Chapter-5 Engineering Department Anticipate d Cost Item (1050 PH-16- Traffic facilities works MD -PNU - Through trap repl. By 1 : 12 turnout with dead 18.00 end Expenditu re upto 31.03.10 Physical progress in % 1 Name of works PB No. 11) Sr. No. PROGRESS OF WORKS-2009-10 Remarks 0.00 Estimate under sanction at Hq level 0% 29 Bikaner-remodeling of yard, BG washing line & sick line 8.16 shed 2.89 30 Lalgarh-Suratgarh-standared III interlocking, central panel, 23.92 MACLS and block proving by axle counters etc. 21.92 73% 31 Suratgarh-Bhathinda standared III interlocking, central panel, MACLS and 24.96 block proving by axle counters etc. 12.01 40% 5 32 LGH: Shunting arrangement for traffic from SOG-LGH 2.5 towards LGH-KLYT side. - 0% 6 33 LGH: Junction Cabin to facilitate direct movement of 7.26 trains from SOG side to LGH- 626 % 100% 2 3 4 59 52% Work of extension of washing line to make it for 24 coaches concreting completed. Integrated sick line shed in progress. Birdwal, Rajiyasar, Piperan, Arjansar, Mahajan and Malkisar stations completed and commissioned. S&T structures stations completed at all stations. Ballast supply completed. Pre NI work of Nathwana, Lunkaransar and Dhirera stations completed. (for balance 7 stations) S&T structures and earthwork completed. P.Way work and material transportation is in progress. Ballast supply in progress. S&T tender awarded and work in progress. (for 2 stations) Dropped due to commissioing of LGH bye pass. Work completed. Bye pass line is commissioned. Work KLYT line. 7 34 8 35 9 38 10 42 can be deleted from PB 2011-12. LGH-KLYT Crossing station 6.96 at New Bikaner Bhatinda-conversion into crossing station by addl. loop 7.00 line at by pass cabin Rohtak-Bhiwani-Std.-III interlocking with central panel NACLS block 11.88 providing by axle counters etc. Nal-Gajner station. : Rewari-Hissar interlocking New – block 0% 5.79 99% Work completed commissioned 5.6.10. 0 0% Detailed estimate under sanction at Railway Board. 8.39 5.47 100% 37.27 0.01 0% Std.-III and on Work completed. Maintenance period completed in May-10. Final bill shall be passed by Aug-10. Work can be deleted from PB-201112. Detailed estimate sanctioned. Tender opened on 31.3.10. Track linking and Pre-NI work completed. CRS sanction awaited. Plan and estimate under preparation. 11 40 12 41 Bhatinda-B (By pass cabin) – 6.42 By pass line towards Sirsa 3.01 90% 13 48 Bikaner Division - New 14.05 crossing station (2 Nos.) 0 0% 14 28 Rewari - Yard remodelling 56.00 45.25 97% Work completed. 15 39 Jaipur - Yard remodelling 28.214 1 0.28 Plan under approval. Estimate sanctioned. 16 17 5% 44 Kanakpura goods shed development as model goods 5.50 terminal. 0.86 7% 47 Malakhera & Digawara Conversion of 2-line stations into 3-line with standard- III 5.90 interlocking, simuttaneous reception & despatch etc. 0.00 0% 60 Work awarded on 27.04.10. Earth work started. The work of coping wall of one PF has been completed & Excavation of RCC OH tank completed. Previously it was decided to do the work doubling work but as the doubling work is not sanctioned it is decided work will be executed by the Division. . Plan under approval of HQ from 28.01.10. Estimate under A/c vetting. 18 25 Jodhpur-Merta road Standard III interlocking with 14.89 central panel (10 stations) 12.23 100% 26 Merta road -Phulera Standard III interlocking with central 19.14 panel (13 stations) 11.18 70% 20 27 MTD BKN-Std-III interlocking with central 19.58 panel (11 stations) 0 0% 21 36 Jodhpur - Phulera - Addl loop 6.00 lines(4 Stations) 0.44 80% 22 37 Bhikamkor-Standard-III interlocking with central panel 6.65 for new block station. (RKBPLC Sec.) 1.00 90% 23 43 Keduli & Naya Kherdia-Addl 4.14 Loop Lines. 0.15 70% 24 45 Phalodi- Bypass line 5.56 0.00 0% 25 46 Mandiya Kalan -New Block 7.67 station. (RKB-PLC Sec.) 0.00 0 19 61 Work completed. Completed:- 7 Station out of 13. (GVMR,SBR,GA, KMNC& NAC, MKN & KQW). Work in progress at balance 06 stations. (BOW, BSRL, NYK, GCH, REN &JAC). Work dropped during 2007-08.Work required by COM under review Work at JWL, AAS & KSW completed. JAC - work to be done with Std-III interlocking work. Work completed except NI. Due to non availability of traffic staff NI work was not taken. Work completed at KQW, at NYK to be done with Std-III. The estimate for this work has been sanctioned and tender is to be invited shortly. Procurement of material management is also in progress. For land acquisition the award is to be published by DM/Jodhpur and file is sent to Forest HQ foffice, Lucknow. Plan prepared under signature at divisional level. 1 65 29- Road Safety Works – LCs MD -PNU Interlocking of level 3.6368 crossing gates ( 20 Nos. ) 0.00 0% 3.93 100% Detail estimate under preparation. Work completed. Final bills of Sr.DEN/N, W & S passed. Final bill of Sr.DEN/E received & will be passed in June-10. Work can be deleted from PB-2011-12. Engineering work awarded on 05.04.10. Work at LC No. 164 & 195 in progress. S&T work awarded on 20.04.10 & 30.04.10 & work in progress. 