FACILITIES AND IM & TE PRESSES 250 Ton Hot Forming Press, Max. 24” www.sbcbend.com 500 Ton Hot Forming Press, Max. 40” 15 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) FURNACES Heat Treatment Furnace, Max. 1250 C, 50 Ton www.sbcbend.com Heating Furnace, Max.60”, 30 Ton 16 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) CUTTING MACHINES 2 Way Gas Cutting Machine, Max. 34” www.sbcbend.com Gas Pipe Auto Cutting Machine, Max. 32” 17 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) WELDING SHOP AND RT ROOM Welding Shop www.sbcbend.com NDE SHOP 18 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) BEVELING MACHINE AND MATERIALS Beveling Machine, 1 Way-Max. 60”, 2 Way-24”, 3 Way-36” www.sbcbend.com Raw Materials and Products 19 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) STORAGE Ready for Shipping www.sbcbend.com Warehouse for Products less than 8” 20 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) INSPECTION, MEASURING, AND TEST EQUIPMENT Universal Testing Machine, 50 Ton www.sbcbend.com Optical Emission Spectrometer, 27 Channels 21 3. MANUFACTURING FACILITIES AND IM & TE (CONT’D) INSPECTION, MEASURING, AND TEST EQUIPMENT Charpy Impact Tester, 50 kgf-m www.sbcbend.com Positive Material Identification, 20 Channels 22 4. QUALITY AND QUALIFICATION SBC QUALITY CONCEPT CORRECTIVE ACTION IMPROVEMENT POLICY TRAINING SYSTEMS DESIGN REVIEW PROCUREMENT AUDIT MANUFACTURING INSPECTION www.sbcbend.com 23 4. QUALITY AND QUALIFICATION (CONT’D) SBC QUALITY PHILOSOPHY WE MAKE QUALITY OUR GOAL, NOT JUST OUR SLOGAN ! WE MAKE CUSTOMER SATISFACTION OUR REASON BEING, NOT JUST OUR LIP SERVICES !! WE WILL DO THE RIGHT THING RIGHT THE FIRST TIME!!! www.sbcbend.com 24 4. QUALITY AND QUALIFICATION (CONT’D) SBC QUALITY, ENVIRONMENT AND SAFETY MANAGEMENT ISO 9001 ISO 14001 OHSAS 18001 PED97/23/EC MANAGEMENT QMS EMS SBC HSMS ASME III PED MANUAL KEPIC MN QA MANUAL Quality Concept & Philosophy QAP QAP For Nuclear Power Plants www.sbcbend.com 25 4. QUALITY AND QUALIFICATION (CONT’D) CERTIFICATES & APPROVALS CERTIFICATE DATE SCOPE ISO 9001 NOV. 11, 1997 Design and Manufacturing of Piping Fittings DNV AUG. 21, 2006 Outer Dia. 610 MM Max., T 10 MM Max. KEPIC MN FEB. 19, 2008 Nuclear Safety Related Piping Fittings PED MAR. 08, 2008 Piping Fittings, Max. Weight 3 Ton, Dia. 60” ASME NPT MAR. 13, 2008 Nuclear Safety Related Piping Fittings OHSAS 18001 NOV. 12, 2008 Design and Manufacturing of Piping Fittings ISO 14001 NOV. 13, 2008 Design and Manufacturing of Piping Fittings GL NOV. 20, 2008 CS, AS, SS Piping Fittings N.D ½” to 24” BV DEC. 08, 2008 CS, AS, SS Piping Fittings N.D ½” to 24” CRN MAR. 11, 2009 Pipe Fittings KNPC May. 03, 2009 CS,AS,SS Piping Fittings upto 14” and above 14” www.sbcbend.com 26 4. QUALITY AND QUALIFICATION (CONT’D) CERTIFICATES & APPROVALS CERTIFICATE DATE SCOPE TAKREER Mar. 17, 2009 CS, AS, SS Piping Fittings ADGAS Mar. 18, 2009 CS, AS, SS Piping Fittings ARAMCO June. 08, 2009 Pipe Fittings www.sbcbend.com 27 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS SPECIFICATIONS SPEC. No. Description ANSI/ASME A/SA 234 Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service