Guide Specification for Plastic Unit Skylights by Naturalite

Naturalite(TM) Skylight Systems
Oldcastle Glass® Engineered Products
750 Airport Road, P.O. Box 629
Terrell, TX 75160
(800) 527-4018
(972) 551-6400
fax: (972) 551-6420
This MANU-SPEC(TM) utilizes the Construction Specifications Institute (CSI) Manual of
Practice, including MasterFormat(c), SectionFormat(c) and PageFormat(c). A MANU-SPEC is
a manufacturer specific proprietary product specification using the proprietary method of
specifying applicable to project specifications and master guide specifications. Optional text
indicated by brackets []; delete optional text in final copy of specification.
This MANU-SPEC specifies plastic unit skylights, as manufactured by Naturalite(TM) Skylights
Systems, Oldcastle Glass® Engineered Products. Revise MANU-SPEC section number and
title below to suit project requirements, specification practices and section content. Refer to
CSI MasterFormat for other section numbers and titles.
SECTION 08620 UNIT SKYLIGHTS
(PLASTIC UNIT SKYLIGHTS)
PART 1 - GENERAL
1.01
SUMMARY
A. The work of this Section includes unit skylights.
Note: Edit paragraph below for type of unit skylights to suit project requirements.
Types: Types of unit skylights include:
Curb-mounted skylights.
Insulated curb skylights - double wall.
Insulated curb skylights - single wall with a wood nailer.
Insulated curb skylights - single wall, wood nailer, with removable counter flashing
Ridge type skylights.
Circular skylights.
In-Tandem skylights.
Cluster skylights.
Vertex™ curb-mounted skylights.
Vertex™ self-flashing skylights.
Vertex2™ curb-mounted skylights.
Vertex2™ self-flashing skylights
Continuous Vaulted non-thermalized skylights
Continuous Vaulted thermalized skylights
Versalite™ Pre-glazed skylights.
Versaridge™ Pre-glazed skylights.
Tubular skylights.
Hurricane Resistant skylights (curb mount).
Hurricane Resistant skylights (self-flashing).
A. Specifier Note: Revise paragraph below to suit project requirements. Add section numbers and
titles per CSI Master-Format and specifier’s practice.
B. Related Sections: Section(s) related to this section include:
1.
2.
3.
4.
5.
Built-Up Bituminous Roofing: Division 7 Built-Up Roofing Sections.
Modified Bituminous Sheet Roofing: Division 7 Modified Bituminous Roofing Sections.
Single Ply Membrane Roofing: Division 7 Single Ply Roofing Sections.
Flashing and Sheet Metal: Division 7 Flashing and Sheet Metal Section.
Sheet Metal Roofing: Division 7 Sheet Metal Roof Section.
Specifier Note: Article below may be omitted when specifying manufacturer's proprietary products and
recommended installation. Retain Reference Article when specifying products and installation by an
industry reference standard. If retained, list standard(s) referenced in this section. Indicate issuing
authority name, acronym, standard designation and title. Establish policy for indicating edition date of
standard referenced. Conditions of the Contract or Division 1 References Section may establish the
edition date of standards. This article does not require compliance with standard, but is merely a listing
of references used. Article below should list only those industry standards referenced in this section.
1.02
REFERENCES
A.
General: Standards listed by reference, including revisions by issuing authority, form a part of
this specification section to extent indicated. Standards listed are identified by issuing authority,
authority abbreviation, designation number, title or other designation established by issuing
authority. Standards subsequently referenced herein are referred to by issuing authority
abbreviation and standard designation.
B.
Aluminum Association (AA):
1.
C.
Specifications for Aluminum Structures.
American Architectural Manufacturers Association (AAMA):
1.
2603-98 Voluntary Specification, Performance
Requirements and Test Procedures for High Performance Organic Coatings on Aluminum
Extrusions and Panels.
2.
2604-98 Voluntary Specification for High
Performance Organic Coatings on Architectural Extrusions and Panels.
3.
611-98 Specification for Anodized Architectural
Aluminum.
D.
American Society for Testing and Materials, ASTM:
D4802 Specification for Poly (Methyl Methacrylate) Acrylic Plastic Sheet.
ASTM E283 Test Method for Rate of Air Leakage Through Exterior Windows, Curtain Walls
and Doors.
ASTM E330 Test Method for Structural Performance of Exterior Windows, Curtain Walls and
Doors by Uniform Static Air Pressure Difference.
E331 Test Method for Water Penetration of Exterior Windows, Curtain Walls and Doors by
Uniform Static Air Pressure Difference.
E.
National Roofing Contractors Association (NRCA):
1.
Roofing and Waterproofing Manual.
Specifier Note: Article below should be restricted to statements describing design or performance
requirements and functional (not dimensional) tolerances of a complete system. Limit descriptions to
composite and operational properties to extent necessary to link multiple components of a system, and
to interface with other systems.
1.03
SYSTEM DESCRIPTION
A.
Performance Requirements: Provide roof accessories which have been manufactured,
fabricated and installed to withstand loads from [Specify code/standard reference.] and to
maintain [Specify performance criteria.] performance criteria stated by manufacturer without
defects, damage or failure.
B.
Unit Skylight Performance Requirements:
Specifier Note: Edit Performance Requirements paragraph below for loads to suit project requirements.
Roof accessories are commonly used in low-rise construction where roof elevations do not exceed 60
feet above grade. Plastic glazing materials are not designed to support live loads or concentrated
impact type loads. "Risk of fall" label is applied to each dome to warn of potential danger. (1)
Performance Requirements: Referenced standards establish the level of quality of unit skylights
available from quality manufacturers conforming to industry standards. (2) Condensation: Under certain
conditions of high humidity and/or large inside to outside temperature differentials, condensation may
occur on the aluminum framing and plastic glazing material. Thermally broken frames can be specified
to help control compensation on aluminum framing. Double glazing will usually reduce the occurrence
of condensation on the plastic, but will not totally eliminate it. The condensation that forms between the
double layers of plastic will normally dissipate as the airspace is heated by the sun. Sealed domes are
more resistant to the formation of condensation and will reduce accumulation of dust and foreign
matter. Sealed domes are available for most dome glazed unit skylights at additional cost.