2 61 Elimination of deficiencies of road surfaces, speed breakers, 2.66 safety sign boards etc. on 183 LXings over BKN Divn. 3 62 Jaipur Division - Upgradation of 2.90 level crossings ( 7Nos) 0.00 10% 4 58 JU Div-Manning of unmanned 2.68 level crossing (21Nos) 1.06 100% Work completed. 80% a) Engg work completed at 20 LCs. b) One LC closed after opening of ROB. c) Work of ROB/Limited height sub way sanctioned on 03 LCs. d) Work in progress at 07 LCs. 90% Work completed. 0 Detailed estimate sanctioned. AII : NIT issued for manning works. Proposal for creation of post submitted to HQ on 18.5.2010. BKN Div.: Tender for 42 LXings opened on 25.06.10 offers received for 31 LXings and for 11 L-xings of Sr.DEN/E section no response, fresh NIT issued and to be opened on 09.09.10. JP: Tnder under finalization for 39 LCs. JU: TENDER OPENED ON 29.06.10 5 60 Jodhpur Division-Upgradation of 2.96 manned level crossings (31nos.) 6 59 N.W.RLY-Manning of level crossings(51Nos.) (AII-14, BKN - 6.34 17, JP-10 & JU -07 Nos.) 7 63 Manning of Unmanned level crossings (210 Nos) North 17.6 Western Railway (AII- 14Nos. BKN-42,JP-39 & JU- 81 )( 62 1.00 0.00 30- Bridge Works (Road Safety Works – ROBs/RUBs) S. PB/ LB Nomenclature of works as Latest NO Item no. per PB/LB sanctioned cost (In Cr.) 1 PB/176 Chouth Ka Barwada 9.8359 Isarda - Re-girdering of Br. No. 23. (30x18.30m) 2 PB/177 2.8678 Sawai Madhopur - Jaipur - Regirdering of Br. No.06 , 77, 81 (Total 3 Bridges) Br. no. 77 (5x18.30m) by steel girder 3 PB/178 MadarPalanpur4.6000 Regirdering & strengthening of sub structure (Bridge Nos. 736, 789, 792, 793, 823, 831, 843, 848 ) (Total 8 Bridges) 4 PB/179 Jethi - Chitrasani 5.5860 Regirdering & Strengthening of sub structure (bridge No. 845) (6x30.50m) with under slung super-structure 5 PB/180 6 PB/181 7 PB/182 Hisar-Bhatinda -Suratgarh strengthening of major bridge for 30 tones axle load for upgrading of feeder route to dedicated freight corridor. Total bridge no. 5 Phulera - Degana - Repl. of steel girders by prestressed concrete slabs (bridge Nos 17, 21, 32, 34, 36, 39, 40, 44 & 47) Jodhpur - Marwar Jn. Repl. of steel girders by pre-stressed concrete Expenditure up to month in Cr. 3.5030 Status in details Work completed in Nov. 2009 0.3420 Work completed in May 09. 1.8400 Work completed for Br. No. 789, 793 & 843. Work in progress for Br. No. 823 & 831. i) GAD approved. CRS sanction awaited. ii) RDSO design for under slung girder for 25 T loading awaited. iii) Tender for strengthening of sub structure awarded. Iv) Work order to be placed to workshop for girder. Work completed for Br. No. 170 & 175. Work under plannig for balance 03 bridge No. 28, 68 & 142 9.0670 0.5710 4.6241 0.1611 Work in progress. 4.0870 2.6790 Jacketting & RCC retainers completed. Slab casting work completed. 63 8 PB/183 9 PB/184 1 67 2 68 3 69 4 70 5 71 6 slabs (bridge No 85) (17X12.20m) Jodhpur - Marwar Jn. Repl. of steel girders by pre-stressed concrete slabs (bridge No 92) (17X12.20m) Phulera Degana Regirdering (bridge No 22) (10X24.40m) 4.0870 0.0000 5.1554 0.9200 30- Road Safety Works – ROBs/RUBs ROB in lieu of LC No. 71 - A 6.99 at Hanumangarh 5.09 100% 2.93 100% 4.06 100% 3.53 100% Rewari-Jhajjar Road -ROB in 17.17 lieu of LC No. 57-B 6.81 50% 72 Sirsa-ROB in lieu of LC No. 10.01 143. 3.48 58% 7 73 Palanpur-Ajmer - ROB in lieu of LC No. 134-B near Abu 7.57 Road 1.5 45% 8 74 Jaipur-Ajmer - ROB in lieu of 7.78 LC No. 28 near Kishangarh 2.99 48% 9 75 Jaipur-Bandikui - ROB in lieu 5.04 of LC No. 181 near Dausa 1.14 30% 10 76 0 0% 11 77 2.33 55% Rewari- Alwar ROB in lieu of 3.56 LC No. 58 - A Hissar ROB in lieu of LC No. 6.67 92-A Hissar ROB in lieu of LC No. 6.17 89-B Rewari-Hissar - ROB in lieu of LC No.C- 53 7.51 Ajmer-Chittaurgarh - ROB in lieu of LC No. 63-C near 6.69 Mandal 64 Launching arrangements are being made. CRS sanction received. Casting of RCC retainers completed. Jacketting work in progress. Casting of PSC slab is in progress. Work order for girder fabrication placed on MMR Workshop on 23-122008. GAD approved. Work completed & commissioned . Work completed on 31.7.06. Commissioned for Road traffic on 15.9.06. Work completed & commissioned. Work completed & commissioned on 26.1.10. Non track span completed up to superstructure completed and track span superstructure work in progress. Work completed up to pier cap level. Superstructure work in progress. Total 4 spans. 3 non track span completed. All PSC girders of track span cast. Substructure completed. Superstructure work in progress. All piles and pile cap cast. 1 pier cap cast and 2nd pier cap in progress. Work awarded. Design and drawing under approval. Total 3 span. Work completed up to pier cap level. Superstructure work in progress for track span (Main). 