PREBID MEETING HELD ON 25 Oct 2013 Addendum For Installation of HVAC system in a building at IST, Islamabad Points raised during pre-bid meeting held on 25 Oct 2013 are as under:-. 1. Date of Bid Submission Bids will be received on 04 Nov 2013 before 1000 hours and will be opened on same date at 1030 hrs. 2. Item 1 Total outdoor units are 15 as given in this item, Unit No 16 shown does not exist and may be ignored. 3. Item 2 is for 100% fresh Air Units with humidifiers, based on 43.9 deg C dry bulb and 28,3 deg C wet bulb C temperature in summer and 0.6 deg C dry bulb and 99% RH in winter. 4. Item 3 & 4 is related to Indoor units. The Indoor Units Given In Schedule On Drawing No 1 Are Correct, As Per Following Details: a. Floor and Number Wise Indoor Units In BOQ (Wall Mounted, Cassette Type & Floor Mounted Are As Under: i. The Unit # 58 To 73 (1.5 Tons) 16 Units Are Wall Mounted. On Lower Ground Units No 158, 159 And 160 Units Have Been Changed From Cassette To Vertical type, However, 158-A, 159-A and 160-A are New Addition as Stand-By Vertical Units. Rest Of The Units are all Cassette Type. b. All Cost Of Y-Connectors And The Cost Of Expansion Valves Will Be Included In The Cost Of Units. c. 5. Item 5 Supply And Installation Of Sheet Metal Ducting Complete In All Respect As Shown On The Drawings, Complete With Accessories Hangers, Supports & As Approved By The Engineer/Consultant: Page 1 of 5 22 Gauge 2500 Sq. ft 24 Gauge 18528 Sq. ft 26 Gauge 1250 Sq. ft 6 Item 6 Supply & installation of following Aluminum Foil Fiber Glass 16kg/m3 density) insulation wrapped with Aluminum tape and shall be protected with 8 oz canvas, complete in all respect as shown on the drawings as approved by the engineer/consultant: Sound liner 1'' thick Thermal insulation 1'' thick Thermal insulation 2'' thick 2860 17150 1860 Sq. ft Sq. ft Sq. ft 7 Item 7 Supply& installation of Refnet Y Connectors for phase 1 as per specification and thickness shall not be less than 18 gaugeand shall be included in the cost of indoor units. 8 Item 8 Supply and Installation of refrigerant pipes type L thickness not less than 20 gauge (Liquid+Gas) with expanded rubber foam insulation for Multi Split type A/C units good quality cable try from each FCU to outdoor units installed on roof top, including control wiring, Flushing, gas charging, hangers, supports and brackets of following sizes all refrigerant pipes should be in PVC Dura Duct as approved by the Engineer/consultant: 6.35mm x t0.8 1450 Rft 9.52 mm x t0.8 1850 Rft 12.7 mm x t1.0 1450 Rft 15.88 mm x t1.2 8.6 mm x t1.2 41.3 mm x t1.6 3320 702 710 Rft Rft Rft 34.9 mm x t1.4 270 Rft 22.2 x t1.2 650 Rft 9 Item 9 Supply and Installation of PVC condensate drain pipe with insulation from each FCU to condensate tank complete in all respect ready to operate as approved by the Engineer/Consultant. Quantity-1 Lot 10 Item 10 Supply& installation ofRefnet Y Connectors for phase 2 as per specification and thickness shall not be less than 18 gaugeand shall be included in the cost of indoor units. 11 Item 11Supply & installation of Communication cable complete project forMDS units complete in all respect, as approved by the Engineer/ Consultant. Quantity- 1 Lot Page 2 of 5 12 Item 12 Supply and installation of Aluminum Registers for supply of fresh air and exhaust air of following sizes, complete in all respect, support and other accessories etc. Make: Steel Craft, as approved by the Consultant: For Basement floor SAD 24'' x 6'' For Lower Ground Floor SAD 24'' x6'' For Upper Ground floor SAD 24''x 6'' 3 9 24 No. No. No. For First Floor For First Floor For Second Floor 10 No. 40 40 No. No. SAD 24'' x 6'' SAD 24'' x 12'' SAD 24'' x 3'' 13 Item No 13Supply and Installation of Electronic Expansion valve (EXV) as per manufacturer's recommendation and approved by the Engineer/consultant. The price of this item shall be included in the cost of indoor units. 