fax message - Chinabidding.org

advertisement
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Mechanical & Electronics Engineering
(20110201-20110225)
Project Name: Industrial R & D and production projects furnace ......................................... 9
Project Name: production of 30,000 tons of castings agricultural mechanization and auto
parts production line project ............................................................................................. 9
Project Name: Industrial large-capacity inverter using high pressure electrolytic capacitor foil
corrosion of industrial projects .........................................................................................10
Project Name: Annual energy saving lamp 12 million, LED200 million construction project ..11
Project Name: Annual production of 30,000 OTR -large engineering tire industrial tires .......12
Project Name: Annual 5,000,000 m HFC134a environmentally friendly automobile air
conditioning hose project.................................................................................................12
Project Name: Annual 2,000 frequency control devices for mining projects .........................13
Project Name: Annual 5 million pieces of car spinning production line ................................14
Project Name: Jiangsu GCL Silicon Technology Development Co., Ltd. with an annual output
25,000 tons of polysilicon ingots increase and expansion project .......................................14
Project Name: Construction Machinery cab project ............................................................15
Project Name: Annual production of 1.2 billion project electrolytic capacitor ................. Error!
Bookmark not defined.
Project Name: Annual 1400 -sets of energy saving equipment items ..................................17
Project Name: Annual 1000 sets of electric vehicle charging equipment items ....................18
Project Name: LG Innotek -Fuzhou Co., Ltd. LED LF and ELF renovation projects ...............18
Project Name: Annual 1920MW project of crystalline silicon solar cells ...............................19
Project Name: Solar energy products production project cum ............................................20
Project Name: 10,000 tons / year production line of weaving metal expansion ...................21
Project Name: Kunshan Cheng Xin Electronic Technology Co., Ltd. Products New Project ....21
Project Name: Annual 4000 energy saving equipment items ..............................................22
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Automotive Transmission Shaft gear parts production project ......................23
Project Name: Xi'an SG Anrui Optoelectronics Technology Co., Ltd. LED sapphire substrate
production and construction projects .................................. Error! Bookmark not defined.
Project Name: Production 50 000 -sets of the piston guide sleeve manufacturing projects ...24
Project Name: Annual production of 300 items of equipment Typhoon power tower ............25
Project Name: To process 50,000 items diamond cut coal tooth .........................................26
Project Name: Electrical and Mechanical Mining Technology R & D Center Project ...............27
Project Name: Annual 120,000 micro-power LED energy saving lamp project .....................27
Project Name: annual output of 12,000 tons of automobile and motorcycle parts
reconstruction project -Phase I project .............................................................................28
Project Name: Expansion of Civil smart metering instruments ............................................29
Project Name: Annual 5000 pump cylinder series of tungsten-based amorphous alloy plating
instead of chrome project. ...............................................................................................30
Progress stage: the record ...............................................................................................30
Project Name: Two tons of precision castings ...................................................................30
Project Name: Production 80 / sets oval Shaker items of equal thickness ...........................31
Project Name: annual output of 30 million passenger electric power steering system project
......................................................................................................................................32
Project Name: annual output of 20 million sets of automotive digital instrument and control
system ...........................................................................................................................33
Project Name: Annual magnetic lights 1 million project .....................................................33
Project Name: New building materials equipment manufacturing base construction projects 34
Project Name: FAW Foundry Co., Ltd. Foundry relocation transformation projects ..............35
Project Name: Chongqing Zhongyi Shock Absorber Co., Ltd. Liaoning Branch annual output of
5 million items Automobile Shock Absorber .......................................................................36
Project Name: Parma -Shanghai Machine Tools Co., Ltd. new plant projects ................. Error!
Bookmark not defined.
Project Name: Hubei Provincial Academy of Agricultural Machinery Promotion Center Project
......................................................................................................................................38
Project Name: Production of 200,000 tons steel cord for radial tire project .........................39
Project Name: FOUNTAIN magnesium alloy technology companies expand annual production
of 500 million sets of magnesium alloy die-casting kit laptop project ..................................40
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Jinghong Ferroalloy Industry and Trade Co., Ltd. Jiangbei site relocation
Project ...........................................................................................................................41
Project Name: Kunming Royal Standard industrial plant construction projects camps ..........42
Project Name: New million units annual output of auto parts machinery technology projects
......................................................................................................................................43
Project Name: LED wind and solar energy efficient lighting fixtures development, and
manufacturing projects ....................................................................................................43
Project Name: Henan Rui Yang annual output of 6 million units body cab floor and covering
parts project ...................................................................................................................44
Project Name: Kaifeng can be quite chassis System Co., Ltd. produce 50 million sets of
automobile chassis production and construction projects ...................................................45
Project Name: evaporative cooling power of wind power equipment R & D center and
production base construction project ................................................................................46
Project Name: Annual crane sets of projects in 2000 .........................................................47
Project Name: iris software on 20,000 new items ..............................................................48
Project Name: annual production capacity of 1,500 tons of precision mechanical products
project ...........................................................................................................................48
Project Name: Annual 1700 Project Construction Machinery ..............................................49
Project Name: Health Kit Boluo Plating Co. Project ............................................................50
Project Name: Surface Treatment Co., Ltd. Huizhou letter state construction projects .........51
Project Name: TFT-LCD flat panel displays with screen material -glass substrate
manufacturing plant construction -Phase II project ...........................................................52
Project Name: Add 36,000 units / year production project motor running ...........................53
Project Name: Annual Intelligent Elevator Project 800 .......................................................54
Project Name: Annual 4000 car after bridge project ..........................................................54
Project Name: Annual assembly of 11 million items of electronic components .....................55
Project Name: Annual 1 billion expansion of electronics production plant construction project
......................................................................................................................................56
Project Name: GG-SUV car SUVs and variable technology projects .....................................57
Project Name: Shenzhen Microchip's production base the government on behalf of the GMP
plant construction project ................................................................................................58
Project Name: Annual 60 sets of Blast Furnace Dust environmental protection equipment
items with a shift cover machine ......................................................................................59
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: produce 50 megawatts of solar cell production line .....................................59
Project Name: high-end smart electro-hydraulic control equipment manufacturing ..............60
Project Name: Screw production project ...........................................................................61
Project Name: High-clean pieces of heavy machinery and equipment manufacturing
transformation projects vital ............................................................................................61
Project Name: Annual 50 TH69 Series CNC boring and milling machining center floor
production line technological transformation project ............ Error! Bookmark not defined.
Project Name: 300MW solar collector pipe project .............................................................63
Project Name: Special Wire technological transformation projects ......................................64
Project Name: Kunshan Shi Ming Metal Plastics Co., Ltd. Add annual 3C/NB 4.72 million
pieces of computer peripheral items .................................................................................64
Project Name: 10 million tons annual output of high-performance cathode materials for
lithium ion batteries and battery production project ..........................................................65
Project Name: Shanghai Airlines Optoelectronics Co., Ltd. D layer thin-film transistor liquid
crystal display technology projects Cr change MoAlMo .......................................................66
Project Name: Annual 50,000 sets of motor vehicle movements Expansion Project .............67
Project Name: Bayer Integrated Site Shanghai PCS Production Line Expansion Project ........68
Project Name: Bayer Integrated Site Shanghai MDI transformation projects .......................68
Project Name: Annual 25MW solar cell components of the project .....................................69
Project Name: Anhui JAC Automobile Co. annual output of 20 million units of highperformance gasoline engine project ................................................................................70
Project Name: Anhui JAC Automobile Co. Refine production capacity multi-functional
commercial vehicle project ..............................................................................................71
Project Name: Hubei Yangtze River Pump -Wuhan Co., Ltd. slurry shield machine production
line construction project delivery system ..........................................................................72
Project Name: ThyssenKrupp Metal Forming -Wuhan Co., Ltd. Coating Line Expansion Project
......................................................................................................................................73
Project Name: Wuhan Hua Canguang Electric Co., Ltd. III LED epitaxial silicon construction
projects ..........................................................................................................................74
Project Name: Industrial Instrumentation Automation Project ............................................74
Project Name: Annual 1000 Project Stake Semi-trailer ......... Error! Bookmark not defined.
Project Name: annual output of 50 million relocation of the motor shaft projects ................76
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Zhanjiang Global Steel Wheel Manufacturing Co., Ltd. produces 300 million
items of aluminum alloy car wheels ..................................................................................77
Project Name: Anshan City Standard Parts Industrial Park Project ......................................78
Project Name: Anshan standard factory equipment manufacturing industry, construction
projects ..........................................................................................................................79
Project Name: Margaret Fagg Midland Auto Parts -Kunshan Co., Ltd. Casting rough annual
vehicle parts -steering knuckle 70 million units of new projects ..........................................80
Project Name: Voith Paper -China Co., Ltd. increase and expansion project ........................81
Project Name: Anshan optoelectronics industry standard factory construction project Phase II
......................................................................................................................................82
Project Name: Wireless MWD construction equipment .......................................................83
Project Name: Tianjin Jinghai County plant Emma Technology Co., Ltd. second phase of the
project ...........................................................................................................................84
Project Name: Annual 6000 -sets of construction projects boiler soot blower ......................85
Project Name: Economic Development Zone, Beijing Shilong Industrial Incubation Centre II Long E-Commerce Industrial Park project .........................................................................86
Project Name: Annual 1 million m high-performance belt Relocation Project .......................87
Project Name: Annual 600,000 kilowatts wind energy converter project .............................87
Project Name: annual 100 million kilowatts of solar PV inverters project .............................88
Project Name: Production of construction machinery products 25,000 items .......................89
Project Name: Automobile Parts Co., Ltd. Beijing Shakespeare Project ...............................90
Project Name: Heshan City, New Fu Industrial Co., Ltd. circuit board annual one million
square meters of construction projects .............................................................................91
Project Name: Annual 120MW of solar photovoltaic industry, vertically integrated product
project ...........................................................................................................................92
Project Name: Annual 30000 thick-walled hydrogenation reactor, nuclear power, pressure
vessel head, from coal to gas heating transformation projects ...........................................93
Project Name: Na Sainuo Technology -Jurong Co., Ltd. Technology Incubation Center Project
......................................................................................................................................93
Project Name: Liaoning Dalian Jinzhou District of Dalian Harbor Industrial Zone, three
Shilibao ship loaders ship supporting the construction projects of industrial plant engineering
......................................................................................................................................94
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Annual 1.2 million sets of 24,000 kilowatts wind turbine blades technology
projects ..........................................................................................................................96
Project Name: automotive rubber parts and seals pipeline construction project ...................97
Project Name: Precision Metal Co., Ltd. Foshan World Bank and Asian auto parts project ....98
Project Name: Dongfeng Liuzhou Motor Co. passenger car base relocation transformation
projects ..........................................................................................................................98
Project Name: Construction of ship repair base relocation project .................................... 100
Project Name: Annual 6 million high-capacity wholly sealed maintenance projects ............ 101
Project Name: Cable Production Line .............................................................................. 102
Project Name: Annual 1200MWH lithium-ion battery, 3000MWH VRLA battery energy projects
.................................................................................................................................... 102
Project Name: Annual production of 20 subway maintenance car project.......................... 103
Project Name: e-west area of Zhongguancun Science Park, E8-2 R & D Center Project...... 104
Project Name: Dongfeng Honda Automobile Co., Ltd engine foundry, machine shop capacity
building projects ........................................................................................................... 105
Project Name: Mechanical processing of digital transformation projects ............................ 106
Project Name: Annual production of 12,000 tons of light cast iron auto parts project ........ 107
Project Name: 1000 tons of textile machinery parts production project............................. 108
Project Name: An annual 120 million construction project when the lithium-ion battery ..... 109
Project Name: Changzhou Noble Electronics Co., Ltd. 50,000 square meters / year project of
electronic components ................................................................................................... 110
Project Name: Production of 3 million sets of electronic digital components, car decoration
accessories 15 million sets, 300 sets of precision molds New Project ................................ 111
Project Name: mountains and shock absorber production project..................................... 111
Project Name: 200MW / annual solar cell production line ..... Error! Bookmark not defined.
Project Name: Shunde Jin Xin Yue Zhixian decorative CNC machinery and CNC projects.... 113
Project Name: Taicang Xuan Color Cards Color Card 104000m2 annual output of new project
cars.............................................................................................................................. 114
Project Name: Tangshan City and the large number of heavy equipment to the forging
industry base autonomy ................................................................................................ 115
Project Name: Shanghai Special Machinery Casting Co., Ltd. Guangdong plant project ...... 117
Project Name: Annual Production of 5,000 tons of 200 variable frequency motor corona
resistant enamel round copper wire project .................................................................... 117
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Annual 34,000 sets of precision molds, die mold embryo project ................ 118
Project Name: Aircraft parts manufacturing .................................................................... 119
Project Name: Professional lighting and LED products project .......................................... 119
Project Name: Annual connection frame 700 million plant construction project ................. 120
Project Name: Annual transformation of the relocation projects 5000MW Steam Turbine ... 121
Project Name: Nantong Tongzhou District, Zhihao Industrial Co., Ltd. standard factory
project ......................................................................................................................... 122
Project Name: Xing shipbuilding base in the second phase of the master -first phase project
.................................................................................................................................... 123
Project Name: annual output of 2 million sets of electronic security equipment and automatic
parking garage project .................................................................................................. 124
Project Name: Annual 20000 and 5000 tons wear parts cylinder head project ................... 124
Project Name: Annual 1 million vehicle axle project ......................................................... 125
Project Name: Annual 100MW crystalline silicon solar cell investment ............................... 126
Project Name: Annual 100000 Agricultural dynamic elastic crawler project ....................... 126
Project Name: Workers of the city back into the park cum business transformation flameproof, metallurgical lifting motor industry project .................................................... 127
Project Name: Wei speed up -China Automotive Safety Systems Co. spray handle 60 million
sets of expansion .......................................................................................................... 128
Project Name: An annual 30.6 million high-performance lithium-ion battery when the
construction project ...................................................................................................... 129
Project Name: High-capacity maintenance-free sealed lead-acid battery manufacturing
projects colloidal ........................................................................................................... 130
Project Name: Chongqing Snyder Shanhua Special Vehicle Special Vehicles Co., Ltd.
Production Project ......................................................................................................... 131
Project Name: 12 million pairs / year frame and 3 million tons / year steel castings
production project chassis ............................................................................................. 131
Project Name: GaN wafer and chip manufacturing projects.............................................. 132
Project Name: Guangzhou Aluminum Casting Co., Ltd. Xu Yu wind expansion, relocation
project ......................................................................................................................... 133
Project Name: Hong Fu Jin Precision Electronics -Chongqing Co., Ltd. notebook calculator
body parts production project a project .......................................................................... 134
Project Name: Beijing Mobis Transmission Co., Ltd. three production projects .................. 135
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Annual solar energy storage battery 200 million KVAH, lithium iron phosphate
battery 1000000, lithium iron phosphate cathode material is 5,000 tons projects .............. 136
Project Name: annual output of 60,000 sets of new commercial vehicle cooling module
project ......................................................................................................................... 137
Project Name: Drug Device R & D Center Project ............................................................ 138
Project Name: annual output of 10,000 sets of new SCR system and an annual output of
80,000 sets of production and construction projects SCR converter .................................. 139
Project Name: Mechanical parts manufacturing project ................................................... 140
Project Name: To process 10,000 tons of hydraulic pillar base project .............................. 140
Project Name: Wuhan East Lake New Technology Development Zone Industrial Park in
Wuhan Lake Tai Electronics Co., Ltd. R & D and high-tech electronic equipment production
base project ................................................................................................................. 141
Project Name: Annual magnetic twenty thousand sets of the new energy system project .. 142
Project Name: Solar lights manufacturing project ............................................................ 143
Project Name: Small mechanical and electrical equipment production projects .................. 144
Project Name: 15 million units annual output of motorcycles factories, office building project
.................................................................................................................................... 144
Project Name: Maintenance-free lead-acid battery production project .............................. 145
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Industrial R & D and production projects furnace
Progress stage: the record
Construction period: March 2011 -2011 in June
Major equipment: lathes, shearing, bending machines, welding machines, etc.
