Name: - Qatarmark.com

advertisement
CURRICULUM VITAE
Hydrogeologist
Proposed Position:
Name:
Profession:
Name of firm :
Asiimwe Allan
Hydrogeologist
Wallan Aquatech Engineering And
Consulting Ltd
P.O Box 3270 Kampala
Permanent address:
Specialization:
Nationality:
Year of birth:
Years with firm:
Ugandan
1978
1 year
Relevant experience:
12 years

Geophysical investigations


Drilling supervision


Interpretation
of geophysical
measurements using Winsev 6

Data analysis of pump test
results

Civil/ construction works

Preparation
of
reports on projects

Rain water harvesting systems

Preparation of Contract and
bidding documents

Sub surface dam, weirs and
sand dam site identification and
construction.
Capacity building in rural water
source maintenance( training of
hand pump mechanics and
water user committees)

Community
hygiene
and
sanitation promotion by PHAST
and CTLS approaches

Test
pumping
supervision,
casting and installation of
boreholes
GIS and Mapping
completion

Key Qualifications
Mr. Asiimwe Allan is a hydrogeologist with relevant experience in geophysical investigations, drilling
supervision, test pumping supervision, casting and installation of boreholes, supervision of hydrofracturing, water treatment, sewage treatment, distribution network/supply systems of water and building
construction.
Mr. Allan is conversant with different types of software to analyze geophysical and hydrogeological
information. Mr. Allan is well acquainted with all aspects of rural water supply implementation projects.
Education
2009-2012
Bsc. Civil Engineering, Ndejje University
2002
Diploma in Water Engineering from Kyambogo University
1999
Uganda Advanced Certificate of Education, Mbarara high school.
CURRICULUM VITAE
1997
Uganda Certificate of Education, Nganwa high school.
Professional Experience
2014-Date
2010- 2013
2013
2013
2013
2013
2012
2012
2011
2010
2010
2010
2010
2010
2010
2010
2010
HYdrogeologist; KLR (U) Ltd a contracting drilling company based in Uganda Kampala
Hydrogeologist, Institute For International Cooperation And Development,
Kampala Uganda. (NGO) an Italian Non govemental organization, I was responsible
for Hydrogelogical surveys, drilling supervision, Aquifer testing and Analysis and
installation of pumps. The fallowing projects were done.
Carried out the geophysical investigation of 20 boreholes in Moroto District ( Client
Moroto Local government)
Carried out geophysical investigation of 10 boreholes in Napak District.( Client: Napak
Local government)
Carried out geophysical survey of 12 boreholes in Districts of Abim, Kotido, Kaabong
and Kitgum ( Client: Mercy corps)
Carried out geophysical investigation of 7 boreholes in the District of Amolu. ( Client:
World Vision )
Carried out the geophysical investigation, drilling supervision of 15 wells drilled under
the funding of GIZ.
Presently overseeing drilling 20 wells with Karamoja sub region. The works includes
geophysical survey, drilling supervision and installation of 20 boreholes with hand
pumps. ( Client;Unicef)
Carried out geophysical and hydro geological investigation of 70 boreholes with in the
seven districts of Karamoja Sub region. This was aimed at increasing access to safe
water points to rural communities, Health Centre and Primary Schools
(Client: UNICEF).
Carried out the Geophysical surveys for 18 boreholes in the District of Moroto, in which
funding was by Italian Government through the Institute for Cooperation and
Development, C&D)
Carried out the Geophysical survey for 6 boreholes in Kapedo Kaabong District (Client
MANOS in Collaboration with Kapedo Catholic Mission).
Carried out the Geophysical surveys for 5 boreholes in Iriiri Sub County Moroto District
(Client: GTZ).
Carried out the Geophysical surveys for 7 boreholes in Lorengedwat and Lotome Sub
Counties Nakapirpirit and Moroto District respectively (Client: Welt hunger hilfe).
Carried out hydrological and geophysical survey for 3 boreholes in Nabwal Iriiri Moroto
District (Client: Clide Consultancy).
Carried out geophysical survey for 3 boreholes in Matany Sub county (Client: Matany
Hospital)
Carried out the hydrological and geophysical survey for 2 boreholes in Iriiri ( Client:
KDDS)
Took part in the identification and construction of rain water harvesting system in
Lokopo. This was done in pattern ship with ASAL Consultants of P.O box 739,Sarit
Nairobi, Kenya. The project was funded by the office of the Prime minister Uganda
( OPM)
CURRICULUM VITAE
2010
2008-2009
2007-2002
2007
2007
2006
Took part in the identification and construction of a Sub surface dam in Lotome Napak
District. This was done in pattern ship with ASAL Consultants of P.O box 739,Sarit
Nairobi, Kenya. The project was funded by the office of the Prime minister Uganda
( OPM)
Technical Manager, KLR UGANDA LTD. In which I was responsible in giving technical
guidance and back up to the field team, Contracts robbing, preparing Bidding
Documents, Bill of Quantities and proper analysis of field data for both Drilling and Test
pumping and doing the cost analysis of the project.
WE Consult, Kampala, Uganda. Involved in the following projects:
Managed and supervised drilling, test pumping, casting and hand pump installation of
187 bore holes in Rwanda, on behalf of the Rwandan Government. The contracted
drilling companies were Saba engineering, China Geo-engineering corporation and
Drillicon. Client: PDRCIU, Funding: IFAD and OPEC.
Supervised and managed rehabilitation of 10 boreholes in Lira District. This included
Borehole assessment, flushing, pumping test, casting and borehole installation. (Client:
IRC)
Pimping test and data analysis of one hand pump borehole in Mubende District (Client:
Sumadhura Technologies)
2006
Drilling supervision and testpumping of one hand pump bore hole in mpigi District
(Client: Rotary club. Funded by Rotary international.
2006
Involved in various ongoing small water projects for private individuals, farms and
institutions. Works include supervision of drilling, testpumping and report writing.
2006
Testpumping and data analysis of pump-test results of 9 shallow wells in the District of
Oyam ( Client: Caritas-Lira )
2006
Water assessment of existing 14 boreholes in the districts of Kitgum and Pader (Client:
AVSI)
2006
Test pumping and casting supervision of 11 boreholes in Kitgum district (Client: MSFHolland)
Drilling supervision of 11 bore holes in the district of Kitgum ( Client: MSF-Holland)
2006
2006
2006
WE-CONSULT database management; sorting of five data bases; RUWASA,
DRILLICON,SUMADHURA, AFRIMAX, DWD/WRMD and WE CONSULT, processing
and editing
It into the we consult standard format
Test pumping supervision of 12 boreholes in districts of Kitgum and Pader.(Client:
Oxfam).
CURRICULUM VITAE
2006
KUMI HOSPITAL WATER SUPPLY AND SANNITATION PROJECT
Site supervisor to complete works on construction of the water supply for Kumi
Hospital. Project structure; 8 km pipeline, 6 boreholes equipped with handpumps,
rehabilitation of storage tanks and distribution network, installation of a pressure sand
filter, construction of latrines, toilets, bathing shelters and sensitization of communities.
(Client: Kumi Hospital, Funding: TCF / CBM).
2005
Took part in geophysical/ hydrogeological investigations for 23 handpump boreholes in
Kitgum district (Client: MSF-holland).
2005
Drilling supervision of 5 boreholes in Lira district which involved logging, well designs
and construction. Client: MSF-Holland).
2005
Test pumping supervision of 10 of the 28 boreholes drilled in Lira district. (Client: MSFHolland).
2005
Test pumping supervision of 5 boreholes in Sudan (Client: PDM associates)
2005
Did the geophysical/ hydro geological investigations for 8 boreholes in the areas of
Rwamagana and Kibungo in Rwanda (Client: JICA).
2004
Testpumping supervision of 3 boreholes rehabilitated in Tororo District (Client: Tororo
Local Government).
2004
Test pumping supervision of 8 boreholes in Tororo district (Client: Tororo Local
Government).
2004
Test pumping of 2 production boreholes in Fiduga estates which involved observation
of the surrounding water bodies in relation to pumping.
2004
Test pumping supervision of 3 production boreholes in Hoima under the mid western
towns water and sanitation project.
2004
Supervision of hydro-fracturing, test pumping, casting and installation of 1 borehole for
Kidera Health Centre, Kamuli District (Client: Arab contractors).
2003
Assessing and monitoring of existing water sources in Mubende. Taking PH, Temp, EC
and yield for operational boreholes and protected springs, static water levels for nonoperational boreholes including data processing. This was under Mid Western Towns
Water and Sanitation project (Client: Directorate of Water Development, Funding: EDF).
2003
Test pumping supervision of 2 production wells in Mubende as well as being involved in
drilling supervision.(Client: Directorate of Water Development, Funding: EDF)
2002
Trainee with National Water and Sewerage Corporation. Trained in the following:

