Kaua`i Community College Annual Program Review for Media Services November 26, 2014 Program Description Unit Description: A subunit under Academic Support, four main technical specialties include: maintaining the campus media inventory, distance education, voice and data operation and maintenance, and production services. Kaua‘i Community College Media Services provides dependable, professional services, ranging from classroom media support and creative production services to advanced digital media communication applications. We use innovative and creative approaches to produce publications of the highest possible quality which enhance the college’s presence online and in print. Part I. Quantitative Indicators Annual Report of Academic Support Services Program Data Unit : Media Services Demand Campus Enrollment (FTE) Number of Faculty Number of Staff Efficiency Number of Media Staff Average Service Hours Number of Student Help Hours Number of Work Orders Completed Media Technical Number of Work Orders Completed Media Graphics Number of Copies Generated Number of Copies per FTE Student Hours of ITV/Videoconference Credit Courses Distance Students Proctored ITV/Videoconference Number of Videoconferences Hours of Videoconference Meetings Media Budget/FTE Student+Fac+Staff Classrooms Equipped/Total Classrooms Effectiveness Satisfaction Measurements: Classroom I am satisfied with the customer service. I am satisfied with the response/delivery time. If there are procedures for use of equipment, they are understandable. I am satisfied with the quality of the work. 1 Quantitative Measure 2010-2011 Quantitative Measure 2011-2012 Quantitative Measure 2012-2013 Quantitative Measure 2013-2014 775 68 81 780 71 85 802 72 93 814 74 89 3 74 NA 3 74 NA 3 74 NA 3 74 NA 550 588 562 557 355 339 347 424,000 547 1016/1342 160/35 196 392 $203,522/924=$220 37/48 600,000 770 705/1195 140/30 186 372 840,000 1,048 760/1561 90/20 207 414 699,000 860 1075/968 75/10 155 223 37/48 37/48 38/48 4.57 4.53 4.57 4.53 NA 76% NA 4.5 4.13 4.13 76% 4.7 4.55 4.55 54% 4.1 Satisfaction Measurements: Elec. Maint. & Repair I am satisfied with the customer service. I am satisfied with the response/delivery time. If there are procedures for use of equipment, they are understandable. I am satisfied with the quality of the work. Satisfaction Measurements: Faculty Workroom I am satisfied with the customer service. I am satisfied with the response/delivery time. If there are procedures for use of equipment, they are understandable I am satisfied with the quality of the work. Satisfaction Measurements: Graphics I am satisfied with the customer service. I am satisfied with the response/delivery time. If there are procedures for use of equipment, they are understandable. I am satisfied with the quality of the work. 4.57 4.55 4.57 4.55 NA 82% NA 4.7 4.19 4.19 78% 4.3 4.63 4.63 88% 4.5 4.73 4.73 4.73 4.73 NA 73% NA 4.7 4.5 4.5 72% 4.7 4.94 4.94 64% 4.6 4.11 4.04 46% 46% 46% 44% 3.9 34% 34% 4.24 54% 54% Part II. Analysis of the Program Photocopy Uptime 99.9% = Xerox Model 7775, #1 99.9% = Xerox Model 7775, #2 Note: Percentage uptime based on non-operational time divided by copy room hours of operation (55 hours per week). Operational Hours per Week, Including Distance Education Programs 74 hours (7:30 a.m. to 10 p.m., Monday to Thursday; 7:30 a.m. to 4 p.m., Friday; 8 a.m. to 5 p.m., Saturday) ITV and Videoconferencing Support The third generation of equipment for the Hawai‘i Interactive Television System (HITS) was installed by Media Services in 2011. The installation and operation of the new system has positive results as seen in the 2012-13 HITS Student Survey (see ITV Student Survey results). Both received audio and video quality student satisfaction has increased. One explanation for this can be attributed to the system’s high definition capabilities with one monitor dedicated to the instructor, one on the instructor’s visual aid, and a third monitor dedicated to the neighbor island students. This new capability for HITS distance education classes seems to bring about the learning environment of the traditional face-to-face classroom. There were comments that the room temperature was too warm. It is assumed that the room in question is the main