Project:
Project is located in Luoyang High-tech Zone changxindianzhen Three Village, the development of
industrial furnaces and production projects, leased 660 square meters factory area, the main production RTL1000, RTL1200 car heaters, -SG750, SG800 roller furnace, -GDL950, GDL1000 roller hearth furnace.
Products are mainly used for bearings, casting, steel ball, forging and other industries. Process technology:
Design - Cutting - Welding - molding made of the furnace shell - Assembly heating system, control system
- Debugging - finished product. Mainly equipped with lathes, shearing, bending machines, welding
machine and so on.
The total investment is about 200 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: production of 30,000 tons of castings agricultural mechanization and auto parts production
line project
Progress stage: the record
Construction period: February 2011 -2011 in June
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: 5t / h hot air cupola, 3-ton induction furnace, 148D molding machine
Project:
Project is located in Town Industrial Park, Chang Hui Xian City, the annual production of 30,000 tons
casting auto parts agricultural mechanization production line, annual production capacity of 30,000 tons
automobile and tractor castings, in the original zones, no new land acquisition and land. Casting process: a
continuous shape duplex melting --- --- --- Blank --- continuous pouring sand reclamation. Major
equipment 5t / h hot air cupola, 3 tons induction furnace, 148D molding machine 3 groups.
The total investment is about 26 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Industrial large-capacity inverter using high pressure electrolytic capacitor foil corrosion of
industrial projects
Progress stage: the record
Construction period :2011-February 02 -2012-07
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in Shaoguan City Manglietia economic zones, industrial inverter with large-capacity
high pressure electrolytic capacitor foil corrosion of industrial projects, the construction scale of 44,035.00
square meters, the new high-pressure corrosion workshop, auxiliary plants, covers an area of 19032.0
square meters, annual output of 20 million square meters of high pressure corrosion of electrolytic
capacitor foil.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 350 million yuan, of which 60.77 million yuan investment in civil
engineering, equipment investment 152,600,000 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual energy saving lamp 12 million, LED200 million construction project
Progress stage: the record
Construction period :2011-2 to 2012-1
Major equipment: vertical plug-in, high-speed placement machine, automatic plastic bubble machine,
horizontal plug-in machine
Project:
Project is located in Changxing County, White Township, Industrial Zone, Da Nang, with an annual
energy-saving lamps 12 million, LED200 million construction project, the project intends to hire San Di
Lighting Co., Ltd. Changxing 4100 square meter plant, the purchase of vertical plug-in, high-speed
placement machine, Automatic plastic bubble machine, horizontal plug-in machines and other production
and testing equipment 31 -set, add 80KVA transformer. After being put into energy-saving lamps is
expected to produce 12 million, LED200 million.
The total investment is 1200 million.
Owner:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Project Name: Annual production of 30,000 OTR -large engineering tire industrial tires
Progress stage: the record
Construction period: February 2011 -2012 in February
Major equipment: mixer, practicing plastic machine, rolling machine, cutting machine, vulcanizing
machine, extrusion machines and related facilities.
Project:
The project is located high Huixian Township, the new annual output of 30,000 tires tire industry of
major projects, construction of the original area, no land, the use of race in Qingdao University of soft
control and advanced tire technology wheels afternoon -leading, with inner tube , to promote energy saving,
development of green tires. Technology: Rubber - mixing - forming - vulcanization - storage; major
equipment mixer, practicing plastic machine, rolling machine, cutting machine, vulcanizing machine,
extrusion machines and related facilities.
The total investment is about 30 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual 5,000,000 m HFC134a environmentally friendly automobile air conditioning hose
project
Progress stage: the record
Construction period :2011-3 to the 2011-10
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: lathes and other related equipment
Project:
Project is located in Longquan, Zhejiang Industrial Park, Great Sandy Park Donglingtai block metal auto
parts, with an annual 5 million m HFC134a environmentally friendly vehicles 2,000 tons of air
conditioning hose cum AGM -ultra-fine glass fibers lead-acid battery separator production line construction
project, with a total land area 14,665 square meters, construction area is about 7320 square meters, total
construction area of 15,180 square meters
The total investment is about 54,482,000 yuan.
Construction:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual 2,000 frequency control devices for mining projects
Progress stage: under construction
Construction period :2011-1 to 2013-2
Major equipment: Lathe
Project:
Project is located in Pujiang Economic Development Zone, Zhejiang Province, with an annual output of
2,000 units frequency control device for mine project, the new 31 acres of industrial land, factory building
35,500 square meters. Annual output of 2,000 mine production capacity of frequency control devices.
The total investment is about 90 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Annual 5 million pieces of car spinning production line
Progress stage: the record
Construction period: February 2011 -2012 in December
Major equipment: Computer automatic punching machine, CNC lathe, hydraulic drawing machine,
spinning machines, milling machines, grinders and related testing equipment
Project:
The project is located Xichuan machinery manufacturing industry cluster areas, annual output of 5
million pieces of car spinning production line, the project covers an area of 100 acres, 30,000 square meters
of factory building workshop, 300 sets of imported equipment, construction vehicles, farm vehicles
spinning pieces 20 production lines, process: steel - stamping - Trimming - tension and compression spinning - milling - finished product. Major equipment computer automatic punching machine, CNC lathe,
hydraulic drawing machine, spinning machines, milling machines, grinders and related testing equipment,
the project put into operation, the annual output of 5 million pieces of car spinning.
The total investment is about 150 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Jiangsu GCL Silicon Technology Development Co., Ltd. with an annual output 25,000 tons
of polysilicon ingots increase and expansion project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: reactor, reflux column separation, purification system, air separation unit, a separator,
the second separator, line measuring instrument, polycrystalline silicon ingot furnace, single crystal furnace
Project:
Xuzhou Economic and Technological Development Project Phase II in planning within the silicon
material in the Jiangsu Association for Science and Technology Development Co., Ltd. Xin existing plant
in the region, not new land. New polysilicon ingot production line and auxiliary facilities, forming an
annual output of 25,000 tons of polysilicon ingots new scale of production.
The total investment is about 1,999,160,000 yuan.
Construction:*******
Post Code:*******
Contact Person:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Construction Machinery cab project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: lathes, CNC machine tools, welding machines, etc.
Project:
Project is located in Xuzhou Economic Development Zone, 206 National Road -East Road south, Enron
gas station east of the village south of Enron, Bo Bo Road, the east side of Industrial Park, covers an area of
about 361.6 acres, the project is completed to form the cab of construction annual production capacity of
100,000 units.
The total investment is about 1,253,420,000 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Progress stage: the record
Construction period: March 2011 -2011 in June
Major equipment: nails roll machine, assembly machine, casing machine, charging boxes, test instruments,
sorting machines
Project:
The project is located high Yanshi high Longzhen Lung Tsuen, Yan Shi Narita annual 1.2 billion
electronics factory electrolytic capacitor production project, the land of 30 mu, building area of 10,000
square meters, annual output of 1.2 billion electrolytic capacitor; main processes: Study nails - assembly -
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
casing - Charge - test - separation; major equipment nail rolling machine, assembly machine, casing
machine, charging boxes, test instruments, sorting machine;
The total investment is about 30 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual 1400 -sets of energy saving equipment items
Progress stage: the record
Construction period: 2011 -2012 years
Major equipment: lathes, etc.
Project:
Project is located in the city fat, energy-saving environmental protection equipment manufacturing
projects, construction of production plants, warehouses and public auxiliary facilities; purchase of research
and testing equipment, 705 pieces -sets; annual production capacity of 1400 units -sets the production
capacity of energy saving equipment
The total investment is unknown.
Owner:*******
Post Code:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Annual 1000 sets of electric vehicle charging equipment items
Progress stage: under construction
Construction period: January 2011 -2011 in December
Major equipment: CNC shearing machine, CNC bending the trigger, hydraulic busbar bending machine,
three lead-free reflow soldering temperature desktop machines, air table, the DC Power Power Quality
Analyzer
Project:
Project is located in Jiyuan City, new and high annual output of 1,000 sets of electric vehicle charging
equipment items, the new production plant and a 5000 square meters annual output of 1,000 sets of
charging equipment production lines. Process with foreign body processing, circuit board assembly, testing,
machine assembly, process assembly, functional testing, packaging, factory. Major equipment CNC
shearing machine, CNC bending the trigger, hydraulic bus bar bending machine, the three lead-free reflow
soldering temperature desktop machines, air table, the DC Power Power Quality Analyzer.
The total investment is about 105 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: LG Innotek -Fuzhou Co., Ltd. LED LF and ELF renovation projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: single crystal furnace, cutting machines, grinding machines, testing equipment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
Project is located in Fuzhou Economic and Technological Development Zone, Riverside Avenue, 40, out
of shadow mask CRT production lines and construction of LED with a lead frame in situ -referred to as
LED LF, ELF -DFR of dry mask process lead frame -referred to as ELF and supporting patch -referred to
as ACF project
The total investment is about 680 million yuan -10.7 million yuan investment in environmental
protection.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Annual 1920MW project of crystalline silicon solar cells
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Main equipment: automatic chip connection machine, laminating machine, thermal oil heaters, diffusion
furnace, screen printing, PECVD system, retractable plate silicon, battery board testing machine, automatic
packaging machines, computer console, diffusion furnace, HF corrosion of equipment, light welding,
laying machine
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project is located in Fujian Xiapu County Railway Station Square north of the river northwest of the
village area -F2-01 Lot, the New Xiapu jiyang 1920MW of crystalline silicon solar cell production line.
The total investment is about 3,075,533,700 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Solar energy products production project cum
Progress stage: the record
Construction period: March 2011 -2011 in September
Major equipment: single crystal furnace, cutting machine, etc.
Project:
The project is located east of county industrial clustering Luoning, Luoning County Solar Energy Co.,
Ltd. Sen cum sun energy production project, which settled in the region of Luoning County Industry
Cluster, a planned lease three Loening 3 county East industrial clustering floor area of 25,000 square
meters standard factory building of a model polycrystalline silicon, silicon products, solar modules, street
lighting, recycling water saving, Sapphire Dan Changjing, LED lights and other production lines to produce
photovoltaic cum 30 million energy-saving products -sets.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 100 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: 10,000 tons / year production line of weaving metal expansion
Progress stage: the record
Construction period: March 2011 -2011 in June
Major equipment: road, cutting machines, welding machines, etc.
Project:
Zhai slope town project is located in Xinxiang County, Circle, 10,000 tons / year production line of
metal weaving expansion project, the enterprise covers an area of 15.5 acres, the project expanded use of
idle land in the original factory production line, total construction area of 2,600 square meters, including
workshop 2,100 square meters, the year after completion of the project can produce 10,000 tons of metal
woven mesh. Process: Design - Cutting - Welding - production. Major equipment traffic, cutting machine,
welding machine and so on.
The total investment is about 18 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Kunshan Cheng Xin Electronic Technology Co., Ltd. Products New Project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
The project is located Yum Road, Jinxi Town, Kunshan City, No. 288, the new plant. Year after
completion of the project design, manufacture computer components, communications equipment, molds,
metal plastic parts 500,000; plastic products and metal surface vacuum evaporation 1,000,000.
The total investment is about 30 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Annual 4000 energy saving equipment items
Progress stage: the record
Construction period: February 2011 -2012 in June
Major equipment: lathes, drill press, milling machine, planer, grinder, etc.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
Project is located in Xinxiang City Xindong industry gathering area, annual output of 4,000 sets of
equipment, energy saving projects, covering 15 acres, production technology, including purchase of
materials - mold making - Machining - quality control - storage, the main equipment including lathes, drill
presses, milling machines, planers, grinders and other machine tools.
The total investment is about 38 million yuan.
Construction unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Automotive Transmission Shaft gear parts production project
Progress stage: the record
Construction period: April 2011 -2012 in January
Major equipment: gear hobbing machine, forging hammer, high-speed gear shaper
Project:
Economic and Technological Development Zone project is located in Yangyang, automotive
transmission gear shaft parts production projects, the nature of the new building, the project completed, the
annual production of 15 million parts transmission shaft gear units, the proposed 120 acres of land, with a
total building area of 79,999.2 square meters, mainly to build factories, office , dormitory. Need to
purchase 16 sets of gear hobbing machine, forging hammer 12, the high-speed slotting machine and various
auxiliary machinery 20 100 units -sets.
The total investment is about 140 million yuan.
Owner:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: single crystal furnace, cutting machines, grinding machines, testing equipment
Project:
Project is located in Xi'an, the national civil space base, the total of about 252 acres of land, of which a
sapphire substrate land for the project area 17889.7 m2, construction area of 40067.94 m2. Pulling the main
building there are plants, power station building, office building and the guard room, waste water treatment
station. Annual production capacity is 2-inch sapphire 1.5 million.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact person: Mr. Shu
Tel :*******
Project Name: Production 50 000 -sets of the piston guide sleeve manufacturing projects
Progress stage: the record
Construction period: March 2011 -2011 in December
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: IF rapid melting furnace, graphite continuous casting machines, lathes, drilling, etc.
Project:
Temple of White Stream project is located in the village of the original calcium carbonate plant in the
region, with an annual output 50,000 -sets set of piston-oriented manufacturing projects, the new plant of
3,000 square meters and annual output of 50 000 -sets of the piston guide sleeve production line; use of
Shaanxi University of Technology development of manufacturing technology, process: raw materials,
intermediate frequency furnace by rapid melting, continuous casting machine through the graphite shape,
by cutting the molding materials into different material specifications under the guidance sets of blanks,
lathe processing, the guide sleeve blank samples car milling, grinding and processing into products. The
rapid melting of major equipment IF furnace, graphite continuous casting machines, lathes, drill press and
so on.
The total investment is about 25 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual production of 300 items of equipment Typhoon power tower
Progress stage: the record
Construction period: February 2011 -2011 in August
Main equipment: automatic volume trigger, drill press, milling machines, bending machines, cranes,
automatic submerged arc welding machines, welding machines, X-ray detection machine, digital ultrasonic
flaw detector.
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The project is located Taikang industrial clustering, the annual production of 300 Typhoon power tower
equipment, construction scale: The total construction area of 27,000 square meters of which: plant of
16,000 square meters, warehouse of 6,000 square meters, office building of 5,000 square meters. Automatic
volume trigger major equipment, drill presses, milling machines, bending machines, cranes, automatic
submerged arc welding machines, welding machines, X-ray detection machine, digital ultrasonic flaw
detector. Production process: raw materials → cutting → bending → rolls → Welding → ultrasonic testing
of the Association.
The total investment is about 160 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: To process 50,000 items diamond cut coal tooth
Progress stage: the record
Construction period: March 2011 -2011 in December
Major equipment: manual hydraulic machine, jack, mold, Wrench tools
Project:
Project is located in Yancheng TOWN, Cross Street North 100 meters, the processing 50000 diamond
cutting teeth coal project covers an area of 10 acres, the new plant, office, warehouse, construction area of
4,000 square meters. Technology: Polycrystalline Diamond - Steel Body - Assembly - sand blasting quality - packaging - storage. Major equipment manual hydraulic machine, jack, mold, wrench tools. After
completion of the project, the processing 50000 diamond cut coal teeth.
The total investment is about 21.8 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Owner:*******
Contact:*******
Tel:*******
Project Name: Electrical and Mechanical Mining Technology R & D Center Project
Progress stage: the record
Construction period: 2011 -2011 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in Lu'an City, the first Metal Materials Co., Ltd. Dah Chong Mine Anhui Huoqiu new
mining technology R & D center mechanical and electrical projects, supporting projects to establish
electrical and mechanical maintenance center, market center, the level of manufacturing equipment
capabilities and the platform; to the metallurgical and mining equipment R & D manufacturing and
technology-based mechanical and electrical services; coal and building materials to the multi-colored
power industry; in product development, to energy efficient, environmentally friendly as the goal.
The total investment is about 543 million yuan, financed mainly by the enterprises according to relevant
provisions of the self-addressed.
