Release 2 - Snam Rete Gas

advertisement
Gas Logistics - the new information system supporting the
commercial planning and balancing processes
Workshop
Antonio Anchora, Milly Aimi
MILAN, 16 July 2014
snam.it
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts
2
Introduction
• In order to overcome the constraints and technological obsolescence of the application
currently being used (CAMINUS/AltraWEB), as well as direct the management and the
support for the development of new commercial processes resulting from national and
European regulations, Snam Rete Gas has started a specific project to create a new
information system dedicated to the commercial area
• The initiative was launched in November 2012 with the establishment of a transversal work
group dedicated to directing the various requirements to all the internal and/or external
processes involved
3
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interactions with users & B2B communications
• Interim
• Next Steps
• Contacts
4
Scope
• New application for the management of the Gas Logistics area to cover the planning process of
the transportation, allocation and gas statement.
Capacity
Contracts
Planning
Planning and Programming of
Contracting of the
the transportation service
transportation capacity
on National and Regional
network. Verification and As an example:
management access
• Annual Planning
services
• Half Year Planning
• Monthly Planning
• Weekly Planning
• Planning at 30 days
• Planning Authority
• Daily Planning (Nomination)
• Intraday Planning (ReNomination)
• Management of products of
trading capacity
• Balancing session
Dispatching &
Measurement
Dispatching and
physical
management of the
transportation
network;
measurement of the
volumes and the
quality of the gas
Balancing
Calculation of the quantities of
gas to be allocated to the
users of the transportation
As an example:
• Provisional Allocation and
Statement
• Final Allocation and
Statement
• Adjustment session
• Default service
• Temporary Supplier
Invoicing
Invoicing of the
transportation
capacity, the
commodity,
considerations for
disequilibrium, other
considerations
Related
processes
NOT Related
processes
5
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts
6
The application solution (1/3)
• The decision-making process relative to the application solution to be created has gone through:
• a software selection of the solutions available on the market
• a verification of the functional coverage offered relative to the distinctive features of the Italian
market
• a verification of the constraints imposed by the various packages
• a comparison with the implementation choices made by other European Transporters, who
have turned to custom applications to meet their needs
• The new application solution identified anticipates the realisation of a custom application based
on the latest technologies.
7
The application solution (2/3)
Portale
Capacità
PSV
Bacheca
Capacità
Bacheca
PSV
Portale
Fatture
Portale
GPIT
Portale
A/D PdR
Portale
Mercato
M- gas
Portale OBS
8
The application solution (3/3)
NLG
«SNAM Applications in use»
«WEB Applications in use»
Under construction
9
The application solution: conceptual model
SRG
Shipper
Storage and
Regasification
Companies
National &
Balancing
Foreign
Trader
Transportation
Companies
GME
Op.
Extra
Business
USER INTERFACE
Planning
Shipper /
Foreign Transportation Companies
Daily and Intraday Planning
Protocols
X12 /
Edig@s …
Allocation & Statement of Provisional Transportation
Allocation & Statement of Final Transportation
Adjustment Sessions
Integration other systems
PSV /
Portal M
M-Gas
Portal OBS
Sampei
Capacity
Portal
Portal
GPIT
Portal SRG
10
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts
11
Features of the new platform (1/2)
• High reliability in the continuity of the service guaranteed by adopting the latest generation
technologies
• Reduction in the processing times and guarantee of their stability
• Easier to adopt new functional and/or regulatory changes through application modularity and
configuration / parameterisation tools
• Preparation to support various communication protocols (Edig@s)
• Optimisation and expansion of the integration capacities and degree of accessibility of the
system both in the internal SRG context and externally with third parties
• Exceeding the technological limits imposed by the current system (increase in performance,
greater compliance and flexibility of adjustment relative to the regulations, the standards of ICT
security....)
12
Features of the new platform (2/2)
• Improvement in the operating methods for all the Users of the Transportation Service
(Users of the Balancing, Storage Companies, Regasification Companies, Foreign and National
Transportation Companies, Balancing Traders...)
