Bosnia and Hercegovina FEDERATION OF - Vlada SBK

advertisement
Bosnia and Hercegovina
FEDERATION OF BOSNIA AND HERCEGOVINA
CENTRAL BOSNIA CANTON IN FIGURES
Surface in km2
Bosnia and Hercegovina
Federation of Bosnia and Hercegovina
Central Bosnia Canton
•
Location of
•
•
•
•
•
•
•
•
•
•
•
•
•
Location of municipality km²
1.Bugojno
361
2.Busovaća
158
3.Dobretići
59
4.Donji Vakuf
320
5.Fojnica
306
6.Gornji Vakuf-Uskoplje 402
7.Jajce
339
8.Kiseljak
165
9.Kreševo
149
10.Novi Travnik
242
11.Travnik
529
12.Vitez
159
•
•
•
•
•
•
•
•
•
•
•
•
•
•
VALUES OF MAJOR METEROLOGICAL PHENOMENA 1) 2003 2004 2005 2006
AVERAGE ANNUAL VALUES
Blast-Pressure , mb 952,5 951,3 951,6 952,5 951,50
Temperature C 9,9 10,7 8,9 9,5 10,6
Relative humidity, % 73 76 76 76 71
Cloudiness(tenths) 5,8 6,6 6,5 6,3 6,1
ANNUAL VALUES
Absolute max. temperature,C 36,2 36,0 35,4 36,0 39,30
Apsolutnemin.temperature ,C -22,8 -16,2 -20,4 -19,8 -15,3
Precipitation, l/m2614 912 924 787 918
Number of days with precipitation, > 0,1 mm 129 134 160 135 155
Number of days with snow, > 1 cm 73 69 85 69 45
Maximum height of snow, cm 41 29 49 19 27
Insolation (sati) 1933,8 1701,7 1666,4 1618,9 1885
•
1 ) The data relating to the Meteorological Station Bugojno Central Bosnia Canton in figures 2010.
51.209,2
26.110,0
3.189,0
MINISTRY OF ECONOMY OF CENTRAL BOSNIA CANTON
Stanična 43, 72 270, Travnik
Tel/Phone/Fax: +387 30 51 12 17
In Ministry of Economy, SBK–a, acting industry, enterprises, trade and
business , whose activities lead of statistical data of industrial facilities in
Canton.
REPRESENTED SECTORS OF THE ECONOMY IN THE CANTON
•
•
•
•
•
•
•
•
•
•
•
•
The favorable geographical position and great natural wealth to influence
the Central Bosnia Canton is attractive to investors and economic
development of the following branches:
Textiles, footwear, leather and rubber
Wood
Metal
Mining
Building
Tourism-hospitality
Traffic
Chemical Industry
Graphic
Trade
Craft
INDUSTRIAL/BUSINESS ZONE
•
POSSIBLE ESTABLISHMENT
AND CONSTRUCTION OF
INDUSTRIAL / BUSINESS ZONE
THE GENERAL IDEA FOR THE DEVELOPMENT OF INDUSTRIALS
ZONE
A new approach to regional development
EU regional policy in the period 2000-2006. spent 226 billion while
for the period 2007-2013. plans to allocate 336 billion €,
Increasing employment growth will be achieved through actions at
regional level:
- Development of regional and local action plans and
strategic documents,
- Promoting the creation of business zones and clusters
- The creation of entrepreneurial culture
- The expansion of cooperation between educational and business
Sector
•
•
In Central Bosnia Canton made a study of establishing industrial / commercial
zone.
The study predicts that the SBK build a total of 21 industrial zones by
municipality:
Bugojno 2; Busovača 2; Donji Vakuf 1; Gornji Vakuf-Uskoplje 2, 3, Novi
Travnik, Travnik 7; Vitez 4;
•
Through the study shows that there is an economic interest in the construction
of industrial zones.
SBK municipalities are ready for joint ventures in industrial zones with potential
investors
.
Gasification SBK
Ordi
nal
PTG3
Work.
press.
Max.
Consumpti
on of gas
(m3)
Invest
ment
(mil.€)
13
Project name
Phase
Lenght
Dia
meter
(inch)
Zenica – Travnik
I–
regija
Lašva
40 km
16
11/18
bar
80 mil.
50 km
12,75
11/18
bar
50 mil.
