1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) NAME : CLASS : Practice Test: SAFe 5 Practitioner Exam (5.1) 50 Questions DATE : 1. The Inspect and Adapt event always starts with which activity? A Quantitative measurement B Retrospective and Problem Solving Workshop C The PI System Demo D Agreement on the problems to solve 2. When should a component team be used? A To obtain high reuse and technical specialization with a focus on Nonfunctional Requirements B To develop T-shaped skills together with continuous integration C To create each replaceable component with minimized dependencies D To gain the fastest velocity with welldefined interfaces 3. What are two reasons Agile development is more beneficial than waterfall development? (Choose two.) A It allows management to track project progress based on steering committees and metrics B It allows businesses to deliver value to the market more quickly C It increases productivity and employee engagement D It requires phase-gate approvals to ensure that everyone is moving together E It relies on external provider dependencies 4. Which factor helps unlock the intrinsic motivation of knowledge workers? A Pay-for-performance B Parallel development C Autonomy D Team performance incentives 5. What is an example of a Program event? A Innovation and Planning B Iteration Review C Daily Stand-up D Scrum of Scrums https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 1/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) 6. What are the four levels of the Scaled Agile Framework? A Portfolio, Value Stream, Program, Team B Exploration, Integration, Deployment, Release C Team, Program, Large Solution, Portfolio D Epic, Capability, Feature, Story 7. Which activity is key to successfully implementing the Scaled Agile Framework? A Use the Innovation and Planning iteration B instead of the PI Planning process Use a cadence-based PI Planning process C Remove blocks such as Portfolio estimation Replace the PI Planning process with the Inspect and Adapt workshop when possible D 8. If the PI System Demo shows the current state of the Solution, then who is this demo intended for? A The Scrum Masters B The Agile Team C The Product Owner D The Business Owners 9. Which statement is true about Iteration planning for Kanban teams? A Kanban teams do not commit to Service Level Agreements B Kanban teams estimate their velocity C Kanban teams find high value in trying to plan the Iteration in detail D Kanban teams publish Iteration Goals 10. Which two views does the Iteration Review provide into the Program? (Choose two.) A How the team is increasing empowerment B How the team is doing on the Program Increment C How the team is responding to the stakeholders How the team did on the Iteration E How the team is demonstrating transparency of decision-making 11. A Cumulative Flow Diagram focuses on which curves? A Backlog curve ("work") and Departure curve ("done") B Arrival curve ("to do") and Evolution curve ("change") C Arrival curve (“to-do”) and Departure curve D (“done”) Implementation curve ("movement") and Departure curve ("done") https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 D 2/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) 12. Which two statements describe the responsibilities of the Product Owner? (Choose two.) A To coach the team B To protect the team from external forces C To own and manage the team Backlog D To be a single voice for the customer and stakeholders E To ensure the team follows Agile principles and practices 13. Which responsibility belongs to the Product Owner in the team? A To foster adoption of Agile technical practices B To facilitate team meetings and drive Agile behavior C To sequence backlog items to program priorities, events, and dependencies D To foster normalized estimating within the team 14. What is an example of a modified Fibonacci sequence? A ...5, 8, 13, 21, 34... B ...1, 1, 3, 5, 5... C ...5, 8, 13, 20, 40... D ... 2, 4, 5, 9, 11... 15. Which concepts are part of Kanban for teams? A Establish flow, preserve options, improve B relentlessly Develop incrementally, build quality-in, maintain Iterations C Visualize work flow, limit WIP, improve flow Build iteratively, demo frequently, maintain Iterations D 16. Why do Lean-Agile Leaders try to connect the silos of business, system engineering, hardware, software, test, and quality assurance? A To align around value B To enforce organizational boundaries between functions C To optimize vertical communication D To reduce friction between the teams 17. Which practice promotes built-in quality? A Iteration goals publishing B Test-Driven Development C Backlog refinement D Iteration planning https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 3/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) 18. Quality is first and foremost a function of what in a Lean-Agile environment? A Empowered solution authority B Deployment on demand C Preserving options D Culture of shared responsibility 19. What is the