Owner:*******
Post Code:*******
Contact:*******
Phone: 18705649126 15055978866 0564-6398722
Project Name: Annual 120,000 micro-power LED energy saving lamp project
Progress stage: under construction
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: January 2011 -2012 in December
Main equipment: automatic solid crystal machine, automatic wire bonders, automatic dispensers, reflow
oven, the test instrument, such as precision spectroscopy
Project:
Project is located in Dongcheng Luohe industry gathering area, with an annual output 120,000 micropower LED energy saving lamps, the project covers an area of 145 acres, factories, warehouses and other
construction area of 48,400 square meters; Process Technology: The Preparation - Dispensing - Patch Baking - wire - Point powder - baking - vacuum - Glue - baking - Stripping - quality control - cutting - UV
- packaging. Major equipment automatic solid crystal machine, automatic wire bonders, automatic
dispensers, reflow oven, the test instrument, such as precision spectroscopy. After completion, the annual
output of 120,000 micro-power LED energy saving lamps.
The total investment is about 220 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: annual output of 12,000 tons of automobile and motorcycle parts reconstruction project Phase I project
Progress stage: the record
Construction period :2011-3 to the 2011-12
Major equipment: multi-station cold extrusion machine, wire drawing machines, forklifts, road, etc.
Project:
The project is located two-Lin Zhenlian flower pocket village, with an annual output of 12,000 tons of
auto and motorcycle parts reconstruction project -Phase I project, using the original 1,600 square meters
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
plant transformation. Add multi-station machine 18 sets of cold extrusion, wire drawing machines, forklifts,
road and other, ancillary equipment, testing equipment. After completion of the project can increase the
yield of 6,000 tons.
The total investment is about 29.8 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Expansion of Civil smart metering instruments
Progress stage: under construction
Construction period: January 2011 -2012 in December
Major equipment: high-speed SMT machines, automatic solder paste printer, high-temperature aging of
laboratory products such as production and testing equipment
Project:
Project is located in Zhengzhou, Henan Suntime Intelligent Technology Co., Ltd. measuring instruments
for civil expansion project and construction of a total construction area of 28,000 square meters, mainly for
construction, renovation, HVAC, power supply, drainage and other facilities, new high-speed stick machine,
automatic solder paste printer, high-temperature aging of laboratory products such as production, testing
equipment, expansion of civil Smart Metering product line and auxiliary facilities, create a good production
environment, the use of automated surface mount line production process, to reach an annual output of 2.8
million sets of new smart metering instruments of production capacity.
The total investment is about 140 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Annual 5000 pump cylinder series of tungsten-based amorphous alloy plating instead of
chrome project.
Progress stage: the record
Construction period: February 2011 -2011 in December
Major equipment: special horizontal plating bath
Project:
The project is located Qingfeng Ma Zhuang Industrial Park, an annual output of 5,000 pump barrel
plating series of tungsten-based amorphous alloy instead of chrome project., Build a new pump corrosion,
annual production 5,000 barrel plating pump. -1 the use of Na Feier YC-2 YC-520 process and Na Feier
process, the composite plating. -2 The flow of plating. The process - acidification - Cleaning - YC-2 ironnickel-plated alloy - YC-520 tungsten-plated nickel-phosphorus alloy - dry - packing - storage. Major
equipment dedicated horizontal plating tanks.
The total investment is about 15 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Two tons of precision castings
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Progress stage: the record
Construction period :2011-3 to 2012-3
Major equipment: 3 ton medium frequency electric furnace, since the hard-molding production line
Project:
New capital projects are located in industrial parks Changshan, two tons of precision castings, the new
8000 m2 factory building, 2,000 square meters warehouse., Newly acquired three tons medium frequency
electric furnace, since the hard-molding production line, assembly line style of the set, the annual output of
two tons of precision castings.
The total investment is about 30 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Production 80 / sets oval Shaker items of equal thickness
Progress stage: under construction
Construction period: January 2011 on May -2011
Major equipment: shears, bending machines, welding machines, hydraulic machines, spinning machines,
cranes, presses, drilling machines, air compressors, etc.
Project:
Project is located in Xinxiang County, seven miles 营镇 industrial clustering Dacheng Road, with an
annual output of 80 units / sets of thick oval shaker project, the project covers an area of 22.185 acres, with
a total construction area of 2720 square meters, of which 1920 square meters workshop area, office
buildings, staff quarters and facilities of 800 square meters. Process: Cutting - Butt - Welding - Grinding Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Inspection - into the installation - painting - test machine. Major equipment shears, bending machines,
welding machines, hydraulic machines, spinning machines, cranes, presses, drill, air compressor and so on.
The total investment is about 14 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: annual output of 30 million passenger electric power steering system project
Progress stage: the record
Construction period: 2011 -2012 years
Major equipment: lathes, etc.
Project:
Project is located in high density cities, annual output of 30 million passenger electric power steering
system project, construction workshop, logistics, warehousing and public auxiliary facilities; new electric
power steering system on the passenger car production lines, purchase of equipment, advanced production
and R & D 548 units -sets; annual output of 300,000 sets of electric power steering system of passenger car
production capacity
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: annual output of 20 million sets of automotive digital instrument and control system
Progress stage: the record
Construction period: February 2011 -2012 in August
Major equipment: digital bridge, automatic terminal plug-in, wave soldering, electrical conductivity tester,
ozone aging chamber, etc.
Project:
Project is located in Hebi City, Jinshan industrial agglomeration areas, annual output of 20 million sets
of automotive digital instrument control systems, project new land of 33,000 square meters -50 acres,
construction of a plant, a total of 23,000 square meters. Main process are incoming inspection, the table
labeled material, chip programming, were missing solder paste, paste inspection, all items new land 33,000
square meters -50 acres, construction plant a total of 23,000 square meters. Process: Table paste material
incoming inspection → → → chip programming omission of surface mount solder paste inspection → →
→ automatic SMT reflow soldering → Check → ICT after the test → test → AOI-line assembly →
Programs → board device programming Three anti-debugging features → Paint → → assembly → high
and low temperature testing machine debugging → packaging and storage. Equipment digital bridge,
automatic terminal plug-in, wave soldering, conductive tester, such as ozone aging test chamber 296 -sets.
Market prospects
The total investment is about 200 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Annual magnetic lights 1 million project
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: May 2011 -2012 in May
Major equipment: testing equipment, instruments and transport equipment
Project:
Project is located in Nanyang area of new energy industry cluster, in the days of Crown Poly Technology
Co., Ltd. magnetic lights low carbon projects -LVD, magnetic light magnetic light of research and
development projects based on industrial production and thus achieve the scale, comprehensive range of the
magnetic lamp production line including lamp, ballast unit, lamp and other parts of the production facilities,
purchase of the necessary production line, testing equipment, instruments and transport equipment,
construction plant, finished products, and other public facilities. Magnetic lights project process
characteristics: magnetic lights are green technology, is characterized by long life, environmental
protection, energy conservation and flexible applications. Generate at least 70 lumens per watt, magnetic
light for energy saving, environmental protection, will replace the existing incandescent lamps, LED lamps
and other low efficiency of the market lights. Construction scale is 1 million units annual output of
magnetic lights.
The total investment is about 60.6 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: New building materials equipment manufacturing base construction projects
Progress stage: the record
Construction period: June 2011 -2013 in January
Major equipment: large lathe, boring machine, milling machine
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
Project is located in Wuhan East Lake New Technology Development Zone on the 8th Buddha Ridge
new energy base, new building materials equipment manufacturing base, the nature of the new building,
expected to produce 580 sets of equipment, the new metal processing workshop, Building a total
construction area of 50972.85 square meters , the purchase of a large lathe, boring machine, milling
machine 20 sets, and other funds for the construction of supporting facilities and liquidity.
The total investment is 158,955,000 yuan.
Construction unit:*******
Postal Address:*******
Tel :*******
Project Name: FAW Foundry Co., Ltd. Foundry relocation transformation projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: welding machine, CNC lathe, lathe, lapping machine, planer, pumps, valves, air
compressors, drilling, heat-conducting oil furnace, radial drilling machine, ordinary boring machine, crane,
etc.
Project:
Project is located in Changchun Economic and Technological Development Zone, West New, used once
the whole project planning, phased implementation of construction methods: one plans to build two model
lines, is expected to start construction in March 2011 to the end of 2012 production; two plan to relocate
the existing the 01 lines and 2 lines, the first half of 2014 to complete the relocation. New plant covers an
area of 27.75hm2, building area of 138642m2, the new plant including manufacturing plant ash, ash clean
plants, sand and sand reclamation plant, the ball making plant, plant the ball clear, core sand preparation
plant, the joint station house and office, etc. ancillary facilities. After completion of the project annual
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
output of medium and heavy trucks block 300,000 cars, 300,000 light vehicles and supporting cylinder
truck chassis castings important to form an annual production capacity of 150,000 tons of castings.
The total investment is about 1,924,835,700 yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Chongqing Zhongyi Shock Absorber Co., Ltd. Liaoning Branch annual output of 5 million
items Automobile Shock Absorber
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: lathes, machine tools, etc.
Project:
Project is located in Hi-tech Industrial Development Zone Tieling, the project covers an area of 60 mu,
building area of 26,000 m2, of which plant 16200 m2, building 3150 m2, yard steel shed 6180 m2, boiler
room 225 m2, waste water treatment stations 225 m2, oil library 225 m2. Annual output of 1,000,000 light
vehicles shock absorber, car shock absorber mini 2,000,000, 2,000,000 car shock absorber.
The total investment is about 90 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Progress stage: construction design
Construction period: June 2011 In June -2012
Major equipment: lathes, Bao bed, milling, drilling, air compressor, heat-conducting oil furnace, machine,
welding machine, cutting machine, precision press, planer, press, crane, machine, submerged arc welding
machines.
Project:
Project is located in Shanghai Pudong New Area, east to Heaven Road -E51 Road, west Sword Road,
south planning D22 road, the construction of several factories and office buildings, covers an area of
10,694 square meters, total construction area of 16,041 square meters.
The total investment is about 30 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Hubei Provincial Academy of Agricultural Machinery Promotion Center Project
Progress stage: construction preparation
Construction period: March 2011 -2011 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
The project is located in Hubei Wuhan Hong mountainous village of Lion Street, Zhang Wu, a
comprehensive development, with a total area of approximately 3,861 square meters, total construction area
of approximately 7,184 square meters, including: a two-storey exhibition center, a two-storey workshops, a
three-story auxiliary building.
The total investment is 1200 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Construction of units:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Production of 200,000 tons steel cord for radial tire project
Progress stage: the record
Construction period: March 2011 -2014 in December
Major equipment: pre-line, large drawing machine, straight pull machine, the drawing machine, plating
retractable cable, retractable cable heat, water tank drawing machine, wet drawing on the welding machine,
back machine, double twist machines.
Project:
Project is located in the county industrial clustering fraternity, with an annual output 200,000 tons steel
cord for radial tire project, with an annual output 200,000 tons steel cord for radial tire project, covering
1056 acres, building area of 370260m2, the main building with surface and wire drawing workshop, heat
treatment shop, library and office accessories living facilities. Using advanced metal transformation and
advanced materials coating technology, which the electroplating process using the key-line continuous
cleaning, pyrophosphate copper, zinc and thermal diffusion of zinc sulfate produce brass, with a technically
advanced and applicable , with safety and reliability of operation, product quality stable and reliable.
Pretreatment line of major equipment, large drawing machine, straight pull machine, the drawing machine,
plating retractable cable, retractable cable heat treatment, wet drawing machine, wet drawing on the
welding machine, down machine, double twist machines.
The total investment is about 3,622,340,000 yuan.
Owner:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Post Code:*******
Contact:*******
Tel :*******
Project Name: FOUNTAIN magnesium alloy technology companies expand annual production of 500
million sets of magnesium alloy die-casting kit laptop project
Progress stage: the construction preparation -EIA at the same time
Construction period: 2011 -2012 years
Major equipment: machine, calibration equipment, testing equipment, etc.
Project:
The project is located 2.5km northeast Yangqu county Department, Xiaotun Village west of annual
output of 500 million expansion of magnesium alloy die-casting kit notebook computer production line.
Magnesium alloy construction as the main raw material, the introduction of advanced magnesium alloy diecasting machine DCC400M, DCC630M and DCC800M production line and configure the related auxiliary
equipment, by dissolving, pouring, injection, open type, take out, surface finishing, degreasing, activation
processing, such as spraying and drying process, an annual 500 million units -that is, 10 million / year diecasting magnesium alloy notebook computer suite. Magnesium alloy die major construction project
workshop, die-casting workshop, machining workshop, painting workshop, raw materials and finished
products warehouse, substations, boiler room, offices, staff quarters, canteen facilities Dengjun use of a
project.
The total investment is about 500 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Jinghong Ferroalloy Industry and Trade Co., Ltd. Jiangbei site relocation Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: submerged arc furnace, ladle furnace, automatic mechanical press, through the grinder,
desulphurization and dust removal system
Project:
Project is located in the town of mango Gasa, Jinghong City, Village Broadcasting -formerly State Road
214 Old Road, Jinghong to 748 km Menghai post office -beside the river sand covers about 46.7 acres, the
total investment 31 million yuan, of which production equipment, plant and office, staff quarters and other
investment 26.91 million yuan, 4.09 million yuan investment in environmental protection; including:
mineral hot furnace exhaust 120 million investment in treatment facilities, cooling water used to invest 40
million yuan, 620,000 yuan solid waste treatment facilities, ecological and other 1.87 million yuan, total
investment in environmental protection investment to 13.2%.
The total investment is about 31 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Kunming Royal Standard industrial plant construction projects camps
Stages of progress: environmental impact assessment
Construction period: March 2011 -2013 in March
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Kunming Economic Development Zone project is located in the northeast of the station the Royal Camp,
Royal Camp dress up games with seamless connectivity, the new South Station 3km around Kunming.
Block in the main city of Kunming, and Chenggong Town, belonging to the new project, by the cloud of
Southern Steel Logistics Co., Ltd. building, with a total land area of 322682.8m2, net land area is 226011.3
m2, ground floor area is 256153.75 m2, of which the standard Library construction area of 116379.15 m2,
building area of 55728 m2, shift room 29000.95 m2, production building floor area of 54833.02 m2.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Tel :*******
Designer:*******
Postal Address:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Project Name: New million units annual output of auto parts machinery technology projects
Progress stage: the record
Construction period :2011-3 to 2012-3
Major equipment: CNC machine tools
Project:
Project is located in Wenling City Industrial Park launched, hundreds of thousands of new mechanical
auto parts sets annual technology projects, adding CNC equipment, land acquisition: 26,658 m2, to build
new production plant area of 14,570 square meters, the project is completed, the formation of Add an
annual output of auto parts production capacity of 50 million yuan.
The total investment is about 21.9 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: LED wind and solar energy efficient lighting fixtures development, and manufacturing
projects
Progress stage: the record
Construction period: March 2011 -2012 in September
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting, etc.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
Project is located in Tong County Economic Development Zone, LED wind and solar energy efficient
lighting fixtures development, and manufacturing projects, construction of new properties, an area of
15,000 square meters, construction area of 5,000 square meters, workshop, office buildings, staff quarters,
product development center, laboratory testing center, showrooms, etc.
The total investment is about 50 million yuan.
Construction Unit:*******
Post Code:*******
Tel :*******
Fax :*******
Project Name: Henan Rui Yang annual output of 6 million units body cab floor and covering parts project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: presses, machine tools, electrophoretic lines
Project:
Project is located in Kaifeng City Longhai all the way to the south east of Eleventh Avenue, the project
covers an area of 80 mu -about 53,338 square meters, the annual output of 6 million units production floor
and the cab panel.
The total investment is about 160 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Kaifeng can be quite chassis System Co., Ltd. produce 50 million sets of automobile chassis
production and construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: presses, welding machines, electrophoresis line, etc.
Project:
Longhai Road Project is located north of Kaifeng city, nine west street, the project covers an area of 50
mu -about 33,335 square meters, with a total construction area of 20,000 square meters, equipped with
punching, welding, electrophoresis lines. Put into operation an annual output of 500,000 sets of automobile
chassis.