HITS classroom (LRC 122). The campus-wide temperature setting is 74 degrees. There is no separate thermostat in the room to control the temperature. Although the completion of the energy management system by Chevron was completed in 2013, the old air handler units in the ceiling were not replaced. This caused higher room temperatures throughout the Learning Resources building because of aging valves that control the flow of chilled water distribution. The installation of new carpet during the 2 summer of 2012 continues to receive positive comments. Students desired that existing chairs be replaced. (Note: The entire LRC building is scheduled for complete shutdown beginning June 1, 2015, to address air conditioning issues. This scheduled one year shutdown will adversely affect all distance education courses.) A survey of the limited student population using videoconferencing was conducted (see Polycom Videoconferencing Student Survey). Those students who have experienced distance education courses by HITS in the past were particularly critical of the quality of both video and audio received from the origination site. Non-HITS students comments centered on being somewhat “distanced” from instruction. Both issues cannot be easily addressed by the non-origination site. Maintenance/Repair and Classroom Equipment Media Services’ campus survey uses a 5-point Lickert scale to measure satisfaction for services provided. Categories of customer service, response time, and quality of work, resulted in a 4.4 rating. As in past surveys, the lowest scores were in the category of procedures. Procedures in the classroom equipment resulted in a 4.1 response. To address this issue, Media Services continues to offer two sessions prior to the first day of instruction on classroom equipment familiarization and procedures for the past five years. Dates and times are communicated to each division at least a month in advance, and morning and afternoon sessions are scheduled. No one showed for spring 2013 and only two showed for fall 2014. Faculty Work Room Customer service, response time, and quality of work resulted in a 4.7 score. As in the above discussion, procedures scored the lowest (4.6). To improve this category, Media offers two instructional sessions at the beginning of each semester. As with classroom equipment procedures, the two sessions each semester are announced to each division at least a month in advance. Attendance has been marginal; the last sessions attracted four participants. It is unknown why the total number of copies reproduced increased by 240,000 from a year ago. Total number of copies made decreased by 20% from the previous year; however, color copies increase by 13%. Graphics Department The Graphics staff person has standing annual work orders for two schedules of classes, a College catalog and the graduation program/invitation. This department also assists in the printing and production of the catalog in Media Services. In addition there are numerous program brochures to be updated and copied each year, various web pages that have to be updated when the College catalog comes out, color copying, laminating and digital photography connected with marketing projects such as: Program brochures Worked with Marketing Director and created new Kaua`i Community College graphic element to be used with KCC banners, brochures, flyers, newspaper editorials, etc. Created new brochures for Financial Aid, Autobody, Automotive, Culinary, Ho`ouluwehi, and Language, Arts, and Humanities. Created various signages for campus, special events, Performing Arts Center shows, directions, and programs. Formed capstone menus with 2nd year Culinary Program students. Provided graphic services to produce fine dining menus at the rate of 50 per week for 2 six-week modules for a total of 600 which 3 were produced on the 5550 HP printer. These menus were also electronically sent to Fine Dining customers. Produced numerous electronic and print ads for Office of Continuing Education and Training. Assisted general college, Nursing, Allied Health Program, and Ohana Committee with various projects. Created Garden Island Newspaper ads for our schedule of classes and registration information. Updated campus map. Produced campus catalog, 1x a year - 8 weeks Created graduation program, 1x year - 1.5 week Worked with Sandy for signage for Career Center. Graphics also does web and hardcopy research for graphics, images, and will create artwork and visuals for PowerPoint presentations, banners, brochures, posters, and flyers. 