Specifier Note: Edit paragraph below. Specify values, minimum 20 psf recommended.
1.
Design framing and dome infill assembly to support the following load requirements:
a.
b.
load.
[30] [40]-psf snow load plus dead load.
[30] [40]-psf negative wind or uplift load plus dead
2.
Fabrication and installation of unit skylights shall comply with governing building code.
Specifier Note: Article below includes submittal of relevant data to be furnished by Contractor either
before, during, or after construction. Coordinate this article with Architect's and Contractor's duties and
responsibilities in Conditions of the Contract and Division 1 Submittal Procedures Section.
1.04
SUBMITTALS
A.
General: Submit listed submittals in accordance with Conditions of the Contract and Division 1
Submittal Procedures Section.
B.
Product Data: Submit product data, for specified products.
C.
Shop Drawings: Submit shop drawings showing layout, profiles, and product components,
including anchorage, accessories, finishes and colors.
1.
Submit shop drawings for approval prior to fabrication. Include details of framing
members, glazing materials where applicable, sealants, fasteners, anchors and
thicknesses and types of formed flashing and closures.
D.
Samples: Submit selection and verification samples for finishes, colors and textures.
1.
Glazing Samples: Submit a verification sample of plastic glazing material in
specified color.
2.
Finish Samples: Submit a verification sample of aluminum finish in specified
color.
E.
Quality Assurance Submittlas: Submit the following:
1.
Test Reports: Certified test reports showing compliance with specified
performance characteristics and physical properties.
2.
Certificates: Product certificates signed by manufacturer certifying materials
comply with specified performance characteristics and criteria, and physical requirements
3.
Manufacturer’s Instructions: Manufacturer’s installation instructions.
4.
Specifier Note: Coordinate paragraph below with Part 3 Field Quality
Requirements Article herein. Retain or delete as applicable.
5.
Manufacturer’s Field Reports: Manufacturer’s field reports specified herein.
F.
Closeout Submittals: Submit the following:
1. Operation and Maintenance Data: Operation and maintenance data for installed
products in accordance with Division 1 Closeout Submittals (Maintenance Data and
Operation Data) Section. Include methods for maintaining installed products, and
precautions against cleaning materials and methods detrimental to finishes and
performance.
2. Warranty: Warranty documents specified herein.
Specifier Note: Article below should include prerequisites, standards, limitations and criteria which
establish an overall level of quality for products and workmanship for this section. Coordinate below
article with Division 1 Quality Assurance Section.
1.05
A.
QUALITY ASSURANCE
Qualifications:
Installer Qualifications: Installer experienced in performing work of this section who has
specialized in installation of work similar to that required for this project.
Installer: Unit skylights shall be installed by workmen with a minimum of 2 years
experience in installation of similar units.
Manufacturer Qualifications: Manufacturer capable of providing field service representation
during construction, approving acceptable installer and approving application method.
Manufacturer: Unit skylights shall be manufactured by a firm with a minimum of 10 years
experience in the fabrication and installation of plastic unit skylights. Manufacturers
proposed for use, which are not named in this Section, shall submit evidence of ability
to meet performance and fabrication requirements specified not less than 10 days prior
to bid date, and shall include a list of projects of similar design and complexity
completed within the past five years.
Specifier Note: Paragraph below should list obligations for compliance with specific code requirements
particular to this section. General statements to comply with a particular code are typically addressed in
Conditions of the Contract and Division 1 Regulatory Requirements Section. Repetitive statements
should be avoided.
B.
Regulatory Requirements: [Specify applicable requirements of regulatory agencies]
Specifier Note: Retain paragraph below for erected assemblies (either onsite or offsite) required
for review of construction, coordination of work of several sections, testing, or observation of
operation. Mock-ups, when accepted or approved, establish standards by which work will be
judged. Coordinate below with Division 1 Quality Control (Mock-Up Requirements) Section.
Specifier Note: Article below should include special and unique requirements. Coordinate
article below with Division 1 Product Requirements Section.
1.06
DELIVERY, STORAGE & HANDLING
A.
General: Comply with Division 1 Product Requirements Sections.
B.
Ordering: Comply with manufacturer's ordering instructions and lead time requirements to
avoid construction delays.
C.
Delivery: Deliver materials in manufacturer's original, unopened, undamaged containers with
identification labels intact. Sequence deliveries to avoid delays, but minimize on site storage.
D.
Storage and Protection: Store materials protected from exposure to harmful weather
conditions and at temperature and humidity conditions recommended by manufacturer.
1. Protect from damage from sunlight, weather, excessive temperatures and construction
operations.
1.07
A.
PROJECT CONDITIONS
Field Measurements: Verify actual measurements/openings by field measurements before
fabrication; show recorded measurements on shop drawings. Coordinate field measurements
and fabrication schedule with construction progress to avoid construction delays.
1. Measurements: Take accurate field measurements before fabrication. Do not delay job
progress; allow for field tolerances if taking field measurements before fabrication is not
possible.
Specifier Note: Coordinate article below with Conditions of the Contract and with Division 1
Closeout Submittals (Warranty) Section.
1.08
A.
WARRANTY
Project Warranty: Refer to Conditions of the Contract for project warranty provisions.
Specifier Note: Coordinate paragraph below with manufacturer's warranty requirements.
