IHI’s Activities for coal-fired generation in Southeast Asia 3rd.September, 2014 IHI Corporation Contents 1. Company Profile 2. Recent Activities for Coal Fired Power Plant Business in Asia 3. Introduction of TIGAR(Twin IHI GAsifieR) 2 1.IHI Company Profile Founded Net Sales Works Branch Offices Subsidiaries : 1853 : JPY 1,236,049 mil (USD 13,355 mil) : 10 : 19(Japan) , 14(Overseas) : 182 Information is on consolidated basis and is corrected as of March 2013 Total Sales Volume The First Steamship Built by Japanese Private Company – “Tsu-un maru”. Global Network / as of March, 2014 Others 8% Social Infrastructu re 9% Resources, Energy and Environme nt 26% Industrial Aero Systems Engines 30% 27% Overseas Office Copyright © 2013 IHI Corporation All Rights Reserved. Global Subsidiary Company 3 1.IHI Business Areas Resources, Energy and and Environment (Boiler, Gas Turbine/Gas Engine, LNG Terminal, Process Plant, Nuclear Equipment, etc.) Resources, Energy and Environment Aero Engines and Space (Jet Engine, Rocket) Social Infrastructure and Offshore Facilities (Bridge, Transportation System, Security, etc.) Aero, Engines and Space Development General-Purpose Machinery (Compressor, Separator, Turbo charger, etc.) Social Infrastructure and Offshore Facilities Industrial Systems and General-Purpose Machinery Industrial Systems (Steel Manufacturing Furnaces, Heat/Surface Treatment Equipment, Logistics Systems, Material Handling Equipment, etc.) 4 2.Overview of IHI Energy & Plant Business • PC Boiler • Oil / Gas Firing Boiler • DeNOx/DeSOx System • CCS System • HRSG (for wide range of Gas Turbine Output) • Gas Turbine (for base load & peak cut) • LNG Receiving Terminal (EPC Service) •Storage Tank (LPG, LNG, Helium) Copyright © 2013 IHI Corporation All Rights Copyright © 2014 IHI Corporation AllReserved. Rights Reserved. 5 2.IHI Clean Coal Technology IHI supplies the world with state-of-the-art coal-fired boilers, utilizing Clean Coal Technology (CCT), which we developed through years of extensive research. This technology enables us to use coal, a cheap and widely available resource, more efficiently and economically, resulting in lower CO2 emissions and a better utilization of the world’s limited natural resources. IHI’s accumulated technology is also used in other coal-fired IHI USC/SC Boiler power plant applications, such as De-NOx and De-SOx. World’s Highest Reheat Temp.(623℃) USC Boiler Oxy-fuel Demo. Project High Plant Efficiency Photo is provided by J-POWER(EPDC) IHI’s Proven Boiler Design CO2 Reduction Low Nox System IHI Clean Coal Technology Over 95% Availability, over 20 years operation High Availability Hekinan No.3 DeNOx DeSOx Copyright © 2014 IHI Corporation All Rights Reserved. Clean & Low Emission Low (First USC Boiler in Japan) Rank Coal Applica CCTF(Test Facility) Sub-bitu. fired boiler -tion 6 2.IHI USC/Super-critical Boilers Proven Design IHI’s expertise in supercritical boiler have been accumulated over the last 30 years since the first supercritical-unit entered into commercial operation in 1980. Design Options ready for Customer’s Preference IHI is ready to offer for optimum supercritical boiler design options according to the customer’s preference and needs, i.e. 2 pass or 1 pass (tower type), 400MW to 1,100MW class, various kinds of fuels, operation and emission requirements. Callide C No.3 & 4 Tomato Atsuma No.2 Hekinan No.3 Tachibanawan No.1 New-Isogo No.1 Lünen Capacity 420MW 600MW 700MW 1,050MW 600MW 813MW Steam Condition 25.0MPa 566/566oC 24.1MPa 538/566oC 24.1MPa 538/593oC 25.0MPa 600/610oC 27.5MPa 600/610oC 28.8MPa 600/610oC Completion 2001 1985 1993 2000 2002 2013 RH SH EVAP ECO Copyright © 2014 IHI Corporation All Rights Reserved. 