ANSI/ASME A/SA 420 Piping Fittings of Wrought Carbon Steel and Alloy Steel for Low-Temperature Services ANSI/ASME A/SA 403 Wrought Austenitic Stainless Steel Piping Fittings ASTM A815 Wrought Ferritic, Ferritic/Austenitic and Martensitic Stainless Steel Piping Fittings MSS SP 75 High Test Wrought Butt Welding Fittings www.sbcbend.com 28 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS SPECIFICATIONS SPEC. No. Description ASTM A105 Carbon Steel Forgings for Piping Applications MSS SP43 Wrought Stainless Steel Butt-Welding Fittings MSS SP79 Socket Welding Reducer Inserts MSS SP83 Steel Pipe Unions Socket Welding and Threaded MSS SP95 Swage(d) Nipples and Bull Plugs MSS SP97 Forged Carbon Steel Branch Out-let Fittings Socket Welding, Threaded and Buttwelding Ends www.sbcbend.com 29 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS OIL, GAS AND PETROCHEMICAL FIELDS CLIENT NAME/ END USER SCOPE OF SUPPLY SAM-SUNG ENG / S- OIL BW FITTING CS 2”~60” ELBOW , TEE, RED, CAP. THK STD~17.48T AND OTHERS 2009 1600 TON REPLACEMENT/ INSTALLATION OF IRT PIPELINE ALZAHAM / KNPC BW FITTING CS 3”~24” ELBOW , TEE, RED THK S/10~S/80 AND OTHERS 2009 100 TON JUBAIL EXPORT REFINERY IHI / TECHNIP, ARAMCO, TOTAL BW FITTING CS 16”~18” ELBOW THK 25.00~29.00 AND OTHERS 2009 4 TON HHI/TOTAL BW FITTING CS 2”~20” ELBOW , TEE, RED. THK S/40~S/160 2009 8 TON DSME/ TOTAL BW FITTING CS 2”~24” ELBOW , TEE, RED. THK S/20~S/40 AND OTHERS 2009 4 TON SHI / PETROBRAS BW FITTING CS 1/2”~18” ELBOW , TEE, RED. THK S/40~S/80 AND OTHERS 2008 ~ 2009 600 TON NO PROJECT TITLE 1 S- OIL ONSAN REFINERY EXPANSION 2 3 4 TOTAL WEIGHT YEAR OF SUPPLY USAN FPSO 5 PASFLOR FPSO 6 DRILLSHIP CONSTRUCTION PRIDE #2 AND OTHERS www.sbcbend.com TOTAL ORDER VALUE 30 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS OIL, GAS AND PETROCHEMICAL FIELDS NO PROJECT TITLE TOTAL WEIGHT CLIENT NAME/ END USER SCOPE OF SUPPLY YEAR OF SUPPLY SK E&C/ SK ENERGY BW FITTING SS, CS 2”~48” ELBOW , RED, TEE, CAP THK S/40~S/80 AND OTHERS 2008 50 TON 2008 45 TON TOTAL ORDER VALUE 7 NRC REVAMP 8 HYDROCRACKING CENTER (HCC) PLANT AND OTHERS SK E&C/ SK ENERGY BW FITTING SS, CS 2”~30” ELBOW , TEE, RED, CAP THK S/10S~S/160 AND OTHERS 9 CHEVRON NORTH DURI DEVELOPMENT 12 ALVINDO/CHEVRON BW FITTING CS 2”~24” ELBOW , RED, TEE THK STD~S/80 AND OTHERS 2008 35 TON 10 WAEDONG GAS SUPPLY PIPING AND OTHERS SK E & C/ KOREA GAS CORP. BW FITTING CS , API 2”~30” ELBOW , TEE, RED THK STD~33.4T AND OTHERS 2008 20 TON 11 GUNSAN GAS SUPPLY PIPING KOREA GAS CORP. BW FITTING API 2”~30” ELBOW , TEE, RED THK STD~33.4TAND OTHERS 2008 38 TON 12 KWANGYANG LNG TERMINAL EXTENSION POSCO BW FITTING CS 2”~30” ELBOW , TEE, RED THK STD~33.4TAND OTHERS 2008 3 TON www.sbcbend.com 31 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS OIL, GAS AND PETROCHEMICAL FIELDS TOTAL WEIGHT CLIENT NAME/ END USER SCOPE OF SUPPLY YEAR OF SUPPLY SK E&C/ SK CORP. BW FITTING CS 3”~18” ELBOW , TEE, RED. THK STD~S/80 AND OTHERS 2008 20 TON 14 NO.5 CRUDE OIL UNLOADING NEW DESALTER SK E&C/ SK ENERGY BW FITTING SS, CS 2”~20” ELBOW , TEE, RED. THK STD~S/80 AND OTHERS 2008 4 TON 15 GUJART REFINERY/INDIA IHI / IOC, TOYO ENRINEERING