Tender for Internet Bandwidth

advertisement

REQUEST FOR PROPOSAL

PROVISIONING OF i) INTERNET BANDWIDTH INCLUSIVE OF LAST MILE

ACCESS NETWORK OVER ETHERNET INTERFACE

UPTO WEBEL BHAVAN & ii) POINT-TO-POINT LEASED DATA CIRCUIT OVER

ETHERNET INTERFACE BETWEEN SDF BLUILDING

(1

ST

FLR ) TO WEBEL BHAVAN

Tender No. WBSWAN/Internet/2009-2010/3 dated 01.06.2009

West Bengal Electronics Industry Development Corporation Limited,

Webel Bhavan, Block-EP&GP,Sector-V,Saltlake, Kolkata-700091

Webel invites tender for supplying Internet Bandwidth inclusive of Last Mile Access Network upto its HQ over Ethernet Interface as well as Point-to-Point Leased Data Circuit over Ether net

Interface between its SDF Building office (1 st flr) to HQ at Webel BHavan. There must be provision of increasing the bandwidth to any desired higher value on demand for a limited time.

Webel reserves the right to buy any quantity of bandwidth from any single or combination of vendors on account of technical/security/redundancy reasons.

Prospective Internet Service Providers (ISPs) having Category-A ISP License & Basic Service

Operator License must submit their tender document in the following format. Deviations from this format will automatically disqualify the offer. Please ensure that each of the following items below is filled up but please be brief and to the point.

E

LIGIBILITY

C

RITERIA

Please fill your details in the table below. Please note that the maximum permissible lead time for commissioning the link is 07 calendar days.

Total

Bandwidth sold outside

India

Internet Connectivity via (Strike out the options not applicable )

Lead Time

Required for Link

Commissioning

(max 07 calendar days)

Company

Name, Postal

Address,

Contact

Details, Phone,

Email

Total

Bandwidth sold in India

Asia-Pacific

Europe

USA

Please fill up the details about your top 10 customers (ranked in terms of Bandwidth serviced) in India.

Company Name Contact Person Details with Phone, Email Address etc

Bandwidth

Sold

Please note that the Tender Evaluation Committee considers your client base to be important criteria for short listing potential bandwidth suppliers.

Compliance of the ISP Service

Criteria

The bidder must be a Category- A ISP license holder. (Provide

Document)

Compliant (YES/NO)

The bidder must be a Telecom Service Provider having Basic

Service Operator ( BSO) license & having its own Telecom

Network across the length & breadth of India.

Direct peering with multiple (at least 10) upstream providers in different geographies in the world.

Direct connectivity to the IP exchange in US/UK/India

Local peering, within India, with multiple ISPs.

The ISP must have centralized trouble ticketing tool for call logging, monitoring and troubleshooting purpose

ISP must provide Internet Bandwidth to Customer Premises inclusive of its last mile Access Network upto State HQ PoP of

WBSWAN at Webel Bhavan, Sector-V, Saltlake, Kolkata-7000091.

Average latency should not be more than 350ms up to ISP’s 1st

Tier 1 peering point.

The ISP should be able to provide online usage report through web.

MTTR should be a maximum of 12 hours, including the last mile connectivity medium

Any civil permission for laying of Cables must be the responsibility of the ISP.

Service Level Agreement (SLA) >99.5%. ( it is preferred to provide

>99.7% SLA)

{Note: Webel has specific QoS parameters regarding the Internet link installation and its access. The QoS definitions (such as uptime, mean time between failures, latency, throughput etc) are clearly defined in the Appendix. In the event of violations of the QoS parameters defined in the SLA the service credit mechanism defined in the Appendix will be invoked. In order to qualify for the tender, the ISP offering their service must clearly certify that they will abide by the stated QoS specifications. }

Please include a brief description about your technical/administrative support team and your complaint redressal mechanism in the table below. Round-the-clock complaint registration and follow up is a minimum. Please define your organizational escalation matrix clearly.