11x17 posters - 750+ on 5550 HP printer Academic and division brochures on Media Copier, total of 3,000+ Miscellaneous: Photography: 300+, 100+ electronically sent out and coming in for color printing. Large laminator is being used by the Liberal Arts Division, Nursing, Early Childhood Education Program, Automotive and Auto Body, KCC Counselors, and Science and Math Divisions Pouch (small) laminator has been heavily used also, for various signs, displays: 450+ Various tickets, numbered and trimmed: 2,000+ Scanning assistance: 75 Copy machine help: 3.5 + hour or so a week Marketing and promotion for the College Wellness Center Updates to Student Handbooks The Academic Support survey showed that 40% (46% in 2013) of the Graphics services customers are satisfied (agree or strongly agree) with its services. Faculty and staff are satisfied with response time at the rate of 42% (2% down from last year), and 42% (54% in 2013) are satisfied with the quality of the work. Fifty-six percent (34% last year) are happy with the equipment procedures. The graphics department has no “public” equipment other than the color copiers that faculty and staff use so this measurement should be eliminated in the future. The laminators are used only by the department due to the cost of the supplies. Part III. Action Plan Media Services has eight goals as listed below. Each of these program goals is then aligned with the Kaua‘i Community College Goals and Strategic Goals chart that follows. 1. Provide and maintain state-of-the-art equipment to support the campus’ communication infrastructure (electronic, videoconferencing, voice) and technology-enabled learning in both physical and virtual environments (classroom equipment, HITS, and videoconferencing). 2. Installing and maintaining the campus’ (backbone, horizontal, and vertical) copper and fiber optical infrastructure for voice and data. 3. Operating communication and teaching/learning technology as needed (including HITS and videoconferencing). 4. Assisting community groups in the delivery and maintaining and operating of appropriate equipment. 4 5. Supporting the college and its programs through print and electronic media (video production, printed media, and electronic media). 6. Providing technical and maintenance support for the campus security systems, such as surveillance cameras, 911 Code Blue, and campus exterior public address system within current policies and guidelines. 7. Working with ITAC to help ensure current technology is addressed and provided in a cost-effective manner. 8. Continuing with ongoing efforts in professional development opportunities concentrating in technology-related fields. Goal Alignment UH System Goals, Kaua‘i Community College Goals, and Strategic Goals 5 Program Goals Goal Alignment UH System Goals, Kaua‘i Community College Goals, and Strategic Goals H Goal 1: Educational Effectiveness and Student Success KCC Goal 1: Access & KCC Goal 2: Learning and Teaching Strategic Goals: Student Recruitment, Retention and Success of All Students and Particularly o Native Hawaiian students o Increase success of Remedial/Developmental Students, focusing particularly on reading o Non-traditional Students in Career and Technical Programs o Increased Completion of Degrees, Certificates, and Licensure o Increase outreach to k-12 to improve college preparation and to ensure that students are aware of specific opportunities that KCC provides, recognizing that outeach must not be limited to high schools Relevant Curriculum Development o Sustainability/Green Jobs/Effectiveness and Sustainability of the KCC environment o Health and/or Safety Issues o DOE-KCC English Alignment o Improve the quality of distance education by addressing student readiness, the course development process, diversity of offerings, assessment and delivery methods (mobile learning) o Increase overall retention and persistence to graduation or transfer (identify goals and track by disaggregated