AL-MOUSHEGAH ARABIA LTD.

advertisement
FIELDS OF ACTIVITY
• TURNKEY CONSTRUCTION, MANUFACTURING AND
ERECTION OF BUILDINGS, INDUSTRIAL PLANTS, POWER
PLANTS;
• CIVIL CONSTRUCTION OF HIGH RISE BUILDINGS, DAMS,
COMMERCIAL CENTERS, HOUSING COMPLEXES, HIGHWAYS
AND BRIDGES;
• ERECTION OF HEAVY STEEL STRUCTURES, INDUSTRIAL
STEAM BOILERS, PRESSURE VESSELS AND SPECIALTY
EQUIPMENT.
HIGHLIGHTS…
• AKON INTERNATIONAL JSC, is registered in both in
Turkey, Kingdom of Saudi Arabia, and Russian
Federation.
• AKON undertakes Construction jobs in Saudi Arabia
since 2009
• Head office is located in Ankara, and KSA office is in
Jeddah, and Russian Federation office is in Moscow
• Mainly structural construction projects of faculty
buildings, infrastructure and high rise towers are
constructed in K.S.A. to date.
FACTS & FIGURES
• AKON employs 850+ various skilled personnel in K.S.A. sites
as of January 2013. With the new job awards, the number
is likely to increase to 1000+ by April 2013.
• Parent company, AKON International JSC, located in
Ankara, TURKEY
• Full management, supervisory, financial and equipment
support from parent company.
• AKON Partners have long term experience in the field and
in Turkey & KSA for more than 15 years.
ONGOING PROJECTS
PETRORABIGH NON PROCESS BUILDINGS
S.A. BAYTUR / SAUDI ARAMCO & SUMITOMO
PETRORABIGH NON PROCESS
BUILDINGS PROJECT for PRB II
EXPANSION. TURNKEY
PROCUREMENT,
CONSTRUCTION &
OPERATIONS
PMT Camp, JV Main Offices,
Permanent Admin Building,
Product Warehouses, Laboratuary
Bldg., Maintenance Bldg.,Fire
Marshall Bldg., Main Cafeteria
Bldg. Construction and operations
for 1500 days in our scope.
KING KHALED UNIVERSITY PHASE III
SA BAYTUR CO. / MINISTRY of H. EDUCATION
TOTAL 62,000 sqm of
CONSTRUCTION AREA
GA-01 – 13+2 floors
GA-02 – 4+2 floors
COMPLETE
STRUCTURAL CONSTRUCTION OF
GENERAL ADMINISTRATION (GA-01) &
GRAND CELEBRATION HALL (GA-02)
BUILDINGS
COMPLETED PROJECTS
HARAMAIN RAILWAY – MADINAH STATION
YAPI MERKEZI / SAUDI RAILWAYS ORG.
800 x 600 meters, with
a concourse, a
platform and a 5
storey car park. Total
85,000 cum concrete
STRUCTURAL CONSTRUCTION
OF HAJJ PILGRIMS TRAIN
STATION in MADINAH, K.S.A.
FOR THE HARAMAIN HIGH
SPEED RAILWAY
JABAL OMAR DEVELOPMENT PROJECT
NESMA & PARTNERS / JABAL OMAR DEVELOPMENT CO.
COMPLETE STRUCTURAL CONSTRUCTION of TWO
HOTEL TOWERS, H8 & H9, HAVING TOTAL 82,000
sqm CLOSED AREA, IN THE PRESTIGIOUS JABAL
OMAR PROJECT, NEXT TO HOLY HARAM, MAKKAH,
K.S.A
JABAL OMAR DEVELOPMENT PROJECT
S.A. BAYTUR/ JABAL OMAR DEVELOPMENT CO.
MOBILIZATION and PROJECT BIDDING /
CONSTRUCTION CONSULTANCY SERVICES
for S1 AREA TOWERS PROJECT for JABAL
OMAR DEVELOPMENT CO / SAUDI ARABIAN
BAYTUR CO.
PRINCESS NOURA UNIVERSITY
RENAISSANCE SAUDIA / SAUDI OGER / MIN. of FINANCE
TOTAL 80,000 sqm
CONSTRUCTION AREA
BUILDING 1.4.0
FAMILY and CONSUMER
SCIENCES FACULTY
COMPLETE STRUCTURAL
CONSTRUCTION of FACULTY
BUILDING IN THE PRESTIGIOUS
PRINCESS NOURA UNIVERSITY
for WOMEN PROJECT, IN
RIYADH, K.S.A.
KING SAUD UNIVERSITY EXPANSION PROJECT
RENAISSANCE SAUDIA / SAUDI BIN LADIN / MIN. of H. EDUCATION
TOTAL 12,500 sqm
CONSTRUCTION AREA
BUILDING B68
AGRICULTURAL SCIENCES
FACULTY
COMPLETE STRUCTURAL
CONSTRUCTION of FACULTY
BUILDING IN THE PRESTIGIOUS
KING SAUD UNIVERSITY for
GIRLS PROJECT, IN RIYADH,
K.S.A.
PROJECTS MANAGED by
AKON PARTNERS
HUNTSTOWN POWER PLANT PROJECT
IRISH ELECTRICITY / GAMA POWER/ 2001
Construction of 380 MW
Combined Cycle Power Plant
for Irish Electricity Co.
Full design, civil,
mechanical,
electrical &
instrumentation
fabrication &
installation
contract.
DENIS COAL HANDLING PROJECT
TEK / GAMA / 1989
Construction of coal handling
facility for Soma Thermal Power
Plant in Manisa, Turkey
Full civil, mechanical,
electrical &
instrumentation supply,
fabrication & installation
contract.