Structure of Technical/ Administrative

Support Team and Escalation Matrix

Complaint Registration Alert Mechanism for

Informing Customers

24x7

T

ECHNICAL

S

PECIFICATIONS

Customer Premises Equipment (CPE) to be used ( Please fill the table below ):

{Note: Webel prefers to have direct fibre access which can plug into routers/network equipment over Ethernet Interface}

Specification Cost Will be supplied by the ISP? Media Type

Yes/No (Choose One) Single/Multi Mode Fibre

(Choose one)

Please fill the table below about IP addresses and IP routing}: .........

Option A

Option B

Option C

Option D

Number of IP Addresses

Provided

Willing to Advertise Webel’s routing information (e.g. via BGP etc) if Webel provides own public IPs

Yes/No

Yes/No

Yes/No

Yes/No

C

OMMERCIAL

O

FFER

A) Annual Charges for the following Internet bandwidth all inclusive, inclusive of local loop charges over Ethernet Interface upto State HQ PoP of WBSWAN at Webel

Bhavan,Kolkata ]:

Link

Capacity

Installation

Charges

Service Tax on

Installation

Charges

Internet

Bandwidth

Charges per

Month

Service Tax on Internet

Bandwidth

Charges

Local Loop

Charges per Month

Service Tax on Local

Loop

Charges

Total

Monthly

Charges

(Internet

Bandwidth inclusive of

Local Loop

Charges over

Ethernet

Interface)

1 Mbps

(1:1)

2 Mbps

(1:1)

4Mbps

(1:1)

8 Mbps

(1:1)

Special note : For two separate Local Loop Charges ( Point-to-Point Leased data circuit over Ethernet Interface) installation charges will be applicable for one only instead of two separate charges.

B) Annual Charges for the following Point-to-Point Access bandwidth (exclusive of Internet

Bandwidth) over Ethernet Interface between Webel office at SDF Building (1 st floor) to State

HQ PoP of WBSWAN at Webel Bhavan,Kolkata

Link

Capacity

Installation

Charges

2 Mbps (1:1)

4 Mbps (1:1)

6 Mbps (1:1)

8 Mbps (1:1)

Service

Taxes on

Installation charges

Local Loop Charges ( Pointto-Point Leased data circuit over Ethernet Interface)

Service

Tax on

Local

Loop

Charges

Total

Monthly

Charges

Special note : 2 separate point-to-point data circuit with same end points are required.

For two separate Local Loop Charges ( Point-to-Point Leased data circuit over Ethernet

Interface) installation charges will be applicable for one only instead of two separate charges.

C) Higher Bandwidth On Demand

Incremental

Bandwidth

Minimum

Available

Period (MAV)

Addln.

Bandwidth

(Port) Charges per MAV

Svc Tax on Port

Charges

Addn.

Local Loop

Charges

Svc Tax on Local

Loop

Charges

Total

Charges per MAV

Termination equipment provided by the Service Provider should be placed in such a way that at given point of time Internet Bandwidth inclusive of last mile access network would be increased upto 24 Mbps within 3 days notice. Minimum Available period should be maximum 7 days.

A

PPENDIX 1

: S

ERVICE

L

EVEL

A

GREEMENTS

R ELIABILITY I SSUES

Please mention the Redundancies incorporated into your IP Network: ........................

International

Partner

Name

Media

Type

Capacity of the

Connection

Routing

Path

Number of hops and average roundtrip delay to

YAHOO

Number of hops and average roundtrip delay to

GOOGLE

{Note: In the table above, please mention here details such as: a) Media such as VSAT, submarine cable plants etc.

b) Mention your International partners such as FLAG, TYCO, I2I, SE-MEA-WE 4 etc. Webel prefers that the applicant ISP have more than one such partner. c) Mention the type of connectivity to each of the partner network, i.e. multiple STM-1 link etc and in each case mention the Routing Path (i.e. if the link is on the transatlantic or transpacific route). d) Webel may conduct field experiments from time to time to ascertain if QoS levels are being maintained. Webel reserves the right to cancel the contract under repeated violations of the specified and mutually agreed QoS parameters.}

