Greeley Colorado June 30, 2009
Dan Perry – Wyoming/Colorado Equipment
AGENDA
• About Endurance
• Endurance Products
• Wind Working For You
About Endurance
Points of Interest!
• Surrey BC – Manufacturing
• R&D - Spanish Fork Utah
• Sales and Distribution – BTI Wind Energy – Greensburg KS
• Colorado Equipment - CO
Company Background
• Dean Davis and David Laino – Founding Engineers
(Won DOE Grant to design and build this machine original Turbine)
• Formation of Company - Endurance Wind Power
(Partnered with Financial and Marketing Executives to become Endurance)
• Commercialize S250 5 kw Turbine
(Turbine designed to offset needs of home owner: Designed to large wind specs for safety/production)
• BTI Wind Energy – Greensburg
(Partnered with BTI Wind Energy to form tight Network of Sales/Service distributors from John Deere dealers)
• Acquire Energy PGE – 35 and 50 kw Turbine
(Bought larger turbine manufacturer to fill the needs of our customer base…Schools, Municipalities, Farmers, Ranchers, Small
Commercial, Small Industrial)
• 100 + S250 Installations
• G and E Series – 14 World Wide
Company Vision and Mission
Our vision:
World leader in distributed wind turbines.
Our mission:
Develop, manufacture and market, through a network of effective
and reputable dealers, a product line of reliable, high
performance wind turbines, specifically engineered to meet our
customers’ needs.
Why Wind Power?
• Save money on electricity
• Hedge against ever increasing electricity prices
• Independence from the grid
• Impact on the environment
1.5 lbs CO2 emission p/kwh of power – US average
• Make a Statement
Why Endurance?
•Engineering
•High Production in Low Wind
•Aesthetics
•Quiet
•Safety
•Excellent support network – BTI
•Efficiency
Product Line-up
- S-343 5 kw model
- E-3120 50 kw 3-phase*
- G-3120 50 kw single phase*
*Power output can be reduced for
states where net-metering regulation
is limited to 40 kW
- Main application: Grid-tied
S-343 5kw Power and Output
G and E Series Description and
Features
• Main principles that governed the design
•
•
•
•
•
•
•
The highest energy production in its category.
Swept area of 3120 ft² (290 m²).
The blade aerodynamic profile is optimized for low wind sites.
Quiet sound and aesthetically sound
20-year lifetime design (meets applicable IEC standards).
Ease of installation to reduce costs.
Designed for grid-tied connection (Three and single phase).
Description and Features
E3120 Power and Output
Wind – Working for You
Site Assessment and Feasibility
•Power profile
Match production to consumption!
•Wind resource evaluation
Firstlook, Windpro and others
•Turbine selection
•Interconnection
Provide complete and accurate technical data
•Incentives
Dsireusa.org, DOE – State Energy Office
Match carefully ..Do Not Try to Overproduce •ROI
•Site assessment
Data, Pictures, Measurments,Complete
Must make sense for customer!
Wind – Working for You
The “Paperwork”
•Interconnection
Request from your utility company, complete in full!
•Net Metering
Complete and return net metering agreement to utility!
•Incentives
Complete loan or grant paperwork or hire someone who has experience.
Must be VERY Thorough!
•Permits
Apply through municipality and follow steps.
Wind – Working for You
Installation and Commissioning
•Foundation
•Electrical
•Commissioning
•Start producing power
•Tell your friends!
Endurance World Tour
Cornwall, England
PGE 20/35
Endurance World Tour
St-Jean-Port-Joli,
Canada
Makemo, French Polynesia
6 wind turbines
PGE 20/32
Endurance World Tour
PGE test site, Saint-Jean-Port-Joli
Quebec, Canada
PGE 20/50