Manufacturer offers the Following: Plastic Unit Skylight Warranty: Provide written five-year
warranty signed by manufacturer, agreeing to repair or replace work which exhibits defects in
materials or workmanship and guaranteeing weathertight and leak free performance. "Defects"
is defined as uncontrolled leakage of water and abnormal aging or deterioration.
B.
Manufacturer’s Warranty: Provide written warranty signed by manufacturer, agreeing to
repair or replace work which exhibits defects in materials or workmanship and guaranteeing
weather tight and leak free performance. "Defects" is defined as uncontrolled leakage of water
and abnormal aging or deterioration.
1. Skylight Warranty: Provide written warranty signed by manufacturer, agreeing to
repair or replace work, which exhibits defects in materials or workmanship and
guaranteeing weather tight, and leak free performance. "Defects" is defined as
uncontrolled leakage of water and abnormal aging or deterioration.
2. Warranty Period: 5 years commencing on date of invoice.
C.
Finish Warranty: Provide written warranty signed by manufacturer and finisher, agreeing to
repair or replace work that exhibits defects in finish. "Defects" is defined as peeling, chipping,
chalking, fading, abnormal aging or deterioration, and failure to perform as required.
1. Warranty Period for Anodized Finish: One year from date of application for film
integrity.
2. Warranty Period for Baked Enamel Finish: One year from date of application for film
integrity.
3. Warranty Period for Fluoropolymer Finish: Five years from date of application for
color and film integrity.
PART 2 - PRODUCTS
Specifier Note: Retain article below for proprietary method specification. Add product attributes,
performance characteristics, material standards, and descriptions as applicable. Use of such phrases
as "or equal" or "or approved equal," or similar phrases may cause ambiguity in specifications. Such
phrases require verification (procedural, legal and regulatory) and assignment of responsibility for
determining "or equal" products.
2.01
A.
B.
UNIT SKYLIGHTS
Manufacturer: Naturalite Skylight Systems, Oldcastle Glass® Engineered Products.
1.
Specifier Note: Paragraph below is an addition to CSI SectionFormat and a supplement to
MANU-SPEC. Retain or delete paragraph below per project requirements and specifier's
practice.
1.
Contact: P.O. Box 629, 750 Airport Road, Terrell, TX 75160; Telephone:
(800) 527-4018, (972) 551-6400; Fax (972) 551-6420
Proprietary Product(s)/System(s): Naturalite Plastic Unit Skylights
1.
Materials: For each type of material required for the work of this Section, provide
primary materials which are the products of one manufacturer. Provide secondary
materials which are acceptable to the manufacturers of the primary materials.
Specifier Note: Edit article below to suit project requirements. If substitutions are permitted, edit
text below. Add text to refer to Division 1 Project Requirements (Product Substitutions
Procedures) Section.
2.02
A.
2.03
PRODUCT SUBSTITUTIONS
Substitutions: No substitutions permitted.
MANUFACTURED UNITS
Specifier Note: Edit paragraphs below. Select options applicable for project and delete options not
required. (1) Typical glazing is acrylic and can be provided colorless, or in white, bronze, or grey colors.
Single and double dome units are available. Double domes are recommended for energy conservation.
Acrylic is the most common and economical material. Polycarbonate may be required for greater
impact resistance or to meet some fire code requirements. Refer to the local building code for
acceptable types and possible square foot area restrictions. Do not specify abrasion resistant acrylic or
polycarbonate plastic glazing materials for use in domes in roof accessories. Sheet materials with
abrasion resistant coatings should not be thermoformed for use in domes. (2) Finishes: Aluminum
framing components are normally supplied in a natural mill finish. For more information and costs
regarding architectural finishes, contact your nearest representative.
A.
Curb-Mounted Skylights: Factory assembled units consisting of plastic dome, 0.062"
extruded aluminum frame and 0.062" extruded aluminum dome retaining angle. Skylight frame
shall have an integral condensate gutter with weep slots. Weep slots shall be protected from
weather and air-borne debris. Curb frame shall be predrilled for anchorage to curbs.
1. Type: [Model NL single dome] [Model NLDD double dome] [Model PNL pyramid
single dome] [Model PNLDD pyramid double dome] [Model NTL thermalized sealed
double dome] [Model PNTL thermalized sealed pyramid double dome]
2. Glazing: Acrylic plastic glazing
3. Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064].
4. Inner Dome Color: [Colorless] [White # 2447].
5. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]
6. Condensation Control: [Non-thermalized type shall have sufficient drainage slots
to carry all moisture to the outside.] [Thermalized type shall have poured and debridged polyurethane thermal break; corners shall be factory sealed].
7. Size: [Insert outside curb dimensions here if not indicated on drawings].
8. Performance Minimums: Air Infiltration per ASTM E283 shall be < .01 CFM/ Cu. Ft.
@ 6.25-psf negative pressure. Water Penetration per ASTM E331 shall pass at a
negative pressure of 15-psf.
These units are designed for built up roof applications
B.
Insulated Curb Skylights: Factory assembled self-flashing units consisting of plastic domes,
0.062" extruded aluminum curb frame, 0.062" extruded aluminum retaining angle, double wall
insulated curb. Skylight frame shall have an integral condensate gutter with weep slots. Weep
slots shall be protected from weather and air-borne debris. The curb shall have a 3" roof
flange and house a 3/4" layer of insulation. Curbs shall be thermally broken.
1. Type: [Model NA single dome] [Model PNA pyramid single dome] [Model NADD
double dome] [Model PNADD pyramid double dome] [Model NTLA thermalized
sealed double dome] [Model PNTLA thermalized sealed pyramid double dome].
2. Curb Height: [9"] [12"].
3. Glazing: Acrylic plastic glazing.
4. Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064].