Travnik –
G.Vakuf
Travnik – Jajce
II –
regija
Vrbas
20
30 km
16
11/18
bar
17 mil
Process of concession
Feasibility study award of the concession building distribution system and
distribution of natural gas for the municipalities of Busovaca, Vitez, Novi Travnik and
Travnik
Opinion FMERI
Energy agreement BH Gas
Approval of municipal councils to
initiate procedure for the award of
concessions
SBK government decision to initiate
procedures for the concession
Choosing the best bidder
Public Tenders
Decision about concession
Concession Contract
Project Fast Road Lašva-Donji Vakuf
In Central Bosnia Canton is in the stage production of design
documents for the project on the fast road between Lašva Donji
Vakuf.
Completed the General project
Total length of roads Lašva - Donji Vakuf 54.66 miles from that
46.88-route miles, or 86%
-Tune 6.10 kilometers, or 11%
-Bridges 1.65 miles or 3%
The total estimated cost of the project would amount to 499.1 KM
Milion, as follows:
-Route of 187.4 million KM
-Tune 253.9 million KM
-Bridges of 57.8 million KM
The project would be built in four phases and that.
1.Lašva-Vitez of the total length of 17.93 kilometers
2.Vitez-Travnik total length of 15.47 kilometers
3. Travnik-Komar total length of 10.81 km
4. Komar Donji Vakuf-total length of 10.45 kilometers
Realization of this project gives the opportunity and the award of
concessions, and joint investment of domestic and foreign.
Tourism development
Major tourist development vision that will get this project should be
sought in the following facts:
1. Everything rests on sustainable development in an
environmentally-preserved and protected areas:
constant cooperation of all (from children to institutions)
2.Turizam "new - old" distinctive product of Central Bosnia to
target foreign and domestic market:
tourism, which knows no seasonality
3. Development of rural areas as a realistic assumption to
keep people, especially youth, in the countryside
of hard work and offers a rich and wealthy life
4. The cult of water - "Water for Life 2005th - 2015. "(World
Project) Water "new gold" at the global business holiday table
develop tourism on and around water
5. Vlasic and prepared and planned to be the backbone of
development of the mountain, winter climate and tourism, but
only in the "embrace" with other beautiful mountains and the
glades of Canton
6. Rapidly organized and work on forming a national park,
nature parks, an arboretum and other functional forms of
protection of natural complexes of exceptional value
Centuries-long proven the value of cultural - historical heritage of
Bosnia
7.Central Bosnia must become postulate and development of all
forms of cultural tourism, especially monumental and religious tourism
8.Termalne, mineral and other natural hot springs focus, in addition to
health - functions in the development of "water city", amusement
parks, etc.
model applied to the project: Photos - thermal area inland tourism
9. Persistently work to realize the great thoughts and ideas
such construction of a golf course with three, nine eighteen
holes
restore international sport of hunting with a hawk is a
tradition in this area
Design and implementation of marketing projects, "the
town of Nobel Prize »
10. Medin International Festival of Honey, "bees, in honor!"
production and marketing of indigenous souvenirs
and thus closer to the beauty and value of Central
Bosnia fastidious European and world markets
11. Organized entertainment, recreation and sport for all ages
constantly enriched through related packages that are offered
in various markets
12. Accept the philosophy of consistently - the subtle marketing and
constantly improved, especially through the activities of
domestic travel agencies, including full cooperation with the
internationally recognized travel agencies
13. Man and time are the biggest human resources
first must be accessible knowledge and skills of the highest
levels, and economic importance of the second should not be
underestimated
14. Tourist Board offices in Canton and municipalities must become a
place of initiation, initiation and coordination of all direct
actions, in full cooperation with the competent state institutions
15.Transformation, privatization and granting of concessions should
become the driving force and an instrument of entrepreneurs
for a faster recovery and activation of resources
16. Just great ideas and projects in tourism can succeed. Their
implementation should be a gradual shift, but the ultimate goal
should be the business and human - a magnificent
TRADE
• In municipalities of the Central Bosnia Canton
has a total regstered 2170 crafts.
• Number of employees per craft is 1.3, which
amounts to a total of 2821 employees.
Project Activities
• Ministry of Economy of Central Bosnia Canton lead activities on the
implementation of important projects.
1. Building the fast road Lašva-Donji Vakuf
2. Construction of pipelines in municipalities SBK
3. Construction of 21 industrial zones in the municipalities of SBK.
4. Awarding concessions for the exploitation of natural resources
5. Power plant in Bugojno-mine Gracanica
THANK YOU