Presentation for EAIE session

advertisement
Implementing Benchmarks and
Performance Indicators for
evaluating University
International Collaboration
Funded by the Accompanying Measures Programme
Contract No: 2004-4606/001-001 S02 81 AWC
Project Acronym: BEPIQUA
Need for an Action Plan?
•
•
•
•
Lisbon Strategy
European Research Area: ERA
European Higher Education Area: EHEA
Bologna Process
Quality Assurance key driver of Bologna and
Lisbon strategy
Quality of the Educational System key
underpinning factor of goals for a knowledgebased society
Global Attractiveness of European
HE system
• Need to enhance attractiveness of
European educational (teaching and
research) system
• Internationalisation IS NOT ONLY Mobility
• Need to ascertain means of “institutional
comparability” in performance
International Collaboration a KEY driver
Establish a QA System
QA system for international collaboration
What does international collaboration entail?
From the BEPIQUA Survey:
• Mobility (students and staff)
• Bologna Process (ECTS/DS, EQF, Joint
Degrees etc)
• Externally funded programmes (research and
others)
• Effective participation in ERA & EHEA
• National & Institutional IR activities
Present situation of use of QA
Survey ascertained:
• Majority of Universities sampled (90%+)
had no established QA system
• Majority of those who had, IR was not
included
• However, “Quality Consciousness” existed
• A lot of the basic data and infrastructure
exists
• “Quality Culture” exists
Is the time right for a QA System?
ALL the prerequisites for establishing a
QA system exist:
• International environment
• Institutional will (political and human)
• Availability of basic factors
(IT infrastructure, human dexterities,
primary data)
Common methodology and
approach (1)
Need to establish Benchmarks (B) and
Performance Indicators (PI´s)
Benchmark: level of achievement set for a
particular activity
Performance Indicator: sets Rate/Quality
of work needed to achieve benchmark
target
Examples of B & PI´s
Student mobility Benchmark (B): To achieve
250 outgoing students by 2010
Performance Indicator (PI): To achieve an
increase of 30 outgoing students /year
B=250 students (target)
PI=30 studs/year
100 students
2005
2010
Common methodology and
approach (2)
Need to establish a set of B&PI´s in order to
cover all the areas of International Collaboration:
• Mobility: incoming-outgoing: students/staff
• Bologna process: 3-cycle system, ECTS/DS,
recognition procedures etc
• Externally funded projects: Total project number
& value, incoming funds, co-funding, geographic
coverage of partners, No. of projects coordinated,
No. of patents, products, jobs etc
Common methodology and
approach (3)
• Contribution to national goals: No. of
bilateral projects, agreements, partners,
spin off companies, countries etc
• Contribution to institutional goals: No of
transnational projects, partners,
developing & third country projects,
geographic coverage etc
EXAMPLE: EXTERNALLY
FUNDED PROJECTS (1)
Effective Participation in the Integrated Programme on LLL
Fictitious Example
Programme
ERASMUS
CD
IP
Grundtvig
Comenius
Minerva
LEONARDO
(excluding placements)
Jean Monnet
Acc. Measures
ERASMUS MUNDUS
TOTALS
As
No. of
No. of
Projects Partners Coordinator
Total Project
Funding
(A)
Funds for **
Institution
(B)
Co-funding
in cash
By Institution
(C)
Total
Co-funding *
(D)
2
1
3
2
10
10
7
15
5
22
1
0
0
0
0
1
1
3
2
10
100,000
70,000
200,000
40,000
1,230,000
30,000
10,000
45,000
5,000
50,000
--5,000
-------
15,000
10,000
25,000
5,000
15,000
1
3
1
2
5
3
40
8
0
3
1
0
1
----2
1,000,000
10,000
100,000
250,000
300,000
10,000
5,000
10,000
------5,000
35,000
10,000
5,000
20,000
25
115
5
20
€3,000,000
€465,000
€10,000
€140,000
** Actual external funding
AM/PD
(Programmes: Integrated Programme)
As
Partner
* Co-funding in kind and cash
EXAMPLE: EXTERNALLY
FUNDED PROJECTS (2)
Fictitious Example
Benchmarks:
B:5.1: Total Value of External Project Funding (A) = €3,000,000
B:5.2: Incoming Project Funding (B)= €465,000
B:5.3 Total Institutional cash co-funding (C) = €10,000
B:5.4: Total No. of partners = 25
B:5.5 Geographic Coverage = No. of Countries/Regions
B:5.6: No. of Projects Coordinated = 5
B:5.7: Total No. of projects = 25
B:5.8: Incoming Funds (B)/ Total Funds (A)= 15.5%
B:5.9: No. of Projects Coordinated/Total No. of Projects= 20%
B:5.10: Co-funding(D)/Incoming Funds (A)= 4.7%
B:5.11: External Incoming Funds (B)/University Budget=