groups), with an additional focus on STEM degrees and certificates o Improve the facilitation of integrative/critical thinking in courses Completion of o Course and Program Student Learning Outcomes (SLOs) o Course Action Forms (CAFs) Assessment Activities and Analysis 6 Program Goals KCC Goal 1: Access KCC Goal 2: Learning and Teaching Above goals are addressed by Media Services Program Goals 1 thru 7. Goal Alignment UH System Goals, Kaua‘i Community College Goals, and Strategic Goals UH Goal 2: A Learning, Research and Service Network KCC Goal 3: Workforce Development & KCC Goal 5: Community Development Strategic Goals: Increased Job Placement and/or Performance through o Revised or New Curriculum o Better Coordination with Business and Industry UH Goal 3: A Model Local, Regional and Global University KCC Goal 6 Diversity Strategic Goals: o Fostering Global Understanding and Intercultural Competence Program Goals KCC Goal 3: Workforce Development KCC Goal 4: Community Development Above goals are addressed by Media Services Program Goals 1, 3, 4, 7, and the Media Services Advisory Board. KCC Goal 6: Diversity Above goal is addressed by Media Services Program Goals 1, 2, 3, and 5. o Increased Enrollment and Success of International Students UH Goal 4: Investment in Faculty, Staff, Students and Their Environment KCC Goal 4: Personal Development Strategic Goals: o Professional Development Directed to Any of the Above Goals KCC Goal 4: Personal Development Above goal is addressed by Media Services Program Goals 3, 7, and 8. o Enriching Student Experience, Particularly Directed to Any of the Above Goals o Increasing the Efficiency, Effectiveness and Sustainability of the KCC Environment UH Goal 5: Resources and Stewardship KCC Goal 5 Community Development Strategic Goals: o Reduce Deferred Maintenance o Address Health and Safety Issues o Promote Sustainability 7 KCC Goal 5: Community Development Above goal is addressed by Media Services Program Goal 6. Action Plan(s) PROGRAM GOAL Program Goal 5 RESOURCES NEEDED PERSON(S) RESP. TIME- LINE Provide wider photo coverage of campus events 0 SO Begin F08 Write copy to promote college events in catalog, schedule, brochures $6,900 SO Begin F08 ACTION ITEM *New: Improve college marketing efforts by improving color images for brochures, posters, etc *New: Improve customer support using electronic tablet to review drafts at their locale Provide information for KCC “spotlight” feature on home page. Indicator of Improvement Enhanced websites, brochures, print media, regular KCC Bulletin submissions Enhanced websites, brochures, print media, regular KCC Bulletin submissions PLO Impacted STATUS 1 Ongoing 1 New brochures are being developed. Drafts are due 1/14/11. New ads for registration were created. Begin S10 Ongoing $2575.00 0 SO SO Begin S10 Begin S10 More storage and updated software for graphic support of programs. Enhanced websites, keep general public informed on KCC updates 1 Purchased postponed Cancelled 1 New spotlight posted and biographies and photos have been collected Ongoing 8 PROGRAM GOAL Program Goal 5 All strategic goals could potentially be impacted if they use the services. ACTION ITEM New: Improve marketing by improving graphic capability to support the campus and UCTR: purchase software upgrades RESOURCES NEEDED PERSON(S) RESP. TIME- LINE $700 SO Begin S12 F13- new flyers Indicator of Improvement Create flyer on graphic services & distribute PLO Impacted 1 Upgraded flyers for campus programs, UCTR programs, etc. STATUS On going Ongoing Create marketing items to improve visibility S14 Program Goal 1, 2, 3 9 Seek funding for classroom spare projector bulbs ($500 ea) 4 @ $500= $2,000 PW Create survey instrument for distance education courses via videoconf. 