• Complete management of the versioning and tracking of the data
• Availability of the business data on the new system going back 5 years, which can be viewed in a
single environment of reference
• Introduction of the Multi-Language option (Italian and English)
• Availability of integrated Help Online & Manuals features
13
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts
14
Release strategy
Daily Nomination/Re-Nomination
(Release 1)
Allocation and Provisional Statement
(Release 2)
Planning
Allocation and Final Statement
(Release 3)
Adjustment session
/Intraday Allocation
(Release 4)
Post Launch Support
• 4 subsequent releases according to a "by process" organization
15
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interim
• Interactions with users & B2B communications
• Next Steps
• Contacts
16
Functionality: Access
• Explorer 11 certified application
• Guarantee compatibily with the main Browser (Firefox , Chrome)
• Access mode as is: one point access with unique authentication by Single Sign On (SSO) of
Snam
17
Functionality (1/4)
• Home Page Nuova Logistica
18
Functionality (2/4)
• Filters: every upper part of the screens has filters that can be used by the dedicated function
19
Functionality (3/4)
• The user can select the language (Italian or English).
• After the selection every screen will be translated
20
Functionality (4/4)
• Every internal User can refer to on line Manual in Italian or English
• Also the Users of the Transportation Service (Users of the Balancing, Storage Companies…) can
refer to dedicated On Line Manual (in Italian or English)
21
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Functions anticipated for the single release
• Interactions with users & B2B communications
• Next Steps
• Contacts
22
Functions for the single Release
• With reference to the strategy for subsequent Releases according to a "by process" organization,
following are the particulars of the functions/features anticipated for each release
Release 1
•
•
Daily Planning
Intraday Planning
Release 2
•
Allocation &
Provisional
Statement
Release 3
•
•
Allocation & Final
Statement
Short, medium and
long term planning
Release 4
•
•
•
•
•
Adjustment Session
Edig@s
kWh
Intraday Allocation
Matching
23
Release 1: Nominations
Release 1
Release 2
Release 3
Release 4
Principal Features in Release 1
Principal innovations introduced compared to AS
IS
• User Profiling (access to features and rights to
 Master data harmonization
relevant data)
• Identification Base
• Management Nomination Cycles
• Supporting reports
 Intraday Renomination
 Detail Nominations Shipper Pair
o Required EIC code
 Communications relative to the Nomination through
Protocol X12/GISB:
o Nomination on RN for the Intraday Cycle pertaining to the
Balancing Session G+1 (by 5:00 p.m. on the Gas G day)
o Intraday renomination on all the points of the RN
o Capacity check on the import/export points at the same
time as the receipt of the Nomination
Enter Nominations through file upload
More information to support the Nomination processes
24
Release 1 : Nominations – Receiving nomination
• The function ‘Receive Nominations' makes it
possible for every authorized outside user to
enter and change the nomination data relative to
the meters on National Network RN and on
Regional Network (NOR, NOC, etc.) for their own
area of responsibility, in compliance with the
deadlines set in the system for the receipt of the
nominations.
25
Release 1 : Nominations – Input nomination
26
Release 1 : Nominations - Displaying nomination
•
The function 'Display Nomination', supporting the nomination process,
displays with daily details and schedule the nominations, entered in the
NLG system by the users of the transportation service.
• Every authorized outside user, through this feature, can
display the nominations for which they are responsible in
the Collection Areas and on the National Network, including
the nominations at the import points, national production,
interconnections with regasification and storage plants and
at the export points.
