listec presentation 2

advertisement
Welcome to
the information pages
of the LIST linear fire detection
system
Sensor Control Unit
SCU 3000
Control and evaluation unit, with total front-panel
control, for fire detection in special applications.
© LISTEC® GmbH
Sensor Control Unit
SCU 2000
Control and evaluation unit with all the necessary control
for fire detection in special applications.
© LISTEC® GmbH
Sensor Control Unit
SCU 800
Control and evaluation unit for digital sensors in applications
such as covered parking, false ceilings etc.
© LISTEC® GmbH
Sensor Control Unit
SCM 4000
Master control unit controls up to 8 slave units
as far as 4km apart.
© LISTEC® GmbH
Sensor Control Unit
SCS 4010
Slave control with up to 2 500m sensor cable
for connection to the LIST star network.
© LISTEC® GmbH
Differential Alarms
Freely adjustable differential alarm threshold, e.g. 3,4º
ºC
Temperature
4
Differential alarm
3
2
Pre-alarm at 50 % of the threshold
1
0
10
20
30
40
50
Measuring cycle no.
© LISTEC® GmbH
60
t
Reference Profiles
°C
Actual ambient temperature
Temperature
40
30
20
Reference value
10
0
10
20
30
40
Time (minutes)
© LISTEC® GmbH
50
60
t
Maximum Temperature
Alarms
FreelyAbsolutalarmschwelle
adjustable absolutefrei
alarm
threshold,
50ºC
definierbar,
z.B. e.g.
70,0 °C
ºC
Temperature
80
60
Absolute alarm
Pre-alarm at 90% of the threshold
40
20
0
1
2
3
4
Measuring cycle no.
© LISTEC® GmbH
5
6
t
Frost Alarms
ºC
Measuring cycle no.
10
Temperature
0
1
2
3
4
5
6
t
-10
-20
Pre-alarm at 5° over threshold
UT-Alarm (frost alarm)
-30
Freely adjustable minimum temperature threshold, e.g.. - 25,0 °C
© LISTEC® GmbH
Software
LISTgraph II
LISTgraph II: Graphic program for WINDOWS™ incl. LISTTERM
LISTterm:
Terminal- and commissioning program for PC‘s,.
Alarm / Fault
No fault
Fire
Legend:
1/5
1/6
2/11
3/21
2/12
2/13
1/4
1/7
3/20
FTS
Fire terminal station
SCU
Sensor control unit
3/22
Sensor cable with
measuring point
2/10
Path for fire brigade
2/14
1/3
3/19
3/23
Entry / Exit
1/8
2/9
Current position
2/1 5
1/2
3/18
3/24
4/37
2/16
1/1
FTS
3/17
3/25
4 = Alarm section
37 = Sensor no.
LIST®
Fire Detection
4/32
4/33 4/34 4/35 4/36 4/37
SCU
4/27 4/28 4/29 4/30 4/31
4/26
© LISTEC® GmbH
Covered parking
LISTEC® GmbH
Münchenerstr.58
84424 Isen
Test Fire in a Tunnel
© LISTEC® GmbH
Test fire in a tunnel
with 10m/s wind speed
© LISTEC® GmbH
Cold Storage at - 28° C
© LISTEC® GmbH
SEC 20
Sensor Cable
Measuring range:
Operating temp. range:
Resolution:
Measuring cycle:
-40°C ... +200°C
-40°C ... +85°C
0,1°
10 sec / 312 sensors
Diameter:
Bending Radius:
Cable Length:
Marking:
approx. 18 mm
min. 30 cm
< 2500 m / SCU
each sensor
© LISTEC® GmbH
Reference List
Tunnels: Germany
Tunnel
Length in m
Emstunnel
Schürzebergtunnel
A44 Düsseldorf
B61n Bielefeld
M11 Oberhaching
Arnsberg
Hausachtunnel
Lämmerbuckel
Bürgerwaldtunnel
Burgbergtunnel
Bad Wildbad
Etterschlag
Allacher Tunel
Engelbergbasistunnel
Tunnel Hemberg
Königshainer Berge
Engelbergtunnel, 2nd tube
Tunnel Bonn
Tunnel Füssen
Gottlob-Grotz-Tunnel
Riedbergtunnel
Tunnel Farchant
Elbtunnel, 2nd tube
2 x 1.000 m
510 m
2 x 1.050 m
1.000 m
240 m
350 m