0 PW Follow-up survey to validate classroom equipment services 0 Smart Board: Seek funding and install in LRC 128 $6,000 Implement media infrastructure for Phase II building 0 No break in down time for projectors 1 Begin S09 Improved videoconf. services for DL 1 Ongoing; conducted yearly PW Begin S09 Improved services 1 Ongoing; conducted yearly PW Begin S09 Enhanced learning assessments Installed 06/2010 Multimedia presentation equipment for OCET classrooms Completed 06/2010 PW Begin F09 Begin S09 Purchased 05/2010 Completed Completed PROGRAM GOAL Program Goal 1, 2, 6 Program Goal 1, 2, 8 Program Goal 1, 2, 3, 4, 6 Program Goal 1 RESOURCES NEEDED PERSON(S) RESP. TIME- LINE Plan, research next generation cabling 0 PW Begin F10 Higher speed voice/data network infrastructure Re-install equipment for renovation of Natural Science, LRC buildings 0 PW Begin 2010 New learning environment Implement work order system 0 PW, SO Dec. 08 Work order tracking Develop PD Subject to available funds $4,500 yearly PW PW FY 2014 99.9% network uptime Yearly Seek feedback within campus KT Nov. 06 Changes made 2006 CCSSE extra questions results say that 86% of students are very satisfied or somewhat satisfied with the website. Campusfunded required if uptime goal not met 0 Media Staff Nov. 07 Established 95% minimum uptime ACTION ITEM Develop & implement UPS battery replacement schedule Website Photocopy equipment Establish advisory committee for catalog 10 Indicator of Improvement PLO Impacted STATUS Estimated completion 2011 Completed Estimated completion 2011 1 Certifications 1 Completed Phase 1 implemented July 2013 Ongoing Completed F10 uptime is 99% Ongoing SO S06 Direction on which medium to use for catalog Completed F08 Ongoing PROGRAM GOAL ACTION ITEM Establish advisory committee for technical aspects Program Goal 1,2,3,6 All strategic goals are impacted by this upgrade. Program Goal 1 RESOURCES NEEDED PERSON(S) RESP. TIME- LINE 0 PW Aug. 09 Enhance Campus Cabling System for Higher Speed Cost: $4000 Add’l $5,000 Enhancing Classroom Learning Environment Cost: $1500 PW F10 Spring 2012 Indicator of Improvement PLO Impacted See Media Services Advisory Board Minutes Provide higher bandwidth for campus voice/data STATUS Second meeting held Aug. 2010 Ongoing 1 APRU budget request for $4000 in 2010 Additional $5K required PW S10 Re-stock burnt bulbs, no backup projectors exists Covered in Media Services Budget Completed Unit Goal 1 11 Improving “Procedure” Category in Data Analysis 0 PW CK S10 Offer each semester 1 Ongoing Part IV. Resource Implications After analyzing the campus’ ability to survive electrical power fluctuations and outages (both scheduled and unscheduled), a marginal report card was assessed. We lack a comprehensive replacement plan for our network backup system. This system is based on UPS (Uninterruptible Power Supply) that serve not only as a backup battery to network equipment, but adds surge protection and line conditioning. It is critical to note that the campus network is the backbone to all of our computing requirements to include but not limited to: all 911 emergencies, security cameras, communication systems, student registration, student financial aid, student classroom outcomes, and soon all systems that control air conditioning, lighting, and entry door mechanisms. The campus has already invested in 60 UPS manufactured by American Power Conversion (APC), a subsidiary to electrical giant Schneider Electric of Canada. APC recommended a three-year replacement battery plan. The campus has numerous models and differing purchase dates, which in turn yields to differing battery replacements at differing pricing. Using $300 as the average replacement battery cost (includes proper environmental disposal, shipping, and applicable taxes), a three-year replacement plan required a budget allocation of $4,500 per year. This amount was requested in the 2012-2013 APRU process. The critical need to maintain the campus’ data network system was seen by the APRU process and the request received the number one ranking. The priority in the replacement plan focused on the units serving the campus’ server farms. The second round of funding will focus on the UPS serving our key data switches. The 2013-2014 APRU funding request addressed the need to provide both voice and data services for the old student services space construction improvement project. The construction funding did not include any voice and data infrastructure requirements for occupancy. In order to provide both voice and data, an APRU request of $2,500 was required. This funding covered the materials (cabling and terminations) and data switches to provide network services required for 911 emergencies, voice, data, air conditioning, exterior