27
Release 1: Nominations – Details: nominations status
Nominations
Status
Description
ACQ
ACT
Acquired Nomination (from GUI and/or File, x12)
Acquired and cut nomination for initial control in relation to the available capacity (related
to cycle 1 and 2 of the day G-1)
Cut nomination for reduction of the exploitable capacity (in relation to intraday
nomination)
Incomplete nomination (from x12)
Incomplete and cut nomination (da x12)
Cut nomination for counterflow
Cut nomination after the cut for capacity change (related to cycle 1 and 2 of the day G-1)
Cut nomination, under capacity control
Matched nomination
Confirmed nomination
Delated nomination
TCU
TIN
TIT
TCF
TVC
TGL
MAT
CNF
ANN
28
Release 1: Nominations – Report
•
Aggregation and comparison reports:
USER NOMINATION
NOMINATION AT THE INTERCONNECTION POINT RN-RR
31/10/2012 Cycle C1
User Name
Unit of measure
Day:
01/10/2012
Nomination Cycle
C1
Unit of measure GJ
GJ
Area of Collection
Meter
Nominated
RN
NOC
NOR
SOC
SOC
MER
CEN
34640200
30000301
30333001
34657100
34845701
50059001
33122501
465,0
65,8
221,4
864,5
9,4
42,4
115,7
User Name Area of Collection
RN
NOC
NOR
SOC
SOC
MER
Nomination at
Entry point
296.185,0
1.121.862,0
205.028,5
202.594,9
268.511,5
110.060,6
Nomination at exit
Difference
point
296.185,0
0,0
1.001.865,0 119997,0
205.028,5
0,0
202.594,9
0,0
268.509,5
2,0
110.060,6
0,0
29
Release 2: Provisional Allocation & Statement
Release 1
Release 2
Principal Features in Release 2
Release 3
Release 4
Principal innovations introduced compared to
AS IS
• Provisional Allocation
• Provisional Statement
• Supporting reports
 Adjustment of the Reporting of the SCADA files of
Provisional Allocation
 Adjustment of the SNP Reporting (Nomination
Statistics Collected)
 Use of easier formats for reporting and integration of
the information supplied
30
Release 2: Provisional Allocation & Statement - File SCADA
• Below is the Provisional SCADA Report File template to display the data of the Provisional Allocation
for every Meter for the Gas Day, User of the Transportation, Publication Version of the Provisional
Statement:
Denominazione Utente
Giorno Gas
Versione
Crea ed Esporta File Scada
Area Log
31
Release 2: Provisional Allocation & Statement - SNP Report
File Template (1/3)
• Below is the SNP Report template to display Provisional Nominations and Allocations by User of the
Balancing and by single Area of Collection:
Nomination Statistics Collected for the user "Company Name of the User of the Balancing"
information relative to the day 22/09/2013 - Version 1
- The Nomination - Collection values are expressed in GJ
Component
Collected
Nominated
Meters
Component
Collected
Nominated
Meters
Total
47194,5
42528,2
737
Total
47194,5
42528,2
737
Measurement Received
Total MP
Pool
Single
45013,2
13606,9
31406,3
39211,2
24155,2
15056,0
689
221
468
Area of National Collection
Measurement Not Received
Total MNP
Pool
Single
2181,3
2181,3
0,0
3317,0
3317,0
0,0
48
48
0
Not Shared
20000
30000
323
Shared
27194,5
12528,2
414
Measured Daily
Not Measured Daily
45194,5
2000
39528,2
3000
635
102
Measurement Received
Total MP
Pool
Single
CEN Area of Collection
Measurement Not Received
Total MNP
Pool
Single
Not Shared
Shared
Not Measured Daily
31406,3
15056,0
468
13606,9
24155,2
221
45013,2
39211,2
689
0,0
0,0
0
2181,3
3317,0
48
2181,3
3317,0
48
20000
30000
323
27194,5
12528,2
414
Measured Daily
2000
3000
102
Export data displayed
Export Meters report (.xls)
Export Meters report (.txt)
Export Meters report with Details (.xls)