The total investment is about 100 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Project Name: evaporative cooling power of wind power equipment R & D center and production base
construction project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: CNC gantry milling and boring machine, CNC forming grinding machine, CNC vertical
lathes, vacuum pumps, CNC floor type boring and milling machine, baking equipment installation, wind
tunnel testing equipment, paint drying equipment, lathes, etc.
Project:
The project is located in Qingdao High-tech Industrial Development Zone, Qingdao High-tech Industrial
Park area, the company covers about 66667m2, the project is completed annual output of 1.5MW doublyfed generator 500 air cooling, evaporative cooling high-power permanent magnet generators, transformers,
frequency of 1000 units -sets. Production process 1, the air-cooled double-fed wind generator stator piece
laminated production technology - embedded line - pressure test - frequency welding - dry white embryo Varnish Baking - Stator assembly - pressure test - the stator finished product. Rotor plate layers Embedding - Varnish Baking - Rotor assembly - Balancing Field Test - Rotor products. Stator and rotor
General Assembly - Assembly Cooling System - Integrated Test - Painting - air dry - generator products. 2,
the evaporative cooling wind turbine production technology of stator lamination layers - embedded line pressure test - frequency welding - dry white embryo - the stator assembly - installed evaporative cooling
sleeve - cooling liquid loading - stress test - the stator finished product. Laminated rotor plate - magnet
assembly - Rotor assembly - Balancing Field Test - Rotor products. Stator and rotor General Assembly Assembly Cooling System - Integrated Test - Painting - air dry - generator products.
The total investment is about 286 million yuan.
Construction units:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Contact:*******
Tel :*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Annual crane sets of projects in 2000
Progress stage: under construction
Construction period: January 2011 -2012 in November
Major equipment: shears, bending machines, CNC lathes, drill presses, planers, milling machines, lifting
cranes, testing equipment, cutting machines
Project:
Project is located in industrial agglomeration area Lankao County, Henan Province, China Steel Heavy
Industry Machinery Co., Ltd. with an annual output of 2000 sets of crane project, covering 100 mu,
building area of 42,000 square meters, annual output of 2,000 sets of cranes. Pretreatment - Cutting Shearing - Bending - Welding - Foundry - lathe finishing - assembly - General Assembly - Inspection - rust
paint ¬ - sales. Major equipment Shearing - Bending Machine - CNC Lathes - Drilling - planer - milling
machine - lifting crane - testing equipment - cutting machines.
The total investment is about 150 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Project Name: iris software on 20,000 new items
Progress stage: the record
Construction period: June 2011 -2012 in December
Major equipment: regulator, anti-truth devices, industrial machines, welding sets, hand test pump, power
supply, vernier caliper, computer, power meter, multimeter, etc.
Project:
Industrial Cluster Project is located in Forest City Industrial Park District, coal, iris recognition
technology products, industrial projects, the new Iris software, 20000; process technology: PCB system
board, soldering, circuit board inspection, assembly, programming procedures, procedures test, CDD
regulation, pager; major equipment regulator, anti-truth devices, industrial machines, welding sets, hand
test pump, power supply, vernier caliper, computer, power meter, meter and other equipment; Market
Forecast: iris image acquisition personnel to complete authentication and network encryption transmission
function, the iris to achieve high-level personnel management, can also be used for wall channel, access or
access control, is a high-tech industries.
The total investment is about 140 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: annual production capacity of 1,500 tons of precision mechanical products project
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: February 2011 -2011 in December
Major equipment: gas furnace, high-performance die-casting machine, precision die casting and machining
center temperature and the plane
Project:
Project is located in Economic Development Zone, with an annual capacity of 1,500 tons of precision
mechanical products, project, project construction area of 8,000 square meters. After the project is the
production company has adequate resources and production capacity, the introduction of German
technology and high precision CNC machining centers and Processing Machine -Germany DECKEL CNC
machining center dozens of deep processing of closed-door shell, designed annual capacity of closed-door
assembly 2000000. Technology: purchase of raw materials - alloy melt - precision casting - rough clean-up
- Machining -precision milling side - Honing the hole - fine twist valve hole - Assembly - to try to pressure
test - Painting - Packaging - Sales, the entire production process, smoke-free, tasteless, self-circulation
cooling water system using cooling ponds. The main burner is equipped with natural gas -Italy ECOFLAM
Evinco BLUPR series furnace, the furnace efficiency, energy saving, environmental protection, highperformance die-casting machine -Hong Kong LK companies 500T, 400T, 280T, etc., high-precision
casting temperature mold and processing centers and plane -Germany DECKEL CNC machining centers
and other equipment.
The total investment is about 38 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Annual 1700 Project Construction Machinery
Progress stage: the record
Construction period: April 2011 -2012 in December
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: machine processing equipment, numerical control equipment, hydraulic equipment
Project:
Xingyang project is located off Highway 310, State Road and the southeast corner of the intersection,
Zhengzhou Hengyi annual output of 1,700 Heavy construction machinery construction project, the project
covers an area of 100 mu, building area of 80,000 square meters, the main building of factories, warehouses
and other buildings, in 1,700 products Engineering Machinery -1,500 hydraulic hammers, rotary machine
100, TBM 100. Technology: supporting parts and raw materials sourcing products - machining - testing and assembled - test evaluation - product packaging and storage. Major equipment machining equipment,
numerical control equipment, hydraulic equipment.
The total investment is about 200 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Health Kit Boluo Plating Co. Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: lathes, air compressors, heat-conducting oil furnace, machine, welding machine, cutting
machine, precision punch, press, crane, machine, submerged arc welding machine
Project:
The project is located Boluo Longxi base 305 3-layer plating, covering 2566.53m2, 305 plant-based
Layer 3, a production line and the main equipment for fully automatic production line 3 -copper, nickel,
silver, 2 sets of reverse osmosis equipment. The main raw material for the LED bracket -3000000000 50t /
a, copper 1t / a, Ni-2t / a, silver 0.6t / a, potassium cyanide and sodium 0.7t / a. The major products are
LED frame, a total of 30 million. Industrial water projects around 170t / d, water consumption 10.8t / d.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 500 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Design Units:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Surface Treatment Co., Ltd. Huizhou letter state construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: lathes, air compressors, heat-conducting oil furnace, machine, welding machine, cutting
machine, precision punch, press, crane, machine, submerged arc welding machine
Project:
The project is located Boluo Longxi plating base 306 2 ~ 3 layers, covering 2566.53m2, building area
5133.06m2, 306 plant-based 2 to 3 layers, a production line and the main equipment for fully automatic
production line 2 -nickel, copper, chromium, reverse osmosis water production equipment 1 set. The main
raw material for the automotive spare parts -plated 500,000 m2 350t / a, copper 20t / a, Ni-25t / a, chromic
anhydride 15t / a. The major products are automotive parts, a total of 350t / a or more. Industrial water
projects around 240t / d, water consumption 18t / d.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 10 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Design Units:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: TFT-LCD flat panel displays with screen material -glass substrate manufacturing plant
construction -Phase II project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: coating equipment, steel equipment, bending tempering furnace, flat steel furnace,
insulating line, pretreatment equipment
Project:
Project is located in Shenzhen Guangming New District Hi-Tech Industrial Park -Section Yue Road east
of the bright road north, the total area of approximately 110,000 m2, total construction area of about 35,000
m2, the construction of the project an annual about 1600 km2 TFT-LCD display materials for flat panel
displays -glass substrate production line 1, the main production process for cutting, chamfering, grinding
and cleaning. Is proposed in a second phase of the project for the construction of the plant, producing
product types and production processes are the same, the original production line to expand capacity, after
the completion of Phase II products output increased by approximately 6400km2, the expanded output to
about 8000km2.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 596 million.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Design:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Add 36,000 units / year production project motor running
Progress stage: start construction in -EIA at the same time
Construction period: 2011 -2012 years
Major equipment: lathes, CNC machine tools, etc.
Project:
Project is located in Zhenjiang New District Hi-Tech Industrial Park Road, west by the second, located
near Kay will Hydraulic Industry -Zhenjiang Co., Ltd. is now the west side of the site, adding 36,000 units /
year production line running the motor, put into operation with an annual output of 36,000 units the motor
running.
The total investment is about 2.8 billion.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual Intelligent Elevator Project 800
Progress stage: under construction
Construction period: January 2011 In January -2012
Major equipment: cutting plate machine, bending machines, presses, etc.
Project:
Changyuan industrial clustering project is located in middle of the road ten road south latitude, with an
annual output of 800 intelligent elevator construction projects, construction of workshops and supporting
facilities 20 million square meters, covers an area of 50 acres. Use of traction technology. Process: raw
materials - Shears - piercing - Bending - Welding - Assembly. Purchase of domestic equipment. Cutting
plate machine, bending machines, presses and other 50 pieces -sets 1000 million units.
The total investment is about 62 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual 4000 car after bridge project
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: April 2011 -2013 in August
Major equipment: hydraulic multi-tool semi-automatic lathes, CNC lathes, CNC machining centers,
automatic drilling machine, automatic testing and inspection equipment, etc.
Project:
Kang Village project is located in Walker County, new energy mechanical precision machining
technology parks with an annual output of 4,000 cars after the bridge project, which covers an area of 50
mu, building area of 20,000 square meters and annual output of 4,000 new rear axle and supporting the
plant production line . The main production process: the main process: outsourcing rough - machining Test and acceptance - product storage. Major equipment hydraulic multi-tool automatic lathes, CNC lathes,
CNC machining centers, automatic drilling machine, automatic testing and inspection equipment.
The total investment is about 68 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Annual assembly of 11 million items of electronic components
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: testing equipment, lighting equipment
Project:
Project is located in the town streets Chengyang District xifu Sui Yuan Ching Road, Special Industrial
Park, No. 116, the scale of production for the assembly of 6,000,000 buzzer and 5 million speakers.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 3.9 million yuan.
Construction:*******
Contact person: Tsinghua University
Tel :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Annual 1 billion expansion of electronics production plant construction project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: lathes, machine tools, welding machine, cutting machine
Project:
Project is located in Qingdao City, Shandong Province Road 108, Chengyang sun, mainly raw materials
for stainless steel and copper categories. The main production equipment for the project: Punch 30.
The total investment is about 30 million yuan.
Construction:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Contact:*******
Tel:*******
Project Name: GG-SUV car SUVs and variable technology projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: stamping production line, processing centers, coating production lines, testing equipment
Project:
Project is located in Yantai Economic and Technological Development Zone, 118 Changjiang Road,
Shanghai GM Dong Yue Motors Co., Ltd. of existing plant in the region, adding 50,000 / year GG-SUV,
while reducing the output of existing products 50,000 / year, the Dong Yue Motors The total production
capacity remains the same. Production sector in the existing body shop, paint shop, assembly shop to
increase production equipment, and the adaptive transformation, stamping plant and other auxiliary
production departments, public power sector, environmental engineering Dengjun existing. Tap water for
the city water plant; drainage system for rain, sewage diversion system, waste water technology projects
and sewage discharge to the existing sewage treatment plant processing, compliance discharged into
municipal sewage pipe network after. Natural gas, steam by the municipal supply, use of the existing
supply of facilities.
The total investment is unknown.
Construction:*******
Post Code:*******
Contact person: soar
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel :*******
Fax :*******
Project Name: Shenzhen Microchip's production base the government on behalf of the GMP plant
construction project
Progress stage: construction preparation
Construction period: March 2011 -2011 in June
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
Project is located in Ping Shan District, Shenzhen, Guangdong, on a three-storey factory building interior
decoration, with a total floor area of approximately 3,900 square meters.
The total investment is about 500 million.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Annual 60 sets of Blast Furnace Dust environmental protection equipment items with a shift
cover machine
Progress stage: the record
Construction period: February 2011 -2012 in February
Major equipment: lathes, etc.
Project:
The project area is located in Haman Town Yokomizo Electrical Industrial Park, with an annual output
of 60 sets of Blast Furnace with environmental dust cover machine moving equipment, construction
expansion properties, with an annual output of 60 sets of Blast Furnace Dust environmental protection
equipment with a shift cover machine, the new a production workshop, a total of 2000 square meters, 10
sets of new production equipment.
The total investment is about 15 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Tel :*******
Project Name: produce 50 megawatts of solar cell production line
Progress stage: the record
Construction period :2011-2 to 2011-7
Major equipment: system board machine, feeding machine, elevator, heat sealing machine, roll forming
machine, cutting machine, packing machine
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
LeCroy project is located in Zhejiang and Jiangxi Electrical Co., Ltd., 50 MW photovoltaic production
line, the introduction of today's most advanced production technology and equipment to build an annual
output of 50 MW solar cell production lines.
The total investment is about 155 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: high-end smart electro-hydraulic control equipment manufacturing
Progress stage: under construction
Construction period: January 2011 -2012 in October
Major equipment: CNC lathes, milling machines and other machine tools and other equipment, and
supporting public facilities.
Project:
Project is located in Luoyang City, No. 277 Jianshe Road Jianxi District, CITIC Heavy intelligent highend electro-hydraulic control equipment manufacturing, new construction based on the original area of
80240m2, annual production capacity of 540 sets of heavy mining equipment, complete sets of hydraulic
lubrication system, 545 sets of heavy mining equipment complete sets of electric automatic control system,
115 sets of high-performance hydraulic explosion-proof equipment, production capacity of coal. The
formation of advanced electro-hydraulic intelligent control product development, industrial base.
The total investment is about 897.5 million yuan.
Owner:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Fax :*******
Project Name: Screw production project
Progress stage: under construction
Construction period: January 2011 -2011 in December
Major equipment: 30 ton crane, boring machine, lathe, drill press, gantry CNC cutting machine, flame
cutting machine
Project:
Project is located in the town of Chaoyang, Chaoyang Village, Mengjin County, Luoyang Huayuan
Comtech Co., Ltd. Screw oil drilling equipment manufacturing production project, the project covers an
area of 20 acres, the main building factories, office buildings of 12,000 square meters, etc.; production
process: raw steel - Next material - processing - Group - Welding - Testing - Assembly - test - delivered;
major equipment 30-ton crane, boring machine, lathe, drill press, gantry CNC cutting machine, flame
cutting machine, etc.; the project is completed, the production of screw conveyor 100 -sets, mainly for the
China Railway Tunnel Group and other supporting production.
The total investment is about 25 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: High-clean pieces of heavy machinery and equipment manufacturing transformation projects
vital
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: July 2011 -2012 in December
Major equipment: forging, heating, annealing, testing, cutting and other equipment
Project:
Tiger Ridge project is located in Jiyuan City industrial agglomeration area, high purity vital pieces of
heavy machinery and equipment manufacturing transformation projects, the project-based company mainly
high-tech production processes rear, high-tech requirements of vital pieces of heavy machinery and
equipment and national defense, etc. Special equipment and special equipment industry to provide high
quality products, materials. This project RF70 radial forging machine type 1800 tons mainly reconstruction
of smelting equipment, new forging, heating, annealing, testing, cutting and other equipment mainly to
form the largest large-scale precision forging production line. Limit mandrel annual output of 13,000 tons,
10,000 tons of oil drilling, 40,000 tons of goods Forgings. The main production process: forging smelting
→ heating → → → straightening annealing cut ends → → → processing → ultrasonic testing sales. After
completion, the Limit mandrel, non-magnetic products such as oil drilling will maintain international and
domestic leading position as is the development of advanced domestic equipment manufacturing and
energy, metallurgy and other industries important to provide the key critical components of professional
manufacturers.
The total investment is about 1,109,580,000 yuan.
Owner:*******
Post Code:*******
Tel :*******
Progress stage: the record
Construction period :2011-2 to 2013-2
Major equipment: vertical lathe, rail grinders, horizontal machining centers, grinding machine, Boring and
Milling, lying Canada, circular grinding, bore grinding
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project is located in Wuyi, an annual 50 TH69 Series CNC boring and milling machining center floor
production line technological transformation project, the new construction area of 20,000 square meters,
the purchase of 4m and 6m in the vertical lathe, Germany 10m rail grinder, made in Japan eight table
horizontal machining centers, Swiss-RZ820 and RZ362A grinding, Russia produced 660 Boring and
Milling Machine, made in Japan HC1800B lying Canada, made cylindrical grinding, grinding, and other
advanced equipment in the hole. Annual production capacity of 50 TH69 Series CNC boring and milling
machining center floor capacity.
