Work problems • #22: An experienced bricklayer constructs a small wall in 3 hours. The apprentice (you) completes the job in 6 hours. Find how long it takes if they work together. The answer is not 4.5 hours (no averaging!) The answer is not 9 hours (Makes no sense!!) An experienced bricklayer constructs a small wall in 3 hours. The apprentice (you) completes the job in 6 hours. Find how long it takes if they work together. Make a chart! Hours to complete total job Part of job completed in 1 hr Experienced worker 3 1/3 You 6 1/6 Team effort x 1/x Equation set-up: 1/3 + 1/6 = 1/x Solution: x = 2 hrs #21 Section 5.6 • Smith Engineering found that an experienced surveyor surveys a roadbed in 4 hours. An apprentice surveyor needs 5 hours to do the job. If the two work together, find how long it takes them to complete the job? How long to finish the job Portion of the job completed in 1 hr. Co-worker 4 hrs ¼ Apprentice 5 hrs 1/5 X 1/x Team or working together • Set-up: • 1/4 + 1/5 = 1/x LCD = 20x Solution x = 20/9 hours #26: Distance = Rate X Time • A boat can travel 9 miles upstream in the same amount of time it takes to travel 11 miles downstream. If the current of the river is 3 mi/hr, complete the chart below and use it to find the speed of the boat in still water. A boat can travel 9 miles upstream in the same amount of time it takes to travel 11 miles downstream. If the current of the river is 3 mi/hr, complete the chart below and use it to find the speed of the boat in still water (let boat speed = x). Dist = rate x time time = Dist/rate Distance Rate (boat & river) Time Upstream (against river current – slows you down) 9 mi X-3 (Same time) Downstream (with river current – speeds you up) 11 mi X+3 (Same time) Set-up: 9 11 9(x+3) = 11 (x-3) 9x+27 = 11x-33 27+33 = 11x – 9x 60 = 2x 30 = x The speed of the boat in still water is 30 mi/hr x3 x3