Export Meters report with Details (.txt)
Back
45194,5
39528,2
635
Log Area
32
Release 2: Provisional Allocation & Statement - SNP Report File (2/3)
• Below is the SNP Report template to display Provisional Nominations and Allocations by User of the
Balancing with details of the Meters for Area of Collection selected:
Nomination Statistics Collected for the user "Company Name of the User of the Balancing"
information relative to the day 22/09/2013 - Version 1
- The Nomination - Collection values are expressed in GJ
- The Limit value is expressed n GJ
Search the meter
which contains
3000
Search
Clean
Adjust Allocation
Area of
Collection
Meter
Nominated
Collected
Shared
No. Users
Measurement
Type
Measurement
Status
Type
Limit
Rank Level
NOC
34606600
39211,2
204,6
Yes
2
MG
Received
Rank
35,5
1
NOC
30009401
39211,2
232
No
MG
Not Received
NOC
34203000
39211,2
232
Yes
NMG
Not Received
33
Export Report (.xls)
Export Meters report with Details (.xls)
Export Report (.txt)
Export Meters report with Details (.txt)
Back
Log Area
33
Release 2: Provisional Allocation & Statement - SNP Report File (3/3)
• Below is the SNP Report template to display the Nomination, Collection and Measurement/Estimate by
Physical Meter and Pool of the Collection Area selected:
Detail Meter for the user "Company Name of the User of the Balancing"
information relative to the day 22/09/2013 - Version 1
- The value of Energy is expressed in GJ; Volume in Sm3; PCS in MJ/Sm3
- The Nomination - Collection values are expressed in GJ
- The Limit value is expressed n GJ
Area of
Collection
NOC
NOC
Aggregate
Meter
Nominated
Collected
30347901
30347902
30347901
30347902
39211,2
39211,2
45013,2
45013,2
Measurement/Estimate
Energy
Volume
PCS
204,6
5276
38,779
204,6
5276
38,779
Export data displayed
Shared
No. Users
No
Yes
2
Measurement
Type
MG
MG
Measurement
Status
Not Received
Not Received
Type
Percent
Adjust Allocation
Limit
Rank Level
35,55
Close
Log Area
Detail Meter for the user "Company Name of the User of the Balancing"
information relative to the day 22/09/2013 - Version 1
- The value of Energy is expressed in GJ; Volume in Sm3; PCS in MJ/Sm3
- The Nomination - Collection values are expressed in GJ
- The Limit value is expressed n GJ
Area of
Collection
NOC
NOC
NOC
Aggregate
Meter
Nominated
Collected
34606600
34606600
34606600
34606600
34606601
34606602
39211,2
45013,2
Measurement/Estimate
Energy
Volume
PCS
204,6
5276
38,779
175,1
4530
38,649
29,5
746
39,513
Export data displayed
Log Area
Shared
No. Users
Measurement Type
Yes
2
MG
MG
MG
Measurement
Adjust Allocation
Status
Type
Limit
Not Received Prorata Consistent
Not Received
Received
Rank Level
Close
34
Release 2: Provisional Allocation & Statement – Appropriate capacity Report
• The "Appropriate Capacity" report provides evidence of the capacity used in the provisional allocation
(appropriate capacity - adequate capacity - booked capacity) for the meter selected and for the period of
interest
35
Release 2: Provisional Allocation & Balancing - Allocation by
Collection Area (1/2)
• Below is the template of the Collection Area Allocation report to display the provisional allocation of the
meter selected and of the relative period of interest:
Company name of the User of the Balancing
Allocation by Area of Collection
July 2012
Unit of measure: Nomination GJ; Allocation GJ; Volume Sm3; PCS MJ/Sm3
Day
01/07/2012
02/07/2012
03/07/2012
04/07/2012
05/07/2012
06/07/2012
07/07/2012
08/07/2012
09/07/2012
10/07/2012
11/07/2012
12/07/2012