14 Item No 14Supply and installation of Best quality PVC water tank 500 gallons normally used as overhead tank for condensate including level automatic controller with upper and lower level sensor complete in all respect as approved by the Engineer/consultant.Quantity-1 No. 15 Item No 15Supply & installation of Centrifugal Pump as specified (25 GPM) against 20 ft head, suitable to throw condensate water collected in the tank from basement to lower ground floor in open space as shown on the drawings through automatic water level controller complete in all respect and as approved by the Engineer/consultants. Quantity- 1 No. 16 Item No 16Supply and installation of electrical DB for air conditioning with incoming and outgoing circuit breakers with AEG/ Hager/Terasaki/Fuji/BB including bus bar volt & Ampere meters, selector switch phase indicator lamps complete in all respect approved equivalent by the engineer/consultant of following capacity. Quantity-1 No. Incoming 1800 ATP MCCB 1 No. Outgoing 200 ATP MCCB 11 No. Outgoing 150 ATP MCCB 5 No. Outgoing 130 ATP MCCB 2 No. Outgoing 125 ATP MCCB 3 No. Outgoing 100 ATP MCCB 3 No. Outgoing 3 No. 80 ATP MCCB Page 3 of 5 17 Item No 17Supply and installation of copper conductor power cables make by Pakistan Cables/ AEG Cables/ New Age cables or approved equivalent cables by the Consultant in cable tray from DB to all out door units installed on roof as shown on the drawings in cable trey , complete in all respect as and as approved by the Engineer/consultant as detailed below: 3.5 core 300 mm sq 660 Rft 3.5 core 35 mm sq 1270 Rft 3.5 core 25 mm sq 80 Rft 3.5 core 16 mm sq 65 Rft 3.5 core 30 mm sq 1 Rft 3.5 core 18 mm sq 1 Rft 3.5 core 10 mmsq 1 Rft 3.5 core 5 mmsq 1 Rft 18 Item No 18Construct, fabricate and install Foundation structure for frame for placing condensing units in consultation with structural Engineer of the client. Quantity-17 No. 19 Item No 19 Supply of Manufacture's recommended spare parts for all above items for 2 years normal operation as approved by the engineer/ Consultant. ( provide list) Quantity- 1 Lot 20 Item No 20Supply of Digital type Wall mounted temperature and humidity indicator. Quantity-12 No 21 Item No 21Make wall openings in concrete walls of lift well and provided 1'' thick wooden Box in the openings as per sizes given on the drawings complete in all respects as per satisfaction of Engineer/Consultant. Quantity -1 Lot. 22 Item No 22Testing, balancing & commissioning of the system. Quantity- 1Lot 23 Item No 23Operation and maintenance of the system (8:00) hr at least one month operation in summer and one month in winter. Quantity- 1Lot 24 Item No 24After completion of commissioningprepare as build drawing for the record of the client after obtaining approval of the engineer/consultant. Quantity-1Lot Page 4 of 5 25 Chinese equipment shall be quoted separatelyas proposal # 1 and Japanese, Korean and Malaysian equipment as proposal # 2. 26 Earnest money should be in Pay Order. 27 Following Advance payments can be taken against scheduled bank guarantee: i. ii. iii. iv. On approval of Technical submittals by the consultant. On opening LC. On production of Bill of Lading On delivery of equipment at site against theft insurance. 10% 10% 10% 20% Page 5 of 5