7 2.References of IHI USC/SC Boilers IHI has delivered a large number of Ultra Super Critical (USC) boilers since the first delivery of a USC coal-fired boiler in 1993. IHI has consolidated this extensive experience in our latest USC technology which powers our reliable, highly efficient boilers. USC Steam Condition >593 ℃ Plant Hekinan No.3 Noshiro No.2 Reihoku No.1 Nanao Ohta No.2 Tachibanawan No.1 Hekinan No.4 Callide No.3 Callide No.4 Hekinan No.5 Tomato Atsuma No.4 Isogo new No.1 Tarong North No.1 Shinko Kobe No.2 Sumitomo Kashima Isogo new No.2 Maizuru No.2 Sandy Creek No.1 TPK Lünen Talin Jimah East Power Copyright © 2014 IHI Corporation All Rights Reserved. Electricity Output 700 MW 600 MW 700 MW 700 MW 1,050 MW 1,000 MW 420 MW 420 MW 1,000 MW 700 MW 600 MW 450 MW 700 MW 507 MW 600 MW 900 MW 998.5 MW 813 MW 800MW 1,000MW Steam Capacity Steam Conditions COD USC 2,250 t/h 1,860 t/h 2,260 t/h 2,120 t/h 3,000 t/h 3,050 t/h 1,281 t/h 1,281 t/h 3,050 t/h 2,040 t/h 1,710 t/h 1,370 t/h 2,340 t/h 1,590 t/h 1,670 t/h 2,570 t/h 2,852 t/h 2,225 t/h 2,369 t/h 25.0MPa /543/596C 25.0MPa /570/596C 25.0MPa /570/568C 25.0MPa /597/595C 25.9MPa /605/613C 25.0MPa /571/596C 25.9MPa /569/568C 25.9MPa /569/568C 25.0MPa /571/596C 25.9MPa /603/602C 27.5MPa /605/613C 25.9MPa /569/568C 25.0MPa /541/568C 25.0MPa /542/568C 27.2MPa /605/623C 25.4MPa /600/598C 26.9MPa /585/583C 28.8MPa /600/610C 25.9MPa /602/601C 1993 1994 1995 1998 2000 2001 2001 2001 2002 2002 2002 2003 2004 2007 2009 2010 2013 2013 ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ ○ Under construction Under Engineering 8 2.Resources in South East Asia Aioi Works Vietnam: IHI Infrastructure Asia Co.,LTD. (Bridge / Steel Structure Manufacturing) IHI HQ JAPAN IHI Aioi Works (Boiler pressure Parts) IHI HQ (Tokyo, Japan) Malaysia: IHI Power System Malaysia (Maintenance) IHI Inc. PPED (Kansas, USA) Philippine: IHI Philippine Inc. (Engineering) Singapore : Jurong Engineering Ltd.(JEL) Indonesia : PT.JEL IHI Asia Pacific (IHIAP) (Singapore) IHI Engineering Australia (Sydney, Australia) Point of Asia Engineering Manufacturing Maintenance Indonesia:PT.Cilegon Fabricators(PTCF) (Boiler/Steel Structure Manufacturing) PT.Cilegon Fabricators In Indonesia projects, IHI can optimize the contribution of Indonesian resources, especially PT. JEL for construction work and PT Cilegon Fabricators for manufacturing. Copyright © 2014 IHI Corporation All Rights Reserved. Copyright © 2013 IHI Corporation All Rights Reserved. 9 2.PT Cilegon Fabricator IHI manufactures Boiler & HRSG Pressure parts with world class quality in INDONESIA. Private Jetty & 150tons Ringer Crane Capability Ground: Approx. 250,000m2 Floor Space: Approx. 40,000m2 Employees: Approx. 1,300 Product Line up: Boiler Pressure Parts, HRSG Pressure Parts, Piping & Structural Steels incl. Ducting, Casing, Backstay Certification ISO9001 / Quality Management System American Society of Mechanical Engineers (ASME) / S, U & PP Stamp Shareholders IHI 89% JEL(a member of IHI group) 11% Copyright © 2014 IHI Corporation All Rights Reserved. Copyright © 2013 IHI Corporation All Rights Reserved. 