CURRICULUM VITAE Hydrogeologist Proposed Position: Name: Profession: Name of firm : Asiimwe Allan Hydrogeologist Wallan Aquatech Engineering And Consulting Ltd P.O Box 3270 Kampala Permanent address: Specialization: Nationality: Year of birth: Years with firm: Ugandan 1978 1 year Relevant experience: 12 years Geophysical investigations Drilling supervision Interpretation of geophysical measurements using Winsev 6 Data analysis of pump test results Civil/ construction works Preparation of reports on projects Rain water harvesting systems Preparation of Contract and bidding documents Sub surface dam, weirs and sand dam site identification and construction. Capacity building in rural water source maintenance( training of hand pump mechanics and water user committees) Community hygiene and sanitation promotion by PHAST and CTLS approaches Test pumping supervision, casting and installation of boreholes GIS and Mapping completion Key Qualifications Mr. Asiimwe Allan is a hydrogeologist with relevant experience in geophysical investigations, drilling supervision, test pumping supervision, casting and installation of boreholes, supervision of hydrofracturing, water treatment, sewage treatment, distribution network/supply systems of water and building construction. Mr. Allan is conversant with different types of software to analyze geophysical and hydrogeological information. Mr. Allan is well acquainted with all aspects of rural water supply implementation projects. Education 2009-2012 Bsc. Civil Engineering, Ndejje University 2002 Diploma in Water Engineering from Kyambogo University 1999 Uganda Advanced Certificate of Education, Mbarara high school. CURRICULUM VITAE 1997 Uganda Certificate of Education, Nganwa high school. Professional Experience 2014-Date 2010- 2013 2013 2013 2013 2013 2012 2012 2011 2010 2010 2010 2010 2010 2010 2010 2010 HYdrogeologist; KLR (U) Ltd a contracting drilling company based in Uganda Kampala Hydrogeologist, Institute For International Cooperation And Development, Kampala Uganda. (NGO) an Italian Non govemental organization, I was responsible for Hydrogelogical surveys, drilling supervision, Aquifer testing and Analysis and installation of pumps. The fallowing projects were done. Carried out the geophysical investigation of 20 boreholes in Moroto District ( Client Moroto Local government) Carried out geophysical investigation of 10 boreholes in Napak District.( Client: Napak Local government) Carried out geophysical survey of 12 boreholes in Districts of Abim, Kotido, Kaabong and Kitgum ( Client: Mercy corps) Carried out geophysical investigation of 7 boreholes in the District of Amolu. ( Client: World Vision ) Carried out the geophysical investigation, drilling supervision of 15 wells drilled under the funding of GIZ. Presently overseeing drilling 20 wells with Karamoja sub region. The works includes geophysical survey, drilling supervision and installation of 20 boreholes with hand pumps. ( Client;Unicef) Carried out geophysical and hydro geological investigation of 70 boreholes with in the seven districts of Karamoja Sub region. This was aimed at increasing access to safe water points to rural communities, Health Centre and Primary Schools (Client: UNICEF). Carried out the Geophysical surveys for 18 boreholes in the District of Moroto, in which funding was by Italian Government through the Institute for Cooperation and Development, C&D) Carried out the Geophysical survey for 6 boreholes in Kapedo Kaabong District (Client MANOS in Collaboration with Kapedo Catholic Mission). Carried out the Geophysical surveys for 5 boreholes in Iriiri Sub County Moroto District (Client: GTZ). Carried out the Geophysical surveys for 7 boreholes in Lorengedwat and Lotome Sub Counties Nakapirpirit and Moroto District respectively (Client: Welt hunger hilfe). Carried out hydrological and geophysical survey for 3 boreholes in Nabwal Iriiri Moroto District (Client: Clide Consultancy). Carried out geophysical survey for 3 boreholes in Matany Sub county (Client: Matany Hospital) Carried out the hydrological and geophysical survey for 2 boreholes in Iriiri ( Client: KDDS) Took part in the identification and construction of rain water harvesting system in Lokopo. This was done in pattern ship with ASAL Consultants of P.O box 739,Sarit Nairobi, Kenya. The project was funded by the office of the Prime minister Uganda ( OPM) CURRICULUM VITAE 2010 2008-2009 2007-2002 2007 2007 2006 Took part in the identification and construction of a Sub surface dam in Lotome Napak District. This was done in pattern ship with ASAL Consultants of P.O box 739,Sarit Nairobi, Kenya. The project was funded by the office of the Prime minister Uganda ( OPM) Technical Manager, KLR UGANDA LTD. In which I was responsible in giving technical guidance and back up to the field team, Contracts robbing, preparing Bidding Documents, Bill of Quantities and proper analysis of field data for both Drilling and Test pumping and doing the cost analysis of the project. WE Consult, Kampala, Uganda. Involved in the following projects: Managed and supervised drilling, test pumping, casting and hand pump installation of 187 bore holes in Rwanda, on behalf of the Rwandan Government. The contracted drilling companies were Saba engineering, China Geo-engineering corporation and Drillicon. Client: PDRCIU, Funding: IFAD and OPEC. Supervised and managed rehabilitation of 10 boreholes in Lira District. This included Borehole assessment, flushing, pumping test, casting and borehole installation. (Client: IRC) Pimping test and data analysis of one hand pump borehole in Mubende District (Client: Sumadhura Technologies) 2006 Drilling supervision and testpumping of one hand pump bore hole in mpigi District (Client: Rotary club. Funded by Rotary international. 