5. Inner Dome Color: [Colorless] [White # 2447].
6. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]
7. Condensation Control: [Non-thermalized type shall have sufficient drainage slots
to carry all moisture to the outside.] [Thermalized type shall have poured and debridged polyurethane thermal break; corners shall be factory sealed.]
8. Size: [Insert inside curb dimensions here if not indicated on drawings].
9. Performance Minimums: Air Infiltration per ASTM E283 shall be < .01 CFM/ Cu. Ft.
@ 6.25-psf negative pressure. Water Penetration per ASTM E331 shall pass at a
negative pressure of 15-psf.
C.
Plastic Dome Skylights with NSC Curb: Factory assembled units, each consisting of a
plastic dome. The 0.062” extruded aluminum frame shall have an integral condensate gutter
and sufficient drainage slots to carry all moisture to the outside. The curb shall consist of an
aluminum wall, 1" x 4" treated wood nailer and 3/4" thick polyisocyanurate insulation (FEO
spec. HH-I-1972/2 class 2) adhered to metal curb. Units are to be designed with removable
tops for installation of roofing and then reattachment of the tops.
1. Type: [Model NSC Single Dome] [Model NSCDD Double Dome] [Model PNSC
Pyramid Single Dome] [Model PNSCADD Pyramid Double Dome] [Model NSCTL
Thermalized Double Dome] [Model PNSCTL Pyramid Double Dome].
2. Curb Height: [9”] [12”]
3. Glazing: Acrylic plastic glazing
4. Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064].
5. Inner Dome Color: [Colorless] [White # 2447]
6. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]
7. Condensation Control: [Non-thermalized type shall have sufficient drainage slots
to carry all moisture to the outside.] [Thermalized type shall have poured and debridged polyurethane thermal break without weep holes; corners shall be factory
sealed.]
8. Size: [Insert inside curb dimensions here if not indicated on drawings].
9. These units are designed for single ply roof applications
D.
Plastic Dome Skylights with SFA Curb: Factory assembled units, each consisting of a plastic
dome. The 0.062” extruded aluminum frame shall have an integral condensate gutter and
sufficient drainage slots to carry all moisture to the outside. The curb shall consist of an
aluminum wall, 1" x 4" treated wood nailer and 3/4" thick polyisocyanurate insulation (FEO
spec. HH-I-1972/2 class 2) adhered to metal curb. Curbs shall be supplied with .062" extruded
aluminum cap flashing and snap in place corner covers.
1. Type: [Model SFA Single Dome] [Model SFADD Double Dome] [Model PSFA
Pyramid Single Dome] [Model PSFADD Pyramid Double Dome].
2. Curb Height: [9”] [12”]
3. Glazing: Acrylic plastic glazing
4. Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064].
5. Inner Dome Color: [Colorless] [White # 2447].
6. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]
7. Size: [Insert inside curb dimensions here if not indicated on drawings].
E.
Ridge Type Skylights: Curb-mounted units consisting of plastic glazing, 0.062" extruded
aluminum outer retainer, and 0.078" extruded aluminum frame and condensate gutter. Rafters
shall be tubular extruded aluminum with manufacturer's standard glazing seals. Units shall
have weep holes to carry all moisture to the outside.
1. Type: [Model RT single glazed] [Model RTDD double glazed].
2. Glazing: [Acrylic] [Polycarbonate] plastic glazing.
3. Outer [Single] Glazing Color: [Acrylic: [Colorless] [White # 2447] [Bronze # 2412]
[Gray # 2064]] [Polycarbonate: [Colorless] [White #4571] [Bronze # 2556]]
4. Inner Glazing Color: [Acrylic: [Colorless] [White # 2447]] [Polycarbonate:
[Colorless] [White #4571]]
5. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]
6. Size: [Insert dimensions here if not indicated on drawings].
F.
Circular Skylights (C): Factory-assembled units, each consisting of plastic glazing, 0.062"
extruded aluminum retaining channel, 0.032" aluminum curb walls, 3" mounting flange and
condensate gutter. Units shall have weep holes to carry all moisture to the outside.
1. Type: [Model C single dome] [Model CDD double dome].
2. Curb Height: [4"] [9"].
3. Glazing: Acrylic plastic glazing
4. Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064]
5. Inner Dome Color: [Colorless] [White # 2447].
6. Frame Finish: Manufacturer's standard [mill finish] [polyester baked enamel color
to be [white] or [bronze]].
7. Size: [Insert inside curb dimensions here if not indicated on drawings].
G.
In-Tandem Skylights (LIT): Curb-mounted units, each consisting of plastic glazing, 0.062"
extruded aluminum retaining angle, 0.078" extruded aluminum frame and condensate gutter.
Intermediate mullions shall be 0.080" extruded aluminum with manufacturer's standard glazing
seals. Units shall have weep holes to carry all moisture to the outside. Support structure by
others to be provided under all framing and mullions.
1.
Type: [Model LIT single dome] [Model LIT-DD double dome] [Model PLIT
pyramid single dome] [Model PLIT-DD pyramid double dome].
2. Glazing: Acrylic plastic glazing
3. Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064].
4. Inner Dome Color: [Colorless] [White # 2447].
5. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]]
6. Size: [Insert outside curb dimensions here if not indicated on drawings].
H.
Cluster Skylights (CLS): Curb mounted units, each consisting of plastic glazing,
0.094”extruded aluminum retaining angle, 0.093" extruded aluminum frame and condensate
gutter. Main and cross gutters shall be 0.093" extruded aluminum with manufacturer's
standard glazing seals. EPDM glazing seals required above and below all glazing. Units shall
have baffled weep holes to control air infiltration and allow all moisture to the outside. Support
structure, by others, must slope a minimum of 1/4" per foot in one direction. Support structure
by others required at perimeter and all framing members parallel to the slope (main gutter).