Contract value : USD 55 M
Contract finish : March 1989
CAYIRHAN THERMAL POWER PLANT
TEAS / GAMA-KBL CONSORTIUM / 1991
Construction of EPC Flue Gas
Desulphurization System of
2x150 MW Thermal Power
Plant
Full detail design, civil,
mechanical, electrical &
instrumentation
fabrication & installation
contract.
SOMA B POWER PLANT UNITS 3&4 PROJECT
TEK / SKODA / GAMA / 1986
Construction 2x135 MW
Soma B Thermal Power
Plant, Units 3&4 in
Manisa, Turkey
Full civil, mechanical,
electrical &
instrumentation
supply, fabrication &
installation contract.
Contract finish : January 1986
YAMULA DAM & HEPP PROJECT
KAYSERI ELECTRICITY/ AYDINER/ 2004
Construction of
Yamula Dam and
auxiliary structures
Full design, civil,
mechanical,
electrical &
instrumentation
fabrication &
installation and
commissioning
RABIGH CEMENT PLANT PROJECT
ACC / OEMAG / GAMA / 2008
Construction of 6000 tpd extension for
Arabian Cement Co. (ACC) in Rabigh,
increasing total capacity to 20,000 tpd.
Civil & structural
supply and erection,
equipment erection,
commissioning
assistance are some
scope items…
Completion : June 2008
NATPET PP PROJECT
TECNIMONT / NATPET / GAMA / 2007
Construction of 400k tpy PP
Plant for NATPET – YANBU
PDH/PP Facilities
Full civil,
mechanical,
electrical &
instrumentation
fabrication &
installation
contract.
Contract finish : March 2007
PETRORABIGH LLDPE / EPPE PLANT PROJECT
PETRORABIGH / TECNIMONT / GAMA / 2009
Construction of 1,000,000 tpy EPPE/ LLDPE
Polymers plant for Petrorabigh
Civil & structural supply and
erection, equipment
erection, commissioning
assistance are some scope
items
Completion : Jan 2009
NAMA EPOXY RESIN PLANT
MITSUI / GAMA / 1999
Turnkey construction of
19,700 tonnes/year Epoxy
Resin Plant and Port facilities.
Epoxy resins plant and
epichlorohydrine supply
port loading and tank
facilities, along with a 22
km transport pipeline is
constructed as turnkey
IBN ZAHR PP-II PROJECT
SABIC / PARSONS / GAMA / 2001
Mechanical construction and erection
main contract for 320,000 TONS/YR
capacity Polypropylene plant & 8 km.
Propylene feed pipeline from
Petrokemya plant…
Heavy lifts, steel structure, tie-ins, clean piping
fabrication, erection & preservation, aluminum
construction are some critical aspects…
HAWIYAH GAS PLANT PROJECT
SAUDI ARAMCO / TECHNIP / GAMA / 2001
Civil & Mechanical supply,
construction and erection main
contract for Hawiyah Gas Plant,
Sulfur Recovery unit.
Heavy lifts, sour service piping fabrication
and installation, steel structure erection,
underground RTR piping network, non-utility
buildings design,supply & construction,
according to Saudi Aramco standards…
PETROKEMYA POLYETHYLENE PROJECT SABIC /
SABIC / SATEC / GAMA 2003
Construction and erection of
800.000 TPY Polyethylene Plant,
GC-2 and RC Buildings Packages.
Turnkey civil, structural and
mechanical erection, E&I
installation contract
Four Reinforced concrete buildings,
one main plant building, two preengineered buildings, 23000 m3
concrete, 3500 mT Structural Steel,
3250 mT equipment, 196.000 wdi
piping, including OSBL 60” FRP
pipeline and full E&I works.
SAFCO AMMONIA / UREA PROJECT
SABIC / UHDE / GAMA / 2005
Civil & underground works
contract for the SAFCO
Fertilizer Plant expansion
works. (SAFCO IV)
. 216,776 m3 excavation
works, 55,000 m3 concrete
works, including works at
KFI Port and working plant
EASTERN PROVINCE CEMENT PLANT PROJECT
EPCC / KRUPP POLYSIUS / GAMA / 2004
Construction of 3500 tpd extension
for EPCC Plant in Khursaniyah
Civil & structural design, supply
and erection, equipment erection
Completed by October 2004
BERRI GAS PLANT SRU PROJECT
SAUDI ARAMCO / TECHNIP / GAMA 2006
Full civil, structural, equipment,
piping fabrication & erection of
SRU unit for Berri Gas Plant, Qatif
Facilities Program.
The job is commenced in a
live plant in seven
different locations on site.
Some major scope items
consist of 69 tie-ins
including hot taps,
700,000 wdi piping
fabrication with different
alloys, heavy lifts and 27
buildings, adding up to
35,000 m3 of concrete,
7250 mT of structural
steel and 10000 mT of
equipment erection
WAFA COASTAL GAS PLANT PROJECT
AGIPGAS / TECNIMONT / GAMA 2004
Full civil, structural, equipment, piping fabrication & erection of
Wafa Coastal Gas Plant in Mellitah, LIBYA, within 25 months…
YAMAMA SAUDI CEMENT PLANT PROJECT
YSCC / KRUPP POLYSIUS / GAMA / 2005
Construction of 10000 tpd extension
forYSCC Plant in RIYADH
Proud to be part of the
construction for the
World’s largest single
line capacity cement
plant..
178 m high preheater
tower, 21000 mT of steel
structure, 110000 m3 of
concrete are major scope
items…
Commissioned by December 2005
PETROKEMYA EPS / SPS WAREHOUSE PROJECT
SABIC / GAMA / 1999
Expansion of the Explosion Proof
Warehouse (EPS) and the new
construction of SPS warehouse in
Petrokemya facility
Complete design, supply, erection
and integration of existing Fire
Water and Instrumentation
networks
Completed on July 1999
Download