Building Good Asset Information and the role of BIM

advertisement
Wellington City Council
Building Good Asset Information
and the role of BIM
Sept 2014
Past: Spade <> Spade
Therefore we cannot share.
Interdisciplinary Model – Building Competency
Interdisciplinary Model – Adopting Standards
International Standards
Local, Regional, National Standards
Design & Build Standards
Technical Standards
GIS Standards
Meta-Data Standards
Hierarchy
Interdisciplinary Model – The Model Hierarchy
Hierarchy
Social Models
Cultural Models
Environmental Models
Economic Models
Financial Models
Demand Models
Capacity Models
Resilience Models
Condition Models
Statistical Models
Interdisciplinary Model – The first blocks
Interdisciplinary Model – Asset Agnostic
Interdisciplinary Model – WCC’s Asset Platform
Interdisciplinary Model – Intra-sectorial
Interdisciplinary Model – Intra-sectorial
Interdisciplinary Model – The Sector
Interdisciplinary Model – Inter-Sectorial
Interdisciplinary Model – Inter-Sectorial
Interdisciplinary Model – Inter-Sectorial
Interdisciplinary Model – Adopting Standards
International Standards
Local, Regional, National Standards
Design & Build Standards
Technical Standards
GIS Standards
Meta-Data Standards
Hierarchy
Meta-Data Standards &
Statistical Models
Social Models
Cultural Models
Environmental Models
Economic Models
Financial Models
Demand Models
Capacity Models
Resilience Models, Criticality
Models
Condition Models
Statistical Models
The most fundamental of all the
building blocks are not / have never
been established
3 pillars of Meta-data Standards
1st Pillar - Meta-Data Standards
1st Strategic Decision
3-Waters
& Transport
& Built
& Green
Common
Data
Platform
2nd Pillar - Asset Mgt. Information Systems
2nd Strategic Decision
One
version of
the truth
3rd Pillar - Analytics
3rd Strategic Decision
DATA SCIENCE
(Statistical Models)
MATERIALS SCIENCE
(Physical Models)
3 Pillars - Integrated
Having set the scientific platform…
…these must line up
Now: Spade = Spade
We have a common language
The Role of BIM
BIM Enabled Investment Analytics – any House……
REVIT Models (BIM)
BIM Enabled Investment Analytics – multiple
applications……
Bracken Rd Flats
WGTN
Wellington City Council
– Retrospective Data
Collection Tool
Berkeley Dallard City
Housing Estate
WGTN
Wellington City Council
– Refurbishment Data
Collection Tool
77 Burke St, CHCH
HNZC
– New Build Data
Collection Tool
SPM integration
• Took the details from the BIM model translated them into our
SPM requirements
• Ensured SPM could take the data needed
• Created a standard structure within SPM
• Imported the appropriate fields
• The import process took less than 2 minutes
Local (individual) Benefits
3D BIM data modelling is an additional up front cost… but
• New Architects and Draughts people are designing buildings in 3D
systems – so the additional cost is reduced
• Electronic plans are available throughout the life cycle of the
building (no redrawing)
• Reduces ongoing survey costs, “is it there?” and “how big is it?”
are already captured – allowing focus on Condition
• One building, one place, all information
Local Benefits (cont’d)
• Plans can be modelled through to SPM (or your AMIS) before the
building gets the green light, therefore operational costs become
part of the initial decision matrix
• It allows multiple design drawings to be modelled for both renewal
and maintenance at a low cost
• It allows multiple component iterations of a single model to be
modelled against each other in SPM
Local Benefits (cont’d)
• It can give FM/AM Managers electronic data from DAY 1
• You know where your assets are and what they are
• Allows evidenced based decision making
Wider Benefits
An integrated Design / Build & Asset Management & Facilities / Operations Management
Wider Benefits
An integrated Design / Build & Asset Management & Facilities / Operations Management
Wider Benefits
An integrated Design / Build & Asset Management & Facilities / Operations Management
Wider Benefits
An integrated Design / Build & Asset Management & Facilities / Operations Management
Wider Benefits
An integrated Design / Build & Asset Management & Facilities / Operations Management
Wider Benefits....
Wider Benefits....
Interrogating
Productive
Potential
??
Wider Benefits....
Wider Benefits....
Design/Construction is
10-20% of ‘Building
Lifecycle Cost’
Leaving how much for
Asset and Facilities
Managers to influence?
Where are WCC going next?
• We are looking at the Business case to go back and capture 3D data on
all our buildings
• We are building tools to improve the linkage out of Revit
• We are looking to build a custom SQL Database to store all 3D model
data, leaving SPM to do what it does best
• We are looking at electronic data submission of projects as Standard,
not as a nice to have
• Proof of Concepts for other design packages e.g. Archicad
Summary
• WCC are moving forward with capturing our buildings in 3D
• Other Asset Management streams are starting to require electronic data
submission
• We have proved that electronic data transfer from a 3D package is
possible, and with a little development will become easier
• We are happy to talk about what we are doing. This will eventually
return big dividends for the Council and NZ Inc.
• Haydn Read, Manager of the SAMP team has been out speaking to other
major Government building portfolio managers.
Wellington City Council
QUESTIONS?
Haydn Read BSc.(Hons), MSc., NZIM, Adv. Dip Fin., MBA (Dist.), MIoDNZ, MIGENIUM, MIPENZ
Strategic Asset Planning Manager, WCC
haydn.read@wcc.govt.nz
Tane Dunne
T/L Green & Built Assets, WCC
tane.dunne@wcc.govt.nz
Download