lighting controls, and entry door mechanisms. Prior to the current construction, all salvageable materials were removed and is currently used for new positions funded by general, Title III, CT3T1, and CT3T2 grants since none of the positions included infrastructure needs for both voice and data. Part V. Program Learning Outcomes and Assessment Program Learning Outcome 1: KCC Media Services facilitates learning and teaching by operating, maintaining, and upgrading the campus communication infrastructure, classroom technology resources, and equipment essential to accessing virtual learning environments (such as HITS). Assessment: survey feedback which included uptime/downtime for telephones, HITS, etc., statistics on classroom use of technology, HITS use, and videoconferencing equipment use. Records of professional development and training (see PD FY 2013), is based on credentials on needed continuous education credits required to maintain current certifications in the technology and environmental field. Professional development addresses the ongoing efforts in Section III (Action Plan 8). User surveys show high satisfaction with the various media services. Graphic services are at about 48% with 30-40% not applicable which points to a self-marketing deficiency. An action plan has been created to address this. The uptime/downtime for telephones, HITS, etc. has not been measured at this time but the copiers have been measured and register almost 100% uptime. The hours of ITV and videoconferencing courses has remained about the same from 2358 to 2321 hours. The number of videoconference meetings has also remained about the same with slight increase from 372 to 414 12 hours. Media Services program remains healthy. Users are very satisfied with this service and action plans center around improving the current data backbone and improving user instructions. Graphics services are working toward improving their products and services and making people more aware of the services available. Part VI. Programs Cost Per SSH Part VII. Capacity ITV Student Survey Test Proctoring Quality of Receive Video Quality of Receive Audio Physical Room Condition Technical Support Received Overall Operation 2011 4.75 4.7 4.4 4.7 5.0 4.8 2011-12 4.83 4.83 4.79 4.74 4.87 4.60 2012-13 4.8 4.8 4.8 4.5 4.8 4.7 2013-14 4.8 4.8 4.8 4.2 4.8 4.7 Polycom Videoconferencing Student Survey Test Proctoring Quality of Receive Video Quality of Receive Audio Physical Room Condition Technical Support Received Overall Operation 2010 4.58 4.07 3.92 4.62 4.77 4.62 2011-12 5.0 4.33 4.33 4.33 5.0 4.33 2012-13 NA 4.4 4.4 4.5 4.8 4.5 2013-14 NA 4.4 4.4 4.3 4.8 4.5 2014 Academic Support Services Survey 1. I am: Response Percent Response Count Faculty 67% 32 Staff 33% 16 Answer Options answered question skipped question 13 48 0 2. Electronic Maintenance and Repair – Outside of the Classroom (Pat W.) Video systems, overheads, campus cable, cable TV, network wiring (wireless and wired), sound systems, electronic display, computers, media classroom design, equipment purchases Answer Options Strongly Disagree Disagree Neither Agree Nor Disagree Agree Strongly Agree N/A I am satisfied with the response/delivery 1 0 0 10 36 1 time. If there are procedures for use of 1 2 1 17 21 6 equipment, they are understandable. I am satisfied with the quality of the 1 0 0 13 32 1 work. Comments I am extremely satisfied with the service provided. I appreciate being told when my request must be delayed due to campus priorities. This communication has greatly helped me plan. For a one person team Pat is extraordinary. I love Pat! I couldn't live without him setting my polycoms and skype interviews. Response Count 48 48 47 11 Pat is the best!! Nothing is too difficult or too last minute!! There have been occasions when I've had to make very last minute requests and each time, its been filled. its hard to contact him in urgent situations Indispensable There were no instructions in my office, but one I found out the procedure for getting help, the response was excellent. I am also still very confused about how to get and use the Chromebooks that were bought by LAH. It is difficult to keep up with all this type of maintenance and repair, especially with so few people. I