Cross gutters shall be self-supporting. (Note: at spans not to exceed 6’ at positive loads not to
exceed 40-psf). Cross caps shall not rise above the glazing flange more than 3/16” so as not
to inhibit the flow of water off the unit. Independent certified testing required indicating
performance levels listed below.
1. Air Infiltration per ASTM E 283: .1 CFM/ Sq. Ft. allowable at a negative pressure of
6.24-psf. Water Penetration per ASTM E 331: No uncontrolled water at a negative
pressure of
10-psf.
2. Type: [Model CLS single dome] [Model CLSDD double dome] [Model PCLS
pyramid single dome] [Model PCLSDD pyramid double dome].
3. Glazing: Acrylic plastic glazing
4. Outer [Single] Dome Color: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064].
5. Inner Dome Color: [Colorless] [White # 2447].
6. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]
7. Size: [Insert outside curb dimensions here if not indicated on drawings].
I.
VertexTM Curb Mount Skylights (PTLP): Skylights shall be factory-assembled units, each
consisting of two sealed pyramid domes of polycarbonate. They shall have a .078" extruded
aluminum frame with polyurethane thermal break to prevent condensation on interior portions
of aluminum frame and .062" extruded aluminum dome retaining angle. The skylights are to be
completely sealed with neoprene gaskets between domes and frame members, with no weep
holes, eliminating air infiltration and ex-filtration. Uniform design load capability of composite
dome and frame to meet or exceeds 40-psf snow load. No breakage or disengagement of
dome from the frame shall occur upon impact of up to 1,000 ft. lbs.
1. Type: Model PTLP.
2. Glazing: Lexan XL10 polycarbonate glazing.
3. Outer Dome Color: [Colorless] [White #4571] [Bronze # 2556]
4. Inner Dome Color: [Colorless] [White #4571]
5. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color
to be [ ] as selected from manufacturers standard color offering]
6. Size: [Insert outside curb dimensions here if not indicated on drawings].
J.
VertexTM Self Flashing Skylights (PTLAP): Skylights shall be factory-assembled units, each
consisting of two sealed pyramid domes of polycarbonate. They shall have a .078" extruded
aluminum frame with polyurethane thermal break to prevent condensation on interior portions
of aluminum frame and .062" extruded aluminum dome retaining angle. The skylights are to be
completely sealed with neoprene gaskets between domes and frame members, with no weep
holes, eliminating air infiltration and ex-filtration. Insulated curbs shall be constructed with an
aluminum inner and outer wall isolated at the top and bottom by PVC thermal barriers.
Insulation material between walls is to be polyisocyanurate. Uniform design load capability of
composite dome and frame to meet or exceed 40-psf snow load. No breakage or
disengagement of dome from the frame shall occur upon impact of up to 1000 ft. lbs.
1. Type: Model PTLAP.
2. Curb Height: [9”] [12”]
3. Glazing: Lexan XL10 polycarbonate glazing.
4. Outer Dome Color: [Colorless] [White #4571] [Bronze # 2556]
5. Inner Dome Color: [Colorless] [White #4571]
6. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color
to be [ ] as selected from manufacturers standard color offering]
7. Size: [Insert inside curb dimensions here if not indicated on drawings].
K.
Vertex2TM Curb-Mounted Skylights: Factory assembled units consisting of impact modified
plastic dome, 0.062" extruded aluminum frame and 0.062" extruded aluminum dome retaining
angle. Skylight frame shall have an integral condensate gutter with weep slots. Weep slots
shall be protected from weather and air-borne debris. Curb frame shall be predrilled for
anchorage to curbs. No breakage or disengagement of dome from frame shall occur upon
impact of up to 1000 ft. lbs.
1.
2.
3.
4.
5.
Type: [Model FNL single dome] [Model FNLDD double dome] [Model FPNL pyramid
single dome] [Model FPNLDD pyramid double dome] [Model FNTL thermalized
sealed double dome] [Model FPNTL thermalized sealed pyramid double dome]
Glazing: Impact modified plastic glazing.
Outer [Single] Dome Color: [Colorless] [White # 2447]
Inner Dome Color: [Colorless] [White # 2447].
Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color
to be [ ] as selected from manufacturers standard color offering]
6.
7.
8.
L.
Condensation Control: [Non-thermalized type shall have sufficient drainage slots to
carry all moisture to the outside.] [Thermalized type shall have poured and debridged polyurethane thermal break; corners shall be factory sealed.]
Size: [Insert outside curb dimensions here if not indicated on drawings].
Performance Minimums: Air Infiltration per ASTM E283 shall be < .01 CFM/ Cu. Ft. @
6.25-psf negative pressure. Water Penetration per ASTM E331 shall pass at a negative
pressure of 15-psf.
Vertex2TM Insulated Curb Skylights: Factory assembled self-flashing units consisting of
impact modified plastic domes, 0.062" extruded aluminum curb frame, 0.062" extruded
aluminum retaining angle, double wall insulated curb. Skylight frame shall have an integral
condensate gutter with weep slots. Weep slots shall be protected from weather and air-borne
debris. Insulated curbs shall be constructed with an aluminum inner and outer wall isolated at
the top and bottom by PVC thermal barriers. Insulation material between walls is to be
polyisocyanurate. No breakage or disengagement of dome from frame shall occur upon impact
of up to 1000 ft. lbs.
1. Type: [Model FNA single dome] [Model FPNA pyramid single dome] [Model
FNADD double dome] [Model FPNADD pyramid double dome] [Model FNTLA
thermalized sealed double dome] [Model FPNTLA thermalized sealed pyramid
double dome].