role of the Scrum Master? A To facilitate Agile Release Train processes B and Solution Train execution To be a stakeholder who has the primary business and technical responsibility for fitness for use C To coordinate Portfolio Epics through the D Portfolio Kanban system To act as a servant leader who helps teams self-organize, self-manage, and deliver using effective Agile practices 20. What is typically included in the Definition of Done for the team increment? A Regression testing is done B Customer documentation is ready C Stories are accepted by the Product Owner D Stories are accepted by Product Management 21. An Agile Team collects the Iteration metrics they have agreed upon during which part of the team retrospective? A During the features agreement retrospective B During the qualitative part of the team retrospective C During the quantitative part of the team retrospective D During the time and materials retrospective 22. What is the role of the System Architect/Engineer? A To guide the teams and support the Architectural Runway B To manage dependencies C To define the design for the system D To implement continuous improvement methods 23. Which statement describes a cadence-based PI Planning event? A It is an all-hands, two day event with the goal to identify impediments that could happen B As many team members as possible should attend remotely to reduce travel costs C It is very important and should be D postponed until all participants can attend It is not a required event but tasks move forward at higher velocity when the meeting occurs https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 4/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) 24. What is the recommended size of an Agile Team? A 5 – 11 people B 10 – 15 people C 3 – 5 people D 8 – 12 people 25. What are the SAFe Core Values? A Quality, Feedback, Alignment, Trust B Commitment, Competency, Collocation, Culture C People and Culture, Transparency, Collaboration, Respond to Change D Built-in Quality, Program Execution, Alignment, Transparency 26. What is the goal of the SAFe House of Lean model? A Flow B Innovation C Continuous Improvement D Value 27. Which statement is true about Work-In-Process (WIP) limits? A Higher WIP limits provide richer feedback B Higher WIP limits result in lower utilization C Lower WIP limits result in fewer Stories being completed Lower WIP limits improve flow 28. What is the role of the Release Train Engineer? A To serve as the Scrum Master for the Agile B Release Train To coach teams to improve their results C To serve as the content authority at the Program level To ensure the technical integrity of all development in the Agile Release Train 29. Which statement reflects one of the steps for setting initial velocity? A The team members assess their availability, acknowledging time off and other potential duties B Determining velocity is a new function in each Iteration; previous Iterations should not be transferred to a new Iteration C Maintenance tasks are not required to list for velocity; maintenance tasks fall outside D this scope Identify work on technical infrastructure, tooling, and other systemic impediments https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 D D 5/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) 30. Iteration Planning, Iteration Review, and Backlog Refinement are examples of which type of event? A Sync event B Team event C Program event D PI event 31. How can a technical exploration enabler be demonstrated? A Exploration enablers do not need to be demonstrated B Show the acceptance tests written for the exploration C Show the knowledge gained by the exploration D Demonstrate working systems in the production environment 32. The "3 Cs" is a popular guideline for writing user stories. What does each of the three C's represent? (Choose three.) A Conform B Concept C Conversation D Card E Confirmation 33. What replaces detailed requirements documents? A Pair work B Task boards C Stories D Unit tests 34. The Agile Release Train aligns teams to a common mission using a single Vision and what else? A Program backlog B Team backlogs C Weighted Shortest Job First D Release on demand 35. During Iteration Execution, a team’s velocity tends to be most affected by what? A Changing financial planners, a new Scrum B Master, or new testers Changing team size, team makeup, and technical context C Product Owner changes, changing estimations, and new features Productivity changes, team location, and innovation measures https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 D 6/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) 36. How does relentless improvement support value in the SAFe House of Lean? A It allows teams to pivot C It uses informed decision-making through D fast feedback 37. Why is the modified Fibonacci sequence used when estimating? A It serves as a way to estimate large ranges B It reflects the uncertainty in estimating larger items C It results in greater precision It can be used to predict