just wish we could get newer overheads that handled better resolution. Thank Goodness for Pat Watase who seems to be available 24/7 and at any time we've ever had an emergency. I appreciate the efforts of staff and wish there was funding to buy new sound system equipment for guest lecturers, campus events etc. Pat Watase is on it! 3. Classroom Equipment Services (Pat W./Tom K. and Computer Services) Overhead projectors, Elmos, VCRs, slide projectors, sound systems, video projectors, display systems, language labs, test scanners Answer Options I am satisfied with the response/delivery time. I am satisfied with the quality of the work. I am satisfied with the technology training provided for classroom equipment. Comments Strongly Disagree Disagree Neither Agree Nor Disagree Agree Strongly Agree N/A Response Count 1 1 1 10 27 8 48 1 0 0 9 30 8 48 1 2 5 10 17 13 48 I haven't really used any of the equipment this year but very happy in the past! what is the priority? Most faculty in nursing do not use Elmo even though it is available in n124 and n128 There was no training given unless I asked for it. But when I asked Jeff Mexia, he was very quick to respond. I need a little more training on making a smooth transition with video and sound on the smart boards. Smart board is never connected. Why the need to call every time you want to use it. It does not get used for that reason. 14 6 4. Faculty Work Room (Pat W./C. Kali) Up-to-date equipment, hours of operation, explanation by staff on how to use variety of equipment Answer Options I am satisfied with the response/delivery time. I am satisfied with the quality of the work. I am satisfied with the technology training provided for equipment in the tech room. Comments Strongly Disagree Disagree Neither Agree Nor Disagree Agree Strongly Agree N/A Response Count 1 0 1 6 29 11 48 1 0 1 5 30 11 48 2 0 1 5 28 12 48 7 Pat is quick and efficient. Clarice is competent and friendly. Clarice is so professional in all situations. Pat is irreplaceable and totally unappreciated....the silent worker who has glued together a fragmented campus without a desire for recognition. Clarice is always there to help. I would suggest that we all have access to color copies. Please keep the workroom open until 7pm during in-service week even though the library closes at 4pm Do not know what a faculty workroom is. There was no training, so I had to figure everything out on my own. Clarice is extremely helpful and very nice about wanting to be of assistance. 5. Graphics Services (Suesue O.) Graphic design support with logos, brochures, flyers, handouts, banners, posters, PowerPoint Answer Options I am satisfied with the customer service. I am satisfied with the response/delivery time. If there are procedures for use of equipment, they are understandable. I am satisfied with the quality of the work. Comments 15 Strongly Disagree Disagree Neither Agree Nor Disagree Agree Strongly Agree N/A Response Count 11. I think my capability to instruct has increased as a result of the services provided by: Strongly Disagree Disagree Neither Agree Nor Disagree Agree Strongly Agree N/A Response Count Electronic Maintenance and Repair 1 0 1 13 14 17 46 Instructional Design Services 1 1 4 7 9 25 47 Classroom Equipment Services 1 0 1 16 15 15 48 Faculty Work Room 1 1 3 14 11 15 45 Graphics Services 3 3 4 6 4 26 46 Library Services 1 1 3 18 8 15 46 Tutoring Services 1 0 3 12 12 18 46 Testing Services 1 0 2 7 13 22 45 Comments Tutoring service--survey should ask separate questions regarding English and Math faculty. Don't know what Will does. Coco is wonderful. support is nice... but quality instruction takes place with no technology or with... As a new faculty member this year, I could have greatly benefited from training in all of these areas. Instead, I had to figure out whom to ask for what and it's still not entirely clear. Thank you for everything! 