12 78 Rewari-Sadulpur - ROB in 10.23 lieu of LC No. 100 6.5 98% 13 79 Rewari-Hissar - ROB in lieu of 1093% LC No.33 478 % 92% 14 80 Bikaner-Lalgarh - ROB in lieu 1015% of LC No. 138 near Bikaner 672 % 95% 0 0% 0.68 45% 0 0% 1.67 15% 6 nos. piles cast. Bhiwani-Rohtak - ROB in lieu of LC No. 53-B 15 81 4.75 16 82 Ajmer-Saradhana - ROB in 8.03 lieu of LC No. 5-A/2 Jodhpur-Samdari-Barmer ROB in lieu of LC No. C-325 5.85 Railway portion completed. Railway portion completed. Work in progress in approaches. Railway portion completed. Work in progress in approaches. GAD under preparation. Estimate for Rly. portion prepared but part of estimate from State Govt. yet to be received. Work deferred by Govt. of Haryana for 2-3 years till completion of ROB in lieu of LC No. 53-C. Total 3 span. Work completed up to pier cap level. Superstructure work in progress for track span. GAD approved and detailed estimate sanctioned. 17 83 18 84 Rewari-Hissar-Bhatinda ROB in lieu of LC No. 19-C (2 9.83 lane) 19 85 Nagaur-Basani road - ROB in 6.05 lieu of LC No. 63-C (2 lane) 0.56 25% Total 2 spans. Substructure completed. Superstructure work in progress. 20 86 Kuchaman city-Makarana ROB in lieu of LC No. 36-C (2 5.74 lane) 0.70 5% Total 1 span. Piling work in progress. 21 87 AWR ROB in lieu of LC 111-C 5.90 (4 lane) 22 88 Bikaner - ROB in lieu of LC No. 139 7.31 31. Track Renewal Works 65 0.01 2% 0 0% Test pile cast. Design of sub and superstructure under approval. Work will be started after commissioning of ROB at LC No. 138. PB (1011) No. Descrp. 91 exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks Mavli - 3,20,95 28,79,09 Barisadri sec. CTR(S) 82.01 Km 40,00 92 Rai ka 45,60,6 Bagh - 3 Jaisalmer CTR (P) 44.92 km 41,18,12 70,00 93 Jaipur Ajmer TRR(S) & TSR(P) 14.00 Km Hisar Bhatinda CTR - 41 km, TRR 32.4 km & TSR - 10.7 km (P) Phulera Jodhpur TSR - 10 km (P) Merta Road - Jodhpur TTR (25 Nos) Phulera Merta Road - TTR (40 Nos) Madar Palanpur TTR (43 Nos) & traps (40 Nos) CTR work of MG section defreezed in June 09.Balance 17 km CTR will be planned as per site requirement. Work completed except replacement of exisiting 1:8.5 T/Out 1 in 12 with fanshaped T/Out. Agency for P.Way work nominated. Work held up for want of S&T agency. Work frozen due to gauge conversion 94 95 96 97 98 Last anticipated Cost DRF SRSF REV 19001 2,80,95 4,76,72 27,29 66,60 1,00 84,55,5 4 1,01,33 84,05,54 50,00 Physical completed. 3,06,00 19,60 1,34,76 11,46 Work completed. 2,78,00 11,34 35,51 84,00 Work completed. 4,13,00 18,60 1,21,70 1,68,00 Balance work planned with STD-III interlocking work. 2,65,78 14,74 1,03,00 1,62,76 Vetted MS sent to HQ vide letter no. S336/2/2-30 dated 30.01.06. Tender opened on 09.02.10 . 66 work PB (1011) No. Descrp. 99 Madar Palanpur TBR -40 km Jaisalmer Rai ka Bagh Palace CTR - 10 km (P) (Osiyan Dhelana) Jaisalmer Rai ka Bagh Palace CTR - 186 km (P) (Marwar Mathanian Jaisalmer) Jaisalmer Rai ka Bagh Palace CTR (P) 30 km (Rai ka Bagh Palace Marwar Mathanian) Jaisalmer Rai ka Bagh Palace CTR (P) -10 km (Jetha Chanda Thaiyat Hamira) Jaisalmer Rai ka Bagh Palace CTR (P) -10 km (Marwar Bithri Ashapur Gomat) 100 101 102 103 104 Last anticipated Cost REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 2,83,93 98,00 15,10 2,68,83 10,20,6 3 16,53 10,16,63 4,00 To be done by BCM, Tender is being invited. Work completed. 1,81,32 ,50 2,79,58 178,37,5 3 1,82,00 Work completed. 26,68,4 3 46,59 19,89,19 42,00 Work completed. 8,74,05 15,03 8,11,28 42,00 Work completed. 11,28,3 2 17,28 11,18,32 7,00 Work completed. DRF SRSF 67 PB (1011) No. Descrp. 105 Suratgarh - 7,30,49 Anupgarh TSR - 17.4 km 106 Hissar Bhatinda CTR 26.37 km, TRR - 0.23 km & TSR 0.545 km Bikaner Bhatinda (Loop / Yard) TSR - 25 km Phulera Jodhpur (Loop / Yard) - TSR - 12 km Loharu Sikar CTR - 30 km Hanumang arh Sadulpur CTR 37.32 km Churu Bikaner CTR 36.89 km Ratangarh Bikaner TRR 48.33 km Marwar Mavli Jn TSR - 32.38 km 107 108 109 110 111 112 113 Last anticip ated Cost exp up to Outlay March 10 Descrp. Last Cost 34,10 Status of PB work/ten (10-11) der/esti No. mate or other remarks 7,19,51 1,00 35,42,6 6 53,21 35,22,66 20,00 Work will be done after gauge conversion of SRPRSGNR section. (GT track.) Physical work completed. 6,94,39 29,40 6,44,39 50,00 TSR of loop lines at PGK, DBI, MNSR, SGRA, DABN, MBY, SGF, GSW transferred to Const. 3,91,59 23,52 1,17,30 1,40,00 Work completed. 13,30,3 6 35,13 13,29,36 1,00 Work frozen due to gauge conversion 23,89,8 1 18,31 8,93,58 2,10,00 Work dropped as section under GC. 23,42,0 2 18,78 2,79,49 1,00 Work dropped as section under GC. 4,90,22 7,00 Work dropped as section under GC. 5,99,36 28,54 Tender to be opened on 09.04.2010. 16,02,1 8 6,27,90 4,41 68 anticipated PB (1011) No. Descrp. 