Plan- x1 meeting no. 4 – 27/04/10 at NCRA Auditorium, Pune GMRT SERVO SYSTEM PLAN X1 TARGET implements : 1a) Brushless drives 1b) PC-104 Servo computer 1c) Generic antenna Controller unit (GACB) 1d) Solid state interface logic– SSI 1e) Feed position system – 6U 3/15/2016 dec 2008 1 3/15/2016 dec 2008 2 Brushless drive … work planned for 2k8-9 • One antenna system testing with test setup (simulating the actual dual drive of either azimuth or elevation axis) in progress in LAB. …..Completed in MTAC period 2010 both in: a) position loop mode b) Velocity loop mode. Overall position accuracy matches with the test report of Leopold 3/15/2016 • dec 2008 3 • Installation and commissioning on antenna by end 2008 …….Documentation / computation of test plots/results in progress to arrive at performance parameters like a) bandwidth b) resonant frequency • Two more antenna systems procurement, testing and installation by March 2009 ……. Purchase order placed in feb 2010 for 4 more systems Brushless drive … work planned for 2k10-11 • Test Large test setup by interfacing SSC to BLDC and later with PC-104 • On successful completion of the above, test antenna - C04 with BLDC + PC104 • Leave the unit at C04 for Observation and feedback from Engineering group / GTAC users. • Assemble one antenna bldc system in a 19” rack for minimising RFI emanating from the drives. • Test / Measure the RFI after the rack is assembled and submit for acceptance and approval for mass production Block Diagram ….BLC configured in position loop Position Error in arcsec with i522=0.1cts/ms pr 6.66 rpm 2.5 2 1.5 Position Error in arcsec 1 0.5 0 0 1 2 3 4 5 6 -0.5 -1 -1.5 -2 Posn.error = +/- 1.6sec -2.5 -3 Time(Sec) 7 8 9 10 Block Diagram ….BLC configured in velocity loop Summary of load velocities for different scale factors in Algorithm Analog i/p – to ADC Load vel. In cnts/sec 350 Load vel. In deg/min 10 V Velocity cmd.Scale factor 5 10 V 63 4500 30 10 V 100 7500 50 Remarks Velocity error 2 +/- 0.02 ‘sec/s LoadVelocity (deg/min) with ADC=10V(10V=32767cts or 2200 rpm) and Cmdvel Scaling factor(P9)=63 100 80 Loadvelocity(deg/min) 60 40 20 0 0 0.2 0.4 0.6 0.8 -20 -40 Time(sec) 1 1.2 1.4 Velocity Error in arcsec/sec with P9=63 and ADC=10V 25.126 25.124 Velocity Error in arcsec/sec 25.122 25.12 25.118 25.116 25.114 25.112 25.11 0 0.2 0.4 0.6 0.8 Time(sec) 1 1.2 1.4 Gear box being hauled up to the setup 3/15/2016 dec 2008 12 Generic Antenna Board Functional Block Diagram Encoder Interface CPLD 2 QUAD UART Addr/data bus buffers SPI Interface 3 x RS232 RS422/RS485 Sensors K/B,mouse Front Panel (Maintenance) VGA USB RS232 PC104 Master 104 lines in Parallel PC104 Slave TCP/IP Addr/data bus buffers Field Sig. Field Sig. AIP section DIP section CPLD 1 CAN controller BLDC Drives AOP section PMDC Drives DOP section Field Sig. Add. lines Data lines Generic Antenna Controller – GAC plan status and projections – 2k10-11 • 1. Generic Antenna Controller Board FY 2009-10 : Work done : • Specification on a new integrated Generic antenna Controller board is finalisedthis year and a detailed design exercise was undertaken in active collaboration with BARC's Control and Instrumentation division. • The design has been completed and frozen. • PCB layout work with a vendor is in progress currently. It is expected to finalize the layout work by Sept 2010. • The boards are expected to be populated by Oct 2010 and tests would start in Oct2010. Antenna tryouts are likely by the end of this financial year. 3/15/2016 dec 2008 14 Solid State Interlocks – SSI plan status and projections – 2k10-11 • FY 2009-10 : Work Done : • • • • • • • --- SSI systems were installed on ----- antennas in this financial years, taking number of antenna with SSI to 22 including 1 prototype board. In addition, work was undertaken to get fresh PCBs ready for 10 antennnas and the population of these PCBs is in progress. It is expected to get 10 systems ready and tested in the coming financial year and install at least 08 systems on antennas, subject to availabilty of antennas during GTAC cycle. 3/15/2016 dec 2008 15 PC-104 • FY 2009-10 : works planned / done • Development of Graphic user Interface – GUI developed for monitoring, data logging from antenna base. • Make RFI measurements and Cabinet vendor identification in progress • Performance checks after installation for one GTAC cycle compensator extensively tested at C02, Antenna test plan report generated to validate the code during the antenna installation,added a state machine “calibrate” 3/15/2016 dec 2008 16 Pc-104 works planned 2k10-11 • Extensive testing from CEB thro’ ABC • Performance evaluation of pc-104 during GTAC observation….2 weeks • Interfacing with BLDC at Rayshed/JOgshed with simulated load • Actual interface with BLDC at antenna base and control from CEB • Make RFI enclosure Budget Utilisation in Lakhs(Rs) & proposed Activity Plan 2k9-10 Actual Plan 2k QTY 10-11 Rs Lacs BLDC 5 ants (150.00) 4 ants (145.78) 6# ( 250.00 ) PC-104 & GACB 30 & 5 ants ( 25.00) Prototype ( 2.04) 10 # 5 # ( 30.00 ) BL Drive ( indig) --------- ----------- 2 nos ( 20.00) Lab eqp . (10.00) ( 4.70) Fps – 6U & Angle enc. 10ants &5# ( 10.00 ) 10ants ( 6.90) 10 ants 5# ( 10.00 ) SSI 15 ants 22ants ( 2.00 ) 08 ants ( 2.00) Lightning protection ---------- 01 ant (4.00 ) ------ DC Servo Motor magnet 5 nos ( 10.00 ) --------- 5# NIL ( 10.00 ) 3/15/2016 Thank you April 2010 19