unit test coverage 38. What is the benefit of separating release elements from the Solution? A It allows the Systems Team to integrate with ease B It allows the Agile Release Train to demo value every two weeks C It allows Agile Teams to launch untested Features D It allows the release of different Solution elements at different times 39. Which statement describes one element of the CALMR approach to DevOps? A Decentralize decision making B Keep everything under version control C Establish a work environment of shared responsibility D Build cross-functional Agile Release Trains around the flow of value to the customer 40. Which practices are demonstrated during the Inspect and Adapt event? A New start, job sequence, funnel, and enable B Move forward, analyze future Stories, integrate, and iterate C Forward focus, develop, cross-domain plan, and expedite execution D Reflect, problem solve, and identify improvement actions 41. B D It builds long-term partnerships based on trust It optimizes the whole Jane is a Product Owner. It is day seven of the Iteration and her team tells her that they may miss their Iteration commitment. What should Jane do? A Support adding an Innovation and Planning Iteration directly after the current B Iteration Agree to add a person from the System Team to complete the work C Support pulling a Story that has not been D started Support splitting a Story into a coding story and a testing story, and then moving the testing story into the next Iteration https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 7/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) 42. Which statement is true about the PI Planning event? A It involves everyone in the Program over a B two-day period It involves only the team members who are most qualified to estimate the work C It involves Product Management and Product Owners on the first day and the rest of the teams on the second day It involves Program Portfolio Management to prioritize the Stories presented by teams during the final plan review 43. D Which three questions should each team member answer during the Daily Stand-up? (Choose three.) A How am I splitting the Solutions into Capabilities and Enablers? B Are there any impediments that will prevent the team from meeting the Iteration goals? C What did I do yesterday to advance the Iteration goals? D What will I do today to advance the Iteration goals? E How am I optimizing the full Solution? 44. What visibility should Scrum Masters provide during the Agile Release Train Sync? A Visibility into System Solution Intent B Visibility into single source design decisions C Visibility into collaboration deployment D Visibility into progress and impediments 45. What is the purpose of the Iteration Review? A To measure the team’s progress by showing working Stories to the stakeholders and getting feedback from them C To show the backlog items and work on possible solutions for the backlog items 46. What is critical to successfully implementing quality in a Lean-Agile environment? A Separation of Dev and Ops B Component teams C A phased-gate rollout D Making quality everyone’s responsibility https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 B To serve as a forecasting meeting where the work is estimated for the Program Increments D To identify where there is too much work in the system and where the teams are being overloaded 8/10 1/4/23, 9:33 AM 47. Practice Test: SAFe 5 Practitioner Exam (5.1) James is a Product Owner. It is day seven of the Iteration and his team tells him that they may miss their Iteration commitment. What should James do? B Support splitting a Story into a coding story and a testing story, and then moving the testing story into the next Iteration D Support adding an Innovation and Planning Iteration directly after the current Iteration A Ensure the Iteration backlog is accurately prioritized C Agree to add a person from the System Team to complete the work 48. What are the three levels of the Scaled Agile Framework? A Value Stream, Program, Team B Essential, Large Solution, Portfolio C Framework, Delivery, Iteration D Epic, Capability, Feature 49. When should a complicated subsystem team be used? A To develop and support platforms that provide services to other teams B To assist other teams to become more proficient in new technologies C To deliver value directly to the customer or end user D To provide deep specialty skills and expertise around a specific subsystem 50. What is one of the typical Kanban classes of service for Agile teams? A Review B Fixed-date C Funnel D Accepted https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 9/10 1/4/23, 9:33 AM Practice Test: SAFe 5 Practitioner Exam (5.1) Answer Key 1.c 2.a 3. 4.c 5.d 6.c 7.b 8.d 9.d 10. 11.c 12. 13.c 14.c 15.c 16.a 17.b 18.d 19.d 20.c 21.c 22.a 23.a 24.a 25.d 26.d 27.d 28.a 29.a 30.b 31.c 32. 33.c 34.a 35.b 36.d 37.b 38.d 39.c 40.d 41.c 42.a 43. 44.d 45.a 46.d 47. 48.b 49.d 50.b https://quizizz.com/print/quiz/6053182f03849c001ca4cb77 10/10