1.100 m
600 m
1.400 m
540 m
1.770 m
2 x 480 m
2 x 1.040 m
2.500 m
2 x 400 m
2 x 2.300 m
2.500 m
4.480 m
1.300 m
650 m
790 m
2 x 2.300 m
2.900 m
Operation
1989
1992
1992
1994
1994
1995
1995
1996
1997
1997
1997
1998
1998
1998
1999
1999
1999
1999
1999
1999
1999
2000
2000
© LISTEC® GmbH
Tunnel
Length in m
Schönbuchtunnel
Dortmund Wambel
Volkardey
Fahrlachtunnel
Bad Abbach
B295 Feuerbach
Tunnel Eching
Pellinger Berg
Gernsbachtunnel
Agnesburgtunnel
Fellbachtunnel
Oerlinghausen
Behringen
Kiesbergtunnel
Tunnel Olpe
Tunnel Hohentwiel
Tunnel Vaihingen
Hofbergtunnel
Saukopftunnel
Tunnel Grötzingen
Pfaffensteintunnel
Elbtunnel, 1st tube
2 x650 m
2 x 1.630 m
2 x 720 m
2 x 480 m
600 m
1.100 m
2 x 380 m
2 x 600 m
1.500m
2 x 700 m
840 m
460 m
2 x 430 m
2 x 860 m
2 x 500 m
2 x 800 m
1.400 m
1.500 m
2.700 m
880 m
2 x 860 m
2.900 m
Operation
1992
1992
1993
1994
1995
1995
1995
1997
1997
1997
1997
1998
1998
1999
1999
1999
1999
1999
1999
1999
1999
2000
Reference List
Tunnels: Austria
Tunnel
Length in m
Selzthaltunnel
Langener Tunnel
Pretallerkogel
Achbergtunnel
Falkenbergtunnel
Ehrentalerberg
A22 Donaucity, Wien
Katschbergtunnel
Tauerntunnel
Selzthaltunnel, 2nd tube
Umfahrung Landeck
1.020 m
2 x 2.400 m
2 x 550 m
1 x 1.480 m
2 x 1.120 m
2 x 3.350 m
6.800 m
5.600 m
6.850 m
940 m
6.900 m
Operation
1989
1991
1992
1993
1995
1995
1996
1997
1997
2000
2000
© LISTEC® GmbH
Tunnel
Length in m
Roppener Tunnel
Voitsberg Tunnel
Tunnel Wald
Lärchbergtunnel
Lendorftunnel
Schmittentunnel
Passürtunnel
Lainbergtunnel
Schönbergtunnel
Ebelsbergtunnel, Linz
5.100 m
800 m
2 x 2.800 m
1900 m
2 x 800 m
6.600 m
1.800 m
2.300 m
3.000 m
430 m
Operation
1990
1991
1992
1994
1995
1996
1996
1997
1999
2000
Reference List
Tunnels: Switzerland
Tunnel
Length in m
J10 La Clusette
J20 Boudevilliers
J20 Les Hauts Geneveys
J20 Vue des Alpes
N16 Métairie de Nideau
N2 Grancia Melide
Gstaad
Tunnel Urten
Tunnel Sierre
Galleria Bisone
1 x 1.100 m
2 x 550 m
1. 250 m
3.250m
2 x 560 m
2 x 1.750 m
420 m
350 m
2 x 2.500 m
2 x 550 m
Operation
1993
1994
1994
1994
1995
1996
1997
1999
1999
1999
© LISTEC® GmbH
Tunnel
Length in m
Traversée de Neuchâtel
J20 Malvilliers
J20 Mont Sagne
N16 La Heutte
Traversée de N'tel II
Vispertal
Cheseaux
J18: Eggflue-Tunnel
Tunnel Linter-Fluhtingen
Schänzlitunnel
2 x 5.450 m
2 x 370 m
1.600 m
2 x 320 m
2 x 1.650 m
2 x 1.630 m
520 m
3.000 m
640 m
1.000 m
Operation
1993
1994
1994
1995
1995
1996
1998
1999
1999
1999
Reference List
Tunnels: Benelux
Tunnel
Length in m
Zeeburgertunnel
Vlaketunnel
Margriet Tunnel
Wijkertunnel
Line 94, Halle
Schiphol Tunnel
650 m
1.150 m
2 x 80 m
760 m
420 m
750 m
Operation
1990
1992
1994
1995
1997
1998
© LISTEC® GmbH
Tunnel
Length in m
Coentunnel
Grouw
Velsertunnel
Line 96, Halle
HSL, Halle
650 m
330 m
1.200 m
400 m
400 m
Operation
1990
1992
1995
1996
1998
Reference List
Further Tunnels
Tunnel
Length in
Operation
6.600 m
1997
2.180 m
800 m
540 m
1996
1996
1997
Sljeme
Vrsek
800 m
860 m
1996
1997
2 x 300 m
1998
Klaratunnel, Stockholm 1.850 m
2000
2.500 m
1991
Valldoreix Tunnel
2 x 860 m
1991
480 m
1997
Brno II
2 x 570 m
1998
Taiwan
Nankung Tunnel no. 1 2 x 400 m
2000