114 Bikaner Bhatinda Suratgarh Anupgarh TTR (52 48 Nos) 115 Phulera Jodhpur & Merta Bikaner TTR (1:12 31 Nos, 1:8.5 - 36 Nos) & trap switches (33 Nos) Hissar Bhatinda TTR (1:12 13 Nos & 1:8.5 - 17 Nos) Rewari Madar TTR (1:16 1 No, 1:12 2 Nos & 1:8.5 - 30 Nos), traps (15 Nos) & diamond crossings (2 Nos) Jodhpur Merta & Bikaner Merta TBR-57km Madar Palanpur TBR - 73.79 km 116 117 118 119 Last anticipated Cost REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 41,94 5,85,02 1,40,00 5,77,61 27,54 2,26,40 2,80,00 Work in progress & Material required fot balance work. KYNT=1 & SGNR=1 and 1in12=13, 1in 8.5=7 will be replaced in STD-III by Const. Work is planned to be executed along with Std-III.Insertion of 1:12 T/outs have been planned in lieu of 1:8.5 existing T/outs 3,00,83 26,88 2,88,51 12,32 2,40,45 12,45 2,39,85 60 4,73,06 1,34,75 3,62,43 28,00 Balance with BCM. 3,76,22 1,81,22 3,40,21 36,01 To be done by BCM, Tender is being invited. DRF - 7,98,50 & & SRSF 69 1in12=8, 1in8.5=11 in HSR yard transferred to Const. 1in12=2 , 1in 8.5 =3 at JKHI balance as on 1.4.10 1 T/out is 1:16 instead of 1:12 planned PB (1011) No. Descrp. 120 Madar Palanpur TFR - 80 km Suratgarh Bhatinda CTR (P) 3.27 km & TRR - 1.33 km Bathinda (Bypass Line) & Hissar Bathinda CTR - 8.27 km (P) Suratgarh Kalyan Kot - TRR (S) 28.83 km, Suratgarh By-pass TRR - 0.7 km & Suratgarh (Yard / Bypass) - TSR (P) - 2.3 km Sri Ganganaga r Yard CTR (P) 1.56 km, TRR (S) & TSR (P) 1.972 km Rohtak Bhiwani TRR (P) 24.3 km 121 122 123 124 125 Last anticipated Cost DRF SRSF REV 3,27,50 exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 3,22,91 4,59 .Vetted M.S. sent to HQ.NIT is being issued. 4,70,54 10,46 4,39,82 30,72 Physical completed. work 9,54,31 26,46 9,34,31 20,00 Physical completed. work 22,23,1 1 7,36 12,14,02 3,08,00 Work will be done after gauge conversion of SRPRSGNR section. (GT track.) 4,79,91 24,90 2,79,80 2,00,11 Physical CTR work completed. 15,25,68 71,19 Physical completed. 15,96,8 7 70 work PB (1011) No. Descrp. 126 Udaipur - 4,13,57 Himmatnag ar - CTR 2.46 km & TSR - 10.57 km (S) 127 Udaipur - 8,32,83 Himmatnag ar - TRR 24.82 km (S) 128 Sri Ganganaga r Hanumang arh - CTR 20.97 km (S) Ratangarh West Sardar Shahar CTR - 15 km (S) Bikaner Bhatinda TSR - 19 km (P) (13 stations) (24 loops) Madar Palanpur Through switches & CMS crossing renewal (212 Nos) 129 130 131 Last anticipated Cost DRF SRSF exp up to March 10 Outlay REV DRF DRF 15,26 75,99 3,37,58 75,99 7,56,84 SRSF Status of work/tender/estimate or other remarks Work frozen in view of GC, Now work has been defrezed in june 09. Tender opened on 08.10.09 & discharged.Tender reinvited, to be opened on 19.03.2010. Work frozen in view of GC, Now work has been defrezed in june 09. Tender opened on 08.10.09 & discharged.Tender reinvited, to be opened on 19.03.2010. Work dropped as section under GC. 14,07,9 7 33,55 3,15,53 7,00,00 10,34,0 7 6,16 2,56,18 1,00 Physical completed. 7,52,14 60,80 2,24,98 2,80,00 Work in progress & will be completed by Mar-10. 75,99 12,57,76 Work is in progress for CMS crossings.Switches are yet to be received from HQ. 13,33,7 5 71 work PB (1011) No. Descrp. 132 Merta Road - Merta City - CTR 14.66 km (P) Rai ka Bagh Jaisalmer TSR - 15.47 km (P) Madar Palanpur TFR - 80 km Rewari Jaipur Madar TFR - 74.2 km Madar Durai & Marwar Jodhpur TBR - 49.63 km Merta Phulera TBR - 29 km Renewal of ordinary curved switches and crossing with new 52 Kg (1:12 & 1:8.5) TWS and WCMSC on existing PSC layout - 416 SETS 133 134 135 136 137 138 Last anticipated Cost REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 15,88,9 8 28,73 5,00,00 3,70,00 Work in progress. 10,69,3 6 30,32 75,99 3,84,00 Work in progress. 3,77,86 3,22,77 55,09 NIT is being issued. 3,41,52 3,28,09 13,43 DRF SRSF 2,59,32 72,96 1,79,25 71,05 88,08,8 8 2,59,32 To be done by BCM, Tender is being invited. 80,00 80,00 Work planned with BCM. 62,74 5,80,00 MS sent to HQ. Tender is to be called. 72 PB (1011) No. Descrp. 138 Renewal of ordinary curved switches and crossing with new 52 Kg (1:12 & 1:8.5) TWS and WCMSC on existing PSC layout - 416 SETS CTR(TRR/S & TSR/P) 5.60 Km at BNSR, KYNT, SRPR, SBNR and RMSR & APH Loop lineson SOG-APH section TRR(P) 33.65 Km (from Km 195 to 228.650 SOG - BKN section. TRR(S) 34 Loop Lines (25.30 Km) on Phulera - Jodhpur BG section of Jodhpur Div. 139 140 141 Last anticipated Cost DRF SRSF REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks Estimate process. 4,01,19 17,92 under 3,00,00 1,01,19 Work in progress & will be completed by Mar-10. 22,89,1 8 2,00,00 8,05,00 Work in progress & will be completed by Mar-10. 9,68,03 5,00 1,28,00 Detailed estimate under vetting. 73 PB (1011) No. Descrp. 142 TRR(S) of 49 Loop Lines (35.581 Km) and Sleeper Renewal (P) of Loop Lines to increase the sleeper density from M+4 to M+7 on Madar Palanpur section TRR(S) of 49 Loop Lines (35.581 Km) and Sleeper Renewal (P) of Loop Lines to increase the sleeper density from M+4 to M+7 on Madar Palanpur section Laying of 60 Kg (90 UTS) 1 in 12 TWS and WCMS crossings on 58 Nos. existing 1 in 12 fan shaped turn out sleepers on Rewari Jaipur section 142 143 Last anticipated Cost DRF SRSF REV 16,71,7 6 exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 2,00,00 Tender to be opened on 09.04.2010 for MD-HP and HPBWA sections. 