10 2.Outline of PT. JEL IHI 95% Board of Directors Mr. Yap Chee Lung, President Director The composition of stockholders 100% subsidiary of JEL, who is 95% subsidiary of IHI JEL 100 PT JEL % Power Plant Division In the Power Plant Sector, aside from conventional Coal or Gas Fired Plants, JEL is also an expert in Combined Cycle, Cogeneration, Hydroelectric and Diesel Generator and Waste to Energy Power Plants. PT.JEL are a certified construction company holding construction licenses. SIUJK SBU Gapeksindo SKT Migas Copyright © 2014 IHI Corporation All Rights Reserved. SBU Aklindo SKT Geothermal 11 Maximization of Local Contents 【Steal Structure(S/S)】 Since PTCF is professional for S/S work, most of S/S is fabricated in PTCF. Raw material for the S/S is becoming available gradually in Indonesia. IHI are planning to fully utilize local material to maximize local contents. 【Installation work】 In the case IHI work on as EPC contractor, we utilize our group company, PT JEL, and more local contents will be expected. only IHI group can maximize the target. Copyright © 2014 IHI Corporation All Rights Reserved. For the large scale 1000MW class projects, We are confident only IHI can achieve higher target. 12 2.References of IHI Sub-Bitu. Coal fired Boilers Typ. Coal Spec. CV(a.r.) : 4,500~4,800kcal/kg Total Moisture : 27%~32% Ash : 6% Sulfur : 0.5wt% HGI : 58 Actual Operating Situation ・Successful Operation over 97% Availability with Full Load in 2011. (Actual Result) - BEST of the BEST IHI’s steam generator was praised as one of the six innovative top coal fired plants by “POWER” and was featured on the October 2009 cover. Client : Nebraska City Power Partners (JV of Black&Veatch, Zachry & Kiewit), USA Unit : OPPD Nebraska City No.2 Turbine Output : 660MWnet Boiler Capacity : 2,155 t/h Steam Conditions: 18.0MPa, 569/567 oC (IHI Natural Circulation Single Drum Reheat Type, Indoor) Fuel : Pulverized Coal (100% Sub-bituminous Coal) Commercial Operation : 2009 Copyright © 2014 IHI Corporation All Rights Reserved. 13 2.References of IHI Sub-Bitu. Coal fired Boilers Client : Sandy Creek Energy Associates, L.P., USA Unit : Sandy Creek Turbine Output : 900MWnet Boiler Capacity : 2,852 t/h Steam Conditions: 26.9MPa, 585/583 oC Fuel : Pulverized Coal (100% Sub-bituminous Coal) Commercial Operation : 2013 Copyright © 2014 IHI Corporation All Rights Reserved. 14 2.References of IHI Sub-Bitu. Coal fired Boilers Confidential Under Construction as of 24th June 2014 Client : Taiwan Power Company, Taiwan Unit : TALIN POWER PLANT RENEWAL PROJECT Turbine Output : 2 x 800MW (Gross) Commercial Operation : 2017(#1) 2018 (#2) Boiler Capacity : 2 x 2,369 t/h Copyright © 2014 IHI Corporation All Rights Reserved. Steam Conditions: 25.9MPa, o 602/601 C (Ultra Super Critical) 15 2.References of IHI Sub-Bitu. Coal fired Boilers Malaysia Jimah East Power Coal Fired Power in Operation Boiler Market sharePlant in Malaysia BTG Market Share (MW) Type : Capacity : Fuel : USC / Once Through, Variable Pressure, Reheat type 2 x 1,000 MW (Net) 100% Sub-bituminous Coal Alstom 34% IHI / TSB 40% IHI / MHI 10% IHI / GE 16% IHI’s Share(66%) will be 73%. SSAA Power Station (Kapar) * 300MW x 2 (1989) B: IHI, TG: MHI * 500MW x 2 (1998) B: IHI, TG: GE Tanjung Bin Power Station 700MW x 3 (2007) B: IHI, TG: TSB Jimah East Power 1,000MW x 2 (2018,2019) B: IHI, TG: Toshiba Jimah Power Station * 700MW x 2 (2009) B: IHI, TG: TSB 16 Copyright © 2014 IHI Corporation All Rights Reserved. 