4 Answer Options 12. I think student learning has increased as a result of the services and technologies provided by: Strongly Disagree Disagree Neither Agree Nor Disagree Agree Strongly Agree N/A Response Count Electronic Maintenance and Repair 1 0 2 16 14 14 47 Instructional Design Services 1 0 6 8 8 24 47 Classroom Equipment Services 1 0 1 20 13 12 47 Faculty Work Room 1 1 3 19 7 16 47 Graphics Services 3 3 3 10 2 25 46 Library Services 1 0 3 20 10 13 47 Tutoring Services 1 0 2 11 18 16 48 Testing Services 1 0 3 8 15 19 46 Answer Options Comments Tutoring service--faculty--should be divided into the English and Math developmental faculty. I checked NA bec. answer required. what percentage of faculty actually use technology to teach? And assess learning ....jeff doesn't even teach online.... The students need to made more aware of what is available to them. All departments work together to create a good learning environment. 16 4 PD 2013 – 2014 07/09 07/16 08/27 09/05 09/11 09/15-09/19 09/26 10/03 10/07 10/10 10/24 10/31 11/06 11/13 11/13 11/19 11/19 11/20 11/21 12/02 12/04 12/05 12/05 12/11 12/11 12/18 12/19 01/09 01/09 01/14 01/16 01/23 02/04 02/12 02/20 03/06 03/18 03/19 03/26 03/27 03/27 04/01 04/10 04/22 04/23 04/24 17 Cabling solutions in harsh environments, Webinar Commscope Cabling administration and management, Webinar Cabling consideration for campus environments, Webinar CI Cabling for small business environment, Webinar Panduit TIA-606-B, cabling labeling requirements, Webinar Rhino BICSI conference and seminars, MGM in Las Vegas Fiber for high speed & long distance, Webinar OFS 40G and 100G migration, Webinar 5 new A/V technologies that will define next 5 years, Webinar C2G Collaborative workspace, Webinar Panduit Green Effects and cabling mismatch, Webinar Standards update 2013, Webinar Commscope/Leviton/Ber-Tek Fiber-optic cleaning & testing practicalities, Webinar EXFO Passive Optical LAN, Webinar JDSU Making 100G economical, Webinar EXFO Testing trends for 2014, part 1, Webinar Lightwave PV codes, Webinar Sandia Labs I-V PV curve, Webinar Sandia Labs Test & Troubleshooting FTTH, Webinar Lightwave EXFO fiber connector cleaning, Webinar Fiber Bandwidth for AV, Webinar INFOCOMM Network Identification, Webinar Video classroom collaboration, Webinar Polycom Testing trends for 2014, part 2, Webinar Lightwave High performance computing in finance, Webinar CDW, HP Fiber & cable management in FTTx networks, Webinar Lightwave Cabling support for intelligent buildings, Webinar Layer 1 wireless testing, Webinar EXFO Diagnosing non-Wife interferences, Webinar Fluke 40G DWDM, Webinar EXFO Fiber testing innovations, Webinar EXFO Increasing fiber bandwidth, Webinar FAFL Challenges of 400G, Webinar EXFO Passive optical LAN, Webinar Graybar 802.2ac revelation, Webinar Fluke Fiber dispersion, Webinar EXFO Altona AT-HDCAT-8ED distribution amp, Webinar Altona Cabling for Demanding Environments, Webinar Safety in fiber optic environment, Webinar Light Brigade Cable density, heat concerns in data centers, Webinar Maximizing performance for voice, data and power, Webinar BrightTalk Altona HDVS applications, Webinar Altoona IEEE 802.11AC, Webinar Fluke Network closets building blocks, Webinar Eaton Photovoltaic Commissioning, Webinar Solar Instructor Training Network Distributed Antenna System, Webinar TE Connect, WESCO 04/29 LEED, Accredited Professional, Existing Building Operation Maintenance, tested Honolulu Cabling Standard Update, Webinar Berk-Tek Altoona single display, Webinar Altoona Photovoltaic operation & maintenance, Webinar U.S. Dept. of Energy Optimizing next generation fiber, Webinar Omnitron 10G Wireless Speed, Webinar Berk-Tek RF Interferences on wireless networks, Webinar High traffic fiber, Webinar EXFO Network closets effective managements, Webinar Eaton Fiber Installation and Maintenance, Webinar Panduit NABCEP entry level certification, tested/received documentation 40G Data Centers, Webinar, Webinar Light Wave DAS, LTE, Small Cell, Wi-Fi, Webinar EXFO Mobile Data Traffic, Webinar EXFO Hyper Data Centers, Webinar Belden Pushing LAN Boundaries, Webinar Berk-Tek PoE power and speed development, Webinar BrightTalk Fiber Optics – Historical, Webinar LightWave Best Practices Deploying 802.11ac, Webinar Fluke Innovations in twisted-pair copper cabling, Berk-Tek Network closets maximizing uptime, Webinar Eaton Latest on Wi-Fi design, Webinar WESCO Video Collaboration Learning Outcomes, Webinar Polycom 04/30 05/06 05/06 05/07 05/08 05/08 05/15 05/20 05/22 05/28 06/03 06/05 06/05 06/10 06/12 06/17 06/18 06/18 06/19 06/19 06/24 06/24 18