5,39,00 Tender to be opened on 09.04.2010 for MD-HP and HPBWA sections. 13,78,4 0 32,23 1,00,00 74 5,60,00 Estimate process. under PB (1011) No. Descrp. 144 Rewari Phulera CTR 20.045 km, TRR 24.09 km & TSR - 13.25 km (S) Jaipur Phulera CTR 28.45 km (S) Marwar Mavali CTR 113.55 km (S) 10,59,4 6,81,47 5 Udaipur Himmatnag ar - CTR 22.32 km (S) Hissar CTR - 9.78 km bye pass line & Rewari Hissar TRR - 3 km & TSR 41.4 km (P) Ratangarh Bikaner & Ratangarh Degana CTR - 0.75 km & 22.77 km (S) respectively 145 146 147 148 149 Last anticipated Cost DRF SRSF REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 4,50,00 6,81,47 1,00 Work frozen due to gauge conversion of RPC section 6,06,84 10,20,00 31,23 3,00 3,31,93 1,00 Work frozen due to gauge conversion of RPC section 2,80,23 42,14,48 1,83,04 1,20,00 39,36,4 1,60,23 2 7,06,22 40,74 3,37,19 1,00 CTR completed.Tender for deep screening of 30.68 km (balance work of CTR) awarded on 23.02.2010 CTR completed. Deep screening and Welding works are now frozen. 29,86,3 1 1,00,31 23,07,04 6,79,27 Work in progress by PQRS & will be completed by Mar10. 15,18,0 4 39,23 40,00 1,00 Work not required, being done under G.C. 75 PB (1011) No. Descrp. 150 Suratgarh Bhatinda Hissar TRR 25.73 km (S) (23 stations) (37 loop lines) Rewari Hissar TRR - 65 km (P) Rewari Hissar TRR(S) & TSR(P) - 15 km (12 stations) Hissar Bhatinda TSR - 16.4 km (P) Hissar Bhatinda TSR - 19.5 km Rewari Ringus TSR - 33.57 km Udaipur City Himmatnag ar - TSR 24.82 km 151 152 153 154 155 156 157 Last anticipated Cost exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 15,23,2 3 14,73,23 50,00 Work in progress & will be completed by Mar-10. 45,89,6 4 45,09,64 80,00 Work in progress by TRT & will be completed by Mar10. DRF SRSF REV 10,91,2 4 29,40 2,16,18 8,75,06 9,31,05 32,14 9,26,05 5,00 Physical completed. work 12,52,5 0 38,22 12,17,00 35,50 Physical completed. work 7,59,83 46,38 3,99,45 1,00 Work frozen due to gauge conversion of RPC section 5,59,48 17,13 1,57,77 4,01,71 Sawai 3,04,08 Madhopur Jaipur TSR - 10.3 km (P) 19,60 2,83,43 20,65 Work frozen in view of GC, Now work has been defrezed in june 09. Tender opened on 08.10.09 & discharged.Tender reinvited, to be opened on 19.03.2010. Work completed 76 PB (1011) No. Descrp. 158 Hissar Bhatinda TSR - 19 km (P) (11 stations) (23 loop lines) Merta Road - Bikaner TSR - 18.2 km (P) (12 stations) (24 loop lines) Merta Road - Jodhpur TSR - 13.2 km (P) (10 stations) (17 loop lines) Rai ka Bag - Phalodi TSR - 7.6 km (P) (7 stations) (10 loop lines) Rewari Hisar - TSR -100 km (P) 159 160 161 162 163 164 165 Last anticipated Cost REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 7,28,79 60,80 4,22,78 3,06,01 Physical completed. 11,32,8 3 35,67 3,50,00 4,10,00 Work in progress. 8,25,46 25,87 30,00 3,74,00 Work in progress. 4,78,15 14,90 80,61 2,70,00 Work completed. 40,80,6 8 1,96,00 32,64,54 8,16,14 Madar - 4,17,99 Palanpur TBR- 80 km Merta Road 2,35,98 - Bikaner TBR & deep screening 40 km Bikaner 3,89,35 Division Turnouts (45 sets) & traps (32 sets) 1,96,00 3,00 4,14,99 98,00 50,00 1,40,00 Work in progress by TRT & will be completed by Mar10. To be done by BCM, Tender is being invited. Work planned with BCM. 46,27 3,59,85 29,50 DRF SRSF 77 work Scope at KSI=3, CKD=3, BNW=6, BWK=2, STD=4, KNL=2, SSA=5, SHN=2, DNG=1, BHT=2, ADR=2, RMN=2, SGA=2 PB (1011) No. Descrp. 166 Rewari - 3,54,93 Bandikui Jaipur TTR (37 Nos) (P) Madar - 3,30,21 Palanpur TTR (43 Nos) & traps (41 Nos) Lalgarh - 3,20,12 Suratgarh TTR (40 Nos) 167 168 169 170 171 172 173 Last anticipated Cost REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 8,56 3,50,66 4,27 Work completed 15,74 1,40,00 Work balance is for 18 (1 in 8 1/2) Turnouts, material awaited as it will be done departmentally. 3,01,43 18,69 4,15,46 2,07,41 2,08,05 Scope of 12 turn out will be utilised during yard remodeling of SOG yard by Const. deptt. Work will be done with STD-III work by Const. deptt. 2,86,95 1,00,30 56,00 DRF Rewari Hissar TTR (53 Nos) Merta Road - Bikaner TTR (34 Nos) Rewari Phulera TTR (39 Nos) Rewari Hissar TTR (P) (70 Nos) (12 yards) SRSF 3,54,93 23,39 3,00,00 54,93 7,89,15 56,00 50,00 93,00 Hissar - 3,64,02 Bhatinda Bikaner TTR (P) (24 Nos & 18 Nos) (22 yards) 29,28 3,59,05 4,97 78 At BNW 1in12=12 & at STD 1in12=8 and 1in 8.5 =41 (BNW=24, STD=3) will be replaced by the division, balance will be replaced by Const. along with STD-III work. 1in12 turn outs at BGD=2, SSA=1, SHN=4, DNG=2 & 1in8.5 turn out at SSA=9, DNG=1, JKHI=2, SGA=2, RMN=1, AS=4, MHJ=4 & SOG=9 will be rteplaced by the division. PB (1011) No. Descrp. 174 TTR(P) 58 nos of existing 1 in 12 (14 Nos.), 1 in 8.5 (31 Nos.) & D/S (13 Nos.) on PSC sleepers in Jaipur yard, RewariPhulera section in Jaipur division Rai ka Bagh Palace Jaisalmer Welding 145 km & Bikaner Merta Road - Welding (13 stations) (858 joints) Madar Palanpur TFR - 80 km (P) Degana Jodhpur TFR - 73 km Bikaner Merta Road - TFR - 73 km Hissar Bhatinda CTR - 21 km & TSR - 10 km (P) 175 176 177 178 179 Last anticipated Cost REV exp up to March Outlay 10 DRF SRSF DRF 21,95 3,00,00 88,18 4,38,14 4,07,32 28,00 3,27,62 1,27,49 2,00,13 Vetted MS sent to HQ. NIT is being issued. 