13/07/2012
14/07/2012
15/07/2012
16/07/2012
17/07/2012
18/07/2012
19/07/2012
20/07/2012
21/07/2012
Collection
Area
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
Meter
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
34640200
Quantity Nominated
Quantity Allocated
Difference
PCS
Volume
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
14,1
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
111,7
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
97,6
37,716
37,676
37,679
37,688
37,690
37,689
37,690
37,691
37,721
37,705
37,681
37,683
37,771
38,032
37,698
37,716
37,708
37,685
37,681
37,671
37,702
2.964
2.967
2.967
2.966
2.966
2.966
2.966
2.966
2.963
2.965
2.966
2.966
2.959
2.939
2.965
2.964
2.964
2.966
2.966
2.967
2.965
Version
1
1
1
1
2
1
1
3
1
1
1
1
1
1
1
2
1
1
1
1
1
Last
Modification
02/07/2012
03/07/2012
04/07/2012
05/07/2012
08/07/2012
07/07/2012
08/07/2012
11/07/2012
10/07/2012
11/07/2012
12/07/2012
13/07/2012
14/07/2012
15/07/2012
16/07/2012
18/07/2012
18/07/2012
19/07/2012
20/07/2012
21/07/2012
22/07/2012
36
Release 2: Provisional Allocation & Balancing - Template
Allocation by Collection Area (1/2)
• Below is the template of the Collection Area Allocation report to display the provisional allocation for all
the points of all the collection areas of the relative period of interest:
Ragione sociale dell'utente del bilanciamento
Allocazione per Area di Prelievo
Mese di Luglio 2012
Unità di misura: Nomina GJ; Allocazione GJ; Volume Sm3; PCS MJ/Sm3
Giorno
01/07/2012
02/07/2012
03/07/2012
04/07/2012
05/07/2012
06/07/2012
01/07/2012
02/07/2012
03/07/2012
04/07/2012
05/07/2012
06/07/2012
01/07/2012
02/07/2012
03/07/2012
04/07/2012
05/07/2012
06/07/2012
01/08/2013
02/08/2013
03/08/2013
04/08/2013
05/08/2013
06/08/2013
Area
Prelievo
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
RN
NOC
NOC
NOC
NOC
NOC
NOC
Misuratore
Quantità Nominata
Quantità Allocata
Differenza
PCS
Volume
37,717
37,677
37,679
37,688
37,690
37,690
38,296
38,351
38,269
38,364
38,293
38,050
38,403
38,397
38,400
38,406
38,440
38,446
38,311
38,291
38,248
38,276
38,233
38,286
2964
2967
2967
2966
2966
2966
5682807
4467927
4404139
4539717
4500349
4346844
9935792
20022287
19419523
17791803
25721616
28757047
24510
18156
7940
2114
7852
21345
Versione
Ultima Modifica
related to cycle 1 and 2 of the day G-1
34640200
34640200
34640200
34640200
34640200
34640200
35718200
35718200
35718200
35718200
35718200
35718200
35718301
35718301
35718301
35718301
35718301
35718301
30009401
30009401
30009401
30009401
30009401
30009401
14,1
14,1
14,1
14,1
14,1
14,1
212612,4
172972,8
172972,8
172972,8
172972,8
172972,8
374572,1
755478,6
749650,9
699668,3
950464,7
1112236,1
41,4
41,5
43,6
49,3
16,6
11,4
111,8
111,8
111,8
111,8
111,8
111,8
217626,8
171349,5
168540,9
174162,9
172330,6
165397,6
381560,0
768793,4
745709,5
683314,7
988751,7
1105580,8
939,0
695,2
303,7
80,9
300,2
817,2
97,7
97,7
97,7
97,7
97,7
97,7
5014,4
-1623,3
-4431,9
1190,1
-642,2
-7575,2
6987,9
13314,8
-3941,4
-16353,6
38287,0
-6655,3
897,6
653,7
260,1
31,6
283,6
805,8
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
2
1
02/08/2013
03/08/2013
04/08/2013
05/08/2013
06/08/2013
07/08/2013
02/08/2013
03/08/2013
04/08/2013
05/08/2013
06/08/2013
07/08/2013
02/08/2013
03/08/2013
04/08/2013
05/08/2013
06/08/2013
07/08/2013
02/08/2013
03/08/2013
04/08/2013
05/08/2013
06/08/2013
07/08/2013
37
Release 2: Provisional Allocation & Statement–
Template Report Provisional Statement
