Date

advertisement
C/o Address
PARMANAND YADAV,
House No-D-881, chawla colony, Ballabgarh,
Faridabad, Haryana.
INDIA.
Email-parmanandyadav007@gmail.com,
parmanand_yadav_007@yahoo.co.in
Móbile No.: +91-8826293018,
OBJECTIVE
SUMMARY
Aspiring for positions in Project Management with a growth-driven
organization of repute.
A Certified Project Management Professional (PMP) with an extensive
background in deploying Telecommunications and Information Technology
(IT) equipment. Proven ability to deliver projects, generate revenue and
achieve high customer satisfaction. First rate skills in building relationships
and an expert at motivating teams. High energy, high integrity and highly
effective at managing multiple complex projects.
PROFESSIONAL
QUALIFICATION


PMP certified from PMI Organization.
B.E. (Electronics & Communication.) from APJ COLLEGE OF
ENGG. SOHNA (GURGAON) affiliated to M.D.U ROHTAK
HARYANA in year 2004.
ACDEMIC
QUALIFICATION

Sr. Secondary from Haryana Board with First division in 2000.

Secondary from Haryana Board with First division in 1998.
WORK EXPERIENCE
:-Working with NOKIA SIEMENS NETWORKS from Oct,2008 to till
date as:1.) Working with NOKIA SIEMENS NETWORKS, Haryana as
“Zonal Project Manager”for its AIRCEL Project, HARYANA
&Delhi Circle from oct,2009 to till date
 Worked on 2G&3G Projects for Aircel,Punjab.
 Worked for 3months on NSN Maxis ROB Swap project
(Ericsson SWAP).
 Working on 2G Projects for Aircel ,Delhi&Haryana.
 Working on 2G swap Project Aircel ROB from
Ericsson to Nokia equipmemts .
.
2.) Also worked on Aircel, Mumbai Circle Project as Field Manager
– Telecom Implementation from Nov.2008 to Oct, 2009.
JOB Responsibilities
=========== =========== ===========
Customer Care Activities
Customer interfacing
Project Planning, Execution, and follow-up
Coordinating with Network Operations, Logistics, Field and Customer care
Planning and Organizing
Organize internal and external Kick Off Meetings as and when required
Plan Projects and prepare the written direction – Project Initiation Schedules
Identify tactical and strategic issues, and estimated time requirements of the
work
Maintain correct Data records of respective customers in ERP.
Project Execution
1
Allocate and track of project resources and highlight the same in the Project
Plan
Report project status to the customer (Internal & external) including
schedules and issues
Analyze task changes within the contract statement of work and new
commitments to the customer (From sales, if different from OPF)
Measurement and Improvement
Analyze improvement goals and implement Best Practices to have an
Effective and Productive Output based on input from PMGT manager
Conduct causal analysis of non-conformities (Lessons learned from last
Project Roll outs)
Report project activity performance during internal meetings implementation
of the Projects
Improve performance of the project
Customer Focus
Ensure that customer requirements are determined, met, and whenever
possible, exceeded.
Interface with customer with regard to project deliverables and timelines.
Establish regular contact and smooth communication with customer
Previous Work Experience:2.) I had worked with Ericsson India Pvt. Ltd. as FM Engineer for its
O&M department from Oct, 2007 to Oct, 2008:Operation and maintenance of sites (preventive maintenance and corrective
maintenance).
Involved in Expansion, Network Migration on any Commercial Live
Network
Emergency handling & Corrective maintenance in the network.
Software updates and Upgrades.
New Features Implementation
Preventive Maintenance and Health Check Monitoring of Network
BSS Support Engineer Shall be able to Troubleshoot GSM BSC, RBSs,
GPRS/EDGE, Features, Transmission Solutions (MiniLink Manager, DXX,
HighCap, Traffic Node, AXX), GPRS (BSS) of Ericsson Platform.
E1 routing of new sites
AT of new sites
Trouble shooting of ericsson equipments
TRU addition and removal
CF faults rectification etc.
MINI-LINK Traffic Node AMM type and difference (2P,6P,20P)
3.) Worked with Nokia Siemens Networks as O&M BSS ENGINEER &
Project Leader for 8 months in Bhopal cluster from June, 2006 to Oct,
2007 for AIRTEL (M.P.) first 8 month as outsource thro IMSI India pvt ltd.
And then as On Roll employee of Nokia Siemens networks on NOKIA