2,97,48 1,00,00 1,40,00 Estimate sanctioned. Fittings required. 2,97,45 1,00,00 1,40,00 Estimate sanctioned. Fittings required. 28,69,47 10,00 Physical completed. DRF 3,88,18 28,79,4 7 SRSF 63,11 79 Status of work/tender/estima te or other remarks work PB (1011) No. Descrp. 180 Merta Road - Bikaner & Jodhpur Through weld repair - 104 km Rewari Madar TFR - 138 km Works in progress costing less than 2.50 Cr Works in progress costing less than 2.50 Cr TRR(P) of 4.023 Km bet Km 508.5-589.6 & 614.7927.9 at Imp & Maj bridges in MD-PNU sec TRR(P) of 15 Km from Km 18.820.8, 35-39, 51.1-53.1, 69-72, 7576 & 76-79 in RE-HSR sec Glued Joints Renewal of 975 Nos. MD-PNU section 181 182 182 183 184 185 Last anticipated Cost exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 6,49,68 1,00,00 2,40,00 Estimate revision 7,09,42 5,00,00 1,91,43 DRF SRSF REV under 47,27,00 2,15,90 2,69,57 50,00 Work sanctioned in PB 2010-11 11,81,7 7 1,50,00 New work sanction in 2010-11. 5,19,84 1,00 Work sanctioned in PB 2010-11 80 PB (1011) No. Descrp. 186 TRR(S) of 12.58 Km & ISD of 47.618 Km of Loop Lines from M+4 to M+7 in MD-PNU sec Laying of 60 Kg 1in12 TWS & WCMSC-50 nos in FLJU-MJ sec Laying of 60 Kg 1in12 TWS & WCMS in RE-BKI sec (18 nos) & JP–SWM sec (40 nos) TBR of 51 Km in MTD–JU sec (33 Km bet Km 670-714) & JU–MJ sec(18 Km from Km 593-611) CTR of 5.166 Km (From Km 187192.166) in AQG-POK sec 187 188 189 190 Last anticipated Cost DRF 10,24,0 4 SRSF REV exp up to March Outlay 10 DRF SRSF DRF 1,13,23 1,00 11,40,9 2 1,00 13,23,6 1 1,00 3,27,94 1,40,12 1,00 7,25,05 15,85 50,00 81 Status of work/tender/estima te or other remarks Work sanctioned in PB 2010-11 Estimate preperation. under PB (1011) No. Descrp. 191 TRR(P) of 5 5,16,63 Km (From Km 160165) & CTR(P) of 1 Km (From Km 181182) in SOG-BKN sec TRR(P) of 3,37,76 4.9 Km (From Km 510.1-515) in BKNMTD sec TTR(P) of 4,61,98 1in8.5 T/out-43 nos & Trap–19 nos in MDPNU sec New Work less than 2.50 Crores 192 193 194 Last anticipated Cost DRF SRSF REV exp up to March Outlay 10 DRF SRSF DRF Status of work/tender/estima te or other remarks 2,38 1,00,00 New work sanction in 2010-11. 50,00 17,89 32- Bridge Works-A S. PB/ LB Nomenclature of works as per NO Item no. PB/LB 1 PB/176 2 PB/177 3 PB/178 Chouth Ka Barwada - Isarda Re-girdering of Br. No. 23. (30x18.30m) Sawai Madhopur - Jaipur Regirdering of Br. No.06 , 77, 81 (Total 3 Bridges) Br. no. 77 (5x18.30m) by steel girder Madar- Palanpur- Regirdering & strengthening of sub structure (Bridge Nos. 736, 789, 792, 793, 823, 831, 843, 848 ) (Total 8 Bridges) 5,00 Work sanctioned in PB 2010-11 2,00,00 Latest sanctioned cost (In Cr.) 9.8359 Expenditure up to month in Cr. 3.5030 Work completed in Nov. 2009 2.8678 0.3420 Work completed in May 09. 4.6000 1.8400 Work completed for Br. No. 789, 793 & 843. Work in progress for Br. No. 823 & 831. 82 Status in details 4 PB/179 Jethi Chitrasani Regirdering & Strengthening of sub structure (bridge No. 845) (6x30.50m) with under slung super-structure 5.5860 i) GAD approved. CRS sanction awaited. ii) RDSO design for under slung girder for 25 T loading awaited. iii) Tender for strengthening of sub structure awarded. Iv) Work order to be placed to workshop for girder. Work completed for Br. No. 170 & 175. Work under plannig for balance 03 bridge No. 28, 68 & 142 5 PB/180 9.0670 0.5710 6 PB/181 4.6241 0.1611 Work in progress. 7 PB/182 4.0870 2.6790 8 PB/183 4.0870 0.0000 9 PB/184 Hisar-Bhatinda -Suratgarh strengthening of major bridge for 30 tones axle load for upgrading of feeder route to dedicated freight corridor. Total bridge no. 5 Phulera - Degana - Repl. of steel girders by pre-stressed concrete slabs (bridge Nos 17, 21, 32, 34, 36, 39, 40, 44 & 47) Jodhpur - Marwar Jn. - Repl. of steel girders by prestressed concrete slabs (bridge No 85) (17X12.20m) Jodhpur - Marwar Jn. - Repl. of steel girders by prestressed concrete slabs (bridge No 92) (17X12.20m) Phulera Degana - Regirdering (bridge No 22) (10X24.40m) 5.1554 0.9200 Jacketting & RCC retainers completed. Slab casting work completed. Launching arrangements are being made. CRS sanction received. Casting of RCC retainers completed. Jacketting work in progress. Casting of PSC slab is in progress. Work order for girder fabrication placed on MMR Workshop on 23-12-2008. GAD approved. 32- Bridge Works 1 195 2 196 3 199 AII-Regirdering of bridge no.509 incl. Strengthening (jacketting) of 6.00 sub-structure & foundation etc. AII-Regirdering of bridge no.676 incl. Strengthening (jacketting) of 3.45 sub-structure & foundation . MD-PNU-Regirdering strengthening of sub 4.34 structures(Br. No. 736, 739, 823, 832, 843 & 848) 83 - 100% Work completed. - 100% Work completed. 