Water treatment which involved pumping water from the source(R.Rwizi),
aeration, sedimentation and chlorination

Water quality analysis in which we were to see that it’s up to international
standards of portable water. This was done by observing the level of chlorine,
CURRICULUM VITAE
turbidity and watercolor among others

Distribution network which involved all the plumbing works to the customers.

Sewage treatment which involved the maintenance of stabilization ponds.
Some of field pictures and Data Computerization
Allan on site identification and the analysis
Allan on drilling supervision and rehabilitation
Allan carrying out Aquifer testing and Analysis
Languages:
Language
English
Runyakitara
Luganda
Kinyarwanda
Reading
Excellent
Excellent
Good
Good
Speaking
Excellent
Excellent
Good
Fair
Writing
Excellent
Excellent
Fair
Fair
CURRICULUM VITAE
Contact me on,
+256774856179 or +256759936825
Email: coopdev.allan@gmail.com
allan.asiimwe@yahoo.com
Certification
I, the undersigned, certify that to the best of my knowledge and belief, these data
correctly describe my qualifications and professional experience,
Date:
08/08/2014
Name Staff Member
Asiimwe
Allan
Referees
1. Mr. Byaruhanga Vicent
Project Manager TGS Uganda
Tel. +256772869119/+256775107473
2. Mr. Tom Olukwita
Project manager We- consult Uganda
Tel. +256772465497/+256772222011
3. Mr. Dismus
Director Modern Contractors Rwanda
Tel. +250788307733
4. Mr. Theophillus Emanu
Food and Nutrition Security and Conflict Management Expert GTZ Moroto
Tel. +256777332959
5. Mr. Mercelo Corraza
Managing Director Wallan Aquatech Engineering and Supplies Ltd Uganda
Tel. +256782008047
Download