2. Curb Height: [9"] [12"].
3. Glazing: Impact modified plastic glazing.
4. Outer [Single] Dome Color: [Colorless] [White # 2447].
5. Inner Dome Color: [Colorless] [White # 2447].
6. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color
to be [ ] as selected from manufacturers standard color offering]
7. Condensation Control: [Non-thermalized type shall have sufficient drainage slots
to carry all moisture to the outside.] [Thermalized type shall have poured and debridged polyurethane thermal break; corners shall be factory sealed.]
8. Size: [Insert inside curb dimensions here if not indicated on drawings].
9.
Performance Minimums: Air Infiltration per ASTM E283 shall be < .01 CFM/ Cu. Ft. @ 6.25-psf
negative pressure. Water Penetration per ASTM E331 shall pass at a negative pressure of 15-psf
M. Continuous vaulted skylights non-thermalized: Curb-mounted units consisting of extruded
aluminum frame. Sill members shall collect and weep water to the exterior. Factory slot sill
members at anchor locations for thermal movement. Rafter members shall be spaced [4’0” on
center for uniform snow load not exceeding 30-psf] [3’0” on center for uniform snow
load not exceeding 40-psf]. All continuous gaskets above and below plastic glazing material
shall be black EPDM. Factory-assemble units in sections not to exceed 20 lineal feet for
outside curb spans of 87 inches or less. All units over 85 inches shall be shipped unassembled
for access to anchors from roof level. Submit test report showing: systems performance when
tested for Air Infiltration per ASTM E-283, 6.24-psf static water resistance when tested per
ASTM E331, Structural Performance when tested to ASTM E-330.
1.
2.
Type: [Model CV single glazed vault] [Model CVR single glazed ridge].
Ends: [Vertical] [Domed] [Wall Abutment].
3.
4.
5.
6.
N.
Glazing: [Acrylic] [Lexan XL10 polycarbonate] plastic glazing.
Glazing Color: [Acrylic: [Colorless] [White # 2447] [Bronze # 2412] [Gray # 2064]]
[Lexan XL10 Polycarbonate: [Colorless] [White #4571] [Bronze # 2556]]
Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color
to be [ ] as selected from manufacturers standard color offering]
Size: [Insert outside curb dimensions here if not indicated on drawings]. Provide
[standard] [custom] spacing and widths as indicated on the Drawings.
Continuous vaulted skylights with thermalized frame: Curb-mounted units consisting of
extruded aluminum frame with polyurethane thermal break to minimize condensation on interior
portions of aluminum frame as shown on the drawings. Sill members shall collect and weep
water infiltration that occurs on the exterior side of the thermal barrier to the outside, however
weep holes shall not penetrate through the thermal barrier. Factory slot sill members at
anchor locations for thermal movement. Rafter members shall be spaced [4’0” on center for
uniform snow load not exceeding 30-psf] [3’0” on center for uniform snow load not
exceeding 40-psf]. All continuous gaskets above and below plastic glazing material shall be
black EPDM. Factory-assemble units in sections not to exceed 20 lineal feet for outside curb
spans of 87 inches or less. All units over 85 inches shall be shipped unassembled for access
to anchors from roof level. Submit test report showing: systems performance when tested for
Air Infiltration per ASTM E-283, 6.24-psf static water resistance when tested per ASTM E331,
Structural Performance when tested to ASTM E-330.
1.
2.
3.
4.
5.
Type: [Model CVTL double glazed vault] [Model CVTLR double glazed ridge].
Ends: [Vertical] [Domed] [Wall Abutment].
Glazing: [Acrylic] [Lexan XL10 polycarbonate] plastic glazing.
Outer Glazing Color: [Acrylic: [Colorless] [White # 2447] [Bronze # 2412] [Gray #
2064]] [Lexan XL10 Polycarbonate: [Colorless] [White #4571] [Bronze # 2556]]
Inner Glazing Color: [Acrylic: [Colorless] [White # 2447]] [Polycarbonate: [Colorless]
[White #4571]].
6.
Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2coat, 70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98,
color to be [ ] as selected from manufacturers standard color offering]
7.
Size: [Insert outside curb dimensions here if not indicated on drawings]. Provide
[standard] [custom] spacing and widths as indicated on the Drawings.
O. Versalite™ Pre-glazed skylights: Pyramid style skylights. Skylight framing members to be
fabricated from 6063-T5 extruded aluminum. Include an integral gutter system to control water
infiltration and condensation. Provide “Versalite” framing system that will collect and channel
condensation and water infiltration to the exterior through weep holes. System shall be cap
glazed and shall be secured with thermally broken glazing clips. Glazing system shall include a
“positive stop” to control compression in the glazing rabbet. Apply cap seal at corner
intersections. Provide continuous cushion below glazing materials with extruded, dense EPDM
black rubber gasket with 60 plus or minus 5 Shore A durometer complying with ASTM C864.
Provide continuous spacer above glazing materials with extruded, closed-cell, sponge EPDM
black rubber gasket complying with ASTM C509. Fabricate gaskets of material to withstand
one part per million ozone for 500 hours at 20 percent elongation at 100 degrees F when
tested in accordance with ASTM D1149.
1. Type: [Model VLG glass skylight] [Model VLP polycarbonate skylight].
2. Glazing: [Model VLG: Insulating glass 1” thick:
Exterior lite: ¼” [clear] [tinted] heat-strengthened glass ½” air space
Interior lite: ¼” laminated glass comprised of 2 plies of 1/8” clear [heatstrengthened] glass [Low E #3] with a 0.030” clear polyvinyl butyl interlayer.]
[Model VLP: Polycarbonate 25mm [clear][white] multi-wall polycarbonate sheet].
3. Framing System: Provide thermally broken framing system to include integral gutter to
control water infiltration and condensation. System to be cap glazed with concealed
fasteners. System to include a “positive” stop to control compression in the glazing rabbet.
4. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color to
be [ ] as selected from manufacturers standard color offering]
5. Size: [Insert outside curb dimensions here if not indicated on drawings].
6. Test Reports: Provide test reports showing allowable air infiltration not exceeding 0.5 CFM/
Sq. Ft. of total glazed surface when system is tested in accordance with ASTM E283 at a
static pressure of 6.24-psf. Provide test reports showing no uncontrolled water leakage
occurring when system is tested in accordance with ASTM E331 at a static pressure of 12psf.
P.
Versaridge™ Pre-glazed skylights: Ridge style skylights with vertical ends. Skylight framing
members to be fabricated from 6063-T5 extruded aluminum. Include an integral gutter system
to control water infiltration and condensation. Provide “Versaridge” framing system that will
collect and channel condensation and water infiltration to the exterior through weep holes.
System shall be cap glazed and shall be secured with thermally broken glazing clips. Glazing
system shall include a “positive stop” to control compression in the glazing rabbet. Apply cap
seal at corner intersections. Provide continuous cushion below glazing materials with
extruded, dense EPDM black rubber gasket with 60 plus or minus 5 Shore A durometer
complying with ASTM C864. Provide continuous spacer above glazing materials with
extruded, closed-cell, sponge EPDM black rubber gasket complying with ASTM C509.
Fabricate gaskets of material to withstand one part per million ozone for 500 hours at 20
percent elongation at 100 degrees F when tested in accordance with ASTM D1149.
1. Type: [Model VRG glass skylight] [Model VRP polycarbonate skylight].
2. Glazing: [Model VRG: Insulating glass 1” thick:
Exterior lite: ¼” [clear] [tinted] heat-strengthened glass ½” air space
Interior lite: ¼” laminated glass comprised of 2 plies of 1/8” clear [heat-
strengthened] glass
[Low E #3] with a 0.030” clear polyvinyl butyl interlayer.]
[Model VRP: Polycarbonate 25mm [clear][white] multi-wall polycarbonate sheet].
3. Framing System: Provide thermally broken framing system to include integral gutter to
control water infiltration and condensation. System to be cap glazed with concealed
fasteners. System to include a “positive” stop to control compression in the glazing rabbet.
4. Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color to
be [ ] as selected from manufacturers standard color offering]
5. Size: [Insert outside curb dimensions here if not indicated on drawings].
6. Test Reports: Provide test reports showing allowable air infiltration not exceeding 0.06
CFM/ Sq. Ft. of total glazed surface when system is tested in accordance with ASTM E283
at a static pressure of 6.24-psf. Provide test reports showing no uncontrolled water
leakage occurring when system is tested in accordance with ASTM E331 at a static
pressure of 12-psf.
Q. Tubular Skylights:
Light Collecting Aperture: Shall be a factory assembled self-flashing skylight comprised of a
self flashing curb constructed with an aluminum inner and outer wall isolated at the top and
bottom by PVC thermal barriers. The curb shall have a 3" roof flange and house a layer of
polyisocyanurate insulation. The skylight frame shall be extruded aluminum with a
polyurethane thermal break to prevent condensation on interior portions of aluminum frame
and 0.062" extruded aluminum dome retaining angle, glazed with a polycarbonate dome, and
sealed to a .030 thick radial lens film.
[Optional: Curb mounted skylight, omit self flashing curb above.]
Extension Shafts: The extension tubes shall be formed from .020 thick high reflective
aluminum, having a specular reflectance of 95% and a total reflectance of 97%.
Ceiling Diffuser: Shall be comprised of a .030 thick polycarbonate radial lens film that shall be
sealed to the bottom of the bottom extender tube. The lens film shall contain optical quality
circular prisms on one side and a smooth finish on the other.
1. Type: [Self Flashing Tubular][Curb Mount Tubular]
2. Glazing: Polycarbonate glazing, Radial Lens film.
3. Frame Finish: (Skylight frame and Retaining angle only) Manufacturer's standard [mill
finish] [A31 clear anodized coating complying with AAMA 611-98, 0.4-0.7 mil thick
minimum] [A44 dark bronze anodized coating complying with AAMA 611-98, 0.7 mil
thick minimum] [Fluoropolymer 2-coat, 50% Kynar 500/Hylar 5000 resin base coating
complying with AAMA 2604-98, color to be [ ] as selected from manufacturers
standard color offering]
4. Condensation Control: Thermalized type skylight frame shall have poured and debridged polyurethane thermal break without weep holes; corners shall be factory
sealed.
5. Size: [2 x 2 at Ceiling Grid or 4 x 4 at Ceiling Grid].
R.
Hurricane Resistant Curb-Mounted Skylights: Factory assembled units consisting of
impact resistant plastic glazing, 0.078" extruded aluminum frame and 0.062" min. extruded
aluminum dome retaining angle. Skylight frame shall have an integral condensate gutter with
weep holes.
Units shall be approved by Miami-Dade County for Protocol PA 201 (Large Missile Impact),
Protocol 203 (Cycle), and Protocol 202 (Air, Water, Structural) and bear a current NOA
number.
1.
2.
3.
4.
5.
Type: [Model HRL single dome] [Model HRLDD double dome]
Glazing: Impact modified acrylic plastic glazing.
Outer or [Single] Dome Color: [Colorless] [White # 2447].
Inner Dome Color: [Colorless] [White # 2447].
Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color to
be [ ] as selected from manufacturers standard color offering]
6. Condensation Control: Drainage slots to carry all moisture to the outside as described
on the tested units.
7. Acceptance #: 04-0302.01
8. Size: Not to exceed 83” x 99” outside curb dimensions.
S.