The total investment is about 200 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: 300MW solar collector pipe project
Progress stage: the record
Construction period: March 2011 -2013 in February
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Liaobu Town project is located in Dongguan City, Village, Dongguan City, New Energy Institute Tat
300MW solar collector cum engineering, construction scale of 48,000.00 square meters, the main building
are of buildings, manufacturing plants, testing platforms, living facilities, covers an area of 46,620.0 square
meters, the main product of solar collector tube, the main production capacity of 300MW / Year
The total investment is about 336.1 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
E-mail: fyzhou@camda.cc
Project Name: Special Wire technological transformation projects
Progress stage: the record
Construction period: March 2011 -2013 in March
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Ng Kong Hubei home project is located in industrial parks, special welding technological transformation
projects, the nature of the expansion construction, annual production of special wire 5 million tons, annual
sales income of 600 million yuan. 114 acres of new land acquisition, plant expansion, purchase of
equipment and process improvement, new production units of two special wire.
The total investment is about 154.3 million yuan.
Construction unit:*******
Post Code:*******
Tel :*******
Fax :*******
Project Name: Kunshan Shi Ming Metal Plastics Co., Ltd. Add annual 3C/NB 4.72 million pieces of
computer peripheral items
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: 2011 -2012 years
Major equipment: sophisticated detection equipment, etc.
Project:
Project is located in the town of Kunshan City Dianshan double and Road 9, with an annual output
3C/NB 4.72 million pieces of computer peripherals.
The total investment is about $ 5,000,000.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal Address:*******
Tel :*******
Fax :*******
Project Name: 10 million tons annual output of high-performance cathode materials for lithium ion
batteries and battery production project
Progress stage: the record
Construction period: April 2011 In April -2013
Major equipment: Multi Combination cathode material sintering equipment, battery manufacturing
equipment preparation and integration
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tube City gold project is located in Wenchang Road East Industrial Park, Dai, Bai Road South, Henan
Cheng Jun 10 million tons annual output of energy and environmental performance cathode materials for
lithium ion batteries and battery production projects with a total area of about 42 acres, the main the content
of a plant 26,246 square meters building, office building 3893 square meters, Building 5693 m2; major
equipment diversified portfolio of a type of cathode material sintering equipment, battery manufacturing
equipment preparation and integration of three sets.
The total investment is 154.73 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Shanghai Airlines Optoelectronics Co., Ltd. D layer thin-film transistor liquid crystal
display technology projects Cr change MoAlMo
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: single crystal furnace, cutting machines, grinding machines, testing equipment
Project:
Project is located in Shanghai Xin Zhuang Industrial Zone Project: replace Cr with Al target metal film
sputtering target materials as may eliminate the production of chromium-containing wastewater.
The total investment is unknown.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual 50,000 sets of motor vehicle movements Expansion Project
Progress stage: the record
Construction period :2011-2 to 2012-8
Major equipment: lathes, etc.
Project:
Camel Street project is located in Zhenhai District, Luo Village, an annual output of 50,000 sets of motor
vehicle movements expansion project and expansion of production plant, construction area of 37,000
square meters. The total floor area of approximately 62,000 square meters. Annual output of 50,000 sets of
automobile production capacity of the motor movements.
The total investment is about 67 million yuan, including fixed assets investment: 60 million yuan -Civil
3700; equipment 1000; installation of 500; construction other costs 300; reserve fund of 500, working
capital 7,000,000 yuan.
Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Bayer Integrated Site Shanghai PCS Production Line Expansion Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: tank class, towers, heat exchangers, reactors, pumps, return pumps
Project:
Project is located in Shanghai Chemical Industrial Park F2 block, the Bayer Integrated Site Shanghai, in
the Bayer Integrated Site Shanghai existing polycarbonate -PCS based on the production, expansion of a 20
ton / year production line of polycarbonate, the project including DPC, BPA / SPC and other processes.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Bayer Integrated Site Shanghai MDI transformation projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: CNC lathes, machine tools, etc.
Project:
Project is located in Shanghai Chemical Industrial Park F2 block, the Bayer Integrated Site Shanghai,
Bayer Integrated Site Shanghai on the existing 35 million tons / year MDI combination unit through
technological innovation, increase production capacity to 50 million tons / year, production device is
mainly related to HCl, NAU, MNB, ANL, MDA, MDI, MMDI and other processes. Compared with the
existing technology, process technology roadmap has not changed.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual 25MW solar cell components of the project
Progress stage: the record
Construction period: February 2011 -2011 in November
Major equipment: Nursing San furnace, the election machine, pressing machine, pulse solar simulators,
glass cleaner, placement machine, scrape solder paste, solder flow machine, detector, by machines
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
The project is located Longzhen Xingyang Yu Jianshe Road, Zhengzhou City Star Optoelectronic
Technology Co., Ltd. 25MW solar cell components and an annual output of 3 million LED lighting
applications industrial construction projects, the project covers an area of 30,000 square meters,
construction area of 16,000 square meters, building a production workshop, warehouse and office building.
Annual output of 25MW solar cell components, three million LED lights. Process: -a purchased the battery
string polysilicon → → → assembly → Cleaning → laminated packaging. -B of the material prepared
paste → → scratch through reflow attached great service LED → → → → Test welding process after
packaging. Major equipment -a retaining bulk furnace, the election machine, tablet machine, pulse solar
simulator, glass washing machines. -B of the placement machine, scrape solder paste, solder flow machine,
detector, by machines.
The total investment is about 105 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Anhui JAC Automobile Co. annual output of 20 million units of high-performance gasoline
engine project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: Instrumentation vehicles, grinders, presses, presses and other equipment
Project:
Project is located in Hefei Economic and Technological Development Zone JAC auto parts production
base. Purple land for the project bottle Road south, west days are way, a factory north of the existing engine,
and east base of logistics corridors and dining center and a logistics warehouse with a total land area of
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
approximately 93,803.5 square meters, total construction area of 57,960 square meters, the project After the
completion of annual output of 20 million high-performance gasoline engines.
The total investment is 663.98 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Anhui JAC Automobile Co. Refine production capacity multi-functional commercial vehicle
project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: hydraulic machine, shearing machine, bending machine, phosphating line, painting
rooms, drying rooms, polished chamber, air compressors, carbon dioxide protection welding machine, etc.
Project:
Peach project is located in Hefei Economic Development Zone Industrial Park, the scale of total
investment of 75 million yuan, the existing passenger car plant to enhance the multi-functional commercial
vehicle Refine capacity.
The total investment is about 75 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Hubei Yangtze River Pump -Wuhan Co., Ltd. slurry shield machine production line
construction project delivery system
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: lathes, machine tools, grinders, welding machine, cutting machine, molding machine
Project:
The project is located east of the Electrical and Mechanical Industrial Park, TCL, six auto parts north of
the forest, the project construction area of about 23462.09m2, construction includes three production and
processing workshop, a comprehensive building 4th floor, and other production facilities, the proposed size
of the annual shield Structure slurry delivery system -pump and control system 600.
The total investment is about 82 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Tel :*******
Project Name: ThyssenKrupp Metal Forming -Wuhan Co., Ltd. Coating Line Expansion Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: welding equipment, CNC machine tools, coating production line, monitoring devices, etc.
Project:
The project is located off East Lake New Technology Development Zone, South Quad, the total land
area of 1344m2, total construction area of 2688m2 -8m plant construction area of more than 2 times the
area, mainly to build a layer of steel plant length 56m, width 24m, high-8m, set up a coating line within the
plant, when completed, the annual painting chassis parts 250,000, the total coating area of 125,000 m2 -the
workpiece surface area 0.5m2 / piece dollars. Other public auxiliary facilities within the project are based
on existing projects.
The total investment is about 500 million.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Post Code:*******
Tel :*******
Project Name: Wuhan Hua Canguang Electric Co., Ltd. III LED epitaxial silicon construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: single crystal furnace, cutting machines, grinding machines, testing equipment
Project:
Project is located in Wuhan East Lake New Technology Development Zone of Wuhan University
Science Park, the new LED chip 22 billion annual production capacity, the third extension of the LED chip
construction project is completed, the whole plant LED chip production capacity will reach 31.6 billion /
year.
The total investment is unknown.
Construction unit:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Tel :*******
Fax :*******
Project Name: Industrial Instrumentation Automation Project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Progress stage: the record
Construction period :2011-3 to 2013-9
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Reclamation project is located in the coastal zone din D08-2 district, industrial automation instruments,
with a total land area of 13,573.62 square meters, total construction area of 26932.65 square meters. The
main production range of instrumentation, measurement and control equipment, electrical and mechanical
products. -Main products for intelligent traffic monitoring and control devices, magnetic vortex flowmeters,
electromagnetic flowmeter, pressure gauge riot, high pressure water distribution devices, smart pressure
transmitter, skid-mounted devices, etc.
The total investment is about 66.13 million yuan, including fixed assets investment: 57.8 million yuan Civil 4520; equipment, 1260;, working capital 8.33 million yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: milling machines, grinding machines, lathes, slotting machine, gear hobbing machine,
hydraulic machine, machine, heat-conducting oil furnace, air compressor, etc.
Project:
Zaoyang City Harmony Road project is located, after completion of the project form an annual output of
1000 Stake Semi-trailer production capacity.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 44.55 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: annual output of 50 million relocation of the motor shaft projects
Progress stage: the record
Construction period :2011-3 to 2012-3
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
The project is located east Minglu Nan Jiao Chuan Street side, High Speed Ring East guillotine, an
annual output of 50 million relocation of the motor shaft projects, the project relocation of production
plants, with a total construction area of 23,000 square meters. Annual output of 50 million production
capacity of the motor shaft.
The total investment is about 60 million yuan, including fixed assets investment: 45 million yuan -Civil
2500; equipment 1,500; installed 30; 470 other costs project construction;, working capital 15 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Title: Expansion of an annual output of 500,000 transportation equipment parts project
Progress stage: under construction
Construction period :2011-1 to 2011-12
Major equipment: radial drilling machines, lathes, tapping machines and other desktop
Project:
Project is located in Longquan town dock Miaoxi Industrial Function Zone, an annual output of 500,000
expansion of transportation equipment parts and transportation equipment 1,000 automated production line,
the project net of about 14.11 acres of land, the new total construction area of 9,500 square meters of
production space and support rooms; purchase radial drilling machines, lathes, tapping machines and other
desktop equipment 49 -set, an annual 500 000 1,000 transportation equipment parts and the production
capacity of automatic conveying equipment.
The total investment is about 40 million yuan, including fixed assets investment: 25 million yuan -civil
750; equipment 1,500; installation of 60; construction of 90 other charges; reserve fund of 100, working
capital 15 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Zhanjiang Global Steel Wheel Manufacturing Co., Ltd. produces 300 million items of
aluminum alloy car wheels
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: crane, cutting, cutting machines, presses, welding machines, plate rolling machine.
Project:
Project is located in Zhanjiang City, Guangdong Province Economic and Technological Development
Zone, East Island Area, annual output of 300 million sets of alloy wheels.
The total investment is unknown.
Owner:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Anshan City Standard Parts Industrial Park Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The project is located in Anshan City of Road Bay industrial area, the project covers an area of
372,362.25 square meters, total construction area of 191,519.18 square meters, the project is only the
standard factory building.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Design unit: Anshan Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Anshan standard factory equipment manufacturing industry, construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in Anshan City of Road Bay industrial zone, the project planning area 429273.46m2,
the project is only the standard factory building and office building.
The total investment is unknown.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Design unit: Anshan Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Margaret Fagg Midland Auto Parts -Kunshan Co., Ltd. Casting rough annual vehicle parts steering knuckle 70 million units of new projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: lathes, air compressors, heat-conducting oil furnace, machine, welding machine, cutting
machine, precision punch, press, crane, machine, submerged arc welding machine
Project:
Project is located in Kunshan City, Jiangsu Province, the Huangpu River Road, west of the town
Qiandeng, Yuxi Road, south side, with a total area of 30,000 square meters. Mainly engaged in research,
development and manufacturing of automotive parts with rough cast -knuckle, and provide after-sales
service and consulting services. After completion, expected annual output of 700,000 sets of steering
knuckle.
The total investment is about 30 million euros.
Owner:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Voith Paper -China Co., Ltd. increase and expansion project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: lathes, machine tools, welding machines, etc.
Project:
Project is located in Kunshan City, Chen Feng Road, Hi-Tech Industrial Park, No. 199, the expansion of
production, mainly paper-making equipment and spare parts production. After completion, annual capacity
is expected Cleaner, pulping machine, flotation cell, and so paper-making equipment and parts 1769.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Title: Radio Monitoring Center room Yunfu Projects
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in the Swan District, Yunfu City Road, No. 22,24,25,26, covering about 680 square
meters, total building area of the project is about 6800 square meters, height of nine and a half, each
covering about 700 square meters .
The total investment is 1200 million.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Design Units:*******
Postal Address:*******
Tel :*******
Project Name: Anshan optoelectronics industry standard factory construction project Phase II
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
Project is located in Anshan City, Anshan -up to Road Bay Economic and Technological Development
Zone, about 50m west of the site at the Shenyang-Dalian highway. Anshan II optoelectronics industry
standard factory covers an area of 113,344 square meters construction project planning, construction area
of 207,000 square meters, including the new 23 standard workshops.
The total investment is unknown.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Design unit: Anshan Environmental Protection Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Wireless MWD construction equipment
Progress stage: the record
Construction period :2011-April -2015-12 months
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Open road project is located north of River Road west of Switzerland, Petroleum Technology Co., Ltd.
Zhongtian blind construction, the construction scale 82701.87 square meters, the main buildings are testing,
machining, electrical equipment, assembly and production plants, covers an area of 37,108.0 square meters,
the main products are wireless MWD apparatus, the main production capacity MWD150 sets / year,
LWD50 sets / year.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 600 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Tianjin Jinghai County plant Emma Technology Co., Ltd. second phase of the project
Progress stage: construction started in
Construction period: August 2010 -2011 in October
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
Project is located in Jinghai County of Tianjin Tianyu Technology Park -Southern coastal economic
development zone, Jinghai bike -electric vehicle Industrial Park, an industrial development, with a total
construction area of 140,000 square meters, including: factories, office buildings. 100,000 square meters industry, 40,000 square meters -office.
The total investment is about 120 million yuan.
Construction Unit:*******
Post Code:*******
Contact Person:*******
Tel :*******
Designer:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Construction of units:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual 6000 -sets of construction projects boiler soot blower
Progress stage: the record
Construction period: March 2011 -2012 in March
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project is located in Jingshan Economic Development Zone, with an annual output of 6,000 pieces -sets
power plant boiler soot blower construction projects, the nature of the new building, covering 100 acres,
building area of 20,000 square meters, building factories, warehouses, new equipment 40 -set .
The total investment is about 50 million yuan.
Construction Unit:*******
Postal Address:*******
Tel :*******
Project Name: Economic Development Zone, Beijing Shilong Industrial Incubation Centre II -Long ECommerce Industrial Park project
Stages of progress: preliminary design
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in Mentougou District, the project covers an area of 48,462.69 square meters,
construction area of 139,697 square meters, the main building of the business office operations centers,
Internet data center services, technical support and R & D centers and related facilities. Construction of the
project organization and implementation in three phases, a construction area of 58,095 square meters,
construction area of 41,620 square meters Phase II, Phase III construction area of 39,982 square meters.
The total investment is unknown.
Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel :*******
Project Name: Annual 1 million m high-performance belt Relocation Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, electrical facilities, ventilation, lighting
Project:
Project is located in Wuxi City, Town, Tai Hu Lake Tai Hu District, the village spent 50 along the bridge,
to be moved to the Lake District, Wuxi Tai Hu Liu Tong Road Industrial Park, No. 29 North lease of 5,000
square meters factory building high-performance drive with the processing, with an annual output of 100
meters of high performance belt.
