Riviera Stations regeneration
Major renewals and refurbishment planned at:
• Torquay
• Torre
• Paignton
Works programmed late 2013 – April 2014.
Network Rail funded works c.£2.8m
Date 00.00.00
Create your footer by changing copy in the Header and Footer section
3
Torquay station
• Phase 1 - Agreed package of
reactive repairs completed 2012.
AFC £50k.
• Phase 2 - Road bridge at country
end of the station to be
refurbished. AFC £400k. On site
20 May 2013 for 18 weeks.
• Phase 3 - Station footbridge and
canopies to be refurbished late
2013 – April 2014. AFC £1.15m.
Date 00.00.00
Create your footer by changing copy in the Header and Footer section
4
Torre station
• Phase 1 -Refurbishment of listed
footbridge completed 2012. Total
AFC: £350k
• Phase 2 – platform canopy to be
refurbished late 2013 –
completion by April 2014. Total
AFC : £150k
Date 00.00.00
Presentation title to go here
5
Paignton station
• Ticket office roof repairs complete
Spring 2013.
• Station footbridge and canopies to
be refurbished late 2013. AFC:
£1.13m
• Works to be completed by April
2014.
• New colour scheme proposed to
match that of Torquay and Torre.
Date 00.00.00
Presentation title to go here
6
In summary..
• Major refurbishment proposals at Torquay, Teignmouth and Torre
aim to restore the listed buildings and structures to former glory.
• ‘Riviera line’ colours scheme to be adopted at each location.
• All proposals will be fully integrated with other Non – Network
Rail work items and funding streams.
• Work programmes to be shared with stakeholders.
• Total expenditure 2013 /14 = c.£2.8m
• Plus… similar packages of work proposed in 13/14 at Dawlish
and Teignmouth stations.
Date 00.00.00
Create your footer by changing copy in the Header and Footer section
7
Riviera station regeneration
•Questions?