€3,000,000/68, 000,000 = 4.4%
[This could also be expressed as a percentage of the Institutional Research +
International Relations Budget = €3,000,000/3,400,000= 88.2%]
EXAMPLE: EXTERNALLY
FUNDED PROJECTS (3)
“PRIMARY DATA”:
Figure 1: Typical data base input for Externally Funded Programmes
External Funding Agency: [EU]
Type of Programme: [FP7]
Title of Project Proposal:
Project Acronym:
Mode of Participation: [Coordinator]; [Partner]
Name(s) of Responsible Scientist(s):
Participating Department:
Project Duration:
Start-up Date:
Closure Date:
Submission Date:
Total Project Budget:
Institution´s Project Budget Allocation:
Institution´s Total Contribution:
Cash Co-funding:
Contribution in-kind:
Project Type: [Research]; [Non-Research]
Scientific Area:
External Partner(s) Details:
Partner Countries:
Internal Partner(s):
Project Staff: [Research Assistants]; [Administrators]; [Secretarial staff]
Examples of B & PI´s (1)
• Mobility: Set target Institutional for 2010
Number of students [out/in & teachers]
Annual Rate of increase [decrease]
Previous 5-year trend:
No. of active partners [bilateral agreements]
Geographic distribution of partners
% of disciplines covered to available total
Examples of B & PI´s (2)
• Bologna Process
Annual Rate of implementation of ECTS/DS
Target date for achieving ECTS/DS Labels
Rate of implementing 3-cycle system
Degree of Compliance with National/
European Qualifications Frameworks
% Recognition of Joint Degrees
Examples of B & PI´s (3)
• Externally Funded Projects
Total Value of Projects
Total incoming Project funds
Geographic coverage of partners
No. of partners
% of projects coordinated
Total No. of projects
% of incoming funds/total project funding
Examples of B & PI´s (4)
% of co-funding/incoming funds
Previous 5-year trend in:
No. of projects
Incoming funds
% incoming/total value of projects
% co-funding/incoming funds
Success Rate of projects funded
% of projects coordinated
% of external funding/total Institutional budget
Examples of B & PI´s (5)
Percentage of Annual Increase [decrease]:
% change in partners
% change in geographic distribution
% change projects coordinated
% change in No. of projects funded/ funding
% change in annual institutional funding
% change in co-funding
% change success rate of projects funded
Examples of B & PI´s (6)
• Effective participation in ERA/EHEA
No. of research posted created
No. of other posts created
No. of incoming EU researchers
No. of incoming third country researchers
No. of outgoing researchers
No. of returning researchers
No. of patents
No. of commercial products
No. of spin off companies
Examples of B & PI´s (7)
No. of Basic Research projects
No. European Infrastructure projects
No. of Centres of Excellence
No. of publications in international scientific
journals
No. of citations in international scientific
journals
Comparable PI´s would be generated
Examples of B & PI´s (8)
• Contribution to National Goals
No. of active Bilateral agreements
No. of partners/ countries/geographic
coverage
Satisfaction of other national goals, ie
No. of Incubators/Science Parks
No. of private/public partnerships
EXAMPLES: POLICY PREDICTION (1)
Example 1: Linearly increasing past 5 year trend
Outgoing
Students
Predicted
Target
*
*
*
*
*
2001
2005
2010
Predict new Benchmark but also assess required CAPACITY
in Human Resources and Technical Infrastructure
EXAMPLES: POLICY PREDICTION (2)
External
Project
Co-funding
Euro
*
*
*
*
Predicted
Amount
(2010)
Rate of annual
increase required
from own budget
*
2001
2005
2010
Prediction of required co-funding
EXAMPLES: POLICY PREDICTION (3)
Outgoing
Teachers
*
*
*
*
Need to “bottom-out”
falling trend
*
2001
2005
2010
Need to Re-engineer Policy and Administrative System
ACTION PLAN FOR REALISING A
QA SYSTEM BASED ON B&PI´s
• Political decision to establish a QA system
• Set institutional goals and objectives in International
Collaboration
• Identify B&PI´s that satisfy HEI goals & objectives (Use
“generic” B&PI´s as basis)
• Develop software to produce automatically B&PI´s from
“primary data”
• Promote the required “Quality Culture”, which is
necessary to “drive” the QA system
• “Centralise” data so as to enable the production of the
“Institutional Profile” as regards International
Collaboration
• Establish the required feedback mechanisms for
reformulation or “tuning”of the international collaboration
policy, based on the results of the B&PI´s
Download