ZNDZA BW FITTING CS 18”~20” ELBOW THK 21.4~24.55 AND OTHERS 2008 2 TON PORT DICKSON PHASE II TPSSC / TNB (TENAGA NATIONAL BERHAD) BW FITTING CS 8”~28” ELBOW , TEE, RED. THK S/40~S/80 AND OTHERS 2008 15 TON NO PROJECT TITLE 13 TOULENE TANK CONSTRUCTION 16 www.sbcbend.com TOTAL ORDER VALUE 32 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS OTHER PLANTS TOTAL WEIGHT CLIENT NAME/ END USER SCOPE OF SUPPLY YEAR OF SUPPLY 1 SIN KORI NUCLEAR POWER PLANT 3,4 SUNG-IL SIM/ KHNP BW FITTING CS 14”~40” ELBOW , TEE, RED, CAP. THK STD~XS AND OTHERS 2009 ~ 2010 682 TON 2 COSIPA Steel mill WWTP/ BRAZIL HYOSUNG / COSIPA BW FITTING CS 2.1/2”~54” ELBOW , TEE, RED, CAP. THK S/40~14.3T AND OTHERS 2009 672 TON 3 SASOL WAX REACTOR / SOUTH AFRICA HHI / SASOL BW FITTING CS 4” ELBOW THK S/80 2009 4 TON HHI / AD WPC BW FITTING CS 2.1/2”~36” ELBOW , TEE, RED, CAP THK 10.5~12.7 AND OTHERS 2009 120 TON HYUNDAI ENG / Pt. DALLE ENERGY BATAM BW FITTING CS 2. 1/2”~12” ELBOW , TEE, RED, CAP. THK STD~S/80 AND OTHERS 2009 8 TON KEOSAN SPECIAL STEEL / POSCO BW FITTING CS 1”~72” ELBOW , TEE, RED. THK S/10~S/80 AND OTHERS 2008 80 TON NO PROJECT TITLE 4 5 6 AL DUR IWPP/ BHARAIN DEB ADD-ON CCPP/ INDONESIA POSCO OXYGEN PLANT www.sbcbend.com TOTAL ORDER VALUE 33 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS OTHER PLANTS TOTAL WEIGHT CLIENT NAME/ END USER SCOPE OF SUPPLY YEAR OF SUPPLY 7 MAADEN POWER & DESALINATION PLANT / SAUDI ARABIA HANHWA E&C / MAADEN BW FITTING CS 2”~24” ELBOW , TEE, RED. THK S/20~S/40 AND OTHERS 2008 5 TON 8 KUNSAN COMBINED CYCLE POWER PLANT SUNG-IL SIM / DAE WOO E&C BW FITTING SS, CS 3”~28” ELBOW , TEE, RED, CAP. THK S/10S~S/40 AND OTHERS 2008 48 TON 9 POWER SERAYA CCPP / SINGAPORE SUNGJIN GEOTEC/ SIEMENS BW FITTING AS 4”~24” ELBOW THK S/80~S/100 2008 1 TON 10 SIN KORI NUCLEAR POWER PLANT 1,2 JEONGWOO I.M. / KHNP BW FITTING SS, CS 24”~30” ELBOW , TEE, RED, CAP. THK STD AND OTHERS 2008 4 TON 11 AREA B FOR 30,000 T-Ni/ Y Fe-Ni PLANT, SNNC KWASAKI PLANT SYSTEM BW FITTING SGP 1/2”~24” ELBOW , TEE, RED. THK S/80 AND OTHERS 2008 16 TON 12 NOUEAUX TRAINS DE GPL A ARZEW IHI CORPORATION / SONATRACH BW FITTING CS 6”~10” TEE, RED. THK S/80 AND OTHERS 2008 2 TON NO PROJECT TITLE www.sbcbend.com TOTAL ORDER VALUE 34 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS OTHER PLANTS NO PROJECT TITLE 13 NHON TRACH 1, VIETNAM 14 SIGMA ELECTRIC POWER STATION www.sbcbend.com TOTAL WEIGHT CLIENT NAME/ END USER SCOPE OF SUPPLY YEAR OF SUPPLY TPSSC / EVN BW FITTING SGP 1/2”~12” ELBOW , TEE, RED. THK S/40~S/80 AND OTHERS 2007 11 TON TPSSC / EVN BW FITTING CS 26”~36” ELBOW , TEE, RED. THK STD AND OTHERS 2007 22 TON TOTAL ORDER VALUE 35 5. MAJOR EXPERIENCES FOR ON-GOING & COMPLETED PROJECTS MAJOR CUSTOMERS FOR SHIPBUILDING CUSTOMER SUPPLIED SPECIFICATIONS HYUNDAI HEAVY INDUSTRIES SINCE 1998 ASTM B16.9, B16.11, MSS SP-95 SAMHO SHIPBUILDING SINCE 1998 JIS B2311, B2313 SAMSUNG HEAVY INDUSTRIES SINCE 1998 KS B1522, B1543 DAEWOO SHIPBUILDING AND MARINE ENGINEERING SINCE 1998 ASTM B16.9, B16.11, MSS SP-95 HYUNDAI MIPO DOCKYARD SINCE 1998 JIS B2311, B2313 STX SHIPBUILDING SINCE 1998 ASTM B16.9, B16.11, MSS SP-95 www.sbcbend.com 36