equipments, Ceragon, NEC, Tejas SDH equipments.
E1 providing for project rollout, integration, AT of new sites.
E1 thro for BTNL.
Co-ordination with Logistic Team for material.
Co-ordination with Project team, O&M BSS Engineers and with RF team.
Reohming of sites from one BSC to another BSC.
Trx addition, removal, creation, deletion etc.
Maintenance of sites.
Local monitoring of sites.
Daily cell outage report preparation.
Working on Nokia transmission equipments, ceragon SDH equipment, NEC
equipment and TEJAS Mux’s.
Responsibilities: To-prepare the daily plan for BTS rolls out. Coordination
2
with subcon- resources. Attending meetings with the customer
Commissioning of transcoder (TCM2E DX200 NOKIA) & NOKIA
BTS(ULTRASITE,METRO BTS)
Working knowledge of BSC3i.
Termination of E1 links at BSC end and testing loop-break from BSC to
BTS sites.
Remote login of BTS .
Q-1 Implementation on NOKIA FIU -19 E & creating Q-1 channel from
BSC end.
TRX addition and cabinet expansion etc.
Supervision of installation of BTS sites.
Ensure support to other BTS field team for Preventive and corrective
maintenance.
To check VSWR.
Installation of BTS & M/W (0.6 and 1.2, 1.8 m) M/W (7&15 GHZ) antennas
installation with commissioning alignment & Faultfinding.
Supervision of outdoor work such as antenna hoisting, feeder/jumpers
routing feeder, Lying, Electrical work. etc.
Ensuring smooth operation of BTS, MW Installation, Configuration and
integration of NOKIA BTS.
Configuration of E1T1 or RRI Card or FIU 19, FIU 19E
MicrowaveNETWORKCAPACITYEXPANSION (4*2,8*2,16*2 Mbps).
Commissioning and traffic shifting on SDH link from PDH
links.(commissioning Tejas-mux(TJ100MC-1 ,
Ceragaon_15G_STM_1(latest) link).
TRAFFIC shifting from PDH NOKIA TRANSMISSION EQUIPMENTS to
SDH EQUIPMENTS
Metro-Hub commissioning, integration and providing loop-protection to
sites.
TRAFFIC shifting from SIEMENS EQUIPMENTS LIKE (SRAL,
SRALXD, SIYA) TO NOKIA TRANSMISSION EQUIPMENTS.
EAC alarm testing & generation.
Coordination with Subcon and O&M team for swap from SIEMENS BTS to
NOKIA ULTRASITE SITE etc.
4.) Worked with “Nutek (India) Pvt Ltd” for NOKIA ULTR SITE & Flexi
BTS &ERICSSON (2202, 2206) BTS. I have worked in this company from
June 2004 to MAY 2006 & worked on NOKIA BTS COMMISSIONING &
ERICESSON BTS (2202, 2206, 2964, 2111 BTS) etc.
Installation NOKIA ultra and flexi BTS & Leading team for Installation &
commissioning & providing them technical help of GSM-900 BTS
infrastructure (e.g., Microwave & Power system).
Installation of DDF RACK and punching alarm & PCM cable.
Rack. Internal and External grounding of BTS cabinet and POWER PLANT,
Termination of E1 links, BTS alarms, External Alarms, PSU Alarms Cables.
Termination of Power supply.
To Check VSWR & Responsibility of RFI.
Installation of 0.6 and 1.2 M/W antennas.
BTS& M/W instillation with commissioning alignment & Faultfinding.
Supervision of outdoor work such as antenna hoisting, feeder/jumpers
routing feeder, Lying, Electrical work. etc.
Ensuring smooth operation of BTS, MW Installation,
Configuration and integration of NOKIA BTS.
Configuration of E1T1 or RRI Card or FIU 19, FIU 19E.
Installation of DC Power Plant, Commissioning & Fault Finding.
EAC alarm testing & generation
3
Worked on ERICESSON BTS & Responsible in BTS Site Project as
Installation & Commissioning Engineer for ERICESSON (RBS
2202,2204,2206) BTS in HARYANA:
BTS Commissioning
COMPUTER
PROFICIENCY
Have a sound knowledge ms-office (WORD, POWER
POINT, EXCEL)
Sound knowledge of computer Hardware & Networking.
PERSONAL TRAITS * Excellent cross-cultural communication skills
AND ATTITUDE
* International living experience and regional exposure
* Passion for continuous learning and personal growth
* Highly motivated and driven, with strong desire to excel
PERSONAL
Name
: PARMANAND
DETAILS
Father’s Name
: Late sh. Mahvir singh
Date of Birth
: 10 jan 1981
Gender
: Male
Permanent
D-881 Chawla colony Ballabgarh
Address
Faridabad
Haryana
Mobile Phone #
: 08053912206
Current CTC
: 10, 00,000/annum (INR)
Passport No.
: G2482197
Total Exp
: 7 years.
DOB
: 10-01-1981
I hereby declare that the information given above is true and correct to the
best of my knowledge.
Date:
Place: Ambala
.
PARMANAND
(Parmanand Yadav)
4