Q O S I SSUES

PACKET TRANSMISSION QUALITY

The ISP will designate routers in India and other key countries. The expected average roundtrip transmission delays between these designated routers are to be calibrated as below:

Country

USA

UK

Singapore

Hong Kong

Tokyo

Australia

Korea

Upper Limit on Round

Trip Delay

Brazil

South Africa

Packet

Percentage

Loss

These benchmark timings and packet loss percentage figures will serve as reference points during the field tests periodically conducted by Webel team once the circuit goes live.

The ISP must provide a usage report like MRTG that can be accessed directly by Webel team.

S ERVICE C REDITS D URING I NSTALLATION

Webel will select a suitable ISP and place a Service Order on that party. It will also clearly spell out a deadline by which the link must be activated. Webel reserves the right to cancel the contract if the commissioning of the link is delayed beyond the stipulated date.

S ERVICE C REDITS DUE TO L INK U NAVAILABILITY

The link is deemed available only when bi-directional signal transmission is possible at a rate corresponding to the channel capacity of the link while meeting the prescribed SLA parameters; otherwise the link is considered to be “Unavailable”.

The ISP will use reasonable endeavours to ensure that the link availability is maintained at the prescribed QoS levels. The link connectivity and the QoS levels will be monitored continuously.

During every 24 hour period (starting with 00:00 hrs till and ending with 00:00 hrs next day), if

there is a loss of connectivity (or poor QoS levels) for more than 59 minutes, Webel will be entitled to claim the prorated charges for one day of the monthly fees as service credit.

Procedure for Tender Processing,

Note I:

Vendor/bidder must confirm the following standards in the prepa ration of the Vendor’s Proposal.

1. For this tender ‘Single stage-Single envelope Procedure’ as per open competitive bidding is adopted & sealed bids should be submitted.

2. Proposals sent by fax or email will not be accepted.

Technical Proposal a. Registered Name of the Organization. b. National Tax Number, Sales Tax Number and TNGST Number. c. Copy of ISP License/ BSO license d. Head Office address. e. Management structure & Organization Chart. f. Name, Address with Telephone and Fax numbers of the contact Person. g. Financial st atus of the Vendor’s/Bidder’s Organization with supporting documents and last two years annual reports. h. List of clients and their Acceptance of deliverables, showing separately the items provided and value thereof. i. Performance of the organization on last three completed projects and the project cost. j. Webel reserves the right to reject any or all Bids/Offers without assigning any reason or cancel the process at anytime. k. Technical Proposal must include the complete solution proposed by the Vendor with filled-in l. specification sheets marked with Yes or No in the compliance column. m. If the specification sheets ask for providing any details, those should be provided as attachment to the Technical Proposal.

Financial Proposal a. Financial Proposal will include the prices quoted for each equipment/service as per the requirement. b. The quoted prices must include all taxes, customs and freight charges for delivery at the required locations at own risk and cost. c. Rate for the next six months shall be 90% of the rates finalized for the first six months. d. All prices to be quoted in Indian Rupees , and must clearly state all applicable taxes which must be included in quoted price. e. The successful tenderer should furnish to the tune of 10% Bank Guarantee of the total value Of the accessories before releasing the purchase order. f. Webel is not responsible for any delays in delivery of equipment. Any Proposal or Bid received after Bid submission time will be unopened.

Webel reserves the right to cancel the tender either in full or part without assigning any reason.

Time Line

Tender Submission due Date & Time : 08.06.2009 at 15.00 hrs

Tender Opening Date & Time : 08.06.2009 at 16.00 hrs

________________________

Tender to be addressed to the following address mentioned below:

Executive Director (Technical)

West Bengal Electronics Industry Dev. Corpn. Ltd.,

Webel Bhavan, Block-EP&GP, Sector-V,

Salt Lake ,Kolkata-700091

Download