The total investment is about 2.7 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Design by: Shanghai Environmental Energy Engineering Co., Ltd. -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Annual 600,000 kilowatts wind energy converter project
Progress stage: the record
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: 2011 -2011 years
Major equipment: testing equipment
Project:
Project is located in Hefei High-tech Learning at Park Friends of Weir Road, Science Park Road junction
and the implementation of Kim, Sun Power Co., Ltd. with an annual output 600,000 kilowatts wind energy
converter project, the main construction content and scale of production for the acquisition of related
processing and testing equipment, add a production plant, an integrated plant, a test center and related
facilities with a total construction area of 21,201 square meters. After completion, the annual output of
wind energy converter series 60 million kilowatts.
The total investment is about 81.63 million yuan.
Owner:*******
Post Code:*******
Tel:*******
Project Name: annual 100 million kilowatts of solar PV inverters project
Progress stage: the record
Construction period: 2011 -2011 years
Major equipment: testing equipment
Project:
Project is located in Hefei High-tech Learning at Park Friends of Weir Road, Science Park Road junction
and the implementation of Kim, Sun Power Corporation annual one million kilowatts of solar photovoltaic
inverter project. The main construction content and scale of production for the acquisition of related
processing and testing equipment, add two production plants, an experimental test center and the substation,
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
compressor station and related facilities with a total construction area of 39,518 square meters. After
completion, the annual output of various models of solar photovoltaic inverter series 100 million kilowatts.
The total investment is 203.85 million yuan.
Owner:*******
Post Code:*******
Tel:*******
Project Name: Production of construction machinery products 25,000 items
Progress stage: the record
Construction period: February 2011 -2012 in December
Major equipment: Large CNC cutting machines, CNC plasma cutting machines, large CNC bending
machine, large CNC machining centers, robotic welding integrated system, the structure and the whole
coating line, the whole assembly line, etc.
Project:
High-tech Zone project is located in Jiaozuo Hill Rd East, Shenzhou Road North, Xiamen Engineering
Machinery -Jiaozuo Co., Ltd. second phase of technological transformation expansion project and
construction of 333,330 square meters land -500 acres, the new plant construction area of 74,900 square
meters. New joint workshop 4 # 5 # joint workshop, 6 # plant, product shipping room and vehicle parts
library, debug, repair shed, as well as the corresponding auxiliary facilities supporting public power. Plans
to achieve annual output of 25,000 units of construction machinery products -including loaders Add 5000
units / year, 10,000 new truck / year. Technology is the main core of steel cutting, the structure of
manufacturing -including coating, machine assembly, the Ministry of loading experiments. The main
equipments are large CNC cutting machine, CNC plasma cutting machines, large CNC bending machine,
large CNC machining centers, robotic welding integrated system, the structure and the whole coating line,
the whole assembly line and so on.
The total investment is about 1,033,910,000 yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction Company: Xiamen Engineering Machinery -Jiaozuo Co., Ltd.
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Automobile Parts Co., Ltd. Beijing Shakespeare Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: ABS plastic injection production line and ABS plastic plating production line
Project:
Project is located in Daxing District, Beijing Huangcun West Village North, the project plant in the
region east of the company hiring Wei Kawei plant, plans to build production lines and ABS plastic ABS
plastic plating production line, and with related production equipment and pollution control facilities. After
completion, the production of automotive interior and exterior pieces 220,000 units / year, and 22 million
sets of products for surface coating, coating an area of 92400m2 / a.
The total investment is unknown.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Heshan City, New Fu Industrial Co., Ltd. circuit board annual one million square meters of
construction projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: laminating machine, shooting machine, RIVETS machines, exposure machines, laser
scanning, thermal oil furnace, the inner layer etching machine
Project:
Project is located in Cape Town in Heshan Lin Village, the new board an annual output of 1,000,000
square meters of construction projects, after the completion of planned annual production of high-density
interconnect laminates 800 000 m2, multi-layer flexible board 10 million m2, rigid-flexible printed circuit
boards 100,000 m2. The main production processes, including the inner plate, pressure plate, drilling,
copper plate surface plating, pattern transfer, graphics, plating, etching, surface treatment, testing and so on.
The total investment is about 8000 million -approximately $ 8,000,000 investment in environmental
protection.
Construction Company: Shenzhen Fu Circuit Co., Ltd.
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design by: Guangdong Provincial Environmental Science Research Institute -EIA agencies
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Project Name: Annual 120MW of solar photovoltaic industry, vertically integrated product project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Main equipment: automatic chip connection machine, laminating machine, thermal oil heaters, diffusion
furnace, screen printing, PECVD system, retractable plate silicon, battery board testing machine, automatic
packaging machines, computer console, diffusion furnace, HF corrosion of equipment, light welding,
laying machine
Project:
Nanan City, Fujian Province, the project is located in the town of Quanzhou Xia U.S. -South
Optoelectronic Information Industry Base, the new annual output of 120MW of solar photovoltaic
production lines and ancillary works.
The total investment is 378.38 million yuan.
Owner:*******
Postal Address:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Annual 30000 thick-walled hydrogenation reactor, nuclear power, pressure vessel head,
from coal to gas heating transformation projects
Progress stage: the record
Construction period: February 2011 -2011 in June
Major equipment: Four-column hydraulic press ,6500-32 spinning machine, 5-ton -30 ton crane, machine
two, four natural gas furnace, universal testing machine
Project:
The project is located in the town of Xinxiang County, Hebei North Section Street Estate in conjunction
with an annual output 30000 thick-walled hydrogenation reactor, nuclear power, pressure vessel head, from
coal to gas heating technological transformation projects, the construction scale: The project accounts to
110 mu, building area of 33,000 square meters, the project annual output of 30,000 to be thick on the
hydrogenation reactor, nuclear power, pressure vessel head production line from coal to gas heating plant.
Technology: According to the U.S. standard ASME container production, the use of automatic digital
control system PLC control technology. Mainly hydraulic machine equipped with four-poster ,6500-32
spinning machine, 5 tons -30 tons crane, machine two, four natural gas furnace, universal testing machine,
all other low-temperature impact testing machine. Year after implementation of the project 120 million
cubic meters of gas.
The total investment is about 118 million yuan.
Construction Company: Xinxiang China United Petrochemical head Forging Co., Ltd.
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Na Sainuo Technology -Jurong Co., Ltd. Technology Incubation Center Project
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
The project is located south of Jurong Economic Development Zone Wenchang Road, Shishi Road, west
of the proposed land 208588m2, major construction projects and R & D Building 167, Building 1, Business
Club, during the pilot project for the assembly of the main, pilot-scale mini-10000 Laser Intelligent
Projector -Laseno SMP-101, laser micro-display engine module -Laseno SEE-100, and laser projection settop boxes -Laseno SEE-400.
The total investment is 646,174,000 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Liaoning Dalian Jinzhou District of Dalian Harbor Industrial Zone, three Shilibao ship
loaders ship supporting the construction projects of industrial plant engineering
Progress stage: construction started in
Construction period: June 2010 -2011 in September
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: lathes, cutting machines, machining centers, steel pre-equipment, water treatment
equipment, air compressor equipment, painting equipment, anti-corrosion equipment, dust removal
equipment, fire fighting facilities, conveyor belts, cranes, welding machines.
Project:
Three projects are located in Dalian, Liaoning Jinzhou Harbor Industrial Zone Shilibao to build a singlestorey workshop, with a total construction area of 34,376 square meters.
The total investment is about 80 million yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact person: He Ping Electrical Engineer
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Construction unit:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual 1.2 million sets of 24,000 kilowatts wind turbine blades technology projects
Progress stage: the record
Construction period :2011-4 to 2012-4
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: Multi-expander, automatic computer double sealing machines, automatic assembly line
Project:
Liang Lake project is located in Shangyu City, industrial areas, annual output of 12,000 sets of 24,000
kilowatts wind power blade technology projects, the project of 25 acres of new land, the new plant 16,000
square meters, the newly acquired 18 sets of multi-function expansion machine, automatic dual-computer 9,
the first sealing machines, automatic assembly line 2, to form an annual output of 12,000 sets of 24,000
kilowatts production capacity of wind turbine blades. Items
The total investment is about 43.8 million yuan.
Owner:*******
Zip Code:*******
Contact:*******
Tel:*******
Project Name: automotive rubber parts and seals pipeline construction project
Progress stage: under construction
Construction period :2011-1 to 2011-12
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in Tiantai County Park, South Park, Ping Qiaozhen function 9, the new automotive
rubber parts and seals pipeline construction projects with a total land area of 8352 square meters, total
construction area of 11,815 square meters -274 square meters of office space, productive use house 11,541
square meters. Formed after completion of the project on production of 100 million sets of automobile
rubber parts, seals pipe production capacity of 500 million sets.
The total investment is about 20.1 million yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Precision Metal Co., Ltd. Foshan World Bank and Asian auto parts project
Stages of progress: The project proposal
Construction period: July 2011 -2012 in February
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
Project is located in Foshan, Guangdong Gaoming Cangjiang Industrial Park, an industrial development
area of approximately 4,000 square meters, including: workshops, warehouses.
The total investment is about 15 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Dongfeng Liuzhou Motor Co. passenger car base relocation transformation projects
Progress stage: construction design
Construction period: June 2011 -2013 in January
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
Project is located in the East District Liuzhou, Liuzhou, Guangxi Liuzhou Automobile City, an industrial
development, including: press shop, welding shop, paint shop, assembly plant, resin plant, warehouse
logistics support, integrated office, restaurant.
The total investment is about 200 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Construction of ship repair base relocation project
Progress stage: under construction
Construction period: 2011 -2015
Major equipment: steel structure, fire facilities, security facilities, water supply and drainage facilities,
electrical facilities, ventilation, low voltage distribution electrical, pipe fittings, conveyor belts, made dock,
gantry cranes, cutting machines, welding machines, etc.
Project:
Project is located in Tianjin Binhai New Area, Tianjin Xingang Shipbuilding Heavy Industry Co., Ltd.
ship repair base relocation port construction projects, major new-made dock Block 1, Block 1 repair dock,
after the completion of an annual shipbuilding capacity of 1,000,000 dwt and annual repair 5-30 ton ship 60
ship repair capacity.
The total investment is unknown.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual 6 million high-capacity wholly sealed maintenance projects
Progress stage: the record
Construction period: 2011 -2013
Main equipment: automatic casting welding, resistance tester, battery weighing system, into charger
Project:
Project is located in Fuling District lidu Panlong Road 88, Industrial Park, the project construction land
area of 200 acres, Chongqing, Johnson Controls Battery, Inc. -chips with an annual output 6 million highcapacity wholly sealed maintenance projects, annual production capacity of 6 million high-capacity wholly
sealed maintenance-free lead-acid battery production lines and supporting projects with a total construction
area of 55,000 square meters
Total Investment The total investment is about 11,830 million U.S. dollars and registered capital of 3,943
million U.S. dollars, controlled by investment Fangjiang Sen Energy and Power Asia Holdings Limited will
invest in money. Total investment and registered capital of the difference between the investors raised by
the settlement.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Cable Production Line
Progress stage: under construction
Construction period :2011-1 to 2012-12
Major equipment: CNC machine tools, boring machine
Project:
Tangxi Baihe project is located in Golden, cable production line projects with a total land 13,386 square
meters, total construction area of 7511 square meters. Acquisition is expected to CNC machine tools,
boring machine and other advanced processing equipment and advanced testing equipment 800 million.
The total investment is about 20 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Annual 1200MWH lithium-ion battery, 3000MWH VRLA battery energy projects
Progress stage: under construction
Construction period :2011-1 to 2013-1
Major equipment: vacuum mixer, automatic system and automatic pack film machine, automatic winding
machine, welding machine and other cast
Project:
The project is located in Hangzhou Hongda Road, Yuhang Economic Development Zone, with an annual
1200MWH lithium-ion battery, 3000MWH VRLA battery energy projects, project land area of 250 acres or 166,606 square meters, land contract number: × ×. New plant and auxiliary building 147,030 square
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
meters, of which more than 8m building 57,600 square meters, the introduction of vacuum mixer,
automatic system for film and other imported equipment 85 -set and automatic pack machine, automatic
winding machine, welding machine and other domestic cast Equipment 1658 -sets. After completion of the
project can be an annual 1200MWH lithium-ion battery, 3000MWH high capacity valve-regulated batteries.
The total investment is about 1.3 billion yuan.
Construction Company: Hangzhou Narada Power Technology Co., Ltd.
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual production of 20 subway maintenance car project
Progress stage: the record
Construction period: February 2011 -2012 in February
Major equipment: SPRT 30 W/A-1XYR air transport unit, 4-axis / 32T moving trolley car station,
switching station bit frame vehicle computers, weighing down car frame car platform-bit machines, mobile
vehicle computer stand
Project:
Project is located in Luoyang City, Chan Kai Ming East River District 2, in Luoyang City Southern
Railway Vehicle Co., Ltd. car production and 20 years of underground engineering maintenance projects,
project construction scale: The total construction area of 17,874 square meters, including: moving trolley
car sets new venue , covers an area of 2880 square meters; new body storage area, covers an area of 5400
square meters; new compressor station of 144 square meters; transformation of ground 9450 m2 assembly
plant. Process: after purchasing the bogie and body paint and other accessories - assembly Taiwan-bit
installation on board, and car parts under the car - get off the train station bit assembly Bogie preparedness - test. Add major equipment SPRT 30 W/A-1XYR air transport unit of a 4-axis / 32T trolley
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
car sets a shift conversion unit of a Taiwan-bit frame vehicles, aircraft off the train car weighing station bit
machine, moving a set of frame-type vehicle unit. After the project may have the annual production of 20
metro engineering maintenance capabilities.
The total investment is about 25.84 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: e-west area of Zhongguancun Science Park, E8-2 R & D Center Project
Progress stage: construction started in
Construction period: October 2010 In October -2011
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
Project is located in East Road, Chaoyang District, Beijing Wang Jing, a comprehensive development,
with a total construction area of 88,940 square meters, including: R & D centers, electronic components
repository.
The total investment is about 200 million yuan.
Construction:*******
Post Code:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Design:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Construction:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Dongfeng Honda Automobile Co., Ltd engine foundry, machine shop capacity building
projects
Stages of progress: environmental impact assessment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Construction period: 2011 -2012 years
Major equipment: CNC machine tools, lathes, cutting machines, welding machines, etc.
Project:
Project is located in Wuhan Economic and Technological Development Zone, 283 cars Cheng East Road,
the project is not a new acquisition, the use of existing open space on the existing engine plant and foundry,
machine shop expansion, production capacity from 24 million / year increase to 480,000 units / year.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Mechanical processing of digital transformation projects
Progress stage: under construction
Construction period: January 2011 in June -2011
Major equipment: lathes, etc.
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project is located in high-tech industry cluster area Pingdingshan City, Henan Electric Co., Ltd.
Machining high level of digital transformation projects, the project intends to Pingdingshan City Industrial
Park High-tech Zone to implement high-voltage electrical, mechanical processing capacity in the existing
digitized on the basis of technological transformation. No civil works of the project, no land, newly
purchased 17 sets of major equipment, including 3 sets of imported equipment, domestic equipment 14 sets.
All newly purchased equipment will be arranged in the park and the hydraulic mechanism of circuit breaker
assembly plant, the occupied floor area of 5400m2. The project is to expand the company's precision
components machining capacity, improve processing accuracy and enhance the level of mechanical
assembly process to meet the production requirements of high voltage switches.
The total investment is about 46.8 million yuan.
Construction Unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Annual production of 12,000 tons of light cast iron auto parts project
Progress stage: the record
Construction period: February 2011 -2011 in August
Major equipment: Dan Maidi automatic mechanized horizontal sand molding line, 3-ton medium frequency
electric furnace, large sand handling system, cleaning equipment, testing and inspection equipment and gas
and dust treatment facilities
Project:
Project is located in Town Industrial Zone Huixian Bangladesh, expansion of annual production capacity
12,000 tons of light cast iron auto parts production lines, using Dan Maidi automatic horizontal-type sand
molding production process without boxes, purchased pig iron - smelting - the slab - machining - finished
product. Major equipment Danmai Di automatic mechanized horizontal sand molding line, add three tons
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
medium frequency electric furnace 2, a large sand handling system, 3 sets of clean-up equipment, testing
and inspection equipment 5 and the gas and dust treatment facilities.