Hurricane Resistant Self Flashing Skylights: Factory assembled self-flashing units
consisting of impact resistant plastic glazing, 0.062" extruded aluminum curb frame, 0.062"
min. extruded aluminum retaining angle, double wall insulated curb comprised of, 063” thick
aluminum inner and outer wall, housing a ¾” thick rigid insulation. The curb shall have a 3"
roof flange and house a 3/4" layer of polyisocyanurate insulation. Skylight frame shall have an
integral condensate gutter with weep holes.
Units shall be approved by Miami-Dade County for Protocol PA 201 (Large Missile Impact),
Protocol 203 (Cycle), and Protocol 202 (Air, Water, Structural) and bear a current NOA
number. Skylight frame and self-flashing curb shall have been tested as a complete unit
1.
2.
3.
4.
5.
Type: [Model HRA single dome] [Model HRADD double dome]
Glazing: Impact modified acrylic plastic glazing.
Outer or [Single] Dome Color: [Colorless] [White # 2447].
Inner Dome Color: [Colorless] [White # 2447].
Frame Finish: Manufacturer's standard [mill finish] [A31 clear anodized coating
complying with AAMA 611-98, 0.4-0.7 mil thick minimum] [A44 dark bronze anodized
coating complying with AAMA 611-98, 0.7 mil thick minimum] [Fluoropolymer 2-coat,
70% Kynar 500/Hylar 5000 resin base coating complying with AAMA 2604-98, color to
be [ ] as selected from manufacturers standard color offering]
6. Condensation Control: Drainage slots to carry all moisture to the outside as described
on the tested units.
7. Acceptance #: 04-0302.01
8. Size: Not to exceed 80” x 96” inside curb dimensions.
2.04 ACCESSORIES
A. Saf-T-Guard Fall Protection Screen: Fall protection screen shall be of welded wire
construction using 5 gauge galvanized wire with a 4” x 4” grid pattern. Protective screens shall
comply with OSHA General Industry Standards 1910.23(e)(8).
B. Burglar Bars/Security Grill: Burglar Bars shall be ½” diameter steel bars at [8” x 8” O.C]
[8” x 12” O.C.] [12” x 12” O.C.] with steel angle 1½” x 2” x 1/8” on 2 sides and are prime
painted white.
2.05
A.
2.06
A.
RELATED MATERIALS
Related Materials: Refer to other sections listed in Related Section paragraph herein for
related materials.
SOURCE QUALITY
Source Quality: Obtain unit skylights from a single manufacturer.
PART 3 - EXECUTION
Specifier Note: Article below is an addition to the CSI SectionFormat and a supplement to
MANU-SPEC. Revise article below to suit project requirements and specifier's practice.
3.01
A.
3.02
A.
MANUFACTURER'S INSTRUCTIONS
Compliance: Comply with manufacturer's product data, including product technical bulletins,
product catalog installation instructions and product carton instructions for installation.
EXAMINATION
Site Verification of Conditions: Verify substrate conditions, which have been previously
installed under other sections, are acceptable for product installation in accordance with
manufacturer's instructions.
1. Take field dimensions and examine conditions of substrates, supports, and other conditions
under which work is to be performed and notify Contractor, in writing, of circumstances
detrimental to proper completion of work. Do not proceed with work until unsatisfactory
conditions are corrected.
3.03
A.
PREPARATION
Adjacent Surfaces Protection: Protect adjacent work areas and finish surfaces from damage
during product installation.
Specifier Note: Coordinate article below with manufacturer's recommended installation details
and requirements.
3.04
A.
INSTALLATION
Unit Skylight Installation:
1. Match profiles, sizes and spacings indicated on approved shop drawings.
2. Coordinate installation with adjacent work such as roofing, sheet metal and other work to
ensure creation of a complete weatherproof assembly. Anchor work securely to supporting
structure, but allow for differential and thermal movement.
3. Isolate between aluminum and dissimilar metals with a protective coating or plastic strip to
prevent electrolytic corrosion.
B.
Related Products Installation: Refer to other sections listed in Related Section paragraph
herein for related products installation.
Specifier Note: Coordinate article below with Division 1 Execution Requirements (Starting And
Adjusting, Cleaning, and Protecting Installed Construction) Section.
3.05
FIELD QUALITY REQUIREMENTS
A.
3.06
Site Tests (Installation and Post Installation Testing): [Specify applicable test
requirements to be performed during and/or after product installation.]
ADJUSTING
A.
Adjusting: After installation, remove shipping clips from components. Do not remove "risk-offall" labels from units. Touch-up and repair minor damage to eliminate all evidence of repair.
Remove and replace work which cannot be satisfactorily repaired.
Specifier Note: Coordinate article below with Division 1 Execution Requirements (Cleaning)
Section.
3.07
A.
CLEANING
Cleaning: Remove temporary coverings and protection of adjacent work areas. Repair or
replace damaged installed products. Clean installed products in accordance with
manufacturer's instructions prior to owner's acceptance. Remove construction debris from
project site and legally dispose of debris.
1. Clean all exposed surfaces including metal and glazing using non-abrasive materials and
methods recommended by manufacturer of material or product being cleaned. Remove and
replace work that cannot be successfully cleaned.
2. Reclean as necessary to prevent damage. Protect completed work from damage and
deterioration and inspect immediately before final acceptance of project.
Specifier Note: Coordinate article below with Division 1 Execution Requirements Section.
3.08
A.
PROTECTION
Protection: Protect installed product and finish surfaces from damage during construction.
END OF SECTION 08620
Conditions of Use: Guide specifications must be modified for use on individual projects. Naturalite® Skylight
Systems, its agents, and employees make no warranties express or implied by operation of law or otherwise
made with respect to the cover sheet or specifications, including any implied warranties of merchantability or
fitness for a particular purpose. © 2006 Naturalite® Skylight Systems. All Rights Reserved. A copyright license
to reproduce this specification is hereby granted to non-manufacturing architects, specification writers, and
designers.