4.15 90% Work completed except br. no. 823. revised estimate under process. Jethi-Chitrasani -Regirdering & strengthening of sub structure (Br. No.845) 200 5.59 0.02 0% GAD approved. Structural design for Pile & Pile cap under scruity at HQ. CRS sanction awaited. Tender for strengthening of sub structure awarded on 29.5.08. Work order to be placed to Worksghop for girders. 5 201 Strengthening of major bridges for 30 ton axle load for upgradation of feeder rout to 9.07 dedicated freight on HSR-BTISOG sec. 0.76 20% Work completed at Br. no. 68, 170& 175. 6 207 HSR-BTI-SOG-BDWL : Strengthening of substructure 4.11 (81 bridges) 0.00 0% Tender opened on 25.05.10 & under TC. 7 208 0.00 0% Tender opened on 25.05.10 & under TC. 8 197 8.24 100% Work completed. 9 198 2.69 100% Work completed. 4 RE-HSR : Strengthening of 2.81 substructure (64 bridges) Chouth ka Barwara- Isarda9.84 Regirdering (Bridge No. 23) Sawai Madhopur- Jaipur Regirdering (Bridge No. 6, 77 & 2.87 81) 0.67 50% Work completed at Br. No. 21 & 44. substructure and slab casting at Br. no. 17, 34, 36 & 40 completed. Work in progress at Br. no. 39. 2.68 85% Work in progress. Completion. 4.09 1.04 65% Work in progress. 5.15 0.93 25% Girder under fabrication at Manmad workshop. 9.77 6.35 9.67 6.54 90% 100% Work commissioned. Work commissioned. 2.76 2.15 100% Work commissioned. 2.58 90% Work commissioned. 2.26 100% Work commissioned. 10 202 FL-DNA-Replacement of steel girders by pre-stressed concrete 4.62 slabs(bridge Nos 17, 21, 32, 34, 36, 39, 40 & 47) 11 203 JU-MJ-Replacement of steel girders by pre-stressed concrete 4.09 slabs(bridge No.85) 12 204 13 205 1 2 210 211 3 212 4 213 5 214 JU-MJ-Replacement of steel girders by pre-stressed concrete slabs(bridge No.92) FL-DNA Regirdering (bridge No.22) 33- S & T Works RRI REWARI AII-COR 6 Quad JP-BKI: Block proving by Axle Counter as last vehicle check device(B-route) 10 sec JAL-BMN-PNU-Block providing 8.25 by Axle Counter (25 Block sec.) BKN-KLYT OFC 3.31 84 Nearing 6 215 7 216 8 217 BU-RE: Block proving by Axle Counter as last vehicle check 3.40 device with P/B token less B/Inst. Suratgarh-AnupgarhRepl. BSNL own O/H by UG composit quad cable (E route) 2.90 78 KM JU-Phalodi OFC STM-I/ STM-4 3.41 equipment and DI/MUX 2.32 20% 0.05 0% 2.32 100% 9 218 MDB _JSM 6 Quad and OFC 10.67 cable 0.50 30% 10 219 JU-MTD-DNA OFC STM-I/ 4.53 STM-4 equipment and DI/MUX 0.45 30% 11 220 MTD,DNA,RKB TC in complete 4.76 yard 0.50 40% 221 Lalgarh-Bhatinda-Strengthing of telecom circuit by optic fibre cable and STM1/STM4 5.6431 equipments and D/I MUX.(318 KM.) 0 0 13 222 Degana-Phulera-optic fibre cable,and STM1/STM4 3.2478 equipments and D/I MUX.(112 KM.) 0 0 14 223 Marwar-Mavli -Replacement of 6.0577 O/H alignment by 6 Quad cable. 0 0 12 85 Out of 9 Section, work completed in 5 ( BU-RHG, RHG-DGW, DGW-MKH , MKH-MWW & MWW- AWR.) Work is ready in 2 block sec. HIS- AIA & BWL- AIA . Work is progress in 2 block sec. (KRH-HIS & AWRPSL). Material received. To be executed by Rail Tel Corporation of India Ltd New Delhi. Estimate duly vetted by S.DFM submitted to HQ on 31.05.10 Work commissioned The work was transferred back from RCIL to Railway in the month of Nov-09. Thereafter contract has been awarded for MDB-PLC 6 quad cable. . For composite work from PLC-JSM tender under finalisation. Contract awarded on 29.12.2009 .work is in progress.100 kms of duct has been laid. Contract awarded. Work in progress at MTD (PDC-Nov10). DNA already covered under GC work, RKB will be done with RRI work sanctioned this year. Detailed estimate sanctioned.Finacial Expenditure kept pending as per Railway bd order. Board has instructed not to incur any liability till further instructions. Detailed estimate sanctioned. Finacial Expenditure kept pending as per Railway bd order. Kept in abeyance as per Railway Board order. Detailed Estimate sanctioned on 25.01.2010.. Finacial Expenditure kept pending as per Railway bd order 15 225 Rai ka bagh RRI 3.00 0.00 0% Detailed Estimate sanctioned Tender schedule under prepration. Tender opened on 09.08.10. 36- Other Electrical Works 1 228 Approval for issue of NIT for consultancy contract given by GM. NIT under preparation and to be issued by 15.7.2010. JU- Provision of 10.5MW Wind 66.50 mill plant at JSM 42- Workshop and Prod. unit 234 Ajmer workshop - Periodical overhauling of broad gauge 4.40 diesel locomotives Ajmer - Modernisation of carriage workshop 72.75 3 235 Madar - Routine over hauling facilities 17.4 4 236 Ajmer modernisation workshop 5 233 LGH Yard-Fright examination facilities. 6 230 JU-Workshop- Enhancement of periodical overhuling capacity of 16.17 coaches. 8.44 90% 7 232 BME-Integrated complex. 0.00 0% 237 BGKT Arumenting Capacity of Diesel Shed for accomodating 6.47 50 EMD locos North Western Railway. 1 2 8 231 coach of train care 58.73 0.97 100% Work completed. 0 0% Detailed estimate sanctioned and tender opened on 22.1.09 0 0% Detailed estimate sanctioned. Tender finalised. 