The total investment is about 36 million yuan.
Owner:*******
Post Code:*******
Contact person: Li Jianjun
Tel:*******
Project Name: 1000 tons of textile machinery parts production project
Progress stage: the record
Construction period: February 2011 -2011 in August
Major equipment: Yuan cars, milling machine, planer, grinder, rolling bed
Project:
The project is located north of Zhengzhou Air Port Newport Road, Zhengzhou Hongda Textile
Machinery Co., Ltd., Newport Branch 1000 tons of textile machinery parts production project, which
converted the company's expansion of their own land, an area of 9017 square meters -about 13.5 acres The
total construction area of about 4,500 square meters, of which 3150 square meters plant, expansion of
office building 1350 square meters, mainly in metal cutting technology, the new car buying dollars, milling
machine, planer, grinder, rolling bed.
The total investment is about 10 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Project Name: An annual 120 million construction project when the lithium-ion battery
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: Chemical charger, external chip coated board machine, automatic casting welding,
resistance tester, battery weighing system, into a charging machine, vacuum filling machines and other acid
Project:
Project is located in Wujin District, Changzhou Wujin Hi-Tech Industrial Development Zone Avenue to
the north, Chang Wu Road, east of City Road, west of the summer, Project scale: annual output of various
types of lithium-ion batteries and communications combined lithium-ion battery 1.2 billion Ah, supporting
the construction of related production and auxiliary facilities. Including 30 million and 6 million 2.7Ah
1.5Ah communication cell; 3,900,000 600,000 10Ah and 35Ah battery power. Project through the slurry
coating machine pole piece segments evenly coated in copper, aluminum sides and dry, depending on the
battery specifications, after the coated copper foil cut to size of the positive and negative pole piece and roll
to the required thickness, using ultrasonic welding to aluminum -or nickel and the copper bars were welded
to the positive and negative roll into the battery on the pole piece, and through the vacuum oven drying, and
then being negative electrode, separator wound into batteries, and aluminum plastic film packaging, in the
70 ~ 90 ℃, using the vacuum oven drying of the batteries after 6 to 8 hours, less than 0.3% into a relatively
dry and room temperature, the injection fluid and vacuum packaging system was batteries, Finally battery
into the battery electrochemical activation devices.
The total investment is 651,205,000 yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Changzhou Noble Electronics Co., Ltd. 50,000 square meters / year project of electronic
components
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: vacuum induction furnace single crystal, semiconductor ultrasonic welding machine,
thermal oil heaters, air compressors, machine tools, rolling mill crystal
Project:
Project is located in the town of San Juan Cheng damiaocun, the total area of 5553.9 square meters the
whole plant, process and products pollution: a material development → water washing → → → washing
→ Etching → laminated to the film forming → test → → Cutting products. Size of 50,000 square meters
production / year electronic components.
The total investment is about 300 million.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Production of 3 million sets of electronic digital components, car decoration accessories 15
million sets, 300 sets of precision molds New Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: CNC lathes, machine tools
Project:
Renewable resources, the project is located in Taicang Port import processing zones, with an annual 3
million sets of electronic digital accessories, car decoration accessories 15 million sets, 300 sets of
precision molds.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Tel :*******
Project Name: mountains and shock absorber production project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Main Equipment: Molding equipment, numerical control machine tools
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
The project is located in Dujiangyan Economic Development Zone, the project covers an area of 28 acres,
with a total investment of 42 million yuan, design completion, the annual manufacture of 1.5 million shock
absorbers.
The total investment is about 42 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel:*******
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Main equipment: automatic chip connection machine, laminating machine, thermal oil heaters, diffusion
furnace, screen printing, PECVD system, retractable plate silicon, battery board testing machine, automatic
packaging machines, computer console, diffusion furnace, HF corrosion of equipment, light welding,
laying machine
Project:
Project is located in Jiangning Economic and Technological Development Zone, West City, 123 Buddha,
$ 99,000,000 of new investment projects will be built in the PV power R & D testing center building new
production facilities and the use of auxiliary equipment and facilities for production. Expansion will add an
annual output of 200MW solar cell production capacity.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about $ 99,000,000.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Shunde Jin Xin Yue Zhixian decorative CNC machinery and CNC projects
Progress stage: the construction preparation -EIA at the same time
Construction period: 2011 -2012 years
Major equipment: CNC lathes, machine tools, etc.
Project:
Heavenly Lake project is located in the town of Le Zhixian, the project covers an area of 29 acres,
building steel plant, ancillary facilities and annual output of 1,200 units 9,000 square woodworking
machinery and equipment production line.
The total investment is about 19 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel :*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Taicang Xuan Color Cards Color Card 104000m2 annual output of new project cars
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: testing equipment, molding equipment
Project:
Liuhe Town Project is located in Taicang City, visit the Village Gate South Road, Taicang annual output
of brightly colored card production car color card 104000m2 new project is located in Taicang City, visit
the Village Gate Liuhe Town, South Industrial Zone, the project covers an area of 3400 m2.
The total investment is about 300 million yuan -990,000 yuan investment in environmental protection.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Tangshan City and the large number of heavy equipment to the forging industry base
autonomy
Progress stage: construction started in
Construction period: September 2010 -2012 in March
Major equipment: steel cutting production line, steel processing line, conveyor belts, 80 ton electric arc
furnace, 150 tons of refining furnace, heat treatment furnace preparation, bag filter.
Project:
Project is located in Tangshan High-tech Industrial Park, a single seven-storey integrated development,
with a total floor area of approximately 122,000 square meters, including: workshop, office building,
dormitories, canteens. 85400 square meters -industry, 18,300 square meters -office, 12,200 square meters residential, 6100 m -retail.
The total investment is about 100 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Designer:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Shanghai Special Machinery Casting Co., Ltd. Guangdong plant project
Stages of progress: The project proposal
Construction period: November 2011 In September -2012
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
Project is located in Fengxian District of Shanghai Happy Road, east, west plant, north to light Tai Road,
the construction of several factory buildings, covers an area of 19,085 square meters.
The total investment is about 40 million yuan.
Construction:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Annual Production of 5,000 tons of 200 variable frequency motor corona resistant enamel
round copper wire project
Progress stage: the record
Construction period: May 2011 -2012 in May
Major equipment: horizontal paint charter, large drawing machine, the drawing machine, drawing machine
and other small micro-pulling
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Coking project is located in Xiangcheng county circular economy industrial park, with an annual output
of 5,000 tons of 200 variable frequency motor corona resistant enamelled round copper wire, the new plant
13000m2, buy enameled wire production line 10. Technology: high-quality raw materials for the oxygenfree copper rod, actinomycetes - annealing - painting - drying - cooling closing lines - testing packaging.
Major equipment horizontal paint charter, large drawing machine, the drawing machine, drawing machine
and other small micro-pulling.
The total investment is about 80 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Annual 34,000 sets of precision molds, die mold embryo project
Progress stage: the record
Construction period :2011-month October -2012-12
Major equipment: machining centers
Project:
The project is located-City Industrial Park, three digital, flat into the mold manufacturing projects,
construction scale of 80,000.00 square meters, the main building a plant, dormitories, offices, covers an
area of 65000.0 square meters, annual output of 34,000 sets of precision molds, mold Mould .
The total investment is about 150 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Contact:*******
Tel:*******
Project Name: Aircraft parts manufacturing
Progress stage: under construction
Construction period :2011-month January -2015-12
Major equipment: lathes, etc.
Project:
Project is located in Shantou City Industrial Park Circle Shengping University Avenue West, aircraft
parts manufacturing, construction scale 6000.00 square meters, the main building a production plant covers
an area of 2315.8 square meters, annual output of 250,000 aircraft accessories, aircraft brakes 5 one
thousand, the output value of about 1.5 million.
The total investment is about 120 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax:*******
Project Name: Professional lighting and LED products project
Progress stage: the record
Construction period :2011-month in March -2013-12
Major equipment: connection machine, soldering machines
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
Project is located in Dongguan Songshan Lake Science and Technology Industrial Park, Industrial West
VI Road 1, Ocean King -Dongguan Co., Ltd. lighting fixtures and LED products professional projects, the
construction scale of 175,715.00 square meters, the main building a plant, R & D building, comprehensive
building and ancillary facilities, the main products are professional lighting fixed, mobile professional
lighting, professional portable lighting, LED products, mainly fixed production capacity of a professional
lighting 624,400 / year, 66,000 mobile professional lighting units / year, professional portable lighting
1200000 sets / year, LED products, 200,000 units / year
The total investment is about 550 million yuan, of which 470 million yuan investment in civil
engineering, equipment investment 80 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
E-mail: zoujuan@oceansking.com.cn
Project Name: Annual connection frame 700 million plant construction project
Progress stage: the record
Construction period :2011-April -2013-04 months
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Songshan Lake Industrial Park project is located in the northern industrial city east of San Road
Industrial West, EPI Precision Technology Co., Ltd. Guangdong Songshan Lake plant, the construction
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
scale 89846.00 square meters, the main building has plant and auxiliary facilities, covers an area of 43333.0
square meters, 700 million annual output connection frame, slide 18 million, LED stent 3000000000
The total investment is about 400 million yuan, of which 150 million yuan investment in civil
engineering, equipment investment 170 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Annual transformation of the relocation projects 5000MW Steam Turbine
Progress stage: the record
Construction period: June 2011 In June -2013
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in East Lake New Technology Development Zone Industrial Park Ridge Buddha,
China Yangtze Power Company -Group transformation of the relocation projects -Buddha Ridge plant,
relocation of Construction, with an annual output of the field of energy saving steam -water wheel power
units, industrial drives and other new energy power generation equipment, steam turbine 5000MW, the new
generator plant, large processing plant, turbine plant, small pieces of processing plant, generator parts plant,
distribution center, plant leaves and partitions, office building, technology center House and other
production, office and living facilities and supporting public power facilities.
The total investment is about 1.8486 billion yuan.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Owner:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Nantong Tongzhou District, Zhihao Industrial Co., Ltd. standard factory project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in Nantong City, Town, Tongzhou District, Jiang Chuan hekou village, construction of
standard factory buildings, built after the introduction of production capacity is 15,000 million units / year
production line of high-end home textiles.
The total investment is about 900 million yuan.
Owner:*******
Post Code:*******
Contact person: Ji Ping Ren
Tel:*******
Designer:*******
Postal Address:*******
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Xing shipbuilding base in the second phase of the master -first phase project
Stages of progress: survey and design
Construction period: 2011 -2012 years
Major equipment: steel structure, fire facilities, security facilities, water supply and drainage facilities,
electrical facilities, ventilation, low voltage distribution electrical, pipe fittings, conveyor belts, made dock,
gantry cranes, cutting machine, welding machine and so on.
Project:
Project is located in Changxing Island, Shanghai, Chongming County, east of Port leap, Hengsha
Kaohsiung west, south of the Yangtze River, and the captain Xing shipbuilding base adjacent to the first
phase, the total available land area of about 603.6 hectares, single span of 48 meters factory buildings and
warehouses . The project production program for the annual shipbuilding capacity of 3.5 million tons, main
construction contents include docks, piers and other hydraulic facilities, outfitting, steel yard, preworkshops, field assembly and welding parts, painting workshops and other production workshop and
production facilities, and supporting utilities.
This works mainly for the 2 sets of 1,800 tons gantry crane, 2 sets of 1,200 tons gantry crane project.
The total investment is about 9,915,510,000 yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Designer:*******
Tel :*******
Fax :*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: annual output of 2 million sets of electronic security equipment and automatic parking
garage project
Progress stage: under construction
Construction period: January 2011 in June -2011
Major equipment: oscilloscope, video tester, audio test instruments, noise tester
Project:
The project is located in Xuchang still set industrial clustering, the new annual output of 2 million sets of
electronic security equipment and automatic production line of garage parking, technology: semi-finished
products - assembly - debug - test - finished, the main equipment oscilloscope, video tester, audio test
instrument noise tester.
The total investment is about 50 million yuan.
Construction units:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Annual 20000 and 5000 tons wear parts cylinder head project
Progress stage: the record
Construction period: February 2011 -2011 in July
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: physical and chemical testing equipment, grinders, milling machines, radial drilling
machine.
Project:
Project is located in county towns Fugou County Garden Road, cylinder head and an annual output of
20,000 pieces of 5,000 tons of wear items, scale of construction projects and the annual output of 20,000
head of 5,000 tons of wear-resistant parts. Standardization of the main steel structure of the new plant 2,000
square meters, warehouse, office, dorm 200 square meters and mechanical processing flow production lines,
casting mechanized molding lines. Technology: Raw materials - cast blank - on the following milling drilling - tapping - Grinding - Inspection - Paint - packaging and storage. Physical and chemical testing
equipment, major equipment, grinders, milling machines, radial drilling machine.
The total investment is about 10 million yuan.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: Annual 1 million vehicle axle project
Progress stage: under construction
Construction period: January 2011 In January -2012
Major equipment: processing and testing equipment
Project:
Project is located in Hubei Province, the county public security trickle Ling Industrial Park, an annual
output of one million vehicle axle projects, the nature of the new construction, new production plant, the
test center, physical and chemical center, an area of 11,514 square meters building, new processing and
testing equipment purchased 54 sets - sets.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 28.8 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Tel :*******
Project Name: Annual 100MW crystalline silicon solar cell investment
Progress stage: under construction
Construction period :2011-1 to 2011-8
Major equipment: printing presses, automatic packaging machines
Project:
Project is located in Lishui City, Industrial Zone, Long Qing Road Shuige 356, with an annual 100MW
crystalline silicon solar cell investment projects, mainly using automatic printing, sintering, sorting
technology, the acquisition of domestic and imported equipment, rental of plant construction area of 1728
square meters . After completion of the project an annual 100MW crystalline silicon solar cell production
capacity, products with energy saving features.
The total investment is about 110 million yuan, including fixed assets investment: 80 million yuan device 7700; other costs construction 300;, working capital 30 million yuan.
Construction:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Annual 100000 Agricultural dynamic elastic crawler project
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Progress stage: under construction
Construction period :2011-month January -2012-1
Major equipment: crawler shot blasting machine, mixer, drum shape and length of curing machine, molding
machine, curing tanks, etc.
Project:
Project is located in Sanmen County, Western Industrial Park, an annual output of 100,000 tracks the
dynamic elastic agricultural project, the project uses high-performance dynamic elastic material, the use of
intellectual property the company owned two patents for inventions pouches sealed tooth trimming
vulcanized method with anti-V and short-fiber plastic with horizontal arrangement of the cutting edge as
the top fabric and trimming the joint with V V with advanced technology production, purchase of
equipment tracked shot blasting machine, mixer, drum sulfide and the length of the shaping machine,
shaping machine, curing tanks, etc., the establishment of agricultural production of complete sets of
equipment caterpillar, forming an annual output of 100,000 tracks the dynamic elastic agricultural
production.
The total investment is about 112 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: Workers of the city back into the park cum business transformation -flameproof,
metallurgical lifting motor industry project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: lathes, machine tools, etc.
Project:
Beibei District, the project is located in the same group Caijiaying Xing Industrial Park, the project
covers an area of 12188.8m2, construction area 22727.68m2, the main production proof, metallurgical
lifting motor, the annual production capacity of 150,000 KW.
The total investment is about 45 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Wei speed up -China Automotive Safety Systems Co. spray handle 60 million sets of
expansion
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: spray equipment, drying equipment, etc.
Project:
Project is located in Taicang Economic Development Zone of Jiangsu south of Guangzhou Road,
Dongting Road, east block, the handle 60 million sets of spraying.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about $ 5,000,000 -100 million investment in environmental protection.
Owner:*******
Post Code:*******
Contact:*******
Tel:*******
Fax:*******
Designer:*******
Postal address:*******
Post Code:*******
Tel :*******
Project Name: An annual 30.6 million high-performance lithium-ion battery when the construction project
Progress stage: the construction preparation -EIA at the same time
Construction period: 2011 -2012 years
Major equipment: Chemical charger, external chip coated board machine, automatic casting welding,
resistance tester, battery weighing system, into a charging machine, vacuum filling machines and other acid
Project:
Hakusan City, seven projects are located in Village, the area 3.3768hm ², new production plants, storage
library, ancillary facilities, new construction total area of 21700m ².