2006 Involved in various ongoing small water projects for private individuals, farms and institutions. Works include supervision of drilling, testpumping and report writing. 2006 Testpumping and data analysis of pump-test results of 9 shallow wells in the District of Oyam ( Client: Caritas-Lira ) 2006 Water assessment of existing 14 boreholes in the districts of Kitgum and Pader (Client: AVSI) 2006 Test pumping and casting supervision of 11 boreholes in Kitgum district (Client: MSFHolland) Drilling supervision of 11 bore holes in the district of Kitgum ( Client: MSF-Holland) 2006 2006 2006 WE-CONSULT database management; sorting of five data bases; RUWASA, DRILLICON,SUMADHURA, AFRIMAX, DWD/WRMD and WE CONSULT, processing and editing It into the we consult standard format Test pumping supervision of 12 boreholes in districts of Kitgum and Pader.(Client: Oxfam). CURRICULUM VITAE 2006 KUMI HOSPITAL WATER SUPPLY AND SANNITATION PROJECT Site supervisor to complete works on construction of the water supply for Kumi Hospital. Project structure; 8 km pipeline, 6 boreholes equipped with handpumps, rehabilitation of storage tanks and distribution network, installation of a pressure sand filter, construction of latrines, toilets, bathing shelters and sensitization of communities. (Client: Kumi Hospital, Funding: TCF / CBM). 2005 Took part in geophysical/ hydrogeological investigations for 23 handpump boreholes in Kitgum district (Client: MSF-holland). 2005 Drilling supervision of 5 boreholes in Lira district which involved logging, well designs and construction. Client: MSF-Holland). 2005 Test pumping supervision of 10 of the 28 boreholes drilled in Lira district. (Client: MSFHolland). 2005 Test pumping supervision of 5 boreholes in Sudan (Client: PDM associates) 2005 Did the geophysical/ hydro geological investigations for 8 boreholes in the areas of Rwamagana and Kibungo in Rwanda (Client: JICA). 2004 Testpumping supervision of 3 boreholes rehabilitated in Tororo District (Client: Tororo Local Government). 2004 Test pumping supervision of 8 boreholes in Tororo district (Client: Tororo Local Government). 2004 Test pumping of 2 production boreholes in Fiduga estates which involved observation of the surrounding water bodies in relation to pumping. 2004 Test pumping supervision of 3 production boreholes in Hoima under the mid western towns water and sanitation project. 2004 Supervision of hydro-fracturing, test pumping, casting and installation of 1 borehole for Kidera Health Centre, Kamuli District (Client: Arab contractors). 2003 Assessing and monitoring of existing water sources in Mubende. Taking PH, Temp, EC and yield for operational boreholes and protected springs, static water levels for nonoperational boreholes including data processing. This was under Mid Western Towns Water and Sanitation project (Client: Directorate of Water Development, Funding: EDF). 2003 Test pumping supervision of 2 production wells in Mubende as well as being involved in drilling supervision.(Client: Directorate of Water Development, Funding: EDF) 2002 Trainee with National Water and Sewerage Corporation. Trained in the following: Water treatment which involved pumping water from the source(R.Rwizi), aeration, sedimentation and chlorination Water quality analysis in which we were to see that it’s up to international standards of portable water. This was done by observing the level of chlorine, CURRICULUM VITAE turbidity and watercolor among others Distribution network which involved all the plumbing works to the customers. Sewage treatment which involved the maintenance of stabilization ponds. Some of field pictures and Data Computerization Allan on site identification and the analysis Allan on drilling supervision and rehabilitation Allan carrying out Aquifer testing and Analysis Languages: Language English Runyakitara Luganda Kinyarwanda Reading Excellent Excellent Good Good Speaking Excellent Excellent Good Fair Writing Excellent Excellent Fair Fair CURRICULUM VITAE Contact me on, +256774856179 or +256759936825 Email: coopdev.allan@gmail.com allan.asiimwe@yahoo.com Certification I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe my qualifications and professional experience, Date: 08/08/2014 Name Staff Member Asiimwe Allan Referees 1. Mr. Byaruhanga Vicent Project Manager TGS Uganda Tel. +256772869119/+256775107473 2. Mr. Tom Olukwita Project manager We- consult Uganda Tel. +256772465497/+256772222011 3. Mr. Dismus Director Modern Contractors Rwanda Tel. +250788307733 4. Mr. Theophillus Emanu Food and Nutrition Security and Conflict Management Expert GTZ Moroto Tel. +256777332959 5. Mr. Mercelo Corraza Managing Director Wallan Aquatech Engineering and Supplies Ltd Uganda Tel. +256782008047