Nankung Tunnel no. 22 x 2.600 m
2000
Turkey
Gültepe Tunnel
Tunnel Adana P3
1993
2000
Korntepe Tunnel
Tunnel Adana P4
1993
2000
France
Mont Blanc Tunnel
(french part)
Croatia
Tuhobic
Sopac
Lucice
Sweden
Häggvik Tunnel
Spain
Vallvidrera Tunnel
Czech Republic
Radiale, Brno I
2 x 600 m
2 x 2.820 m
© LISTEC® GmbH
Tunnel
Length in m Operation
2 x 1.030 m
2 x 1.230 m
Reference List
Conveying systems
Project
Location
Hamburger Stahlwerke Hamburg
UNA
Amsterdam / NL
QIT. Titan et Fer Montreal / CAN
BASF
Ludwigshafen
Power station HKW
Cottbus
Power station MIBRAGSchleenhain
Operation
Project
1989
1993
1994
1995
1998
1999
Neckarwerke
IKW Wählitz
Saarbergwerke
Isar Amperwerke
Power station
RVA Peres
© LISTEC® GmbH
Location
Stuttgart
Wählitz
Völklingen
Zolling
Boxberg
Schleenhain
Operation
1991
1994
1994
1998
1998
1999
Reference List
Metro Marshalling Yards
Project
Location
Station Duissern
Duisburg
Station Waldring
Bochum
Heinrich-Heine-Allee Düsseldorf
Metro Leiden
Leiden/NL
Metro Gerlingen
Gerlingen
Operation
Project
1991
1993
1995
1995
1997
Station Rathaus
Duisburg
Main station
Düsseldorf
Station HandelszentrumDüsseldorf
SSB bus depot
Stuttgart
Tunnel Waldau-WernhaldeStuttgart
© LISTEC® GmbH
Location
Operation
1992
1995
1995
1997
1998
Reference List
Cable Trays
Project
Location Operation
EVS Power station
Heilbronn
EPON
Montfoort / NL
AKZO Nobel
Groningen, NL
Concert hall
Freiburg
Sozialkasse
Berlin
Cement plant
Bernburg
Museum der Europ. Künste
Berlin
Alexander Television Tower
Berlin
Bayer. Vers. Kammer
München
DASA
Ulm
Supermarket
St. Augustin
Power Station Pournary
Arta, GR
UNA
NL
Admin. Building, RWE
Wesel
PPC Power Station
Amynteo, GR
Treptowers
Berlin
Bank
Korbach
Admin. Building
Frankfurt
PPC Power Station
Aliveri, GR
PPC Power Station
Lavrio, GR
© LISTEC® GmbH
1989
1994
1995
1995
1995
1996
1996
1996
1996
1996
1997
1997
1997
1997
1998
1998
1998
1998
1999
2000
Reference List
Further References
Project
Location Operation
Dillingen
District heating
Ingolstadt
Petroleum tank
Hann. Münden
Assembly hall
Domdier, CH
Geothermical appl.
Wien, A
Bakery
Gasoline filling station Rancate, CH
Vernier, CH
Gasoline filling station
Moerdijk, NL
Composting plant
Wasserburg
Covered Parking
Verden
Cold storage
Viernheim
Covered Parking
Stuttgart
Covered Parking
Berlin
Wall display
Kehl
Fodder dehydrator
Bremen
Coffee roasters
Neckarsulm
Assembly hall, Audi
Hamburg
Petroleum depot
Bremerhaven
Garbage incinerator
Hasle, CH
Wooden Bridge
Aschaffenburg
Covered Parking
Luzern, CH
Wooden Bridge
Lenzburg, CH
Cold storage depot
Östringen
Air shaft
Bremen
Petfood plant
Reichenbach
Recycling plant
Munich
Covered parking
Hüfingen
Timber storage
Ehingen
Covered parking
Taipei, ROC
Autom. parking tower
Utrecht, NL
Covered parking
Erasmusburg, NL
Covered parking
© LISTEC® GmbH
1986
1993
1994
1994
1995
1995
1995
1995
1995
1995
1996
1996
1996
1996
1996
1996
1997
1997
1997
1997
1997
1998
1998
1998
1998
1998
1998
1999
1999
1999
2000
Good Bye
We hope that this presentation has awakened your interest
in this unique fire detection system for special applications.
Give your LISTEC team a call!
© LISTEC® GmbH
Download