The total investment is 146,004,400 yuan.
Construction unit:*******
Postal address:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Project Name: High-capacity maintenance-free sealed lead-acid battery manufacturing projects colloidal
Progress stage: the construction preparation -EIA at the same time
Construction period: 2011 -2012 years
Major equipment: Chemical charger, external chip coated board machine, automatic casting welding,
resistance tester, battery weighing system, into a charging machine, vacuum filling machines and other acid
Project:
The project is located Guanyun port industrial area, including construction of a new production plant,
single brick; warehouse two, office, living floor of the building, with brick-concrete structure; power
distribution room, shed, guard number of rooms and other buildings, laboratories, a single layer light steel
structure. Also supporting the construction of the plant roads, fences, buildings and other attractions. Scale
of construction projects with an annual output of lead-acid batteries 20000 KWh / year.
The total investment is about 30 million yuan.
Construction unit:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Post Code:*******
Contact:*******
Tel :*******
Project Name: Chongqing Snyder Shanhua Special Vehicle Special Vehicles Co., Ltd. Production Project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: CNC lathes, machine tools, cutting machines
Project:
The project is located in Chongqing Banan District Dobashi Wangjiaba Road 100 plant area, mainly
outside the company building the content of my existing models share the domestic vehicle -chassis, engine
and other components, according to their needs modification, assembly; production of special annual
production of 500 vehicles / year; renovation of 15,500 square meters plant, the purchase of CNC platen
machine, pipe welding machine and other equipment 202 sets.
The total investment is about 26.85 million yuan.
Construction Unit:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Tel:*******
Project Name: 12 million pairs / year frame and 3 million tons / year steel castings production project
chassis
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: CNC lathes, machine tools, lighting, etc.
Project:
Dianjiang industrial park project is located in Chongqing, project construction content of the main
casting plant 1, 2, frame factory, 3, casting plant, office building, R & D center, dormitory, guard and
power distribution room. The total land area of 60231m2, of which construction area 51592.95m2,
construction area 26817.5m2.
The total investment is unknown.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Design:*******
Mailing address: Mianyang Branch Chong Park, 20th Street Garden Center Environmental Assessment
Post Code:*******
Contact:*******
Tel :*******
Project Name: GaN wafer and chip manufacturing projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: single crystal furnace, cutting machines, grinding machines, testing equipment
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project:
High-tech Industrial Park project is located in Jiangmen, 34, the project design capacity of GaN epitaxial
wafers 720,000 / year, supporting the lighting bright LED chip design capacity 28800KK / year. Building
land area 58738.5m2; total construction area of 61920m2, of which a building area of approximately
27000m2.
The total investment is about 600 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Design:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Guangzhou Aluminum Casting Co., Ltd. Xu Yu wind expansion, relocation project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: machine tools, lathes, etc.
Project:
The project is located by the new Town Lai Sin Estate New Road junction, covering about 280 acres, the
main construction contents include 15 industrial plants, five offices, the three library staff quarters and
spare parts, high total power distribution room, air compressor room, mold maintenance, the sewage
treatment station, compressor room, gasification, the duty room and other facilities with a total construction
area of 95221.6 square meters.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 935 million yuan.
Construction:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel :*******
Design:*******
Postal Address:*******
Contact:*******
Tel :*******
Project Name: Hong Fu Jin Precision Electronics -Chongqing Co., Ltd. notebook calculator body parts
production project a project
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: electrical installations, ventilation, lighting
Project:
Project is located in the West Wing Microelectronics Industrial Park in Chongqing West Wing
Comprehensive Bonded Zone A areas, project covering 58362m2, total construction area of 62210 m2,
annual output of 46 million notebook calculator body parts.
The total investment is unknown.
Owner:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel :*******
Design Units:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Beijing Mobis Transmission Co., Ltd. three production projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: CNC machine tools, lathes, etc.
Project:
Project is located in Tongzhou District, Beijing Opto-Mechatronics Industrial Base Ka Chong Road 2,
the project covers an area of 22570m2, total construction area of 17506m2. Mainly for the construction of
transmission manufacturing, the main product is 5-speed manual transmission 10 million units of new
small-scale, 6-speed manual transmission 6 million units of new small-scale, 6-speed manual transmission
4 million units of new medium.
The total investment is about 580.8 million yuan.
Construction:*******
Post Code:*******
Contact:*******
Tel:*******
Designer:*******
Postal address:*******
Post Code:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Contact:*******
Tel:*******
Project Name: Annual solar energy storage battery 200 million KVAH, lithium iron phosphate battery
1000000, lithium iron phosphate cathode material is 5,000 tons projects
Stages of progress: environmental impact assessment
Construction period: 2011 -2012 years
Major equipment: Chemical charger, external chip coated board machine, automatic casting welding,
resistance tester, battery weighing system, into a charging machine, vacuum filling machines and other acid
Project:
The project is located south of a new economic zone Gaoyou, specifically in the Region Prosperous
Road, north east of Ho Chi Road, the project covers an area of 61928.2m2, green area 9289.23m2, building
area: 49060.5m2. Annual output of 200 million solar energy storage battery KVAH, lithium iron phosphate
battery 1000000, lithium iron phosphate cathode material is 5,000 tons. Utilities and ancillary works
including: water supply, drainage works, fire engineering, heating engineering, electricity engineering,
HVAC engineering, green engineering, environmental engineering, including: waste gas, waste water
treatment system, the accident to collect pools.
The total investment is about 200 million yuan -5.38 million yuan investment in environmental
protection.
Construction:*******
Postal Address:*******
Contact:*******
Tel:*******
Designer:*******
Postal Address:*******
Contact person: Zhang Yi
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Project Name: annual output of 60,000 sets of new commercial vehicle cooling module project
Progress stage: the record
Construction period :2011-1 to 2012-12
Major equipment: pipe machine, semi-continuous gas-aluminum brazing furnace, aluminum continuous
gas-furnace, water tank assembly machine, automatic ultrasonic cleaning machines, in the cold dry test
meter, the water tank dry test meter, portable coordinate measuring instrument, coating line and exhaust gas
treatment device, module assembly, the assembly line, 300T hydraulic machine
Project:
Silver wheel factory project is located in Phase II of the annual output of 60,000 sets of new commercial
vehicle cooling module and an annual output of 40,000 sets of production machinery cooling module
construction projects, the new cooling module of the project plant 13056 m2, for the economical use of
land and the new annual output of 1 million units by SCR system and an annual output of 80,000 sets of
SCR converter production and construction projects to build three plants, two plants used in this project, an
annual output of 10,000 sets of new SCR system and an annual output of 80,000 sets SCR converter
production and construction projects with a layer of plants. Proposed new pipe machine, semi-continuous
gas-aluminum brazing furnace, aluminum continuous gas-furnace, water tank assembly machine, automatic
ultrasonic cleaning machines, in the cold dry test meter, the water tank dry test meter, portable coordinate
measuring instrument, coating line and exhaust gas treatment device, module assembly, the assembly line,
300T hydraulic machine and other advanced equipment, 124 pieces -sets. Annual output of 60,000 sets of
the formation of new commercial vehicle cooling module and an annual output of 40,000 sets of
construction machinery cooling module production capacity.
The total investment is about 128 million yuan.
Construction:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Project Name: Drug Device R & D Center Project
Progress stage: the record
Construction period: January 2011 In January -2012
Major equipment: high-frequency digital oscilloscope, resistance to ground, leakage detector, pressure
detector, power supply etc
Project:
The project is located Erqi District Jia Huang Kuo Tsui Road, Zhengzhou Glorious of Medical Devices
Co., Ltd. Zhengzhou Glorious device R & D center of pharmaceutical projects, the project covers an area of
19,343 square meters -29 acres, with a total construction area of 65,400 square meters . The proposed R &
D center, laboratory, testing center. Purchase of high-frequency digital oscilloscope, resistance to ground,
leakage detector, pressure detector, power supply and other ancillary equipment, the company completed
the world patented product with independent intellectual property row of stone machine extracorporeal
shock wave research and development, technological innovation for the enterprise, provide technical
support for long-term development, to further enhance the core competitiveness of enterprises, and actively
participate in domestic and overseas markets.
The total investment is about 99.9 million yuan.
Owner:*******
Postal Address:*******
Contact Person:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: annual output of 10,000 sets of new SCR system and an annual output of 80,000 sets of
production and construction projects SCR converter
Progress stage: the record
Construction period :2011-1 to 2012-12
Major equipment: power testing system, drum test stand, divided gas analyzer, exhaust particle analyzer,
NH3 analyzer, CVS sampling system -smoke meter, synchronized measurement, spectroscopy, Doppler,
laser holography , laser cutting machine, welding robot, MSC carrier assembly machines
Project:
Silver wheel factory project is located in Phase II of the annual output of 10,000 sets of new SCR system
and an annual output of 80,000 sets of SCR converter production and construction projects, the project
plans to build production plant and laboratory SCR area of 10810m2. New production plant in which a total
area of 8810m2, the new SCR laboratory area 2000m2. And an annual output of 60,000 sets of new
commercial vehicle cooling module and an annual output of 40,000 sets of production and construction
machinery cooling module project to build three plants, a layer of the project, added an annual output of
60,000 sets of commercial cooling module and an annual output of 40,000 sets of production and
construction machinery cooling module project with the two layers. Mainly the introduction of electric
testing system, Drum Tester, 5-component gas analyzer, exhaust particle analyzer, NH3 analyzer, CVS
sampling system -smoke meter, synchronized measurement, spectroscopy, Doppler, laser holography
photography, laser cutting machine, welding robot, MSC carrier assembly machine and other advanced
equipment, 76 pieces -sets, forming an annual output of 10,000 sets of SCR system and an annual output of
80,000 sets of SCR converter production capacity. After the project is expected to realize sales income of
306.6 million yuan, the new total profit of 31.5 million yuan and tax 16.26 million yuan.
The total investment is about 109.5 million yuan.
Construction:*******
Post Code:*******
Contact:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Tel:*******
Project Name: Mechanical parts manufacturing project
Progress stage: the record
Construction period :2011-3 to 2011-8
Major equipment: laser cutting machine, large processing center and other equipment
Project:
Before the project is located in the town, machine parts manufacturing project, the project of 14 acres of
new land acquisition, the new total construction area of 7598.4 square meters, all for the production of
space. Purchase of laser cutting machine, large processing center and other equipment to form a
manufacturing and processing 100,000 on mechanical parts, metal products 1,000,000, 200,000 auto parts
capabilities.
The total investment is about 60 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact:*******
Tel:*******
Project Name: To process 10,000 tons of hydraulic pillar base project
Progress stage: the record
Construction period: January 2011 -2011 in December
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Major equipment: CNC lathe, grinder, horizontal milling, vertical milling machine, hydraulic planer,
slotting machine, horizontal boring machine, gear hobbing machine, crane, etc.
Project:
Project is located in the town of zhucun Yichuan County woman Peng Industrial Park, Luoyang Mining
Machinery Equipment Co., Ltd. vision processing 10,000 tons of hydraulic support base, the project intends
to land 79 acres, the new plant area of 12,000 square meters. Drawings provided by customer requirements,
the purchase of raw materials, through car processing, grinding, drilling, milling and boring processes for
machining of individual parts, assembled; major equipment CNC lathes, grinding machines, horizontal
milling, vertical milling machine, hydraulic planer, slotting machine, horizontal boring machine, gear
hobbing machine, crane, etc.; project is completed, can process 10,000 tons of hydraulic pillar base, the
product is mainly used for Coking Coal Group, righteousness Coal and Coal Chemical Industry Group of
Henan Province, etc. for the entire coal machinery Factory support.
The total investment is about 30 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Project Name: Wuhan East Lake New Technology Development Zone Industrial Park in Wuhan Lake Tai
Electronics Co., Ltd. R & D and high-tech electronic equipment production base project
Progress stage: construction preparation
Construction period: February 2011 -2011 in December
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting.
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project is located in Wuhan East Lake New Technology Development Zone, Tai Industrial Park, an
industrial development area of 94,957 square meters, total construction area of 46,299 square meters,
including: office building, comprehensive building, service building, Workshop.
The total investment is about 60 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Construction units:*******
Post Code:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: Annual magnetic twenty thousand sets of the new energy system project
Progress stage: the record
Construction period :2011-month January -2012-12
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Project is located in Nansha District, No. 38 Hexing Road, Hengli Town, MOSFET DC / DC -half-effect
transistors based on copper converter new system of magnetic energy production, construction scale of
6000.00 square meters, the main building has the original plant, the annual twenty thousand sets of new
energy producing magnetic systems.
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
The total investment is about 100 million yuan, of which three million yuan investment in civil
engineering, equipment investment 97 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Solar lights manufacturing project
Progress stage: the record
Construction period :2011-2 to 2011-10
Major equipment: vehicles, and welding equipment
Project:
Before the project is located in the town, solar lights manufacturing project, the project of new
acquisition to 9.405 acres, the new total construction area of 6620 square meters, all for the production of
space. Purchase of vehicles, and welding machines and other equipment to form an annual output of 300
sets of solar lights, solar landscape lights 200 sets, 500 sets of traffic signs, road signs, 1,000 tons of
guardrails.
The total investment is about 18 million yuan.
Owner:*******
Postal address:*******
Post Code:*******
Contact person: Wenming
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project Name: Small mechanical and electrical equipment production projects
Progress stage: the record
Construction period :2011-month in August -2013-08
Major equipment: lathes, Bao bed
Project:
Project is located in Huadu District, Guangzhou City, New Town Road, Xinhua Industrial Zone, small
mechanical and electrical equipment production projects, the construction scale of 40,000.00 square meters,
the main building there are factories, office buildings, dormitories, an area of 31,487.54 square meters,
annual output of 15 million units of small Mechanical and Electrical Equipment.
The total investment is about 96.5 million yuan.
Owner:*******
Postal Address:*******
Contact:*******
Tel:*******
Fax :*******
Project Name: 15 million units annual output of motorcycles factories, office building project
Progress stage: the record
Construction period :2011-February -2011-09 months
Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical
facilities, ventilation, lighting
Project:
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Project is located in the Bay Area Joint Venture North Port Industrial Zone 1, Phase II -joint factories,
office buildings, construction scale 17000.00 square meters, the main building has joint factories, office
buildings, covers an area of 15000.0 square meters, the two scooter 15 million units / year motorcycle
engine 12 million units / year.
The total investment is about 23 million yuan.
Construction Unit:*******
Postal Address:*******
Contact:*******
Tel :*******
Fax :*******
Project Name: Maintenance-free lead-acid battery production project
Progress stage: the record
Construction period: February 2011 -2011 in December
Major equipment: lead powder machine, co-cream machine, pasting machine, cast plate machine
Project:
Project is located in front of the stage before the sheets of Ma Lou Xiang Hutong village, maintenancefree lead-acid battery production project, covering 20 acres, the annual production of 400,000 maintenancefree lead-acid battery production lines. Technology: to lead alloys, electrolytic lead as raw materials - raw
board coating system - curing drying - plates, sub plates - assembly - battery products. Major equipment
lead powder machine, co-cream machine, pasting machine, cast plate machines.
The total investment is about 15 million yuan.
Owner:*******
Postal Address:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
The weekly issued Project E-journal collects the latest information of projects which are approved by the Chinese
government.
The E-Journal fee : RMB5,000/one industry, RMB8,000/two industries, RMB10,000/three industries,
RMB15,000/All industries
You can choose the suitable Journal according to your needs.
Contact:*******
Tel:*******
Chinabidding
11th Floor, Guoxing Tower, No.22 Capital Gymnasium South Road, Haidian District, Beijing,
China 100044
Phone :
+86-10-82744588
Fax :
+86-10-82743720
E-Mail :
contact@chinabidding.com.cn, chinainfo@chinabidding.com.cn
http://www.chinabidding.com.cn www.chinabidding.org
Download