PHILLIP SMITH - Deicke Richards

advertisement
PHILLIP SMITH
ASSOCIATE DIRECTOR, DEICKE RICHARDS
ACADEMIC QUALIFICATIONS
B Arts (Env Des), B Arch
EXPERIENCE OVERVIEW
PROFESSIONAL EXPERIENCE
Phil Smith is an Associate Director and manages Deicke Richards’ Sunshine
Coast office. Phil is a registered architect with a wide range of experience
in both architecture and urban design projects. His 20+ year career has
been divided between private architectural practice and working within
local government. Past roles with Maroochy Shire Council include working
as Principal Urban Designer where he led Councillor and community
visioning processes, workshop facilitation and public forums, as well as the
master planning and implementation of key urban design projects.
Associate Director, Deicke Richards (2006 – Present)
With Deicke Richards Phil was Project Leader on the Maroochydore
City Centre Concept Plan (2006), Bowen Hills UDA Master Plan (2008)
for ULDA, CoastConnect BRT Project (2007 – 2009), completed design
options for the Maroochy Rail Station and Bus Interchange (2008-9) for
the Queensland State Government and Bokarina Beach Village Master
Plan (2008 – 2011) for Stockland. In 2011, Phil was part of the Moreton
Bay Rail Link team and was also project leader on the Yeerongpilly TOD
project, one of the most significant recent urban regeneration and transit
oriented developments in Brisbane and his experience enables him to move
comfortably between the macro and micro scales. Phil currently sits on
Sunshine Coast Regional Council Urban Design Advisory Panel.
PROFESSIONAL AFFILIATIONS
Registered Architect, QLD (3031)
Urban Design
-- Project Leader, Yeerongpilly TOD Master Plan, DIP/BCC (2010 – 2014)
-- Project Leader, Little Mountain Integrated Care Facility (2012 – 2013)
-- Project Leader, USC Creative Models of Infill Development for Seniors
Research Project (2010 – 2011)
-- Project Leader, Sippy Downs Anchored Smart Community Master Plan,
University of the Sunshine Coast (2010 – 2011)
-- Project Leader, Coomera Urban Village, Alexander Properties (2009 – 2012)
-- Project Leader, Bokarina Beach Master Plan, Stocklands (2008 – 2011)
-- Team Member, Bowen Hills TOD Master Plan, ULDA (2008)
-- Project Leader, Coast Connect Bus Rapid Transit Project (2007 – 2008)
-- Project Leader, Kelvin Grove Urban Village Density Review – Lots 15 and
16 (2007 – 2008)
-- Project Leader, Maroochydore City Centre Concept Plan (2006)
Architecture
-- Design Architect, University of Sunshine Coast, Resources Building
(2013 – 2014)
Member, Australian Institute of Architects (AIA)
-- Project Leader, Our Lady of the Rosary Primary School BER Project
(2009 – 2010)
Member, Urban Design Alliance Qld (UDAL)
-- Project Leader, Marina Keys Multi-Unit Development, Hope Island (2007)
PROFESSIONAL LEADERSHIP
-- Project Architect, Solomon Martinkovic Residence, (Gomango
Architects) (2005)
Sunshine Coast Council Urban Design Advisory Panel Member
(2010 – present)
-- Project Architect, Caloundra Community Kindergarten
(Gomango Architects) (2004)
Chair RAIA Sunshine Coast Region (2011 – 2014)
-- Design Architect, MSC Brisbane Road Carpark Scheme (2001)
Mayors Economic Roundtable, Sunshine Coast Council (2014)
-- Design Team, Alkira Apartments (Gabriel Poole Architect) (1994)
Australian Green Development Forum, Sunshine Coast Executive (2007)
-- Design Team, Ranbow Shores Apartments (Lindsay Clare Architects)
(1991)
RAIA Sunshine Coast Chapter, Awards Jury Chair (2002, 2008)
Caloundra City Plan Economic Working Group (2003
Design Studio Tutor, University of Tasmania (1989, 1990)
Policy Formulation
-- Project Leader, Coast Connect Bus Rapid Transit Project (2007 – 2008)
SPECIALIST SKILLS
-- Urban Designer, Maroochy Plan 2000 – MSC IPA Planning Scheme
(1998 – 2005)
Architectural and Urban design / Conceptual design
-- Project Leader, MSC Commercial Centres Hierarchy Policy (2002 – 2004)
Urban Design Analysis, critique and policy formulation
-- Project Manager, MSC Maroochydore CBD
Masterplan (2005 – 2006)
Strategic Planning and planning Scheme policy development
Design Guidelines and Codes, Implementation
Design visualisation and illustration
-- Project Director, MSC Palmwoods Centre
Masterplan (2005 – 2006)
Download