• Below is the template of the Provisional Statement report to display the provisional statement for the
relative period of interest:
38
Release 3: Final Allocation & Balancing,
Transportation Planning
Release 1
Release 2
Principal Features in Release 3
Release 3
Release 4
Principal innovations introduced compared to
AS IS
• Final Allocation
• Final Statement
• Short, medium and long term planning
• Supporting reports
One input template for planning data
Management in "rolling" mode of the missing
Nomination information with the Planning data and
relative supporting report preparation
Use of easier formats for reporting and integration of
the information supplied
39
Release 3: Final Allocation & Balancing,
Template Final Statement Report
• Below is the template of the Final Statement report to display the Final Statement for the relative
period of interest:
Ritaglio schermo acquisito: 07/07/2014 11:07
09:32
40
Ritaglio schermo acquisito: 07/07/2014 11:07
09:32
Release 3 -Planning–
Overview Planning Template
• The template for the input of planning data has the following structure:
o Head Informations (dislpayed in authomatic by LG)
 Name of the users: Company name of the User
 Period of interest: time interval for the planning
 Unit of Measure: Unit of Measure used for planning data
o Planning informations
 Meter: code meter displayed
 Month/Day: quantity of gas to be transported displayed
 % Market Shares: displayed as % of the quantity of gas
 Total: displayed as total quantity of gas to be transported through a Meter for a Day/Month
41
Ritaglio schermo acquisito: 07/07/2014 11:07
09:32
Release 3: Planning–
Template Annual and Half-Yearly Planning
• Below is the template for the input of Annual and half-Yearly Planning
User Name:
STATEMENT
THERMAL YEAR 2014/2015
Unit of Measure
GJ
METER
Civil Taking
OCTOBER
(%)
Indusrtial Thermoelectric
… SEPTEMBER
Taking (%)
Taking (%)
User Name:
STATEMENT
THERMAL YEAR 2014/2015
Unit of Measure
GJ
METER
APRIL
Civil Taking
(%)
Head
Informations
Civil
Taking
(%)
Indusrtial
Taking
(%)
Thermoel
ectric
Taking
(%)
Civil
Taking
(%)
Indusrtial
Taking
(%)
Thermoel
ectric
Taking
(%)
TOTAL
Planning
Informations
TOTAL
Planning
Informations
Head
Informations
Indusrtial Thermoelectric
… SEPTEMBER
Taking (%)
Taking (%)
42
Ritaglio schermo acquisito: 07/07/2014 11:07
09:32
Release 3: Planning –
Template Monthly and Weekly Planning
• Below is the template for the input of Monthly and Weekly Planning
User Name:
STATEMENT
June
Unit of Measure
GJ
2014
Civil Taking
01/06/2014
(%)
METER
Head
Informations
Indusrtial Thermoelectric
…
Taking (%)
Taking (%)
30/06/2014
Civil
Taking
(%)
Thermoel
Indusrtial
ectric
Taking
Taking
(%)
(%)
TOTAL
Planning
Informations
User Name:
STATEMENT
June
Unit of Measure
GJ
METER
2014
Civil Taking
01/06/2014
(%)
Head
Informations
Indusrtial Thermoelectric
… 08/06/2014
Taking (%) Taking (%)
Civil
Taking
(%)
Indusrtial
Taking
(%)
Thermoel
Thermoel
Indusrtial
ectric
Civil Taking
ectric
… 30/06/2014
Taking
Taking
(%)
Taking
(%)
(%)
(%)
TOTAL
Planning
Informations
43
Ritaglio schermo acquisito: 07/07/2014 11:07
09:32
Release 3: Planning–
Template 30-days planning
• Below is the template for the input of 30-days planning
User Name:
STATEMENT
Beginning date
Unit of Measure
GJ
METER
24/05/2014
24/05/2014
Civil Taking
(%)
Head
Informations
Indusrtial Thermoelectric
…
Taking (%)
Taking (%)
23/06/2014
Civil
Taking
(%)
Indusrtial
Taking
(%)
Thermoel
ectric
Taking
(%)
TOTAL
Planning
Informations
44
Release 4: Sess. of Adjustment, Intraday Allocation, ...
