INDEX
1.
Existing Campus Plan
2.
Campus Facilities Analysis
a.
b.
c.
d.
e.
f.
g.
Campus identity/Front door
Vehicular access
Parking
Facilities assessment
Infrastructure
Material palate
Outdoor student gathering spaces
3.
Educational Trends for Better Learning
4.
Master Plan
a. Site analysis - Square Footage summary
b. Conceptual masterplanning
c. Square Footage summary
66th street / SR 693
AERIAL VIEW OF CAMPUS
Park Blvd
SITE ANALYSIS: VEHICULAR ACCESS
OP
HEC
66th street / SR 693
VT
Storage
→
→
Dental THRIFT
Park Blvd
→
HEC
ANNEX
Park Blvd
→
Vehicular access
SITE ANALYSIS - PARKING
Student and
faculty Parking (245 cars)
Overflow
Parking (278 cars)
OP
Visitor and
Handicapped
Parking (213 cars)
VT
PB6
Dental
PB66
THRIFT
STORE
Park Blvd
66th street / SR 693
HEC
Total existing
Parking: 736 cars
EXISTING CAMPUS IDENTITY & FRONT DOOR
Campus Entrance
Spencer’s Western World
Thrift Store
ORTHOTICS & PROSTHETICS
OP
OP
OP
HEC MATERIAL PALETE
HEC
HEC
HEC
HEC
CARUTH HEALTH EDUCATION CENTER – FIRST FLOOR
3
1 ENTRY LOBBY
2 ADMINISTRATION
4
2
1
3
TYPICAL CORRIDOR
4 BOOKSTORE
CARUTH HEALTH EDUCATION CENTER – FIRST FLOOR
5 DENTAL HYGIENE
6
7
EMS LOBBY
8
7 RADIOLOGY
8 EMT BREAK
AREA
5
6
CARUTH HEALTH EDUCATION CENTER – FIRST FLOOR
9
10
9 LIBRARY
11
10 LEARNING SPECIALIST
11 SECONDARY ENTRY/EXIT
CARUTH HEALTH EDUCATION CENTER – SECOND FLOOR
3
1 RESPIRATORY THERAPY
2 NURSING CORRIDOR
1
2
4
3 NURSING OFFICE
4 CAFETERIA
Site Analysis - Square Footage Summary
Existing
Buildings
HEC - HEALTH EDUCATION CENTER
VT - VET TECH*
MAINTENANCE ANNEX
SERVICE ANNEX (THRIFT STORE)
OP - ORTHOTICS & PROSTHETICS
HECANNEX - HEC ANNEX BUILDING**
STORAGE SHED
NUHS PORTABLE
PB6 - NUHS PORTABLE
STORAGE SHED
PB66 - PORTABLE
STORAGE SHED
STORAGE SHED
Bldg
ID
61
62
63
64
66
67
153
205
206
265
266
268
269
Year Built
1981
1981
1981
1974
2008
1971
1975
2003
2000
2001
2000
1997
2003
Year(s)
Renovate
SF Subtotal
Total Existing SF of Campus: 249,737
* Vet Tech SF is excluded from this study
**Of 50,138 GSF Space available, current 12,000 GSF has been assigned for usage
Buildings to Remain
(SF)
Building in Need of Updating
& Renovation (sf)
Buildings to Demo
(SF)
165,983
(32,514)
1,127
2,308
28,529
50,138
144
2,336
n/a
960
280
960
960
240
83,754
170,211
MASTER PLAN
HECANNEX
PBs
VT
HEC
OP
- Existing siteplan
MASTER PLAN
HECANNEX
VT
PBs
HEC
OP
PHASE 01
● VT – Vet Tech Demolition*
MASTER PLAN
HECANNEX
PBs
OP
HEC
A
PHASE 02
● A – Building A Construction (58,000 SF)
- Campus Sitework
PROPOSED CAMPUS FRONT DOOR
ADDED LANDSCAPE
SPC HEC SIGNAGE
WATER FEATURE
● Establish a sense of arrival and identity
● Create connection to the future
medical district and services
FUTURE
MOB
SPC HEC
66th street
Proposed Roundabout/Medical Corridor connection
MASTER PLAN
HECANNEX
PBs
Thrift
Store
OP
HEC
A
PHASE 03
● PBs – Thrift Store and Portable Demolition
MASTER PLAN
HECANNEX
OP
HEC
B
A
PHASE 04
● B – Building B Construction (58,000 SF)
- Dental Office Relocation/Demolition
- MOB Sitework
MASTER PLAN
HECANNEX
HEC
OP
B
A
PHASE 05
● HEC – HEC building demolition
(-165,983 SF)
MASTER PLAN
HECANNEX
MOB
OP
C
B
A
PHASE 06
● C – Building C Construction (33,000 SF)
● MOB – MOB Construction (49,500 SF + 250 cars)
- Spencer’s Demolition
- Covered Walkway
- Quad Sitework
CONCEPTUAL SITEPLAN
HECANNEX
MOB
OP
C
B
A
Total Demolished SF:
Total Added SF:
Total Parking:
170,211 SF
198,500 SF
1,070 Spaces
MASTERPLAN SUMMARY
PHASE 01 – VET TECH Demolition
PHASE 02 - Build building ‘A’,
Campus road realignment.
OP
PHASE 03 – Thrift store and
portable 205 & 206.
C
PHASE 04 - Build building ‘B’ and
Dental office demolition and
Sitework preparation for MOB
PHASE 05 – HEC building
Demolition
B
MOB
A
PHASE 06 – BLDG ‘C’ and MOB
Construction and add covered
walk connecting to the campus
and Spencer’s demolition
Square Footage Summary
Total Existing Square Footage of Campus:
Total Existing Square Footage to be Demolished:
Existing Square Footage remaining:
New Buildings to be Constructed in the Future
A - PROPOSED BUILDING 'A'
B - PROPOSED BUILDING 'B'
C - PROPOSED BUILDING 'C'
D - PROPOSED MIXED-USED MOB
249,737
-170,211
83,754
58,000
58,000
33,000
49,500
Total
198,500 gsf
New Grand Total
282,254 gsf
Total SF Gained based on Master Plan Build out (198,500 - 170,211)
28,289 gsf