0 2% Work in progress. 07-08 3.33 86 0.00 0% Work dropped due to commissioning of KLYT-PLC section and LGH bye pass. Drawing approved,Tender opened on 26.03.2010 & under T.C. Work dropped in ref.to CME/NWR letter no.NWR/M/ 324/Intra/coach/vol-I dated 7.2.2008. Again case referred in feb-10 for review. Engg, Elect, Mechanicna estimate prepared but S&T estimate still awaited. Plan under signature of Divisional officers. Mech. & Engg. estimate vetted. Elec. Estmate under vetting. 1 2 3 242 245 243 4 246 5 248 6 7 8 51- Staff Quarters UDZ-HMT- Shifting of gang from section to stations (16 4.23 Gangs) ABR- Repl. Of gang quarters, 10 gangs (100 units type I quarters) 2.83 with type II. Reconstruction of quarters TypeI-66, Type-II-17, Type-III-2 & Type-IV-1 unit over BKN Divn. (Type-I = BNW-2, HSR-33, BKN-10, SGNR-6 & SDLP-15 Total-66 Qtrs.) (Type-II = BNW- 2.52 2, HSR-9, BKN-1, SGNR-1, SDLP-2 LHU-1 & RTGH-1 Total17 Qtrs.) (Type-III = BNW-1 & SDLP-1 Total - 2 Qtrs.) (Type-IV = BNW-1) Replacement of quarters, type-I88 & type-II-1 with type-II total 3.29 89 units on Bikaner Division. Replacement of ganf quarters with type-II 63 units over RTGH 3.27 sub-divn. Nizampur & Ateli :Replacement of gang quarters, type I 118 & type II 22 units. 0.00 0% Estimate resubmitted for A/C vetting for construction of Type II qtrs. In place of type I qtrs. 0.00 0% Vetted material modification sent to HQ on 18.12.09. 0.24 10% Revised preparation. plan under Work de-freezed, NIT being issued. 0.00 0% 0.00 0% Estimate sanctioned. Tender to be opened on 27.07.10. 240 4.11 0.00 0% Tender opened on 24.10.08 & tender cancelled. Material modification (Type I to type II) sent to HQ for sanctioned second week of Nov. 09. Proposal returned by HQ with objervation. The remarks of objervation sent to HQ on 17.02.10 & again observation received from HQ. 241 RKB-JSM- Replacement of jack arch roof type 4.03 quarters,type-I-136 units 0.71 0% Revised estimate sanctioned for 74 Qtrs. Tender to be opened on 10.08.10. 244 Jodhpur division- Replacement of arch type I- 84 type -II - 33 3.88 units with standard type-II. 0% Estimate sanctioned for total 67nos. Type-II Qtrs on replacement basis within sanctioned cost. Tender to be opened on 03.08.10. 52- Staff Aminities 87 0.00 1 250 Construction of community halls at Sikar, FL, JU, AII, HMH, 4.34 UDZ and ABR. 3.34 70% 2 251 Rewari- Jaipur - Improvement to 3.20 water supply, roads & drainage. 0.00 10% 3 252 Jodhpur - Upgradation of Divisional Hospital (Pb No. 1 526/09-10/SR) 0.00 0% ABR - Work in progress. (35%) UDZWork started but stopped due to stay order. (Land dispute between Army and state govt.) started again in Mar.2010 but stopped in April 10. (10%) AIIWork awarded on 25.08.09 but proposed to be dropped. work sanctioned for renovation of existing community Hall instead of constructing new one. HMH, SIKR, FL & JU : Work completed. The progress in water supply work is 70 %. The progress of RCC OH tank 20% & in drain work 30% . The tender of road work is under finalization. Specification for modular OT is being collected,tender schedule under preparation. 64- Other Specified Works 1 258 Udaipur- Upgradation of training facilities at zonal railway training 3.00 institute. 2.25 80% 2.51 0.00 0% for (7 3.27 1.45 100% AII-PNU-Infrastructure facilities for mechanization of track(7 stations). 2 259 3 260 Infrastructure mechanisation stations) facilities of track 88 2 sub works costing Rs. 55 lacs being done by RTM-LKO. Supply order for 4 other sub works costing Rs. 9.27 lacs have been placed by COSJP/DMM-AII Siding is to be provided on 6 stations i.e. MJ, RN, ABR, JWB, SOH, IQG while rest room is to be provided on 5 stations i. e. DOZ, JWB, SOH, IQG & SOD. Detail Estimate sanctioned. Tender to be opened on14.07.10 for resting facility & on 22.07.10 for stabling siding. T. No. 100 & 101/10) Work completed at JMS, HMH, RMN, PGK & SBNR (5 stations) and work dropped at KNL & APH (2 stations) Track work will be executed by CAO/C alongwith Std III work. 4 257 5 261 6 262 Jaipur- setting up of Western Railway Zone. North 133.74 Jaipur :- Upgradation of 15.06 Railway hospital North Western Railway Integrated security system ( 4 8.27 stations) ***** 89 94.72 82% 0.06 0% 0.00 0% HQ Office: - Work completed. Township: For township, 2.99 hectare land out of total 15.50 hectare allotted is available. Balance 12.51 hectare land is under court’s stay order. Work of construction of 17 unit type-V PHOD houses completed and handed over to Open Line. Construction of club house has been short closer due to land under litigation. Construction of 36 unit Type-V and 36 unit Type-IV is in progress. The progress held up due to Court case. Construction of 72 units TypeII, 108 units Type-III and 36 units Type-IV (Multistory), health unit, shopping complex near Getore Jagatpura Railway Station in progress. Tender to be opened on 16.07.10. Tender floated by HQ & opened on 30.03.10. Site to be decide.