3.IHI Gasification Technology “TIGAR” (Twin IHI GAsifieR) ~ Application to Low Rank Coal~ 3.Characteristics of TIGAR IHI has been developing TIGAR both for Low rank coal and Biomass gasification based on in-house Circulating Fluidized Bed (CFB) technology. Basis of TIGAR Multi product application Operation condition ・Atmospheric ・Low temp. Shift Supply the required heat for gasification reaction with hot bed material Combustor (heat emission) Reforming H2 CH4 Circulation Synthesis Gasifier Circulate remaining char after gasification with bed material (heat absorption) Fuel/materials DME MeOH Syngas component at gasifier outlet CH4 9% Air Steam SNG Syngas CTL Combust char with air Fuel cell NH3 Steam gasification, Bubbling Fluidized bed CO2 19% Automobile fuel Chemical raw material Other HC 3% H2 51% CO 18% 18 2. Characteristics of TIGAR ① Lower CAPEX and simple Operation & Maintenance - Lower pressure and lower temperature in operating condition ② Simple Fuel preparation - Coarse size and higher moisture are acceptable ③ No N2 contamination in Syn-gas, because of Steam gasification IHI -TIGAR- Type A Type B Type C Gasifier type Fluidized bed Pressure Atmospheric >3MPa >3MPa 1-3MPa Temperature 800-1,000℃ >1,400℃ >1,400℃ >1,200℃ Gasification agent Steam Oxygen Oxygen Oxygen Fuel particle size <10mm <0.1mm <0.1mm 4~5mm Fuel configuration Bulk, powder Powder Slurry Bulk Residue Dry Ash Slag Slag Dry Ash Entrained bed Moving bed 19 3. TIGAR Development schedule at present 2004~ 2009 2010 2011 2012 2013 2014 2015 2016 2017 Japanese Government (METI*) Support *Ministry of Economy, Trade and Industry Basic Test 6TPD Pilot Plant 50TPD Prototype Plant EPC 6TPD@Yokohama, JAPAN 50TPD@Kujang, INDONESIA Demonstration Test Commer cial Plant Commercial plant image TIGAR×4units (1reserve) Coal feed : 3000 TPD ( Substantially NH3 : 1000 TPD) 20 3. 50t/d prototype plant PJ at Indonesia Organization chart Government Talk METI Ministry of Economy, Trade and Industry Ministry of Industry Ministry of state-owned enterprises PT. Pupuk Indonesia (PIHC) IHI Corporation Cooperation MEMR Ministry of Energy and Mineral Resources ARDEMR Agency of Research and Development of Energy and Mineral Resource tekMIRA PT. Pupuk Kujang Support 21 3. 50t/d prototype plant PJ at Indonesia 【Purpose】 ①Check the maintenance durability in long operation (Total 4,000 hr operation) using Indonesia lignite. Jakarta Easy access for site visit IHI Cilegon factory Easy access for maintenance ②Confirmation of TIGAR performance and reliability, and reflect in commercial plant engineering. ③Demonstration of TIGAR gasification technology for future clients. <50t/d (About 75km from Jakarta) Java, INDONESIA <Plant site> plant spec> Coal feed rate 50ton/day(as received, 43% moisture) Syngas output 1,800m3N/h-dry Steam generation 4.5t/h(2.0MPaG, 513deg.C) Site area PT Pupuk Kujang 100m×80m <50t/d 3D bird’s view> 22 3. 50t/d prototype plant PJ at Indonesia at present Schedule Year 2011 Month 7-12 2012 1-3 4-6 7-9 2013 10-12 1-3 4-6 7-9 2014 10-12 1-3 4-6 7-9 10-12 2015 2016 1-12 1-12 Design Procurement / Construction Operation / Test Procurement / Fabrication Site Mobilization 50TPD Civil / Building Erection / Installation Pre-Commissioning Operation 23 3. 50t/d prototype plant PJ at Indonesia Progress July 2014 Waste Water area Gasifier structure area Copyright © 2014 IHI Corporation All Rights Reserved. Gas Purification area TIGAR Control Center KIKC Main Road Kujang Plant KIKC Gate TIGAR Site 3. Summary Twin IHI Gasifier (TIGAR) is being developed for lignite gasification TIGAR is suitable for Indonesia market needs & Expectations TIGAR This year, we will start the demonstration operation with 50TPD in Indonesia 25 Terima kasih atas perhatian Anda Copyright © 2014 IHI Corporation All Rights Reserved. 26