Release 1
Release 2
Principal Features in Release 4
Release 3
Release 4
Principal innovations introduced compared
to AS IS
• Adjustment session
• Intraday Allocation
• Display Matching data
 kWh
 Introduction protocol Edig@s to manage the
Nomination and Allocation messages
• Additional supporting reports
45
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• Access method
• B2B Communications
• Next Steps
• Contacts
46
Interim: Release 1
• For the planning of the activities for subsequent releases in accordance with an organization by process, below
is an outline of the operations in relation to the application systems (old and new) given their coexistence
during the transitional phase relative to the Nomination Management activities
NLG System
• It will be used for the following activities:
 Display of supporting identification
information
 Input, change, display Nomination
information, both in web mode, for the
authorized shippers, and X12
Caminus System
• It will continue to manage:
 Display and availability data of Provisional
and Final Statement
 Adjustment Session
 Input, change, display of Planning
information
 Display Reports
 Display nomination information with 5 year
history
47
Interim: Release 2
• For the planning of the activities for subsequent releases in accordance with an organization by process, below
is an outline of the operations in relation to the application systems (old and new) given their coexistence
during the transitional phase relative to the Allocation and Statement activities
NLG System
• In addition to the functions already highlighted for
Release 1, the NLG system will be used for the
following additional activities:
 Display and availability data of Provisional
Statement
 Display Allocation and Provisional Statement
information with 5 year history
Caminus System
•
It will continue to manage:
 Display and availability data of Final
Statement
 Adjustment Session
 Input, change, display of Planning
information
48
Interim: Release 3
• For the planning of the activities for subsequent releases in accordance with an organization by process, below
is an outline of the operations in relation to the application systems (old and new) given their coexistence
during the transitional phase relative to the Allocation and Final Statement activities
NLG System
• In addition to the functions already highlighted for
Release 1 & 2, the NLG system will be used for the
following additional activities:
Caminus System
•
It will continue to manage:
 Adjustment Session
 Display and availability data of Final
Statement
 Input, change, display of Planning
information
 Display Allocation and Final Statement
information with 5 year history
49
Interim: Release 4
• With regard to Release 4, focused on functional and regulatory enhancement, operations will be conducted
entirely on the new system
NLG System
• In addition to the functions already highlighted for
Release 1, 2 & 3, the NLG system will be used for
the following additional activities:
Caminus System
•
n.a. due to complete decommissioning
 Adjustment Session
 kWh
 Management of the Nomination and
Allocation messages through protocol
Edig@s
 Intraday Allocation
 Display Matching data
50
Interim: Attention Points
• In the new platform will exist more data details, for example there will be 7 decimal numbers for the
data expressed in Energy (GJ), until the transition is completed we point out the coexistence of a
different method of managing the number of decimal numbers between the nomination and
allocation data.
• Simultaneous use of both systems (Caminus and NLG), maintaining the operations as is
• Where possible, setting up the data base with depth of five years according to the logic of NLG
51
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• B2B Communications
• Next Steps
• Contacts
52
Interaction Method with the Users
• Communication with the Users can take place in various ways
o
Web interface
 Planning (GUI, File Upload)
 Allocations (GUI, File Download)
 Statements (GUI, File Download)
o
B2B Integration - Protocol X12
 Nominations
o
B2B Integration - Protocol Edig@s
 Nominations
 Allocations
53
Interaction Method with the Users: B2B Communications
• Starting in March special information communications have been published of the Snam Rete
Gas site for the Users relative to the development of the new system, containing information and
instructions on the approach to adopt regarding the innovations introduced by the new platform.
• News of the solution: Increased Security Level
o
the Snam Rete Gas Logistics System will use exclusively the HTTPS (HyperText Transfer Protocol
over Secure Socket Layer) protocol in both directions, with authentication of the system (Basic
Authentication).
o
The coding of the message is not anticipated in the communications, only the transmission channel
through Secure HTTP (HTTPS).
• Connectivity Test on HTTPS protocol completed in June (further details to follow)
54
Connectivity Test X12 - Results
• Number of Shippers who attended the connectivity test: 56
• Results at 30th June 2014 (end of the test)
 Positive: 46 (82%)
 Negative: 2 (3,5%)
 Not attended: 8 (14,5%)
55
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• Access method & interaction with users
• B2B Communications
• Next Steps
• Contacts
56
Next Steps
• Integration Test Release R1: July 2014 / August 2014 (ongoing)
• R1 System Tests: 2 weeks before the go live system, there will be a week for system
test
57
Agenda
• Introduction
• Scope
• The application solution
• New Platform Features
• Release Strategy
• Functionality
• Interim
• Access method & interaction with users
• B2B Communications
• Next Steps
• Contacts
58
Contacts
Contacts
•
Should you need clarifications, please contact the following:
LogisticaGas.support@snamretegas.it
Thank you for your attention
59
Download